Castlegate II Community Center
Public Sidewalk Construction
Engineer's Estimate of Construction
Item
Description
Unit
Estimated
uanti
Unit Price
Total
General Items
I Mobilization, Overhead and Construction Staking LS I l
$ 500.00 $ 500.00
General Items Subtotall $ 500.00
Public Sidewalk
2 Demolish & Remove Existing Concrete Sidewalk, complete in place
SF 526 $ 2.00 $
1,052.00
3 Concrete Sidewalk, complete in place
SF 140 $ 4.50 $
630.00
4 ADA Ramps - Detectable Warning Surfaces, complete in place
EA 4 $ 600.00 $
2,400.00
Public Sidewalk Items Subtotal $
4,082.00
TOTAL CONSTRUCTION1 $ 4,582.00
SCHULTZ ENGINEERING. LLC.
Page 1 of 1
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
Castlegate II Community Center
Public Sidewalk Construction
Engineer's Estimate of Construction
Item
Description
Unit
Estimated
Quantity
Unit Price
Total
General Items
1
Mobilization, Overhead and Construction Staking LS 1
$ 500.00 $ 500.00
General Items Subtotal $ 500.00
Public Sidewalk
2 Demolish & Remove Existing Concrete Sidewalk, complete in place SF 526 $ 2.00 $
1,052.00
3 Concrete Sidewalk, complete in place SF 140 $ 4.50 $
630.00
4 ADA Ramps - Detectable Warning Surfaces, complete in place EA 4 $ 600.00 $
2,400.00
Public Sidewalk Items Subtotal $
4,082.00
TOTAL CONSTRUCTION $ 4,582.00
r -,".f
SCHULTZ ENGINEERING, LLC.
Page 1 of 1
7,15
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
Castlegate II Community Center
Public Sidewalk Construction
Engineer's Estimate of Construction
Item
Description
Unit
Estimated
Quantity
Unit Price
Total
General Items
1 Mobilization, Overhead and Construction Staking
LS 1
1 $ 500.00 $ 500.00
General Items Subtotal $ 500.00
Public Sidewalk
2 Demolish & Remove Existing Concrete Sidewalk, complete in place
SF 526 $ 2.00 $
1,052.00
3 Concrete Sidewalk, complete in place
SF 140 $ 4.50 $
630.00
4 ADA Ramps - Detectable Warning Surfaces, complete in place
EA 4 $ 600.00 $
2,400.00
Public Sidewalk Items Subtotal $
41082.00
TOTAL CONSTRUCTION $ 4,582.00
r-ICq<T
SCHULTZ ENGINEERING, LLC.
Page 1 of 1
7,15
10 U 20
SCALE IN FEET Af
A
c0xa¢ie .,Axro PLI V
b
E O 3R
7,
eoeTtOumP a
6• SIDE WALLSi
su-rrne.l-e
AREA INL r
11.1
LEGEND
GRAVEL BAC
� GRAVEL BA
NDTE:
TEMPORARY DEVICES AROUND STORM DRAINS ARE USED i DETAIN AND/OR
EI H E )HFUER SEDIMENT -LADEN RUNOFF. THE
PROTECTIONSHALLOWS SEDIMENT MENT TO SETTLE PRIOR TO DISCHARGE INTO A STORM DRAIN INLET OF CATCH BASiN,
GRAVEL BAGS SHALL BE UV RESISTANT AND MUST NOT DEGRADE DUE TO ATMOSPHERIC CONDITIONS. GRAVEL BAGS
SHALL REPLACED UPON PSIGN OF DETERIORATION. GRAVEL BAGS SHALL BE INSTALLED k MONITORED
THROUGHOUT THE PROJECT UPON
INSTALLATION OF AN INLET.
, GRAVEL BAGS TO BE FILLED WITH CLEAN 3/4' OR LESS GRAVEL.
STORM DRAIN INLET PROTECTION
N:1'.S
As�OA®6 Avutr
9LT R%£ AAn/OR �
74
ax
xArwul w i rF D
oPEc
w
4 xt Yd. Da.a 4 I .. •.
t
SILT rENCE ASSEMBLY
( a Cl.OI—E AsiOtte) uvER
3 SAVE sW� E 60' iO I"
FOOTALE
n0.E.3xAna
5TGNE IS o ecEu' n
MucnwFROM iv`iR
FAee�c FROAc£Ri RIIG W
siaEErs.
