Loading...
HomeMy WebLinkAboutCORRESPONDENCESchultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 July 17, 2017 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas RE: Letter Acknowledging City Standards — Meadow Creek Subdivision — Phase 4B Dear Mr. Gibbs: The purpose of this letter is to acknowledge that the construction plans for the water line for the above - referenced project, to the best of my knowledge, do not deviate from the B /CS Design Guideline Manual. I also acknowledge that, to the best of my knowledge, the details provided in the construction plans are in accordance with the B /CS Standard Details. Sincerely, Jo WP.chultz, E. Civil Engineer A ## #iiN #NAi #i• # #•"Alt JOSEPH P. SCHULTZ sifii # # #•M# # # # #ii #•iii #i #iii 65889 t�NA1.. 7 I7 —(2 F -12327 5CHULTZ ENGINEERING, LLC. P.O. Box 11995 i College Station, Texas 77842 schultzengineedngllc.com (*41 CITY OF COLLEGE STATION Planning d Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 7, 2012 l i� TO: BCS Development; via email: french @stylecraft- builders.com V/ FROM: Danielle Singh, Graduate Civil Engineer SUBJECT: Engineering Document Comments for Meadowcreek Phase 5 Staff reviewed the above - mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review and approval of the plans: One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Schultz Engineering, LLC.; via email: joeschultz84 @verizon.net Case File No. 12- 00500153 ENGINEERING COMMENTS NO. 2 1. Please provide a Notice of Intent. 2. Please provide BTU's electrical /street light layout with the next submittal. 3. On sheet 4, the ADA ramp labels do not point to the actual ramps. 4. On sheet 5, please label the street slopes on Carriker Court. 5. On sheet 6, please specify that the channels are concrete in the plan view. 6. On sheet 8, pipe 304, please show the sanitary sewer crossing in the profile view. 7. On sheet 9, the minimum slope for a concrete flume in a detention pond is 0.5 %. Please revise the design to meet these criteria. 8. Please coordinate this construction with the sanitary sewer service provider. 9. Before the plat can be filed, a letter will need to be issued from Wellborn Water certifying that all required water line and sanitary sewer infrastructure needed to serve this development has been built and accepted. 10. Please be aware that the BCS Design Guidelines require that fire flow tests be performed once the infrastructure has been completed to verify that the hydrants /system meets minimum requirements. 11. All street and drainage infrastructure will need to be accepted by the County. All County requirements must be met prior to the plat being filed for record with the County courthouse. Reviewed by: Danielle Singh Date: 8/06/2012 Schultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 August 10, 2012 Danielle Singh Graduate Civil Engineer City of College Station 1101 Texas Avenue College Station, TX 77840 Re: Meadowcreek Ph. 5 Construction Plans - 12- 00500153 Dear Ms. Singh: Attached are 1 revised set of construction documents and the response to staff comments. If you have any questions, please do not hesitate to call. Very truly yours, P.O. Box 11995 • College Station, Texas 77842 schultzengineeringllc.com Schultz Engineering, LLC. 4 Schultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 August 22, 2012 Danielle Singh Graduate Civil Engineer City of College Station 1101 Texas Avenue College Station, TX 77840 Re: Meadowcreek Ph. 5 Construction Plans - 12- 00500153 Dear Ms. Singh: Attached are 4 additional sets of construction documents for the above referenced project. If you have any questions, please do not hesitate to call. Very truly yours, Schultz Engineering, LLC. 431 r Joe S ultz, P.E. Civil Engineer P.O. Box 11995 • College Station, Texas 77842 schultzengineeringllc.com J �- Q Q Z J I a 1 &G Z O r d Z� p 0 s s Qv LO O�Cr r N U Y n _ I..L Y W W U O 0 Q W S W Od, W W M O os m N ON M �r C a W O rl M � M W N 0 Wr N W W � 0 OG S� U GP s Qv LO O�Cr r N U Y n _ I..L Y W W U O 0 Q W S W Od, W 9� d Off, s Qv LO O�Cr r N U Y n _ I..L Y W W U O 0 Q W S W W Z Lli a W O J W W 0 Nw LL. G b. 8 - "A0 n Ile LU LLI fy C) 3: 0 LIJ 2 III LLJ Im o LLI ui 7 - n 0 1 LLI LLJ r) Oaa -A) LEE : = aleog 1�7 O L 3 ..Lb .Lb oZb N 09L 3..