HomeMy WebLinkAboutStaff Comments STAFF REVIEW COMMENTS NO. 1
Project: REDTAIL RENTAL (SP) — 02 -256
PLANNING
PLEASE NOTE: We will continue with the site plan review, but will be unable to stamp it
approved until the replat of the property is filed.
1. Please include the name of the site plan (Redtail Equipment Rental) in the title
block.
2. The off -site improvement for the proposed driveway on Longmire will be allowed
since it is in an easement, but the limit of construction will have to be shown on the
site plan. The entrance into the Signs Now property will have to be curbed until they
develop. A temporary curb may be used.
3. Please include curb and pavement details with the site plan.
4. As the six bays at the rear of the building will be used for rental equipment and not
for customer and employee parking, they may not count towards meeting the
minimum parking requirement. Six spaces will need to be provided in front of the
fences.
5. A chain link fence will not be an acceptable screening fence. Please provide a solid
screen so equipment storage can not be seen from a right -of -way.
6. The buffer has to be installed by the first property to develop since the time of the
ordinance. The entire planted buffer must be planned with this development if it
intends to receive site plan approval before Signs Now. The buffer area may only
be split between properties if the properties receive site plan approval at the same
time, or if the land is put into a landscape buffer easement. Also, a 5 -ft. planted
buffer is required along the property line shared with the mini - warehouses. The
area devoted to buffers may be removed from the landscaping /streetscaping point
calculations.
7. Please show fire lanes and sign or striping details.
8. Please provide knox box entry for the fenced area.
PLEASE NOTE: Staff will re- review the whole landscaping plan with the next submittal.
9. On the landscape plan, please show the fence locations and the parking island that
is proposed in the row of parking against the right -of -way.
10. Required landscaping must be dispersed throughout all visible areas of the site. A
considerable amount of landscaping is shown in areas behind fences.
11. Buffer plantings should be shown on the landscape plan.
12. Please add a note to the landscaping plan that the gas meter will be screened from
the right -of -way.
13. Please add a note to the landscaping plan that irrigation will be approved before
C.O.
14. Please call out the minimum calipers of the non - canopy trees.
Reviewed by: Molly Hitchcock Date: December 11, 2002
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 3
s
ENGINEERING
1. Mylar of Final Plat was never submitted for filing. Last version of Final Plat did not
show an access easement.
2. A complete driveway including curbs on both sides will need to be constructed.
3. Is dumpster located behind locked gate? What provisions to be made for
sanitation?
Reviewed by: Carol Cotter Date: December 16, 2002
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 2000i version of plat and /or site plan.
E -mail to rbolin(a7ci.college- station.tx.us
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines.
Reviewed by: Ronnie Bolin Date:12 -12 -02
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker or
Reduced Pressure Principle Back Flow Device and installed as per City Ordinance
2394.
2. All BackFlow devices must be installed and tested upon installation as per City
Ordinance 2394.
Reviewed by: Rob Werley
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 3 of 3
STAFF REVIEW COMMENTS NO. 2
Project: REDTAIL RENTAL (SP) - 02 -256
PLANNING
1. As discussed in the meeting with Signs Now on February 4, 2003, please
shift the dumpster pad so it will blocked from public view by the building when
the gates are open.
Landscaping
2. The site layout shown on the landscaping plan is not the updated site layout.
This will affect where some landscaping could or could not be placed. Please
ensure the site layouts are the same with the next submittal.
3. Buffer planting requirements are a 5- gallon shrub for every 3 linear feet and a
2 -inch caliper canopy tree for every 25 linear feet. The buffer requirements
for the northern property line will be a five -foot buffer yard, 120 shrubs, and
15 canopy trees.
4. The site plan states that the site is 1.257 acres. There are enough plantings
to meet the total points required, but please use the stated size of the site in
the point calculations.
5. Please state that non - canopy trees will be at least 1.25 inches in caliper.
6. All new plantings require irrigation, including those provided for the buffer.
Please ensure that the site will meet this requirement.
Reviewed by: Molly Hitchcock Date: February 27, 2003
ENGINEERING
1. Please refer to Engineering Comments No.1 for the Development Permit.
Verify that energy dissipation in not required for discharge from outlet
structure.
Reviewed by: Carol Cotter Date: March 3, 2003
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review.
2 of 2
STAFF REVIEW COMMENTS NO. 3
Project: REDTAIL RENTAL (SP) - 02- 00500256
PLANNING
1. Dwarf shrub species are not acceptable buffer plantings. Please substitute a
different shrub for the dwarf burford hollies.
Reviewed by: Molly Hitchcock Date: March 27, 2003
ENGINEERING
1. For copies turned in to be stamped, please show stabilized construction exit as part
of erosion control.
Reviewed by: Carol Cotter Date: April 2, 2003
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the
City, will constitute a completely new review.
2 of 2