•"v'Yzs ic6c a
aix
ceL
CONSTRUCTION EXIT SILT CONTROL
N.T.S
,. K oolPTn�a Iles! aaxGa ]iff�u.V[e�w OM oFxviY%s oc r n M ewmwn P�Clae Tm
As] oe0) ae)�nr n�[nsnnF oox,Drt nau menu uas],aF wmwr ro 4x xewc na oPranni IUKnwl
nE sraEr mcxra-ur 9vz1 s mPACEa ro ass o£ ME Rwmnnl mr DD,sm.
L
THE-- ME CONC(Ert SFffL4X$ SWLL BE CdnACiEO A. 'PFtlOF-RC1IE0'. NA' arAY OR SOFT
AWT WR[ED B! ME'P0.JnF-RMIxG' S,WL BE 0.ElD5TD HA RFPIM
1 HV[KM 0.46+ $IIFQ SiW1 SOi OL® 1Y.IM
a i5E roPOGRIAlr 90x1 K iA)11 fELD SIaM1EY GTA PPFPNYD.
0. SIRLCINiLL BAWEL (tn UNIF! OR Srpx DAbi tRIXUEs K REOUFYD a1GFfR THE iPFHEH IS x1rRw e' OF
PAflfOR nR'SIC—
TIC mOw>m+c iLNtS. WM AMKM](R ro ilff ACR -L
M `—CD CONIGW WMELFII 9pxi A9E MPA0.x4£ldFxE
E IXaY M `—N I—E � ¢�EYAlg1K pUDt
fDR CONSIR101KK1 OF ME SRE xXi1L
]. u]IF ro Pavmrt rvN POA waelmrt oxKravcTDRI BLnns xm xoT¢
l ME CIXtIF/CTOR 9W1 aaYA3( NL TOPaOa Aho TrtPI/cE rt OH ALL OKtURLfO IRFAS ALL PARI[0 wf 19AAD5
/AFA MY[Exf W PI.�G Ab SOEw41( RYAS SWIt RECO,E 6' Waf IAW tnPSpL PpM ro ftIGFT¢ltf
OF OMs3 600 OR HM1nONAfiL
0. Svvl[3 M UIV+V!' PaMO S151DK tO�RgIIE�erdNrA]FR�AIGAD AW Hlr tl@id%N' USES xIERLTTfIXt
to ]Iff eEtFti FEL Pb SHALL HOT IXIDO Bc1Ddb M FA[E Di ME [IIDxO lOIRG110lL
,L 1K IPPiY P0Rn051 tK ALL BMT IXGW501K 9fGRD % BACIYTrm YRM ppA+£FLY
<OlPrelm CUT 5063 t0 THE t[l1PAlxx C•f SIF[ACE YAIE0. A CIAY ilW' 9gLlD BE PRT^DFD x ME
51n00..dE� Mit�ff F sIRIF:1MEWd MMOHUC FXNOr TM FE£T BETb® a 14 IN41—TCIOMEHS,
TRxF
maatzmgs
I . ALL W— 91416E a4vAGE0 AM SN—E0 i[R NNSE
i [A]0ll ALL PROPo9D PA¢ wT t4A103 xM FULL —TH
TOPSOL
SrCP9 SD1FA KE T As 9VIL 6£ ROPE
51x-33. AStY t J0.H9 PPE MAY Y USED M FVtE Cf —
KG LOPE AAOHro -zat. 1tPE
TIXM1I S.LL W1EE51111 r�PRnPdfD 6itlx YrfA K PRVAIE
AIO 31V11 BE IN3TADID N AttxAnA <[ MM LCUL g1AVbiO
LWiPA01Ms9W1 Mix Y LOCAL elAOx'0 ORKOLs ]IMEE
iFI6A16 flEGF TH BT ME tltt ttawFE aTAMx1
1WM 10 COWtI6R6101pN DF ME STORY 5£xx
l RYA PAER WT BE Gst x PLACE OR PRECAet AVE Aic
Ys-wwwlwREs9�cs�c s�ur�c�aF 3wo Psi �"�
a—ANDRAL BAQ6HL I.Ws AK t%iRYD As AMT iPE]Itll 9:CTAY
12ap1 0R x]1@1 a' 0f PA\Flmrt.