£L .ZL oLb S Ob'BZ£ L M ..E l .Z L oLb N bZ 9 L l 3 ..Lb .Lb oZb N 009 AA., LZ .L£ oZb S £Z 9L 3 ..EL .ZL oLb S 99'99£ 3 ..£ L .Z L oLb S ZZ GL L M ..Lb .Lb ,Zb S 6L'OZL M..Lb.Lb oZb S LZ 09L 3..£L .ZL oLb S 09 3 ..£ L .ZL oLb S OZ L£'Ob 3 X17,6 L o179 S 6L'99 3 ..Lb .Lb oZb N 6L 09 3 ..£ l .ZL oLb S 0£3..£L.ZL S 9L 0LL N E9'LZ3.117117 ,ZbN LL OLM..EL.ZLo Lt N LL'Z6 3 ..ZZ .Ob .69 S 9L 09 3 ..Lb .Lb oZb N L1710E 3 ..Lb .Lb oZb N 9L 0 1 3 ..£ L .Z L aLb S 99Z 3 ..EL .Z eLb S bL 9ZL 3 ..Lb .Lb 217 N £L ZL ll 0 6 9 L 9 9 b E Z L v CITY OF C0J.J F'GR STATION Home of Texas A&M University* FOR OFFICE USE ONLY CASE NO.: I - IS 3 DATE SUBMITTED: S TIME: ,, V10 STAFF: PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. ❑ New Project Submittal ❑ Incomplete Project Submittal - documents needed to complete an application. Case No.: ❑x Existing Project Submittal. Case No.: 12- 00500153 Project Name Meadowcreek Subdivision Phase 5 Contact Name Joe Schultz, P.E. Phone Number 979 - 764 -3900 We are transmitting the following for Planning & Development Services to review and comment (check all that apply): ❑ Comprehensive Plan Amendment ❑ ❑ Rezoning Application ❑ ❑ Conditional Use Permit ❑ ❑ Preliminary Plan ❑ ❑ Final Plat ❑ ❑ Development Plat ❑ ❑ Site Plan ❑ ❑ Special District Site Plan 1XI ❑ Special District Building / Sign ❑ Landscape Plan Non - Residential Architectural Standards Irrigation Plan Variance Request Development Permit Development Exaction Appeal FEMA CLOMA /CLOMR /LOMA /LOMR Grading Plan Other - Please specify below Acceptance letters from Brazos County, Wellborn SUD and Meadow Creek Sewer Co. INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete The following are included in the complete set: ❑ Comprehensive Plan Amendment ❑ ❑ TxDOT Driveway Permit ❑ ❑ TxDOT Utility Permit ❑ ❑ Drainage Letter or Report ❑ ❑ Fire Flow Analysis ❑ Special Instructions: ;et. Waterline Construction Documents Sewerline Construction Documents Street Construction Documents Easement Application Other - Please specify 10/10 Print Farm BRAZOS COUNTY ROAD AND BRIDGE DEPARTMENT R. Alan Munger, PE, CFAf, County Engineer Lloyd w Comminioner ('mina I S AMMY CRIAlow commission-T Pncinct 2 Duane Peters, County Judge K Nwlatd, Cominizioaff N—nz I sna C ao j ey. Pmcinci 4 Ma� Schultz Engineering, LLC P.O. Box 11995 College Station, Texas 77842 Re: Final Plat of Meadowcreek Subdivision Phase 5 12.722 Acres, Samuel Davidson League, A-13 College Station ETJ, Brazos County, Texas On Tuesday, May 7, 2013, the Brazos County Commissionere Court approved the referenced plat as submitted. If further information is required please contact us at 979-822-2127, Best regards R. Alan Munger, P.E. County Engineer Mes&wcmek Ph 5-final plat cc: Office File(s) 2617 Highway 21 West Bryan,'I'mm 77803 Office (979)822-21271 Fax (979)775-0453 Joe Schultz From: Stephen Cast <wsud.sc @verizon.net> Sent: Monday, May 13, 2013 11:12 AM To: Joe Schultz Subject: Re: Meadowcreek - Phase 5 Joe Schultz, The water lines for Meadowcreek Phase 5 have been accepted by Wellborn Special Utility District. Stephen Cast General Manager Wellborn SUD - - - -- Original Message - - - -- From: Joe Schultz To: Stephen Cast Sent: Monday, May 13, 2013 11:05 AM Subject: Meadowcreek - Phase 5 Stephen, Has the waterline for Meadowcreek — Phase 5 been approved and accepted by Wellborn SUD? Thanks Joe Joe Schultz, P.E. Schultz Engineering, LLC 2730 Longmire, Suite A College Station, TX 77845 Office 979.764.3900 1 Meadow Creek Sewer Co. P.O. Box 279 New Waverly, Texas 77358 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas Re: Meadow Creek Subdivision — Phase 5 Dear Mr. Gibbs: The sanitary sewer system for the Meadowcreek Subdivision — Phase 5 has been approved and accepted by Meadow Creek Sewer Co. If you have any questions or need additional information, please do not hesitate to call. Very truly yours, Meadow Creek Sewer Co. Date