Loading...
HomeMy WebLinkAboutSTAFF COMMENTSoil CITY OF COIJT"G,I? STATION Home of TexasAerM University' MEMORANDUM May 16, 2013 TO: Glenn Jones, J4 Engineering; via: gjones @j4engineering.com FROM: Jason Schubert, AICP Principal Planner SUBJECT: PLANTATION OAKS ADDITION (DVPL) I reviewed the above - mentioned DEVELOPMENT PLAT application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal for initial review. Please submit the following information by 10 a.m. on any Monday for review that week: Page 3 of the application is to be signed by the owner of the property or a power of attorney provided by them for someone else to sign. Provide a revised page 3 with the owner's signature or power of attorney statement from the owner; and As the owner of the property is a company, provide proof of authority for the signing individual to sign the application on behalf of the company. Please be aware that if this application is not completed before Monday, July 1, 2013, it will expire and a new application and fees will be necessary to continue the platting process. Also, please note the name of the project has been changed to the name of the plat. If you have any questions or need additional information, please call me at 979.76 .3570. cc: Bo Miles, Miles Construction Corp.; via: milesconstruction @gmail.com Case file No. 13- 00900098 Planning & Development Services 1 1 .0, BOX 941,0 . 1101 "I I.XAS AVENUF - C:OLL C,F STATION • TEXAS . TT?.L. 970.76!1.35 7 ( ) . FAX. 979.704.3496 cstx.gov /devservices _ 6 (,'] COTJJ`,GF STiNTION Home of TexasA&M University* MEMORANDUM May 20, 2013 TO: Glenn Jones, J4 Engineering; via: gjones@j4engineering.com � ✓ FROM: Jason Schubert, AICP Principal Planner SUBJECT: PLANTATION OAKS ADDITION (DVPL) Thank you for the submittal of the required documents for your DEVELOPMENT PLAT application. This project will be distributed to staff this week for their review. cc: Bo Miles, Miles Construction Corp.; via: milesconstructiccs@gmail.com P&DS Project no. 13-00900098 Planning & Development Services P.O. BOX 9960 - I 10 ITEXASAVENUE - C'Of ITGE S'f ATION • TFXAS • I Fl- 9`'976 • FAX, 11" +) 7 6�i.3'i')(, cstx.gov/devservices TRANSMITTAL HEngineeiing Consulting • Engineering • Construction Services PO Box 5192 Bryan, Texas 77805 (C)979 -739 -0567 (F)979- 774 -5025 From the Desk of: Glenn Jones, PE -CFM Principle Engineer / Owner To: With: Phone: Jason Schubert, AICP City of College Station - Planning 979 - 764 -3570 19) Fax: 979- 764 -3496 RE: Date: Notes: Development Plat: Plantation Oaks Addition Case File No. 13- 00900098 May 20, 2013 Attached are the two items you requested in your memo date May 16, 2013 as being needed to complete the application for the development plat of Plantation Oaks Addition, Case No. 13- 00900098. Thank You. Email: giones@i4engineering.com MEMORANDUM May 31, 2013 TO: Glenn Jones, J4 Engineering; via email: gjones @j4engineering.com FROM: Morgan Hester, Staff Planner SUBJECT: Plantation Oaks Addition (DVPL) - Development Plat Staff reviewed the above - mentioned development plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted on any Monday by 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24 "x36" copy of the revised development plat; Thirteen (13) 11 "x17" copies of the revised development plat; One (1) Mylar original of the revised development plat (required after P &Z approval); and One (1) copy of the digital file of the development plat on diskette or e-mail to: pdsdigitalsubmittal(aD.cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P &Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P &Z meeting. http://www.cstx.gov/pz Please note that a Mylar original of the revised development plat will be required after P &Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: Bo Miles, Miles Construction Corp.; via email: milesconstruction @gmail.com P &DS Project No. 13- 00900098 Ph,tu ing & Development S€ridees €'.0, b0X x 9o0 • 1 01 "I EXA5 AVEINUT - C01 I FGE S M ION • TXAS • 7 78= +2 1 ) 7 ').764 ,357( . FAX. 9 , 9 ' ?6=f.3 96 cstx.gov /devservices STAFF REVIEW COMMENTS NO. 1 Project: Plantation Oaks Addition (DVPL) (13- 00900098) PLANNING 1. Please remove the Certificate of City Planner as this plat requires the approval of the Planning & Zoning Commission. 