HomeMy WebLinkAboutStaff Comments MITCHELL MORGAN Bridgette George July 3, 2005 City of College Station Planning & Development Services P.O. Box 9960 College Station, TX 77842 Re: Cove of Nantucket Final Plat Comments Dear Bridgette, Please find attached with this letter the following: • Two (2) 24 "x36" copies of the revised final plat • Ten (10) 11"x17" copies of the revised final plat • One (1) Mylar original of the revised final plat • One (1) copy of the digital file of the final plat on diskette Below are the answers to the Staff Review Comments for the Cove of Nantucket. ENGINEERING: Comment: TxDOT made the following comment on this plat: "Access driveways to SH6 must meet TxDOT's current `Regulations for Access Drive -ways to State Highways.' Regulations are primarily based on posted speed limits and distances between proposed and adjacent access points. Where posted speed limits are 50 MPH or more the required spacing between access points is 425. Developer should coordinate construction activities with TxDOT Bryan Area Office for 2005 Nantucket Drive U -Turn Project w /conversion of frontage roads to one -way traffic. Future development south of this site should consider location of proposed SH6 ramps associated with the U -Turn Project. Appropriate data will be required for any future permits at this site. 0 Answer: As mentioned in the Preliminary Plat comment dated March 21, 2005, the entrance for Parkview Trail has already been constructed. It was constructed under an old Preliminary Plat scenario. We are simply utilizing the existing roadway apron. The spacing between Windrift Cove and Parkview Trail is C r� /�B currently 480 feet. The TxDOT access criterion currently states for a one -way V � frontage road that the spacing shall be a minimum of 425 feet. For a two -way ( frontage road, the access criterion requires 510 feet spacing. Because the apron is existing and we will meet the criteria for a one -way frontage road (which is currently under design and will be under construction within a year) we are NO 1 'el. requesting that this location be allowed. We have also looked at the new exit ramp and it exits south of Wayfarer Lane, well south of Parkview Trail and the u- turn at Nantucket Drive is well north of Parkview Trail. 511 UNIVERSITY DRIVE EAST, SUITE 204 • COLLEGE STATION, TX 77840 • T 979 260 6963 • F 979 260 3564 q3ba- CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS SUBDIVISIONS info@mitchellandmorgan . com • www.mitchellandmorgan.com [ 0-.61-X- - Comment: If any lots are proposed for zero lot line construction, please note this (including which lots) on the plat. Xnswer: There are no lots proposed for zero lot line construction. V ' omment: The application and FP do not show the same amount of parkland dedication. Are 3.7144 acres of parkland really in detention as shown on the application? /Answer: Per our discussion on June 28 there are 3.71 acres of parkland dedication, of 4;kti C which 0.14 acres will be used for detention. The remainder of the detention will « be located in common areas indicated on the Final Plat. /Comment: The application asked for a statement addressing any differences between the Final Plat and the approved Preliminary Plat. The response given on the application was "Please note that lots 1 -29, Block Two..." Please clarify. ✓Answer: The response should have read, "Please note that Lots 1 -29, Block 2 of the Cove .0 (k of Nantucket Subdivision have been shifted in order to accommodate the , in detention in the identified 0.57 acre common area." n� v omment: Define PDE. All public drainage easements have to be improved to City standards. /Answer: We have provided a legend on the Final Plat indicating what PDE, PUE, etc. represent. In addition, all public drainage easements (PDE) will meet City of College Station standards. /mment: The median shown in the cul -de -sac of Twin Pond Circle will need a PIP if not / designated as Common Area on the Plat. ,/Answer: This area has been designated as a common area on the final plat with a 50' ROW at all locations on Twin Pond Circle. ✓Comment: Is there enough width in the PUE on Lot 58 to allow the sanitary sewer main to be 5.5' from PUE boundary? ✓Answer: We have adjusted the easement to ensure that there is at least 5.5' from the proposed sanitary sewer to the PUE boundary. `omment: You will need to dedicate a public drainage easement over the portion of drainage channel that has been concrete lined and is located on your property. ' 4nswer: A 20' public drainage easement has been dedicated on the Final Plat. 0 Comment: Remove note "Grading by City of College Station" from construction documents. The City is not prepared to perform this work at this time. O Answer: While there is no comment on the Final Plat regarding the grading of the drainage channel adjacent to the Cove of Nantucket property, the City of College Station Department of Public Works has agreed to fill the existing channel and regrade the channel in the 50' PDE on the South Hampton property. This discussion is detailed in a letter to Mark Smith, Director of Public Works dated June 30, 2005. I have included a copy of the letter for your reference. t omment: Construction documents and reports are still under review and may affect the plat. Answer: As of Friday, July 01, 2005 we have not received comments for the construction drawings. Q( l (140 due_ 56, ELECTRICAL: Wr141 I 1 iS /Comment: Developer installs conduit per city specs and design. 