HomeMy WebLinkAboutCorrespondance Vanecek's Landscape & Irrigation Company
Landscape & Irrigation Design/Installation
Registered Landscape Architect #602,Licensed Irrigator #5411
2731 Sandy Circle,College Station,Texas 77845
979 - 693 -7153
February 1,2005
Jennifer Prochazka
Staff Planner
Dept.of Planning & Development Services
P.O.Box 9960
College Station,Texas 77842
Jennifer:
The Indian Hawthorn shrubs used as screening for the parking lot at Redtail Equipment
company can grow to a 3' ht. I cannot guarantee 100% that they will reach that height in
one growing season.If the plants do not reach that height by Nov.15,2005,then we will
replace them with taller,3' ht.shrubs..1 would like to change the quantity to 35 -40 plants
instead of 53.There would still be plenty of points for the streetscape section of the
landscaping.We would be reducing the points by 130- 180.And we would space the plants
at 4' o.c vs.3' o.c.
Let me know if this is a satisfactory solution.
Thanks very much.
Sincerely,
‘1
Peter B.Vanecek
Landscape Architect
:),:or-)
tic McCLURE ENGINEERING, INC. 0 a56
M arch 13 , 2003
Ms. Bridgette George
Assistant Development Coordinator
CITY OF COLLEGE STATION
P.O. Box 9960
College Station, TX 77845
RE: Site Plan Revisions
Redtail Rental
Lot 18-R, Block 18
Southwood Valley Section 4-B
Dear Bridgette:
Attached please find the following for the above referenced Site Plan re- submittal:
1. One (1) copy of revised Site Plan
2. One (1) copy of revised Landscape Plan
The following comments are in response to the 3/3/2003 Site Plan review comments:
PLANNING:
1. The dumpster location has been shifted and coordinated with Pete Caler.
LANDSCAPING:
2 -6. To be addressed by Landscape Architect
ENGINEERING:
1. See Development Permit Response comment below.
DEVELOPMENT PERMIT COMMENTS:
1. Exit Velocities As Designed:
V100 (Pond #1) = 4.2fps
V (Pond #2) = 5.9 fps Maximum allowable velocity is 6fps for natural channels.
NO ENERGY DISSIPATION REQUIRED
Should you have any questions or need additional information, please advise.
Very truly yours, /
ichael R. cC ur P.E., R.P.L.S.
President
MRM/mlm
attachments
1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845
(979) 693 -3838 • FAX (979) 693 -2554 • email: mcclure@tca.net
4. 05
-l(-1-o3
ti ci McCLURE ENGINEERING, INC. 41
III February 19, 2003
Ms. Bridgette George
Assistant Development Coordinator
CITY OF COLLEGE STATION
P.O. Box 9960
College Station, TX 77845
RE: Site Plan Revisions
Redtail Rental
Lot 18-R, Block 18
Southwood Valley Section 4 -B
Dear Bridgette:
Attached please find the following for the Above referenced Site Plan re- submittal:
1. Two (2) copies of revised Site Plan V
2. Two (2) copies of revised Landscape Plan k
3. Three (3) copies of Grading and Erosion Plan
4. Two Copies of revised Drainage Report for Lots 18 -R and 19 -R (Signs Now Project)
The following comments are in response to the 12/17/2002 Site Plan review comments:
PLANNING:
1. Redtail Equipment shown in title block.
2. Driveway entrance will be as required.
3. Curb and pavement details are included.
4. Per the meeting between City Staff and Owner, the six bays will be allowed to count as part of the
minimum parking requirements.
5. Per the meeting between City Staff and Owner, chain link fence will be used on the sides and solid screen
across the rear.
6. See Note No. 4 on Replat.
7. Revisions shown on Plans
8. Know box entry provided.
9 -14. Are addressed with revised Landscape Plan
ENGINEERING:
1. Upon approval of the revised prints of Replat, a mylar will be submitted.
2. Driveway to be completed.
3. Owner is aware of his responsibility to provide access to dumpster.
Should you have any questions or need additional information, please advise.
Very truly yours,
Mi hael R. M Clure .E., R.P.L.S.
President
MRM/mlm
attachments 1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845
(979) 693 -3838 • FAX (979) 693 -2554 • email: mcclure @tca.net