HomeMy WebLinkAboutCORRESPONDENCESchultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
July 17, 2017
Alan Gibbs, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
RE: Letter Acknowledging City Standards — Meadow Creek Subdivision — Phase 4B
Dear Mr. Gibbs:
The purpose of this letter is to acknowledge that the construction plans for the water line
for the above - referenced project, to the best of my knowledge, do not deviate from the
B /CS Design Guideline Manual.
I also acknowledge that, to the best of my knowledge, the details provided in the
construction plans are in accordance with the B /CS Standard Details.
Sincerely,
Jo WP.chultz, E.
Civil Engineer
A ## #iiN #NAi #i• # #•"Alt
JOSEPH P. SCHULTZ
sifii # # #•M# # # # #ii #•iii #i #iii
65889
t�NA1..
7 I7 —(2
F -12327
5CHULTZ ENGINEERING, LLC.
P.O. Box 11995 i College Station, Texas 77842
schultzengineedngllc.com
(*41
CITY OF COLLEGE STATION
Planning d Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
August 7, 2012 l i�
TO: BCS Development; via email: french @stylecraft- builders.com V/
FROM: Danielle Singh, Graduate Civil Engineer
SUBJECT: Engineering Document Comments for Meadowcreek Phase 5
Staff reviewed the above - mentioned engineering documents as requested. The following page
is a list of staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information by any Monday at 10:00 a.m. for further staff
review and approval of the plans:
One (1) set of revised construction documents.
Please note that the Development Permit Balance (Public Infrastructure Review and Inspection
Fee), will be calculated and requested once the construction documents and engineer's
estimates have been reviewed and approved.
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
cc: Schultz Engineering, LLC.; via email: joeschultz84 @verizon.net
Case File No. 12- 00500153
ENGINEERING COMMENTS NO. 2
1. Please provide a Notice of Intent.
2. Please provide BTU's electrical /street light layout with the next submittal.
3. On sheet 4, the ADA ramp labels do not point to the actual ramps.
4. On sheet 5, please label the street slopes on Carriker Court.
5. On sheet 6, please specify that the channels are concrete in the plan view.
6. On sheet 8, pipe 304, please show the sanitary sewer crossing in the profile view.
7. On sheet 9, the minimum slope for a concrete flume in a detention pond is 0.5 %. Please
revise the design to meet these criteria.
8. Please coordinate this construction with the sanitary sewer service provider.
9. Before the plat can be filed, a letter will need to be issued from Wellborn Water certifying
that all required water line and sanitary sewer infrastructure needed to serve this
development has been built and accepted.
10. Please be aware that the BCS Design Guidelines require that fire flow tests be performed
once the infrastructure has been completed to verify that the hydrants /system meets
minimum requirements.
11. All street and drainage infrastructure will need to be accepted by the County. All County
requirements must be met prior to the plat being filed for record with the County courthouse.
Reviewed by: Danielle Singh Date: 8/06/2012
Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
August 10, 2012
Danielle Singh
Graduate Civil Engineer
City of College Station
1101 Texas Avenue
College Station, TX 77840
Re: Meadowcreek Ph. 5 Construction Plans - 12- 00500153
Dear Ms. Singh:
Attached are 1 revised set of construction documents and the response to staff comments.
If you have any questions, please do not hesitate to call.
Very truly yours,
P.O. Box 11995 • College Station, Texas 77842
schultzengineeringllc.com
Schultz Engineering, LLC.
4 Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
August 22, 2012
Danielle Singh
Graduate Civil Engineer
City of College Station
1101 Texas Avenue
College Station, TX 77840
Re: Meadowcreek Ph. 5 Construction Plans - 12- 00500153
Dear Ms. Singh:
Attached are 4 additional sets of construction documents for the above referenced project.
If you have any questions, please do not hesitate to call.
Very truly yours,
Schultz Engineering, LLC.
431 r
Joe S ultz, P.E.
Civil Engineer
P.O. Box 11995 • College Station, Texas 77842
schultzengineeringllc.com
J �-
Q Q
Z J
I a
1 &G
Z
O
r
d
Z�
p 0
s
s
Qv LO
O�Cr r
N
U
Y
n _
I..L
Y
W
W
U
O
0
Q
W S
W
Od,
W
W
M
O os
m N ON
M
�r
C
a
W
O
rl M
�
M W
N 0 Wr
N W
W
�
0
OG
S� U
GP
s
Qv LO
O�Cr r
N
U
Y
n _
I..L
Y
W
W
U
O
0
Q
W S
W
Od,
W
9�
d
Off,
s
Qv LO
O�Cr r
N
U
Y
n _
I..L
Y
W
W
U
O
0
Q
W S
W
W
Z
Lli
a
W
O
J
W
W
0
Nw
LL.
G
b.
