Loading...
HomeMy WebLinkAboutStaff Report .4ff ill5111111 CITY OF COLLEGE STATION Planning O Development Services CITY OF COLLEGE STATION PLANNING & DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979)764 -3570 / Fax (979)764 -3496 TO: MCCLURE & BROWNE ENGINEERING /SURVEYING, INC. RE: PEBBLE CREEK SUBDIVISION PHASE 9D FAX: 979-69i-2554 FROM: Lisa Lindgren, Staff Assistant DATE: April 5, 2005 RE: Agenda & Staff Report P &Z Meeting, April 7, 2005 Following this coversheet is a copy of the Staff Report that was prepared for the above referenced project. Please keep in mind that staff's responsibility is to provide the Planning & Zoning Commission with all pertinent facts of a development case, but that staff is not acting as an advocate for the applicants. Therefore, it is in the applicant's best interest to send a representative to the Planning & Zoning Commission meeting to speak on behalf of the proposal. This item is scheduled for the April 7, 2005, Planning & Zoning Commission Meeting. This meeting will begin at 7:00 P.M. in the City Hall Council Chambers., 1101 Texas Avenue. I have included a copy of the agenda for this meeting. Please contact our office at (409) 979-3570 if you should have any questions. Thanks. ( l it r ff 151414 CITY OF COLLEGE STATION Planning 6- Development Services CITY OF COLLEGE STATION PLANNING & DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979)764 -3570 / Fax (979)764 -3496 TO: PEBBLE CREED COUNTRY CLUB, INC. RE: PEBBLE CREEK SUBDIVISION PHASE 9D FAX: 979 - 690.6081 FROM: Lisa Lindgren, Staff Assistant DATE: April 5, 2005 RE: Agenda & Staff Report P &Z Meeting, April 7, 2005 Following this coversheet is a copy of the Staff Report that was prepared for the above referenced project. Please keep in mind that staff's responsibility is to provide the Planning & Zoning Commission with all pertinent facts of a development case, but that staff is not acting as an advocate for the applicants. Therefore, it is in the applicant's best interest to send a representative to the Planning & Zoning Commission meeting to speak on behalf of the proposal. This item is scheduled for the April 7, 2005, Planning & Zoning Commission Meeting. This meeting will begin at 7 :00 P.M. in the City Hall Council Chambers., 1101 Texas Avenue. I have included a copy of the agenda for this meeting. Please contact our office at (409) 979 -3570 if you should have any questions. Thanks. O McCLURE & BROWNE ENGINEERING /SURVEYIN , INC. 1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845 1A ' (979) 693 -3838 • Fax (979) 693 -2554 • Email: mcclure @tca.net March 24, 2005 Bridgette George Development Coordinator Planning and Development Services, City of College Station College Station, TX 77840 Re.: Pebble Creek Phase 9D & 9F Construction Documents MBESI Proj No.: 1065 -0007 Dear Ms. George: Below is the summary of the revisions made per the staffs comments. COMMENT #1: Either separate Phases 9D and 9F or indicate construction requirements for each phase on construction documents. As submitted, each phase needs to stand on its own. ACTION: Notes have been added to the plans on sheets 2, 4, 11, & 12 to indicate the construction requirements if the phases are separated. COMMENT #2: Where there is a change in pipe diameter, the soffit of smaller upstream pipe shall match the soffit of the larger pipes (Inlet 19). ACTION: The pipe soffits at inlet 19 were not shown correct graphically. They have been adjusted on the revised set of plans. COMMENT #3: St. Andrews Drive requires bike lanes in accordance with Bikeways Master Plan. Please note on construction documents. ACTION: A 7' bike lane has been added to both sides of the street on the 39' typical street section on sheet 20. COMMENT #4: Make sure the low point is graded to drain where St. Andrews Drive (Sta. 61 +75) meets future Pebble Creek Parkway. ACTION: An 18 "pipe has been added to the plans in this location to carry water across St. Andrews Drive. COMMENT #5: A number of water /sanitary crossings do not specify centering joint of water pipe on profile. ACTION: A joint of pipe has been centered on all water and sanitary sewer crossings. COMMENT #6: Water Line WA -1 (Sta. 259 +81) should center on S /L. ACTION: See ACTION for COMMENT #5. COMMENT #7: Water, Sewer, and Drainage Reports are okay. ACTION: Duly noted. Sincerely, Jeff Robertson P.E. McCLURE & BROWNE ENGINEERING /SURVEYING, INC. mu , McCLURE & BROWNE ENGINEERING /SURVEYING, INC. 1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845 0 (979) 693 -3838 • Fax (979) 693 -2554 • Email: mcclure @tca.net 2S. • • 3 Os' r ,r' March 21, 2005 55 Bridgette George Development Coordinator Planning and Development Services, City of College Station College Station, TX 77840 Re.: Pebble Creek Phase 9D Final Plat MBESI Proj No.: 1065 -0008 Dear Ms. George: Below is the summary of the revisions made per the staffs comments. ENGINEERING: COMMENT #1: Show floodplain boundaries on the Plat, based on FEMA BFE 230. ACTION: The floodplain has been added to the plat according to FEMA FIRM Panel 48041CO205 D. COMMENT #2: Provide finish floor elevations for lots in the Floodplain. ACTION: No lots in Phase 9D are located in the Floodplain. However, finished floor elevations for lots along Alum Creek have been added to the plat. COMMENT #3: Provide offsite Drainage Easement. ACTION: The easement document is not yet available. The city will be provided with a copy once it is ready. COMMENT #4: Dedicate PUE for 16 -inch sewer line (outside plat boundaries). ACTION: A 20' PUE is provided for the 16 -inch sewer line through phase 9D on the plat. No documentation of an easement currently exists for the remainder of the sewer line. Pebble Creek Development prefers to dedicate easements for this line with future plats as development continues to the west. COMMENT #5: Add note to plat that driveway access for corner lots on St Andrews Drive will be to lesser street. ACTION: General Note #4 has been added to the plat to address this issue. ELECTRICAL: Comment #1: Developer installs conduit per city specs and design. ACTION: Duly noted. Comment #2: Developer provides 30' of rigid conduit for riser poles. ACTION: Duly noted. Comment #3: Developer installs pull boxes and secondary pedestal as per city specs and design. (Pull boxes and secondary pedestal provided by the city). ACTION: Duly noted. Comment #4: Developer is responsible for the install of 4-4 inch sch 40 conduits for a proposed electric feeder to be installed along St Andrews Dr. ACTION: Duly noted. Comment #5: Developer provides digital AutoCAD 2000 version of plat, email to bread@cstx.gov. ACTION: Duly noted. Comment #6: Developer provides easements for electric infrastructure as installed for electric lines (including street lights). ACTION: Duly noted. Comment #7: Will need a 10' easement along the south side of St Andrews Drive for proposed underground feeder route. ACTION: The easement has been added to the plat. Comment #8: To discuss any of the above electrical comments, please contact Tony Michalsky @ 979.764.3438. ACTION: Duly noted. Sincerely, //, J ` ( P obton P.E. CLURE & BROWNE ENGINEERING /SURVEYING, INC. 0--__ , mu McCLURE & BROWNE ENGINEERING /SURVEYING, INC .. ' ` 7� 0 i3- 1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845 a-Kk (979) 693 -3838 • Fax (979) 693 -2554 • Email: mcclurebrowne@ verizon.net February 11, 2005 Mrs. Bridgette George Development Manager CITY OF COLLEGE STATION Post Office Box 9960 College Station, Texas 77842 RE: PEBBLE CREEK SUBDIVISION; PHASE 9D Dear Bridgette: Attached please find the following items for the above referenced submittal: V Final Plat Fee of $400.00 2. Development Permit Fee of $200.00 3. Infrastructure Fee of $600.00 __Completed Final Plat Application and Final Plat checklist Supplemental Development Permit Application 6/Thirteen (13) folded copies of Final Plat , --7.1-Paid tax certificates 8. Two (2) Copies of the Public Infrastructure Plans 9. Two (2) Copies of the Engineer's Estimate 10. Two (2) each of the Drainage Report & the Water & Sewer System Analysis Report It is my understanding that these items will be reviewed by the Planning and Zoning Commission on Thursday, March 17, 2005. Should you have any questions or need additional information, please advise. Very truly yours, - ,. /i/ eeL A____ chael R. cCl e P.E., R.P.L.S. resident MRM/gsm attachments