Loading...
HomeMy WebLinkAboutStaff Comments (111h CITY OF COLLEGE STATION Planning & Development Services 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM March 7, 2005 TO: Pebble Creek Development Company, via fax 690.6081 FROM: Bridgette George, Development Coordinator SUBJECT: PEBBLE CREEK PHASES 9D,9E,9F,9G &9H(PP) - Preliminary Plat Staff reviewed the above - mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, March 7, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for Thursday, March 17, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24" x 36" copies of the revised preliminary plat; Ten (10) 11" x 17" copies of the revised preliminary plat; One (1) Mylar original of the revised preliminary plat; and, One (1) copy of the digital file of the preliminary plat on diskette or e-mail to nmanhart@cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Trey Fletcher or Carol Cotter at 979.764.3570. Attachments: Staff review comments cc: McClure & Browne Engineering /Surveying, Inc., via fax 693.2554 Case file #05- 00500005 Home of Texas A &M University • STAFF REVIEW COMMENTS NO. 1 Project: PEBBLE CREEK PHASES 9D, 9E, 9F, 9G & 9H (PP) - 05- 00500005 PLANNING 1. The original preliminary plat for the Pebble Creek Subdivision, Phase 9 -E and 9 -F, consisting of 100 lots on 44.28 acres Commissioner Nichols was approved by the Planning & Zoning Commission with the following stipulations: Driveway access (backing maneuvers) to St. Andrews Drive, a minor collector be minimized so a turn- around area could be required; a sidewalk be considered for connectivity purposes along Olympic Court to the .29 -acre common area adjacent to the Pebble Creek Parkway extension and a public access easement should be shown within the common area. Please add note regarding driveway requirements to the plat. 2. Additional residential lots are shown fronting on a minor collector in the following areas: • Lot 1, Block 50 • Lots 2 -6, Block 51 The Commission may restrict residential access on lots adjacent to St. Andrews Drive per Section 8 -G.8. 3. Show ROW and Pavement widths for Congressional Court. 4. This plat must show compliance with the Bikeway & Pedestrian Master Plan Update (2002) where St. Andrews Drive has bike lanes and the bike path shown in common area east of Birkdale Drive must be located in an easement. 5. Staff and the developer have met recently (2/9/2005) regarding various issues in Pebble Creek, including the possibility of the HOA Common Area being a City park facility. 6. It is the Planning & Zoning Commission's discretion to require pedestrian accessways (PAWs) to link one or more of the cul -de -sacs to the future bikeway location adjacent to the Alum Creek floodplain. 7. Show sidewalks on preliminary plat per section 8.M. Reviewed by: Trey Fletcher Date: 02 -28 -2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 ors ENGINEERING 1. Provide volume /page for existing PUEs and sanitary sewer easements. 2. Provide water to serve lots on Pablo Creek Drive. 3. All utilities are required to meet BCS Design Guidelines. Line sizes will be determined at Final Plat stage. 4. Provide minimum finished floor elevations for lots where the flood plain encroaches. 5. All storm sewer discharge is required to be to a defined channel. Offsite drainage easements and improvements may be required. Public Drainage Easements are required to be improved to City standards. 6. There are a number of offsite easements proposed on the plat. These will be required to be dedicated by separate instrument or on respective plats. 7. The design of the stub -out of St. Andrews to the future Pebble Creek Parkway will need to consider the pipeline cover requirements and include the design of the tie - in. Reviewed by: Carol Cotter Date: March 8, 2005 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of rigid conduit for riser poles. Developer installs first 10' City installs remainder. 3. Developer installs street lights per city spec and design. 4. Developer provides digital AutoCAD 2000 version of plat and /or site plan email to tmichals@cstx.qov 5. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 6. College Station Utilities will provide the developer an electric design plan for the installation of conduits and street lights. 7. Coordinate with College Station Utilities to receive plan of electric layout for the location of easement needed on plat. 8. Developer will be responsible installation of feeder conduit along St Andrews Dr. (4 -4 inch conduit and pull boxes). A location for a switchgear will need to be determined at the Birkdale Dr intersection. 9. To discuss any of the above electrical comments, please contact Tony Michalsky at 979.764.3438. Reviewed by: Tony Michalsky Date: 1 -24 -05 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 3