HomeMy WebLinkAboutStaff Comments STAFF REVIEW COMMENTS NO. 1
Project: GRAHAM BUSINESS PARK (PP) - 02- 00500263
ENGINEERING
1. Due to number of lots per length of property frontage, show how you intend to provide water
and sewer service (private or public) and fire protection to each individual lot. Each lot will
not be allowed an individual tap from the line along Graham Road.
2. By defining the shared areas as "Common Area ", a private access easement is not
necessary.
3. How will storm water be handled?
4. Do you intend the entire Common Area to be a public utility easement? We normally only
require PUE along public utility lines.
5. Property is in Impact Fee Area 92 -01. Impact fees are due at time of building permit.
Reviewed By: Carol Cotter Date: December 23, 2002
ELECTRICAL
1. Developer installs conduit as per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser pole. Developer installs first 10' city
installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design. Pull boxes provided by the city.
5. Developer provides digital AutoCAD 2000i version of plat and /or site plan. Email to
rbolinRci.college- station.tx.us.
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction purposes.
8. Developer provides easements for electric infrastructure as installed for all electric lines.
Reviewed by: Ronnie Bolin Date:12 - 20 - 02