HomeMy WebLinkAboutCorrespondance r McCLURE & BROWNE ENGINEERING /SURVEYING, INC.
r
1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845
111 (979) 693 -3838 • Fax: (979) 693 -2554 • Email: McClureBrowne @Verizon.net
i
•
October 24, 2006
Mr. Davis Young
Pebble Creek Development
4500 Pebble Creek Parkway
College Station, Texas 77845
Re.: PEBBLE CREEK SUBDIVISION, PHASE 9 -D
MBESI No. 10650008
Dear Davis:
Pursuant to your request, I have estimated the cost to mill the edges and place a 1 -1/4 -inch
thick overlay of Hot -mix asphalt concrete pavement (Type D) for a 100' x 17' segment along the
northwest one -half of St. Andrews Drive (approximate station 57 +50).
Thickness measurements of the cores obtained by CME Testing and Engineering, Inc.
indicate that the paving thickness was deficient in this area.
I estimate the cost to mill and place the 1 -1/4 -inch overlay at $2500.
Should you have any questions or need any additional information, please do not hesitate to call.
Very truly yours,
1.44,1
4 t
Michael R. McClure, P.E., R.P.L.S.
OF ) .N
*f ..• '._4. 11.
A
* s ..• �•% s *1 rid
f MICHAEL R. McCLURE
4 3
po; 32740 a; sal
1 1 ,--„.. ..isTeck., ,:
l o® ®V
F- \1065 - Davis Young10008 - Pebble Creek - Phase 901CorrespondencelPCD - Young03 - Letter.wpd