mlmFucTR6RI RnT¢
,. TSE w6racrw n.•: � A[SPoM.'9tE FDR SIRP,na Tiff Quer we zrel a Au DaTPw umucPnw Pram¢
6DMG10N a TIE ulalrc cowuaF_s 4e Ions x Anaxx a wKiRllclml rs RmzRm.
6n TEss eao) us -am
ARFFns u+ER6 : n4-ssos
StCODi l!e( N16R6aCx1xNS 0a Sa3-2420
s sat. wv ez,-nw
2 [ K THE CttRWLTgt ro VSE [MTMF IS 5 IECESS4Yf TO I@56ZE FFOSOR NO PF£9if
�Y➢eE6R FRO- tE6N] THE FR0.4et 9TE 1H5 BiL10Ee ME NsfNUiOH OF A WNsiPo1Ci1 A pvr ASID Rr FOKF
IFCF3StAY.
1 ME Obit T. K R6NIISHE fM BrsPL<INO AND W81IAxP0 TRY [AOSWi A'0 SEpSYM Cttf11gL Ofl%FS
IM5 9W1 I%MC fl4Rf ,4 ax NO MER flFA/ WNFNL E\4Rr CP ,/z• qi ME WHIPIerPi
PdT£ ILL Yt0 [OV9rw ON THE Mi:![NT SrFSEK AS A aF61Ai F THE COWT—I YLRE OF 116 PRhffCi.
a CMEtt6'ILPCIplIOSRfIErsSR£ i0 YMTAn ME TiD6 0E]iF➢!1. PERIar W. 1>R 160000 RFDwtEYEN15 FOR
a ME canwcroa 95YL T6xoc ME rRo90x mllnaal 5[ASLss aHtt puts K mramlm.
a 6aE] MOlEC11Ct1 ro 6E x59UID AT ALL P ILO EainxO Nkte AQSYAT TO THE PROECr SRE
VICINITY MAP
Schultz Engineering, LLC
THE SEAL NT APPEARING ON D ISB
DOCUMENT WAS AUTHORIZED tT'
JOSEPH P. S P.E. LICENSE
2730 Longmire, s9keA
ON MA,
N0. 65889 ON MARCH 27, 2013.
college station, Texas77845
-979.764.3900 TOPE N0.12327
ISSUED FOR REVIEW
SURVEYED DESIGNED DRAIVN A"' OVED JOBNO.
DAIS
KERR JPS JKO JPS 12-220
MARCH 2013
As�OA®6 Avutr
9LT R%£ AAn/OR �
74
ax
xArwul w i rF D
oPEc
w
4 xt Yd. Da.a 4 I .. •.
t
SILT rENCE ASSEMBLY
( a Cl.OI—E AsiOtte) uvER
3 SAVE sW� E 60' iO I"
FOOTALE
n0.E.3xAna
5TGNE IS o ecEu' n
MucnwFROM iv`iR
FAee�c FROAc£Ri RIIG W
siaEErs.
•"v'Yzs ic6c a
aix
ceL
CONSTRUCTION EXIT SILT CONTROL
N.T.S
,. K oolPTn�a Iles! aaxGa ]iff�u.V[e�w OM oFxviY%s oc r n M ewmwn P�Clae Tm
As] oe0) ae)�nr n�[nsnnF oox,Drt nau menu uas],aF wmwr ro 4x xewc na oPranni IUKnwl
nE sraEr mcxra-ur 9vz1 s mPACEa ro ass o£ ME Rwmnnl mr DD,sm.
