HomeMy WebLinkAboutCorrespondance MEMORANDUM
December 3, 2002
TO: Planning and Zoning Commission
FROM: Spencer Thompson
Email: sthompson @ci.college- station.tx.us
SUBJECT: FINAL PLAT - RESIDENTIAL for INDIAN LAKES SD - PH I (FP)
Item: Consideration and possible action on a Final Plat (Residential) for Indian Lakes
Subdivision - Phase I (FP), consisting of 400 acres off Arrington Road in the City's ETJ.
(02- 00500236) a6-7
Applicant: Paul Clarke
Staff Recommendations: Staff recommends approval as submitted.
Item Summary: This item is for the consideration of a Final Plat in the City's ETJ. The
Property is being platted for single - family residences on one -acre and acreage tracts.
This is basically the same plat that was approved by the Commission on 8/15/02 and
11/14/02. The Applicant has amended several lots on page 7 due to incorrect pipeline
easement information.
Staff for Brazos County had no comments.
Comprehensive Plan Considerations:
Thoroughfare Plan: Arrington Road is shown as a major collector on the Thoroughfare
Plan. Mesa Verde is the required minor arterial being provided by the Developer. 100 -
ft ROW is being dedicated for this purpose. The development requires a collector as its
main thoroughfare, being Indian Lakes Drive.
Attachments:
1. Area map
2. Application
3. Copy of Plat
4. Correspondence from Applicant
KLING ENGINEERING & SURVEYING
Consulting Engineers • Land Surveyors
4101 Texas Avenue, Suite A Post Office Box 4234
Bryan, Texas 77802 Bryan, Texas 77805
Telephone 979/846 -6212
Fax 979/846 -8252
B.J. Kling, P.E., R.P.L.S. Email:
S.M. Kling, R.P.L.S. stewart®klingeng.com
November 22, 2002
TO: Spencer Thompson
City of College Station 0 g-
FROM: S. M. Kli
RE: Lot line adjustments to 7 Tots - Indian Lakes Phase 1
Spencer,
Subsequent to submitting the final plat for your review and approval, we have determined
working in conjunction with Mitchell Pipeline and Aquilla Pipeline that the as -built location of
their pipelines is not consistent with the record location of their easement (as contained in the
easement document).
Attached are sheets 2 of 7 and 7 of 7 of the final plat which shows the changes to 7 Tots
(clouded).
I am requesting that the staff review and approve the changes in lot size (typically a few
hundredths of an acre) and replace the updated sheet 7 in your documents.
Please advise if you have any questions.
Attachment
04/07/03 16:28 '979 846 8252 KLING ENGINEERIN 2001
FLING ENGINEERING & SURVEYING
Consulting Engineers • Land Surveyors
4101 Texas Avenue, Suite A Post Office Box 4234
Bryan, Texas 77802 Bryan, Te 77805
Telephone 979/846 -6212
Fax 979/846 -8252
B.J. Kling, P.B., R.P.L.S. Email:
S.M. Kling, R.P.L.S. stewartQklingeng.com
April 7, 2003
TO: Natalie Ruiz, AICP % 0
Development Manager Phone: (979) 764 -3570
City Of College Station Fax: (979) 764 -3496
FROM: S. M. Kling //'
RE: Modification to Final Plat, Indian Lakes
The fol lowing are modifications to the final plat which hopefully can be handled at the staff level
prior to filing the final plat. If not, then through a re -plat.
Please review these changes and let me know ASAP.
1.) Modify the common line between HOA Lot 2B Blk 9 & Lot 3 Blk 9 by moving the front
corner 75' South.
2.) Remove reference to HOA on Lot 2B Blk 9.
3.) Add a landscape easement to Lot 17A Bik 9.
4.) Eliminate the 40' drainage easement between Lots 2 & 3 Blk 1. The culvert has
been eliminated, storm water will now drain to the lake along the common line between
Lots 8B &9 Bik 2.
5.) Add a 40' X 100' drainage easement along the common line between Lots 8B &9 Blk
2.
6.) Add note to cover sheet to clarify that all drainage easements are private and are to
the benefit of the HOA.
cc. Paul Clarke i urctack
ents (4)
Attachm (} �
aV.CArc--
ijrNIAA- c733--
r �-�
g - 3C OJ1 '
KLING ENGINEERING & SURVEYING
Consulting Engineers • Land Surveyors
4101 Texas Avenue, Suite A Post Office Box 4234
Bryan, Texas 77802 Bryan, Texas 77805
Telephone 979/846 -6212
Fax 979/846 -8252
B.J. Kling, P.E., R.P.L.S. Email:
S.M. Kling, R.P.L.S. stewart()lclinEes.com
November 30, 2002
To: Natalie Ruiz AICP
Development Manager, City of College Station
From: S. M. Kling )/
RE: Indian Lakes Final Plat
I spoke with you on Wednesday, November 27 concerning some changes to the final
plat based on resolving the discrepancy between the easement location and the as -built
location of two pipelines - Mitchell Pipeline & Aquilla Pipeline.