4 nswer: Acknowledged. g tomment: City of College Station will provide design drawings for conduit installation as required for this project. Answer: Acknowledged. V Comment: Developer provides 30' of 2" IMC or rigid conduit for riser poles. / Answer: Acknowledged. /Comment: Developer installs pull boxes, pre fab transformer pads and secondary pedestals as per city specs and design. (pull boxes, transformer pads and pedestals provided by the city). /Answer: Acknowledged. /Comment: Developer provided digital AutoCAD2000 or later version of plat and/or site plan e -mail to sweido@cstx.gov. /Answer: Acknowledged. /Comment: Developer provides easements for electric infrastructure as installed for electric lines (including street lights). , /Answer: Acknowledged. If you have any questions or comments regarding the above answers to the Staff Review, please feel free to call. Thank you. Sincerely, �Ai" 5 •• * S' *1A � .. J0EL J. MITCHELL oel J. itchell, P.E. iiV••94` 80649 44/1 •.G /STSte. a�'/ Part • r % iced: Cc: File Don Morris, Nantucket Cove, Ltd. Joe Hobson CITY OF COLLEGE STATION Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM July 1, 2005 TO: Veronica J. B. Morgan, Mitchell & Morgan, LLP, via fax 979.260.3564 FROM: Bridgette George, Development Coordinator SUBJECT: Cove Of Nantucket — Engineering documents Staff reviewed the above - mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: Two (2) sets of revised construction documents. If you have any questions or need additional information, please call Carol Cotter or myself at 979.764.3570. Attachments: Staff Review Comments Cc: Don Morris, via fax 713.802.1655 Case file no. 05- 00500108 Home of Texas ABM University COVE OF NANTUCKET (FP) (05- 00500108) Engineering Review Comments No. 1 1. Valves required on waterlines, one less than every leg of tee or cross. 2. Show sewer conflict (Sht 02). 3. Indicate TCEQ requirements for crossings on profiles. 4. Blow off required at end of 8" water line (Sht 03). 5. There is conflict between sheets on storm sewer material RCP /HDPE. 6. HDPE pipe needs to be water tight. Verify your spec meets this. 7. Show sewer main conflict (Sht 04). 8. Please refer to BCS Design Guidelines for water and sewer lines crossing channels. 9. Show tie -in of flume to ground. 10. To be public drainage easement, the improvements need to meet City standards. Please verify. 11. What is velocity of flow in channels? 12. You will be required to raise existing manhole (Sht 07). 13. Covers less than 6' on sewer mains require ductile iron pipe (Sht 07). 14. Show conflict with water main (Sht 07and 08). 15. Structural backfill required for utilities under pavement (Sht 02, sidewalk, Sht 10). 16. Utility Crossing Detail — sewer main is also required to be backfilled with cement stabilized sand. 17. Are there any conflicts with TxDOT's project? 18. Provide 10 -yr and 100 -yr hydraulic grade lines on storm sewer. 19. Provide drainage design on channel that runs behind Lot 1 -19 and Lots 20 -29. I did not see it in the drainage report. 20. Please explain the velocities exceeding the design maximum. Reviewed by: Carol Cotter Date: July 1, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City of College Station will constitute a completely new review. Page 2 of 2 Olff CITY OF COLLEGE STATION Planning 6. Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 28, 2005 / TO: Veronica Morgan, via fax 979.260.6963 %/ FROM: Bridgette George, Development Coordinator SUBJECT: COVE OF NANTUCKET (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Tuesday, July 5, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, July 21, 2005, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24 "x36" copies of the revised final plat; Ten (10) 11"x17" copies of the revised final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart @cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Carol Cotter or myself at 979.764.3570. Attachments: Staff review comments cc: Don Morris, via fax 713.802.1655✓ Case file #05- 00500108 Home of Texas ABM University STAFF REVIEW COMMENTS NO. 1 Project: COVE OF NANTUCKET (FP) - 05- 00500108 ENGINEERING Y'TxDOT made the following comment on this plat: "Access driveways to SH 6 must