Loading...
HomeMy WebLinkAboutStaff CommentsCITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM November 4, 2002 TO: Paul Clarke, Smiling Malard Development, Ltd., Via fax 846 -1461 FROM: Bridgette George, Assistant Development Manager SUBJECT: INDIAN LAKES SD - PH I (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Tuesday, November 5, 5:00 p.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for November 14, 2002, 6:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart @ci.college- station.tx.us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will be pulled from the scheduled Planning & Zoning Commission Agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Spencer Thompson or myself at 764 -3570. Attachments: Staff review comments cc: Kling Engineering & Surveying, Via fax 846 -8252 Case file #02- 00500236 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: INDIAN LAKES SD - PH I (FP) - 02- 00500236 ENGINEERING 1. Please change the owner's dedication paragraph on Sheet 1 to reflect County standard. 2. Please change Note 2 on Sheet 1. Delete "No base flood elevations determined" statement. 3. Note 7.,d.) states normal pool elevation as 260'. This does not agree with previous statements. 4. Please label 175' wide drainage easement as private. 5. Please show well location, Sheet 7, as Reserve Tract. Reviewed by: Spencer Thompson Date: October 31, 2002 ELECTRICAL BTU Distribution 1. The plat shows a slope easement on these lots. To make the installation of underground conduit and cable easier, the following slope easements should be shown as a slope easement and electrical easement or PUE: Sheet 4 Block 1, Lot 16 Block 2, Lots 1 A, 1 B and 1 C Block 4, Lot 8 Block 9, Lot 1 Sheet 5 Block 2, Lots 2 and 3 Block 9, Lots 10, 11, 17A and 17B Sheet 6 Block 9, Lots 23, 27 and 27 Sheet 7 Block 9 Lots 9, 10, 11, 17A, 17B, 18 and 19 2. A clarification on page 1 is needed. One of the notes refers to 20' easements centered on interior lot lines. We are taking "interior" to mean lots inside of the overall Indian Lakes and not interior to the current plat. (e.g., is there is a 10' easement along the back of Block 1, Lots 18, 19, 20, 21, etc.) 3. On sheet 3, Block 1. Lot 20, the HOA easement is shown incorrectly. 4. On sheet 3, a 16' PUE along the southwest side of Indian Lakes Road between Mesa Verde Drive and Arrington Road needs to be included on the plat. 5. On sheet 7, a 16' PUE along the east side of Indian Lakes Road between Chaco Canyon Drive and Calusa Springs Drive needs to be included on the plat. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 6 6. On sheet 6, a 20' easement is needed along the south side of Block 1 Lot 1, Block 2 Lot 9 (the south and west sides of the lot) and along the south, west and east sides of Block 12 Lot 1 continuing along to join the PUE on Block 9, Lot 27. 7. A 20' easement is needed at the entrance of the development beginning at the northwest corner of Block 5, Lot 18 and extending 390.39' to the northeast corner of said Lot 18. 8. Additional easements are needed as shown on the attached photos. Reviewed by: Randy Trimble Date: October 28, 2002 rtrimble @btutilities.co NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 6