At that time you requested a letter detailing the changes along with ten prints of the final
plat and the processing fee of $400 submitted to you at 8:00 AM Monday December 2nd, and
you would try to get the revised final plat on the December 12 Planning and Zoning meeting.
Toward that goal, I offer the following:
1) Check #31315 in the amount of $400
2) Ten prints of the final plat with revision clouds for the pipeline changes only
3) A detailed listing of the pipeline changes:
Sheet 2 of 7 - 4 Line Tables changed
- Line 203 - 216
- Line 217 - 233
- Line 185 -202
- Line 28- 29/291 -300
(Each of these has revision cloud)
Sheet 7 of 7
- Lot 12, Blk 4
- Bearing and distance on southeast lot line
- Acreage
- Lot 13, Blk 4
- Bearing and distance along north lot line
- Acreage
- Relationship of pipeline easements to lot line
- Lot 14, Blk 4,
- Relationship of pipeline easements to lot lines
267
/11-Zr DX# -
- Lot 7, BIk8
- Bearings and distance along north and west lot line
- Acreage
- Lot 8, Blk 8
- Bearing and distance along north and west lot line
- Acreage
- Lot 9, Blk 8
- Bearing and distance along north lot line
- Acreage
- Lot 10, Blk 8
- Relationship of pipeline easement to lot line
The location and configuration of the riding trail adjoining Blk 8 and going through
Blk 4.
- Lot 4, Blk 9,
- Bearing and distance along southwest lot line
- Acreage
- Lot 1, Blk 10
- Bearing and distance along north lot line
- Acreage
- Relationship of pipeline easement to lot lines.
Thank you for your prompt attention to this matter.
R?}
KLING ENGINEERING & SURVEYING
Consulting Engineers • Land Surveyors
4101 Texas Avenue, Suite A Post Office Box 4234
Bryan, Texas 77802 Bryan, Texas 77805
Telephone 979/846 -6212
Fax 979/846 -8252
B.J. Kling, P.E., R.P.L.S. Email:
S.M. Kling, R.P.L.S. stewart®klingeng.com
November 22, 2002
TO: Spencer Thompson
of College Station
.S)
FROM: S. M. KlitzgA I
RE: Lot line adjustments to 7 lots - Indian Lakes Phase 1
Spencer,
Subsequent to submitting the final plat for your review and approval, we have determined
working in conjunction with Mitchell Pipeline and Aquilla Pipeline that the as -built location of
their pipelines is not consistentwith the record location of their easement (as contained in the
easement document).
Attached are sheets 2 of 7 and 7 of 7 of the final plat which shows the changes to 7 lots
(clouded).
I am requesting that the staff review and approve the changes in lot size (typically a few
hundredths of an acre) and replace the updated sheet 7 in your documents.
Please advise if you have any questions.
Attachment
arkt
KLING ENGINEERING & SURVEYING
Consulting Engineers • Land Surveyors
4101 Texas Avenue, Suite A Post Office Box 4234
Bryan, Texas 77802 Bryan, Texas 77805
Telephone 979/846 -6212
Fax 979/846 -8252
B.J. Kling, P.E., R.P.L.S. Email:
S.M. Kling, R.P.L.S. stewart(aklingeng.com
November 30, 2002
To: Natalie Ruiz AICP
Development Manager, City of College Station
From: S. M. Klin ,{
RE: Indian Lakes Final Plat
spoke with you on Wednesday, November 27 concerning some changes to the final
plat based on resolving the discrepancy between the easement location and the as -built
location of two pipelines - Mitchell Pipeline & Aquilla Pipeline.
At that time you requested a letter detailing the changes along with ten prints of the final
plat and the processing fee of $400 submitted to you at 8:00 AM Monday December 2nd, and
you would try to get the revised final plat on the December 12 Planning and Zoning meeting.
Toward that goal, I offer the following:
1) Check #31315 in the amount of $400
2) Ten prints of the final plat with revision clouds for the pipeline changes only
3) A detailed listing of the pipeline changes:
Sheet 2 of 7 - 4 Line Tables changed
- Line 203 - 216
- Line 217 - 233
- Line 185 -202
- Line 28- 29/291 -300
(Each of these has revision cloud)
Sheet 7 of 7
- Lot 12, BIk 4
- Bearing and distance on southeast lot line
- Acreage
- Lot 13, Blk 4
- Bearing and distance along north lot line
- Acreage
- Relationship of pipeline easements to lot line
- Lot 14, Blk 4,
- Relationship of pipeline easements to lot lines
DL # 434
- Lot 7, BIk 8
- Bearings and distance along north and west lot line
- Acreage
- Lot 8, Blk 8
- Bearing and distance along north and west lot line
- Acreage
- Lot 9, Blk 8
- Bearing and distance along north lot line
- Acreage
- Lot 10, Blk 8
- Relationship of pipeline easement to lot line
The location and configuration of the riding trail adjoining Blk 8 and going through
Blk 4.
- Lot 4, BIk 9,
- Bearing and distance along southwest lot line
- Acreage
- Lot 1, Bik 10
- Bearing and distance along north lot line
- Acreage
- Relationship of pipeline easement to lot lines.
Thank you for your prompt attention to this matter.