2. Please revise the following Certificates accordingly: • Certificate of Ownership and Dedication o "I, Joseph P Miles, owner and developer of the land shown on this plat, and designated herein as the Plantation Oaks Subdivision to the City of College Station, Texas, and whose name is subscribed hereto, hereby dedicate to the use of the public forever all streets, alleys, parks, greenways, infrastructure, easements, and public places thereon shown for the purpose and consideration therein expressed. All such dedications shall be in fee simple unless expressly provided otherwise." • Certificate of City Engineer o "I, _, City Engineer of the City of College Station, Texas, hereby certify that this Subdivision Plat conforms to the requirements of the Subdivision Regulations of the City of College Station." • Certificate of Planning and Zoning Commission o "I, _, Chairman of the Planning and Zoning Commission of the City of College Station, hereby certify that the attached plat was duly approved by the Commission on the _ day of _, 20_." 3. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Morgan Hester ENGINEERING Date: May 24, 2013 1. No comments on the plat. 2. Please be aware that the construction documents and reports are still under review and may affect the plat. Reviewed by: Erika Bridges Date: May 24, 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN /PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: gmartinez(a)_cstx.gov , sweido cstx.gov , ehorton(a)_cstx.gov , or wdavis cstx.gov 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 3. EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure as designed by CSU. 4. The following easements will be required: • 20' PUE around the perimeter of the property GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255, Sam Weido at 979.764.6314, Eric Horton at 979.764.6280, or Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis Date: May 31, 2013 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: May 24, 2013 C ITY OF C OIT EGE ST<-STION Home of Texas A &M University' MEMORANDUM June 10, 2013 TO: Glenn Jones, J4 Engineering; via email: gjones @j4engineering.com a,/ FROM: Morgan Hester, Staff Planner SUBJECT: PLANTATION OAKS ADDITION (DVPL) - Final Plat Thank you for providing the requested documents for the above - mentioned final plat as requested. Your project will be placed on the June 20, 2013 Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. Please provide one (1) copy of the digital file of the final plat on diskette or e-mail to pdsdigitalsubmittal(aD-cstx.gov If you have already done so, please disregard. Please note that this application will expire in 90 days from the date of this memo. The agenda and staff report can be accessed at the following web site on Monday the week of the P &Z meeting. http://www.cstx.gov/pz Please note that a Mylar original of the revised final plat will be required after P &Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. cc: Bo Miles, Miles Construction Corp.; via email: milesconstruction @gmail.com J6 V/ Case file #13- 00900098 Planning & Developuzent Services P,0. BOX 9960 • l 7 i)1 'I EXAS Al I \ U • (' "0111,C;L: STMI }N • I 1 XAS • 77 8 4 2 '1'1?l 979.704,3570 1 - AX. 979.764 3496 cstx.govldevservices r CITY OF C OT.d.r;GE. STATIO Home Uf Texas AeaM University" MEMORANDUM June 4, 2013 TO: Glenn Jones, J4 Engineering; via email: gjones @j4engineering.com' FROM: Morgan Hester, Staff Planner SUBJECT: Plantation Oaks Addition (DVPL) - Development Plat Staff reviewed the above - mentioned development plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted on any Monday by 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24 "x36" copy of the revised development plat; Thirteen (13) 11 "x17" copies of the revised development plat; One (1) Mylar original of the revised development plat (required after P &Z approval); and One (1) copy of the digital file of the development plat on diskette or e-mail to: QdsdigitalsubmittalCaD-cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P &Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P &Z meeting. http://www.cstx.gov Please note that a Mylar original of the revised development plat will be required after P &Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: Bo Miles, Miles Construction Corp.; via email: milesconstruction @gmail.com P &DS Project No. 13- 00900098 Planning & Development Services PA), BOX 9 960 • I01 "11 XAS A E'NUE (- COL.L.E (lE S"tAUION • 1 k:�LAS cstx.gov /devservices STAFF REVIEW COMMENTS NO. 2 Project: PLANTATION OAKS ADDITION (DVPL) - 13- 00900098 PLANNING 1. Please add the following sentence to the end of the Certificate of Ownership and Dedication: All such dedications shall be in fee simple un less expressly provided otherwise. Reviewed by: Morgan Hester Date: June 4, 2013 ENGINEERING 1. Please add a 20' PUE to the rear of the lot. 2. Please remove the existing and proposed infrastructure from the plat. Reviewed by: Erika Bridges Date: June 4, 2013 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2