HomeMy WebLinkAboutStaff Comments DUCK HAVEN PHASE 4 — FINAL PLAT
RESPONSE TO STAFF REVIEW COMMENTS
PLANNING
1. We do not stock mylar film at the office. The material has been ordered, but not yet received.
Copy Corner was unable to print the AutoCAD file as provided. This item will have to be provided
at a later date.
ENGINEERING
1. See attached revised Final Plat.
2. See attached revised Final Plat.
ELECTRICAL
1. No comments.
SANITATION
2. No comments.
10/19/2008 Page 1 of 1
STAFF REVIEW COMMENTS NO. 1
Project: DUCK HAVEN PH 4 (FP) - 08- 00500226
PLANNING
1. A mylar of the approved preliminary plat has not been submitted. Please provide.
Reviewed by: Jennifer Prochazka Date: October 8, 2008
ENGINEERING COMMENTS NO. 1
1. What happened to the private drainage easements approved on Preliminary Plat? Indicate
maintenance responsibility.
2. County typically requires public drainage easement be dedicated on storm sewer outfalls
sized at toe + 30' for maintenance of culvert.
Reviewed by: Carol Cotter Date: October 8, 2008
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. N/A
GENERAL ELECTRICAL COMMENTS
1. This plat is outside the College Station Utility electric service area. Customer will have
to get with their electric supplier for this area to determine electric service specifications
and requirements.
Plat reviewed by Timothy Crabb, CSU Electric, (979) 764 -3439. Date: 09/30/08.
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: September 30, 2008
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 2 of 2