L
THE-- ME CONC(Ert SFffL4X$ SWLL BE CdnACiEO A. 'PFtlOF-RC1IE0'. NA' arAY OR SOFT
AWT WR[ED B! ME'P0.JnF-RMIxG' S,WL BE 0.ElD5TD HA RFPIM
1 HV[KM 0.46+ $IIFQ SiW1 SOi OL® 1Y.IM
a i5E roPOGRIAlr 90x1 K iA)11 fELD SIaM1EY GTA PPFPNYD.
0. SIRLCINiLL BAWEL (tn UNIF! OR Srpx DAbi tRIXUEs K REOUFYD a1GFfR THE iPFHEH IS x1rRw e' OF
PAflfOR nR'SIC—
TIC mOw>m+c iLNtS. WM AMKM](R ro ilff ACR -L
M `—CD CONIGW WMELFII 9pxi A9E MPA0.x4£ldFxE
E IXaY M `—N I—E � ¢�EYAlg1K pUDt
fDR CONSIR101KK1 OF ME SRE xXi1L
]. u]IF ro Pavmrt rvN POA waelmrt oxKravcTDRI BLnns xm xoT¢
l ME CIXtIF/CTOR 9W1 aaYA3( NL TOPaOa Aho TrtPI/cE rt OH ALL OKtURLfO IRFAS ALL PARI[0 wf 19AAD5
/AFA MY[Exf W PI.�G Ab SOEw41( RYAS SWIt RECO,E 6' Waf IAW tnPSpL PpM ro ftIGFT¢ltf
OF OMs3 600 OR HM1nONAfiL
0. Svvl[3 M UIV+V!' PaMO S151DK tO�RgIIE�erdNrA]FR�AIGAD AW Hlr tl@id%N' USES xIERLTTfIXt
to ]Iff eEtFti FEL Pb SHALL HOT IXIDO Bc1Ddb M FA[E Di ME [IIDxO lOIRG110lL
,L 1K IPPiY P0Rn051 tK ALL BMT IXGW501K 9fGRD % BACIYTrm YRM ppA+£FLY
<OlPrelm CUT 5063 t0 THE t[l1PAlxx C•f SIF[ACE YAIE0. A CIAY ilW' 9gLlD BE PRT^DFD x ME
51n00..dE� Mit�ff F sIRIF:1MEWd MMOHUC FXNOr TM FE£T BETb® a 14 IN41—TCIOMEHS,
TRxF
maatzmgs
I . ALL W— 91416E a4vAGE0 AM SN—E0 i[R NNSE
i [A]0ll ALL PROPo9D PA¢ wT t4A103 xM FULL —TH
TOPSOL
SrCP9 SD1FA KE T As 9VIL 6£ ROPE
51x-33. AStY t J0.H9 PPE MAY Y USED M FVtE Cf —
KG LOPE AAOHro -zat. 1tPE
TIXM1I S.LL W1EE51111 r�PRnPdfD 6itlx YrfA K PRVAIE
AIO 31V11 BE IN3TADID N AttxAnA <[ MM LCUL g1AVbiO
LWiPA01Ms9W1 Mix Y LOCAL elAOx'0 ORKOLs ]IMEE
iFI6A16 flEGF TH BT ME tltt ttawFE aTAMx1
1WM 10 COWtI6R6101pN DF ME STORY 5£xx
l RYA PAER WT BE Gst x PLACE OR PRECAet AVE Aic
Ys-wwwlwREs9�cs�c s�ur�c�aF 3wo Psi �"�
a—ANDRAL BAQ6HL I.Ws AK t%iRYD As AMT iPE]Itll 9:CTAY
12ap1 0R x]1@1 a' 0f PA\Flmrt.
mlmFucTR6RI RnT¢
,. TSE w6racrw n.•: � A[SPoM.'9tE FDR SIRP,na Tiff Quer we zrel a Au DaTPw umucPnw Pram¢
6DMG10N a TIE ulalrc cowuaF_s 4e Ions x Anaxx a wKiRllclml rs RmzRm.
6n TEss eao) us -am
ARFFns u+ER6 : n4-ssos
StCODi l!e( N16R6aCx1xNS 0a Sa3-2420
s sat. wv ez,-nw
2 [ K THE CttRWLTgt ro VSE [MTMF IS 5 IECESS4Yf TO I@56ZE FFOSOR NO PF£9if
�Y➢eE6R FRO- tE6N] THE FR0.4et 9TE 1H5 BiL10Ee ME NsfNUiOH OF A WNsiPo1Ci1 A pvr ASID Rr FOKF
IFCF3StAY.
