Loading...
HomeMy WebLinkAboutStaff Comments STAFF REVIEW COMMENTS NO. 1 Project: EDELWEISS GARTENS (PIP) — 08- 00500144 PLANNING . Please show the dimensions of the ROW and pavement/edge. Please show existing or proposed elec -s for the proposed electric vayl e. /3. Staff was unable to locO6d existing raffic sign meter boxes, light pole manholes, overhead electric line ,fire hydrants, va ves,'- nd electric transformers contained within the cii right -of -way. Please show the total square footage of improved area on the plan. Reviewed by Lauren A. Hovde, Staff Planner Date: July 7, 2008 CITY TRAFFIC ENGINEER 1. The image isn't to scale, but it appears that the distance between SH 40 and the proposed landscaping is greater than 14.5 feet. Therefore, the proposed landscaping should not impact motorists' visibility of NB traffic on SH 40 approaching the Eagle Avenue intersection. Reviewed by: Troy Rother, P.E. Date: June 25, 2008 ELECTRIC No comments. Reviewed by: Tony Michalsky Date: June 26, 2008 ENGINEERING COMMENTS NO. 1 1. Upon re- submittal, please submit the cash surety to cover the cost of removal of the facilities proposed. The cash surety is required per the Code of Ordinances Chapter 3 (Building Regulations): Section 3.J and is $50 for this type of work. Reviewed by: Josh Norton Date: July 7, 2008 STAFF REVIEW COMMENTS NO. 2 Project: EDELWEISS GARTENS (PIP) - 08- 00500144 PLANNING 1. Please show the total square footage of improved area on the plan. / r 5 �YdPr� ID124a 2. Staff was unable to locate existing traffic signs. no - - iyetc- 6 i 5i�jr l rx 3. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by Lauren A. Hovde, Staff Planner Date: July 25, 2008