TO: MCCLURE & BROWNE ENGINEERING /SURVEYING, INC.
RE: PEBBLE CREEK SUBDIVISION PHASE 9D
FAX: 979-69i-2554
FROM: Lisa Lindgren, Staff Assistant
DATE: April 5, 2005
RE: Agenda & Staff Report
P &Z Meeting, April 7, 2005
Following this coversheet is a copy of the Staff Report that was prepared for the above
referenced project. Please keep in mind that staff's responsibility is to provide the
Planning & Zoning Commission with all pertinent facts of a development case, but that
staff is not acting as an advocate for the applicants. Therefore, it is in the applicant's best
interest to send a representative to the Planning & Zoning Commission meeting to speak
on behalf of the proposal.
This item is scheduled for the April 7, 2005, Planning & Zoning Commission Meeting.
This meeting will begin at 7:00 P.M. in the City Hall Council Chambers., 1101 Texas
Avenue. I have included a copy of the agenda for this meeting. Please contact our office
at (409) 979-3570 if you should have any questions. Thanks.
( l it r ff 151414
CITY OF COLLEGE STATION
Planning 6- Development Services
CITY OF COLLEGE STATION
PLANNING & DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764 -3570 / Fax (979)764 -3496
TO: PEBBLE CREED COUNTRY CLUB, INC.
RE: PEBBLE CREEK SUBDIVISION PHASE 9D
FAX: 979 - 690.6081
FROM: Lisa Lindgren, Staff Assistant
DATE: April 5, 2005
RE: Agenda & Staff Report
P &Z Meeting, April 7, 2005
Following this coversheet is a copy of the Staff Report that was prepared for the above
referenced project. Please keep in mind that staff's responsibility is to provide the
Planning & Zoning Commission with all pertinent facts of a development case, but that
staff is not acting as an advocate for the applicants. Therefore, it is in the applicant's best
interest to send a representative to the Planning & Zoning Commission meeting to speak
on behalf of the proposal.
This item is scheduled for the April 7, 2005, Planning & Zoning Commission Meeting.
This meeting will begin at 7 :00 P.M. in the City Hall Council Chambers., 1101 Texas
Avenue. I have included a copy of the agenda for this meeting. Please contact our office
at (409) 979 -3570 if you should have any questions. Thanks.
O
McCLURE & BROWNE ENGINEERING /SURVEYIN , INC.
1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845
1A '
(979) 693 -3838 • Fax (979) 693 -2554 • Email: mcclure @tca.net
March 24, 2005
Bridgette George
Development Coordinator
Planning and Development Services, City of College Station
College Station, TX 77840
Re.: Pebble Creek Phase 9D & 9F Construction Documents
MBESI Proj No.: 1065 -0007
Dear Ms. George:
Below is the summary of the revisions made per the staffs comments.
COMMENT #1: Either separate Phases 9D and 9F or indicate construction
requirements for each phase on construction documents. As
submitted, each phase needs to stand on its own.
ACTION: Notes have been added to the plans on sheets 2, 4, 11, & 12 to
indicate the construction requirements if the phases are separated.
COMMENT #2: Where there is a change in pipe diameter, the soffit of smaller
upstream pipe shall match the soffit of the larger pipes (Inlet 19).
ACTION: The pipe soffits at inlet 19 were not shown correct graphically. They
have been adjusted on the revised set of plans.
COMMENT #3: St. Andrews Drive requires bike lanes in accordance with Bikeways
Master Plan. Please note on construction documents.
ACTION: A 7' bike lane has been added to both sides of the street on the 39'
typical street section on sheet 20.
COMMENT #4: Make sure the low point is graded to drain where St. Andrews Drive
(Sta. 61 +75) meets future Pebble Creek Parkway.
ACTION: An 18 "pipe has been added to the plans in this location to carry water
across St. Andrews Drive.
COMMENT #5: A number of water /sanitary crossings do not specify centering joint of
water pipe on profile.
ACTION: A joint of pipe has been centered on all water and sanitary sewer
crossings.
COMMENT #6: Water Line WA -1 (Sta. 259 +81) should center on S /L.
ACTION: See ACTION for COMMENT #5.
COMMENT #7: Water, Sewer, and Drainage Reports are okay.
ACTION: Duly noted.
Sincerely,
Jeff Robertson P.E.