1 ME Obit T. K R6NIISHE fM BrsPL<INO AND W81IAxP0 TRY [AOSWi A'0 SEpSYM Cttf11gL Ofl%FS
IM5 9W1 I%MC fl4Rf ,4 ax NO MER flFA/ WNFNL E\4Rr CP ,/z• qi ME WHIPIerPi
PdT£ ILL Yt0 [OV9rw ON THE Mi:![NT SrFSEK AS A aF61Ai F THE COWT—I YLRE OF 116 PRhffCi.
a CMEtt6'ILPCIplIOSRfIErsSR£ i0 YMTAn ME TiD6 0E]iF➢!1. PERIar W. 1>R 160000 RFDwtEYEN15 FOR
a ME canwcroa 95YL T6xoc ME rRo90x mllnaal 5[ASLss aHtt puts K mramlm.
a 6aE] MOlEC11Ct1 ro 6E x59UID AT ALL P ILO EainxO Nkte AQSYAT TO THE PROECr SRE
VICINITY MAP
CASTLEGATE II GRADING, DRAINAGE, &TIG�SCALE A SHEET
1 x../..................1`r.
„.P;.n COMMUNITY CENTER ��
6 NORWICH DRIVE EROSION & SEDIMENT HORIZONTAL 1•=20'
COMMON AREA —CASTLEGATE II SUBDIVISION CONTROL PLAN PLOTTING SCALE: 1:1
FIRM 111 i232
SCHULR ENGINEEPoNO, NG, LED LLC SECTION 200, COLLEGE STATION rTLENa.Ie 12-220
„Hr aye,
.�•
. L
l'e 1
t►
-c►
•"nye.µ-`'��•I i�I11rp
I
CASTLEGATE II GRADING, DRAINAGE, &TIG�SCALE A SHEET
1 x../..................1`r.
„.P;.n COMMUNITY CENTER ��
6 NORWICH DRIVE EROSION & SEDIMENT HORIZONTAL 1•=20'
COMMON AREA —CASTLEGATE II SUBDIVISION CONTROL PLAN PLOTTING SCALE: 1:1
FIRM 111 i232
SCHULR ENGINEEPoNO, NG, LED LLC SECTION 200, COLLEGE STATION rTLENa.Ie 12-220
Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
March 29, 2013
Alan Gibbs, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
RE: Letter Aeknowledging City Standards — Castlegate II Community Center
Dear Mr. Gibbs:
The purpose of this letter is to acknowledge that the construction plans for the public
sidewalk improvements for the above -referenced project, to the best of my knowledge, do
not deviate from the B/CS Design Guideline Manual.
I also acknowledge that, to the best of my knowledge, the details provided in the
construction plans are in accordance with the B/CS Standard Details.
Sincerely,
Jr seph P. Schultz, P.E.
Civil Engineer
/ gV, OF '
*J' .
.a%.j
.i.#..,..........i11t.....** ith
JOSEPH P. SCHULIZ
865889
F-12327
SCHULTZ ENGINEERING, LLC,
P.O. Box 11995 • College Station, Texas 77842
schultzengineeringllc.com
March 29, 2013
Danielle Singh, P.E.
Civil Engineer
City of College Station
1101 Texas Avenue
College Station, Texas 77840
Re: Castlegate II Community Center (SP) — 13-00900034
Pond A Drainage Report Letter
Dear Ms. Singh:
4Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
This project results in minor decreases in Pond A volume (decreases shown below), which have a
minor impact on the pond outflow and no increase in pond water surface elevation. A revised HEC -
HMS Analysis was performed on the system using the decreased volumes resulting in a 0.6 cfs increase
in the pond outflow and no increase in the Pond A 100 -year water surface elevation (311.70') for a
fully functioning outfall or (314.70') for a blocked outfall. There are no negative effects of the minor
filling of the pond area on the adjacent properties. Refer to Appendix A for the previous As -built
Report for Pond A.
