LETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
PUBLIC WORKS PAGE 01
DATE: - -14--X B
RE; COMPLETION OF
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and i4 affirm their warranty on the work, This approval
and acceptance by the City of the improvements listed below does hereby void the letter,
of guarantee for the listed improvements on the above referenced project,
The one-year warranty is hereby affirmed and agreed to by
and by their subcontractors as Indicated by signatures below,
WORK COMPLETED WARRANTY DATE
r
Owner: ? ' ~ t>~ st n? t LLC- Contricto
Phone Number. 9'1 6 D 100 Phone Number; q'79- &q n- D 71 D
Address: Addro;_ f ~L~
LC-11/ .
Signatu
A TANCE APPROVAL
ity RepmsantatiVe
1-7
SignutUr@;p~~~.~.-~ .
t e.: p
a
Rovis6d 1/.91/07
GREAT OAKS, PHASE IA
M13ESI PROJ 1015-0002
Engineer's Estimate of Construction Costs
July 9, 2012
Item g I e 6rtpriptt ( Dnit ~aaniiiy 't7nit Price j Toiai
Paving Construction
I I
C.learing and Grubbing (ROW Esmts)
Ac
O.b
2,000.0 0 1,200
2
Earthwork
- -
C Y
300
6.60 :,Soo
_
3
6 Lime Stabilized Subgrade (6% by wetght)
S Y (
835
41 3,340;
4
4" Concrete Sidewalk
SF
811
2,839i
3,51
5
6 Crushed Limestone Base
S Y
771
_
12.10p] 912521
6
2 I-MAC Surface Course (mcludingprime coat)
S.Y.
647
11 00 7,117
Paving Subtotal( $25,548
Wtit l Syswm Construction
7 Fire Hydrant Assembly EACH 11 3,250.001 3,250
_
8 Water Service, 1.5" short side (ASTIR D3035, includes 3 EACH 1
Casing) 850.00 850
9 Water Service, 1.5" long side (ASTM D3035, includes 3" EACH 1 3
1.600901 I.1tt70
Erosion Control Construction _
IErosiou Control Plan 8c Sedimentation Control (per Item 1061
10 (includes silt fencing, construction exits, straw bale barriers, 1 S 1 3,500.001 3,500
inlet protection, grass seeding, and any other sedimentation f
5:3
Construction Cost: $34,748
The above construction estimate is based on the engineer's preliminary opinion of probable construction costs. This estimate
constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier
workloads and the degree to which inflation may affect project costs between now and the bid date. During construction,
additional features ma c tc apparent as the work progresses, which will result in an increase in cost.
Jc: 1., lit bertson, PT"! Date
I of2