Loading...
HomeMy WebLinkAboutStaff Comments STAFF REVIEW COMMENTS NO. 1 Project: GOLD SUBDIVISION (PP) - 02- 00500264 ENGINEERING 1. Please add note to plat regarding lot being served by on -site sewage facilities (OSSF). OSSF shall comply with TNRCC regulations. Reviewed by: Carol Cotter Date: December 23, 2002 BRAZOS COUNTY 1. Show 50ft setback along FM -60 Blk 1 Lot 1. 2. Show 20ft PUE along FM -60 Blk 1 Lot 1. 3. Show 10ft PUE along sides and back lot lines of Blk 1 Lot 1. Reviewed by: Ray Crow, CFM, Director of Planning and Traffic ELECTRICAL 1. ETJ. No comment Reviewed by: Ronnie Bolin Date:12 -20 -02 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 STAFF REVIEW COMMENTS NO. 1 Project: CAVENDER'S BOOT CITY (SDSP) — 03 -262 PLANNING 1. On the site plan, please identify the owner(s) of Tots 1 -R and 2 -R, Block One Sutton Place Subdivision, and the zoning of Lot 1 -R and 3. 2. Please identify in the Legend the different types of fencing proposed that will screen the mechanical area and dumpster. 3. Please identify all fire lanes necessary to provide adequate fire coverage. 4. Please take note: Signage will be permitted separately. 5. Please call out how tall the concrete block edging wall will be. 6. Provide a general note that all roof and ground- mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right - of -way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. LAN DSCAPING /STREETSCAPING /BU FFER 1. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and adjacent property disturbed during construction. 2. In the Plant List (Newly Planted), please identify the minimum individual cane size as 1.25" for the crepe myrtles. 3. In General Note #8, please clarify that the system will be installed and approved before C.O. DESIGN DISTRICT BUILDING AND SIGN REVIEW 1. The freestanding sign proposed on the site plan will have to be reviewed by the DRB before a building permit may be issued. Please provide sign details if the intent is for it to be reviewed at this time. 2. Please provide material samples for signage and architectural details. Reviewed by: Molly Hitchcock Date: October 27, 2003 ENGINEERING 1. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 3 Reviewed by: Date: ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2002 version of plat and /or site plan. email to rbolin 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines. Reviewed by: Ronnie Bolin Date: 10 -23 -03 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 4 of 4 /� " _ .. tcs:4 ;a' _ 4ti's 3a'+' spat w ' t FeA 12/23/02 t4 : 39 From: Bridgette C•eorge Page 3 o' 3 STAFF REVIEW COMMENTS NO. 1 Project: GOLD SUBDIVISION (PP) - 02- 00500264 ENGINEERING 1. Please add note to plat regarding lot being served by on -site sewage faclilties (OSSF). OSSF shall comply with TNRCC regulations Reviewed by: Carol Cotter Date: December 23, 2002 BRAZOS COUNTY Show $oft setback along FM-60 Blk 1 Lot 1. Show 20ft PUE along FM-60 BJk 1 Lot 1. 3 Show 10ft PUE along sides and back bt lines of Blk 1 Lot 1. . Reviewed by: Ray Crew, CFM, Director of Planning and Traffic ELECTRICAL 1. ETJ. No comment Reviewed by: Ronnie Bolin Date:12 - 20 - 02 • NOTE: Any changes made to the plans. that have not been ra uestel by the City of Co!lepe Station, mjzt be egseines In you nett tra 4rni tat fitter and "b,bbled' on your piers. My additional changes on tows plans that nave not been petntae out to the City, will oanattttaa a comp!etey new review.