Elevation
Decrease in
Volume
FT
AC -FT
308.5
0
309.00
0.0043
310.00
0.0261
311.00
0.0609
312.00
0.1068
314.00
0.1413
314.50
0.1443
315.00
0.1473
If you have any questions, please do not hesitate to call.
Sincerely,
Schultz Engineering, LLC.
�k"
JoPm
chultz, P.E.
Mger/Civil Engineer
1 1 &iJLT'
SCHULIZ ENG(NEERIN0, LLC.
P.O. Box 11995 • College Station, Texas 77842
schultzengineeringllc.com
_(3
Appendix A
Addendum #1 for Detention System Report
Castlegate H Subdivision, Section 200
College Station, Texas
Reflecting As -built Conditions Following Construction
ADDENDUM #1 FOR
DETENTION SYSTEM REPORT
CASTLEGATE II SUBDIVISION, SECTION 200
COLLEGE STATION, TEXAS
Reflecting As Built Conditions following Construction
OCTOBER 2011
Prepared by:
Phillips Engineering
4490 Castlegate Drive
College Station, Texas 77845
(979) 690-3141
TBPE Firm #13130
�P-es OF Jr�
ADDENDUM #1
Revisions to Drainage Model resulting from In -the -Field Modifications
During the construction phase of Section 200 in Castlegate II, three significant modifications were made to
the detention system design that had potential for changing the results predicted by the HEC -HMS computer
model previously described in the Drainage Report. These modifications were input into the model and re-
analyzed to determine what effect they had on the system. The three changes made to the design were:
Increase in the size of Detention Pond A — Following discussions with the city staff, it was determined
that the existing FEMA Floodplain lines had strong impacts on the ability to develop the land adjoining
the original pond boundaries. To address this situation and facilitate future development of the property,
the southeastern boundary of the detention pond and its corresponding Common Area Boundary was
moved outward to the existing FEMA Floodplain line. The northwest boundary of the pond adjacent to
the city park property was not changed. The resulting pond is approximately 0.40 acres larger than the
original at elevation 312.0. This increased size produces an additional 1.42 ac -ft of storage or about 15%
more than the original pond design. The change in shape also required one of the inflow pipes to be
rerouted to align with future lot lines planned in the area adjacent to the pond.
2. The shape of the outlet control structure on the existing pond in Castlegate was modified from a step
weir configuration to a straight wall configuration — This modification was necessary as a result of in -
the -field constraints that were not accounted for in the original design.
Reduced excavation downstream of WS Phillips Parkway — The area immediately downstream of WS
Phillips Parkway was originally planned for excavation in order to increase storage capacity available
during peak flow periods. As construction neared completion, it became evident the additional
excavation was not needed due to the pond enlargement described in #1 above. The area was cleared
and shaped, but no significant excavation was performed except around the flume connecting the box
culverts on WS Phillips with the existing pool in Castlegate.
Summary of Results
The Post -development flowrates were re -analyzed at the same point immediately downstream of the outlet
control structure of the existing detention pond near Castlegate Drive. The revised results are shown below:
Location
Study Pt A2 Castlegate Drive
(original design results)
Pre-Dev
Post Dev
448.8 cfs
448.8 cfs
383.8 cfs
405.3 cfs
Max. WSEL — Mod. Castlegate Pond (peak 100 yr)
Max. WSEL — Mod. Castlegate Pond (blocked)
Top of Berm — Mod. Castlegate Pond
Max. WSEL — Pond A (peak 100 yr)
Max. WSEL — Pond A (blocked)
Low Pt of WS Phillips Pkwy
Reduction
65.0 cfs
43.5 cfs
As -Built
Or_ iginal
= 309.30
309.10
= 309.80
309.80
= 310.50
310.50
311.70 311.70
314.70 * 314.70
314.03 314.03
As demonstrated above, the three modifications made over the course of the construction project show a
slight decrease in the peak flowrate released from the original design and a slight increase in the WSEL of
the Castlegate Pond. The new WSEL is still more than 1 foot below the Top of Berm level in the pond as
required by the BCS Design Guidelines. From these results we conclude that no adverse effects will result
from the three as -built modifications described above.
