Loading...
HomeMy WebLinkAboutCorrespondance r McCLURE & BROWNE ENGINEERING /SURVEYING, INC. r 1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845 111 (979) 693 -3838 • Fax: (979) 693 -2554 • Email: McClureBrowne @Verizon.net i • October 24, 2006 Mr. Davis Young Pebble Creek Development 4500 Pebble Creek Parkway College Station, Texas 77845 Re.: PEBBLE CREEK SUBDIVISION, PHASE 9 -D MBESI No. 10650008 Dear Davis: Pursuant to your request, I have estimated the cost to mill the edges and place a 1 -1/4 -inch thick overlay of Hot -mix asphalt concrete pavement (Type D) for a 100' x 17' segment along the northwest one -half of St. Andrews Drive (approximate station 57 +50). Thickness measurements of the cores obtained by CME Testing and Engineering, Inc. indicate that the paving thickness was deficient in this area. I estimate the cost to mill and place the 1 -1/4 -inch overlay at $2500. Should you have any questions or need any additional information, please do not hesitate to call. Very truly yours, 1.44,1 4 t Michael R. McClure, P.E., R.P.L.S. OF ) .N *f ..• '._4. 11. A * s ..• �•% s *1 rid f MICHAEL R. McCLURE 4 3 po; 32740 a; sal 1 1 ,--„.. ..isTeck., ,: l o® ®V F- \1065 - Davis Young10008 - Pebble Creek - Phase 901CorrespondencelPCD - Young03 - Letter.wpd