Loading...
HomeMy WebLinkAboutComments -1?2( 44 ?"" MITCHELL Ma- MM MORGAN - )S August 12, 2005 Bridgette George City of College Station Planning & Development Services P.O. Box 9960 College Station, TX 77842 Re: Freebirds (SP) City Comments #2 Dear Bridgette, Please find attached with this letter the following: • One (1) complete set of revised construction documents, with the site and landscape plans attached. Below are the answers to the Staff Review Comments for Freebirds at Gateway. PLANNING: Comment: The bike rack had been relocated as requested, but must maintain 3' separation from the building as well. Answer: The bike rack has been relocated three feet from the building as well. Comment: Table should reflect total vertical square footage minus openings for each facade. Answer: The table has been changed as requested. Comment: Color # 1 submitted for the facade is not an approved color. All buildings facades 0540/ and roofs shall consist of only colors from the color palette approved by the City Council as amended by DRB and maintained in the Office of the Administrator. Two options are available to address this issue: 1. Select an approved color from Sherwin Williams color palette. Samples are available in our office, and the list of approved colors is included on the following pages. 2. Seek a variance from the Design Review Board (DRB) as provided in Sec. 7.9.K.2 below: Alternate colors or materials on each facade if the applicant shows that: a. The applicant is a franchised and /or chain restaurant to be developed as a single detached building (not integrated into a multi- tenant building); and b. The proposed colors /materials are part of a corporate branding; and c. The applicant provided all of the alternative color /materials schemes the chain or franchise has used. Answer: See attached variance request. 511 UNIVERSITY DRIVE EAST, SUITE 204 • COLLEGE STATION, TX 77840 • T. 979.260.6963 • F 979.260.3564 CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS info@mitchellandmorgan.COm • www.mitchellandmorgan.com Comment: Reminder, that previous comment # 13 is still outstanding per your response that the " access and parking agreements are forthcoming." Answer: See attached agreement. ENGINEERING Comment: Site plan cannot be approved until executed copies of agreements with adjacent property owner for off -site drainage and construction are submitted. Answer: See attached agreement. If y • have any questions or comments, please feel free to contact us. Thank you. Si •-rely, i I r; Ili, e Veronica J.B. t org.n P. :. Managing Partner Cc: Bryan Danna Adolfo Alzate