March 29, 2013
Danielle Singh, P.E.
Civil Engineer
City of College Station
1101 Texas Avenue
College Station, Texas 77840
Re: Castlegate II Community Center (SP) —13-00900034
Pond A Drainage Report Letter
Dear Ms. Singh:
Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
This project results in minor decreases in Pond A volume (decreases shown below), which have a
minor impact on the pond outflow and no increase in pond water surface elevation. A revised HEC -
HMS Analysis was performed on the system using the decreased volumes resulting in a 0.6 cfs increase
in the pond outflow and no increase in the Pond A 100 -year water surface elevation (311.70') for a
fully functioning outfall or (314.70') for a blocked outfall. There are no negative effects of the minor
filling of the pond area on the adjacent properties. Refer to Appendix A for the previous As -built
Report for Pond A.
Elevation
Decrease in
Volume
FT
AC -FT
308.5
0
309.00
0.0043
310.00
0.0261
311.00
0.0609
312.00
0.1068
314.00
0.1413
314.50
0.1443
315.00
0.1473
If you have any questions, please do not hesitate to call.
Sincerely,
Schultz Engineering, LLC.
Jo kl--L-
,
P.E.
M' nager/Civil Engineer
I IAOff
SCHULTZ ENGINEERING, LLG,
P.O. Box 11995 - College Station, Texas 77842
schultzengineeringllc.com
_t3
Appendix A
Addendum #1 for Detention System Report
Castlegate II Subdivision, Section 200
College Station, Texas
Reflecting As -built Conditions Following Construction
ADDENDUM #1 FOR
DETENTION SYSTEM REPORT
CASTLEGATE II SUBDIVISION, SECTION 200
COLLEGE STATION, TEXAS
Reflecting As Built Conditions following Construction
OCTOBER 2011
Prepared by.-
Phillips
y:Phillips Engineering
4490 Castlegate Drive
College Station, Texas 77845
(979) 690-3141
TBPE Firm #13130
ADDENDUM #1
Revisions to Drainage Model resulting from In -the -Field Modifications
During the construction phase of Section 200 in Castlegate II, three significant modifications were made to
the detention system design that had potential for changing the results predicted by the HEC -HMS computer
model previously described in the Drainage Report. These modifications were input into the model and re-
analyzed to determine what effect they had on the system. The three changes made to the design were:
Increase in the size of Detention Pond A — Following discussions with the city staff, it was determined
that the existing FEMA Floodplain lines had strong impacts on the ability to develop the land adjoining
the original pond boundaries. To address this situation and facilitate future development of the property,
the southeastern boundary of the detention pond and its corresponding Common Area Boundary was
moved outward to the existing FEMA Floodplain line. The northwest boundary of the pond adjacent to
the city park property was not changed. The resulting pond is approximately 0.40 acres larger than the
original at elevation 312.0. This increased size produces an additional 1.42 ac -ft of storage or about 15%
more than the original pond design. The change in shape also required one of the inflow pipes to be
rerouted to align with future lot lines planned in the area adjacent to the pond.
2. The shape of the outlet control structure on the existing pond in Castlegate was modified from a stet,
weir confleuration to a straight wall configuration — This modification was necessary as a result of in -
the -field constraints that were not accounted for in the original design.
Reduced excavation downstream of WS Phillips Parkway — The area immediately downstream of WS
Phillips Parkway was originally planned for excavation in order to increase storage capacity available
during peak flow periods. As construction neared completion, it became evident the additional
excavation was not needed due to the pond enlargement described in #1 above. The area was cleared
and shaped, but no significant excavation was performed except around the flume connecting the box
culverts on WS Phillips with the existing pool in Castlegate.