meet TxDOT's current 'Regulations for Access Drive -ways to State Highways.' Regulations are primarily based on posted speed limits and distances between proposed & adjacent access points. Where posted speed limits are 50 MPH or more the required spacing between access points is 425'. Developer should coordinate construction activities with TxDOT Bryan Area Office for 2005 Nantucket Drive U -Turn Project w /conversion of frontage roads to one -way traffic. Future development south of this site should consider location of proposed SH 6 ramps associated with the U -Turn Project. Appropriate data will be required for any future permits @ this site." F q X If any lots are proposed for zero lot line construction, please note this (including which lots) on the plat. OW_ ve The application and FP do not show the same amount of parkland d dication. Are 3.7144 acres of parkland really in detention, as shown on the application? — d 6-0. The application asked for a statement addressing any differences betwee the Final Nat and the approved Preliminary Plat. The respons given on the application as "Please note _ that lots 1 -29, Block Two..." Please clarify. — (Q.�� C cn\ 5. Define PDE. All public drainage easements have to be i proved to City standards. ?jet. ��'�` R ° � 6. The median shown in the cul -de of Twin Pond Circle will need a PIP if not designated as Common Area on the Plat. T Gvo Lc& oura at It commenit cvu_a_ 0 Is there enough wid h in the PUE on Lot 58 t.9 allow the sanitary sewer main to be 5.5' from PUE boundary? GL uS - t 1'11a SS '8. You will need to de 'cate a public drainage easement over th portion of drainage channel that has been concrete lined and is located on your property. }? Remove note "Grading by City of College Station" from construction documents. The City is of prepared to perform this work at this time. Construction documents and reports are still under review and may affect the plat. Reviewed by: Jennifer Prochazka & Carol Cotter Date: June 27, 2005 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. City of College Station will provide design drawings for conduit installation as required for this project. 3. Developer provides 30' of 2" IMC or rigid conduit for riser poles. 4. Developer installs pull boxes, pre fab transformer pads and secondary pedestals as per city specs and design.(pull boxes, transformer pads and pedestals provided by the city). 5. Developer provides digital AutoCAD2000 or later version of plat and /or site plan email to sweido @cstx.gov. 6. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 7. To discuss any of the above electrical comments, please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 6 -21 -05 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2 3. Streetscape trees are to be calculated based on every 25'. University Drive is a major arterial. Based on our measurements, this would be 11 streetscape canopy trees. 4. Canopy trees should be 50% of the total landscape points (landscaping plus additional streetscaping points). Please make changes to your landscape plan accordingly. 5. Provide a note that all irrigation will be approved and installed prior to Certificate of Occupancy. 6. Irrigation plan is under review for water conservation point reduction. 7. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and adjacent property disturbed during construction. Reviewed by: Lindsay Boyer Date: June 24, 2005 ENGINEERING 1. Depict water service line material type. 2. Depict sanitary sewer service line material type. 3. Sanitary sewer service lines require a clean out every 150 ft. 4. Depict storm sewer line, size and material type. 5. Depict domestic water meter size and locate in an easement. 6. Depict irrigation meter size and locate in an easement. 7. All public meters must be located in an easement. 8. Backflow preventer appears to be located under pavement? 9. Provide water demands. 10. Provide sanitary sewer demands. 11. Depict fire hydrant location, dependent upon use of 24' access easement. 12. Provide drainage report. This area is located in the Burton Creek Basin which is a mandatory detention area of the City of College Station as defined in Chapter 2 of the Drainage Policy and Design Standards manual. 13. Provide fire flow report. 14. Verify existing water main size. 15. Verify all easements with volume, page, size and type. 16. Verify legal description. Reviewed by: Josh Norton Date: June 23, 2005 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. City will provide design drawings for primary conduit installation as required for this project. 3. Developer pours transformer & pull box pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city). 5. Developer provides digital AutoCAD version 2000 of plat and /or site plan email to sweido @cstx.gov. 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 4 of 5