Loading...
HomeMy WebLinkAbout12-00500144- 00077914Letter of Completion City Engineer City of College Station College Station, TX DATE: 1/2/2013 RE: COMPLETION OF 2008 Oakwood Trail Sandstone Addition- Lot 5R Dear Sir, The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, TX. This approval and acceptance by the City is Requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to by Al a/ l by their subcontractors as indicated by signatures below. WORK COMPLETED 6" Sewer 217 ft 1" Water Service Owner: Paul Leventis Phone Number: Address: 9007 Sandstone Dr College Station, TX 77845 Signature: ' _ ACC,FP AL City Representative CVl1 4~141L_ Ciky! Enginee WARRANTY DATE 1/2/2013 Contractor: Elliott Construction Phone Number ( 979) fi 0-7071 Address: P.O. Bx 510 Wellborn, TX 77881 Signature: J~ 2008 Oakwood Trail Replat 6" Sanitary Sewer Extension Engineer's Estimate 8/17/2012 Item Quantity unit Description Unit Costs Total Price 1 217 LF 6" Sanitary Sewer line $17.00 $3,689.00 2 1 EA 6" Clean Out $250 $250.00 3 1 EA Water Service Line $1,050.00 $1,050.00 4 1 EA Reconnect Existing SS Service Line $200 $200.00 5 1 LS Erosion Control -(Silt Fence-Hay Bales) 1 $250 $250.00 Total $5,439.00 OF t ~ f~E .~'s roe p,A ~G467d5C ' QOM 005 PAUL. J. L EVEN IlS f~@( Lqi 1}]9a COG;B~a aoSOO f~ k 64716