Summary of Results
The Post -development flowrates were re -analyzed at the same point immediately downstream of the outlet
control structure of the existing detention pond near Castlegate Drive. The revised results are shown below:
Location Pre-Dev Post Dev Reduction
Study Pt A2 Castlegate Drive 448.8 cfs
(original design results) 448.8 cfs
Max. WSEL — Mod. Castlegate Pond (peak 100 yr)
Max. WSEL — Mod. Castlegate Pond (blocked)
Top of Berm — Mod. Castlegate Pond
Max. WSEL — Pond A (peak 100 yr)
Max. WSEL — Pond A (blocked)
Low Pt of WS Phillips Pkwy
383.8 cfs
65.0 cfs
405.3 cfs
43.5 cfs
As -Built
Ori
= 309.30
309.10
= 309.80
309.80
= 310.50
310.50
= 311.70
311.70
= 314.70 * 314.70
= 314.03
314.03
As demonstrated above, the three modifications made over the course of the construction project show a
slight decrease in the peak flowrate released from the original design and a slight increase in the WSEL of
the Castlegate Pond. The new WSEL is still more than 1 foot below the Top of Berm level in the pond as
required by the BCS Design Guidelines. From these results we conclude that no adverse effects will result
from the three as -built modifications described above.
FLOODPLAIN FILL REPORT FOR
CASTLEGATE II COMMUNITY CENTER
COLLEGE STATION, TEXAS
March 2013
Prepay_ ed By
k
tz Engineering, LLC
TBPE Firm No. 12327
P.O. Box 11995
College Station, TX 77842
2730 Longmire Drive, Suite A
College Station, Texas 77845
(979) 764-3900
The proposed Community Center site is located in an area designated as a Special Flood Hazard
Zone. The site was previously filled, and this project will require a small amount of additional
fill material placement. The previously placed fill was accounted for in the as -built certification
and analysis of the detention pond. The additional fill material for the Community Center will
result in a slight decrease in the volume of the pond. The decreased storage volume in the pond
was input into the HEC -HMS Model, and the result was a slight increase in the pond outflow, 0.6
cfs, but no rise in the pond water surface elevation.
The purpose of this report is to address Chapter 13 - Flood Hazard Protection, Section 13-5 —
Special Provisions, E — Special provisions for areas of special flood hazard, I I(a)(1):
a) An increase in the base flood elevations. In the event that base flood elevations are not
known at the time of submitting the information required herein, base flood elevations
must be determined;
The base flood elevations (BITE) for the special flood hazard area ranged from 313.5
to 317.4 prior to the placement of fill. A storm sewer system was constructed in this
area with Section 201. In accordance with the Drainage System Report for
Castlegate II Subdivision, Section 201— Revised February 2010, prepared by
Phillips Engineering, the hydraulic grade line (HGL) in the storm sewer piping
ranged from 313.3 to 314.8 which is lower than the BFE.
b) Creation of additional areas of special flood hazard area;
The base flood elevation did not increase, therefore there was no creation of special
flood hazard area.
c) A loss of conveyance capacity to that part of the special flood hazard area that is not in
the floodway and where the velocity of flow in the base flood event is greater than one
(1) foot per second. This area can also be approximated to be either areas within one
hundred (100) feet of the boundary of the regulatory floodway or areas where the depth
of from the BFE to natural ground is eighteen (18) inches or greater;
The storm sewer system designed and constructed with Section 201 passes the 100 -
year flow in the pipes so adequate conveyance has been provided. There is no loss of
conveyance.
d) A loss of base flood water storage volume to the part of the special flood hazard area that
is beyond the floodway and conveyance area where the velocity of flow in the base flood
is equal to and less than one (1) foot per second without acceptable compensation as set
forth herein. Acceptable compensation for the loss of storage volume requires a
demonstration of cuts and fills, must be mitigated on-site and must demonstrate no net
fill. In general, excavation within the special flood hazard area and below the base flood
elevation is the only acceptable method of mitigation of fill placed below the base flood
elevation in the special flood hazard area;
The loss of base flood water volume was compensated by the construction of the
adjacent stormwater detention pond which created additional storage volume to the
natural condition and resulted in a lowering of the 100 year stormwater surface
elevation.
e) An increase in base flood velocities. In the event the future conditions flood data is
known at the time of submittal, then the future conditions modeling must be used in lieu
of the base flood modeling.
The existing channel has been filled, and the velocities in the storm sewer pipe are at
acceptable levels. The flows in the pipes are based on future conditions.
5CHULTZ ENGINEERING, LLC.