Loading...
HomeMy WebLinkAboutCORRESPONDENCEJI y }R OF BRAZOSCOUNTY ROAD AND BRIDGE DEPARTMENT R Alan Munger, PE, CFM, County Engineer Lloyd Wassermann, Commissioner Precinct I Sammy Catalena, Commissioner Precinct 2 Duane Peters, County Judge Kenny Mallard, Commissioner Precinct 3 Irma Cauley, Commissioner Precinct 4 June 12, 2013 Schultz Engineering LLC 2730 Longmire Drive, Suite A College Station, Texas 77845 Re: Final Plat of Saddle Creek Subdivision Phase 10 26.66 Acres, James C. Stuteville League, A -216 College Station ETJ, Brazos County, Texas Dear Sir: On Tuesday, June 11, 2013, the Brazos County Commissioners' Court approved the referenced plat as submitted. if further information is required please contact us at (979)822 -2127. Best re ards, R. Alan Munger, PE Brazos County Engineer Saddle Creek Ph10 -final plat cc: Office File(s) 2617 Highway 21 West Bryan, Texas 77803 Office (979)822 -2127 / Fax (979)775 -0453 Ricky Flores From: Joe Schultz Uoeschultz84 @verizon.net] Sent: Friday, June 28, 2013 3:35 PM To: 'Ricky Flores' Subject: FW: Saddle Creek - Phase 10 Print out and send to City next week with mylar From: Greg Burkhalter [ mailto :gburkhalter @btutilities.com Sent: Friday, June 28, 2013 3:18 PM To: 'Joe Schultz' Subject: RE: Saddle Creek - Phase 10 Joe, We do have a signed contract and all AIC has been paid. Thanks, Greg Burkhalter Field Engineering & System Manager eburkhalter(@btutilities.com Bryan Texas Utilities 979- 821 -5773 From: Joe Schultz [ mailto :joeschultzQ+CDverizon.net Sent: Friday, June 28, 2013 2:56 PM To: Greg Burkhalter Subject: Saddle Creek - Phase 10 Greg, Please confirm that Saddle Creek Partners has signed a contract and paid for BTU to install the electrical service for Phase 10. Thanks Joe Joe Schultz, P.E. Schultz Engineering, LLC 2730 Longmire, Suite A College Station, TX 77845 Office 979.764.3900 This e -mail and /or attachment is for the sole use of the intended recipient(s) and may contain confidential and /or legally privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e -mail and destroy all electronic and paper copies of the original message and any attachments. Schultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 July 2, 2013 Morgan Hester Staff Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: SADDLE CREEK PHASE 10 (FP) —13- 00900028 Dear Ms. Hester: Attached are the following: • A mylar of the Final Plat • A cd with the Final Plat in a CAD file • A Deed showing Saddle Creek Partners ownership of the tract • An updated tax certificate for the tract • A water system fire hydrant flow test report • An email from Wellborn SUD with their acceptance of the waterline • An email from BTU that Saddle Creek Partners have paid for electrical service in phase 10 • A letter from Brazos County showing approval of the Final Plat Please let me know if any additional items are needed in order to file the Final Plat. If you have any questions, please do not hesitate to call. Very truly yours, Schultz Engineering, LLC. rrlq --- Joe Aurtz, P.E. Civil Engineer P.O. Box 11995 • College Station, Texas 77842 schultzengineedngllc.com Joe Schultz From: Stephen Cast <wsud.sc @verizon.net> Sent: Wednesday, July 03, 2013 2:02 PM To: Joe Schultz Subject: Re: Saddle Creek - Phase 10 Joe Schultz, P.E. Wellborn Special Utility District has accepted the water lines for Saddle Creek Phase 10. Stephen Cast - - - -- Original Message - - - -- From: Joe Schultz To: Stephen Cast Sent: Tuesday, July 02, 2013 11:36 AM Subject: Saddle Creek - Phase 10 Stephen, Please confirm that the waterline for Saddle Creek — Phase 10 has been accepted by Wellborn SUD. Thanks Joe Joe Schultz, P.E. Schultz Engineering, LLC 2730 Longmire, Suite A College Station, TX 77845 Office 979.764.3900 1 EXHIBIT B SCHULTZ ENGINEERING, LLC FIRM #12327 WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT 7 -2 -2013 Date: Water System Owner: _Wellborn SUD Saddle Creek Subdivision Development Project: FH -2 Between Lots 201 and 200 Block 10 Flow Test Location: �E OF • 7 , E��� .. e ° aee J OSEPH e �v �+o(o�a9e�oaosoy 000 JO �E( Heo «:o J4flULIZ 0aoa� e.o 6B L a Nozzle size (in.): _2.5 Discharge Coeff: (c) = 0.90 Pitot Reading (psi): 50 Flowrate Formula: Q= 29.84cd 1190 c = discharge coeff. Flowrate (gpm): d = orifice size (in) P = pitot pressure (psi) East of the intersection of Latigo Court and Stirrup Drive Pressure Gauge Location: 81 Static Pressure (psi): 60 Residual Pressure (psi): 2015 Computed Discharge at 20 psi Residual Pressure: QR = Discharge Formula: QR = QF X (h, 0.54 /hf 0.54 ) Note: The flow test and report were prepared in accordance with NFPA 291. Joe Schultz Report Prepared by: Ricky Flores Others Present: _ Clenden Adams — Wellborn SUD_ Britt Curless L ltz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 July 11, 2013 Deborah Grace - Rosier Planning and Development City of College Station 1101 Texas Avenue College Station, TX 77840 Re: SADDLE CREEK PHASE 10 (FP) —13- 00900028 Dear Ms. Hester: Attached is the tax certificate for the above referenced project. Please let me know if any additional items are needed in order to file the Final Plat. If you have any questions, please do not hesitate to call. Very truly yours, Schultz Engineering, LLC. �V4 Joe Ohultz, P.E. Civil Engineer P.O. Box 11995 - College Station, Texas 77842 schultzengineeringllc.com