McCLURE & BROWNE ENGINEERING /SURVEYING, INC.
mu ,
McCLURE & BROWNE ENGINEERING /SURVEYING, INC.
1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845 0
(979) 693 -3838 • Fax (979) 693 -2554 • Email: mcclure @tca.net 2S.
•
•
3 Os'
r ,r'
March 21, 2005 55
Bridgette George
Development Coordinator
Planning and Development Services, City of College Station
College Station, TX 77840
Re.: Pebble Creek Phase 9D Final Plat
MBESI Proj No.: 1065 -0008
Dear Ms. George:
Below is the summary of the revisions made per the staffs comments.
ENGINEERING:
COMMENT #1: Show floodplain boundaries on the Plat, based on FEMA BFE 230.
ACTION: The floodplain has been added to the plat according to FEMA FIRM
Panel 48041CO205 D.
COMMENT #2: Provide finish floor elevations for lots in the Floodplain.
ACTION: No lots in Phase 9D are located in the Floodplain. However, finished
floor elevations for lots along Alum Creek have been added to the
plat.
COMMENT #3: Provide offsite Drainage Easement.
ACTION: The easement document is not yet available. The city will be provided
with a copy once it is ready.
COMMENT #4: Dedicate PUE for 16 -inch sewer line (outside plat boundaries).
ACTION: A 20' PUE is provided for the 16 -inch sewer line through phase 9D on
the plat.
No documentation of an easement currently exists for the remainder
of the sewer line. Pebble Creek Development prefers to dedicate
easements for this line with future plats as development continues to
the west.
COMMENT #5: Add note to plat that driveway access for corner lots on St Andrews
Drive will be to lesser street.
ACTION: General Note #4 has been added to the plat to address this issue.
ELECTRICAL:
Comment #1: Developer installs conduit per city specs and design.
ACTION: Duly noted.
Comment #2: Developer provides 30' of rigid conduit for riser poles.
ACTION: Duly noted.
Comment #3: Developer installs pull boxes and secondary pedestal as per city
specs and design. (Pull boxes and secondary pedestal provided by
the city).
ACTION: Duly noted.
Comment #4: Developer is responsible for the install of 4-4 inch sch 40 conduits for
a proposed electric feeder to be installed along St Andrews Dr.
ACTION: Duly noted.
Comment #5: Developer provides digital AutoCAD 2000 version of plat, email to
bread@cstx.gov.
ACTION: Duly noted.
Comment #6: Developer provides easements for electric infrastructure as installed
for electric lines (including street lights).
ACTION: Duly noted.
Comment #7: Will need a 10' easement along the south side of St Andrews Drive
for proposed underground feeder route.
ACTION: The easement has been added to the plat.
Comment #8: To discuss any of the above electrical comments, please contact
Tony Michalsky @ 979.764.3438.
ACTION: Duly noted.
Sincerely,
//,
J ` ( P obton P.E.
CLURE & BROWNE ENGINEERING /SURVEYING, INC.
0--__ ,
mu McCLURE & BROWNE ENGINEERING /SURVEYING, INC .. ' ` 7� 0 i3-
1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845 a-Kk
(979) 693 -3838 • Fax (979) 693 -2554 • Email: mcclurebrowne@ verizon.net
February 11, 2005
Mrs. Bridgette George
Development Manager
CITY OF COLLEGE STATION
Post Office Box 9960
College Station, Texas 77842
RE: PEBBLE CREEK SUBDIVISION; PHASE 9D
Dear Bridgette:
Attached please find the following items for the above referenced submittal:
V Final Plat Fee of $400.00
2. Development Permit Fee of $200.00
3. Infrastructure Fee of $600.00
__Completed Final Plat Application and Final Plat checklist
Supplemental Development Permit Application
6/Thirteen (13) folded copies of Final Plat
, --7.1-Paid tax certificates
8. Two (2) Copies of the Public Infrastructure Plans
9. Two (2) Copies of the Engineer's Estimate
10. Two (2) each of the Drainage Report & the Water & Sewer System Analysis Report
It is my understanding that these items will be reviewed by the Planning and Zoning Commission on
Thursday, March 17, 2005.
Should you have any questions or need additional information, please advise.
Very truly yours,
- ,. /i/ eeL A____
chael R. cCl e P.E., R.P.L.S.
resident
MRM/gsm