8 -
"A0
n
Ile
LU
LLI
fy
C)
3:
0
LIJ
2
III
LLJ
Im
o
LLI
ui
7 -
n
0
1
LLI
LLJ
r)
Oaa -A) LEE : = aleog
1�7
O L 3 ..Lb .Lb oZb N
09L 3..£L .ZL oLb S
Ob'BZ£ L M ..E l .Z L oLb N
bZ
9 L l 3 ..Lb .Lb oZb N
009 AA., LZ .L£ oZb S
£Z
9L 3 ..EL .ZL oLb S
99'99£ 3 ..£ L .Z L oLb S
ZZ
GL L M ..Lb .Lb ,Zb S
6L'OZL M..Lb.Lb oZb S
LZ
09L 3..£L .ZL oLb S
09 3 ..£ L .ZL oLb S
OZ
L£'Ob 3 X17,6 L o179 S
6L'99 3 ..Lb .Lb oZb N
6L
09 3 ..£ l .ZL oLb S
0£3..£L.ZL S
9L
0LL N
E9'LZ3.117117 ,ZbN
LL
OLM..EL.ZLo Lt N
LL'Z6 3 ..ZZ .Ob .69 S
9L
09 3 ..Lb .Lb oZb N
L1710E 3 ..Lb .Lb oZb N
9L
0 1 3 ..£ L .Z L aLb S
99Z 3 ..EL .Z eLb S
bL
9ZL 3 ..Lb .Lb 217 N
£L
ZL
ll
0
6
9
L
9
9
b
E
Z
L
v
CITY OF C0J.J F'GR STATION
Home of Texas A&M University*
FOR OFFICE USE ONLY
CASE NO.: I - IS 3
DATE SUBMITTED: S
TIME: ,, V10
STAFF:
PLANNING & DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Please check one of the options below to clearly define the purpose of your submittal.
❑ New Project Submittal
❑ Incomplete Project Submittal - documents needed to complete an application. Case No.:
❑x Existing Project Submittal. Case No.: 12- 00500153
Project Name Meadowcreek Subdivision Phase 5
Contact Name Joe Schultz, P.E. Phone Number 979 - 764 -3900
We are transmitting the following for Planning & Development Services to review and comment (check all that apply):
❑
Comprehensive Plan Amendment
❑
❑
Rezoning Application
❑
❑
Conditional Use Permit
❑
❑
Preliminary Plan
❑
❑
Final Plat
❑
❑
Development Plat
❑
❑
Site Plan
❑
❑
Special District Site Plan
1XI
❑
Special District Building / Sign
❑
Landscape Plan
Non - Residential Architectural Standards
Irrigation Plan
Variance Request
Development Permit
Development Exaction Appeal
FEMA CLOMA /CLOMR /LOMA /LOMR
Grading Plan
Other - Please specify below
Acceptance letters from Brazos County,
Wellborn SUD and Meadow Creek Sewer Co.
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete
The following are included in the complete set:
❑ Comprehensive Plan Amendment ❑
❑ TxDOT Driveway Permit ❑
❑ TxDOT Utility Permit ❑
❑ Drainage Letter or Report ❑
❑ Fire Flow Analysis ❑
Special Instructions:
;et.
Waterline Construction Documents
Sewerline Construction Documents
Street Construction Documents
Easement Application
Other - Please specify
10/10 Print Farm
BRAZOS COUNTY
ROAD AND BRIDGE DEPARTMENT
R. Alan Munger, PE, CFAf, County Engineer
Lloyd w Comminioner ('mina I
S AMMY CRIAlow commission-T Pncinct 2
Duane Peters, County Judge
K Nwlatd, Cominizioaff N—nz
I sna C ao j ey. Pmcinci 4
Ma�
Schultz Engineering, LLC
P.O. Box 11995
College Station, Texas 77842
Re: Final Plat of Meadowcreek Subdivision Phase 5
12.722 Acres, Samuel Davidson League, A-13
College Station ETJ, Brazos County, Texas
On Tuesday, May 7, 2013, the Brazos County Commissionere Court approved the referenced
plat as submitted.
If further information is required please contact us at 979-822-2127,
Best regards
R. Alan Munger, P.E.
County Engineer
Mes&wcmek Ph 5-final plat
cc: Office File(s)
2617 Highway 21 West Bryan,'I'mm 77803 Office (979)822-21271 Fax (979)775-0453
Joe Schultz
From: Stephen Cast <wsud.sc @verizon.net>
Sent: Monday, May 13, 2013 11:12 AM
To: Joe Schultz
Subject: Re: Meadowcreek - Phase 5
Joe Schultz,
The water lines for Meadowcreek Phase 5 have been accepted by Wellborn Special Utility District.
Stephen Cast
General Manager
Wellborn SUD
- - - -- Original Message - - - --
From: Joe Schultz
To: Stephen Cast
Sent: Monday, May 13, 2013 11:05 AM
Subject: Meadowcreek - Phase 5
Stephen,
Has the waterline for Meadowcreek — Phase 5 been approved and accepted by Wellborn SUD?
Thanks
Joe
Joe Schultz, P.E.
Schultz Engineering, LLC
2730 Longmire, Suite A
College Station, TX 77845
Office 979.764.3900
1
Meadow Creek Sewer Co.
P.O. Box 279
New Waverly, Texas 77358
Alan Gibbs, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
Re: Meadow Creek Subdivision — Phase 5
Dear Mr. Gibbs:
The sanitary sewer system for the Meadowcreek Subdivision — Phase 5 has been approved and
accepted by Meadow Creek Sewer Co.
If you have any questions or need additional information, please do not hesitate to call.
Very truly yours,
Meadow Creek Sewer Co.
Date