Loading...
HomeMy WebLinkAbout11-00500193- 0007790901/17/2012 12:19 9797943499 LETTER OF COMPLETION CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS PUBLIC WORKS PAGE 01 DATE: - -14--X B RE; COMPLETION OF Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and i4 affirm their warranty on the work, This approval and acceptance by the City of the improvements listed below does hereby void the letter, of guarantee for the listed improvements on the above referenced project, The one-year warranty is hereby affirmed and agreed to by and by their subcontractors as Indicated by signatures below, WORK COMPLETED WARRANTY DATE r Owner: ? ' ~ t>~ st n? t LLC- Contricto Phone Number. 9'1 6 D 100 Phone Number; q'79- &q n- D 71 D Address: Addro;_ f ~L~ LC-11/ . Signatu A TANCE APPROVAL ity RepmsantatiVe 1-7 SignutUr@;p~~~.~.-~ . t e.: p a Rovis6d 1/.91/07 GREAT OAKS, PHASE IA M13ESI PROJ 1015-0002 Engineer's Estimate of Construction Costs July 9, 2012 Item g I e 6rtpriptt ( Dnit ~aaniiiy 't7nit Price j Toiai Paving Construction I I C.learing and Grubbing (ROW Esmts) Ac O.b 2,000.0 0 1,200 2 Earthwork - - C Y 300 6.60 :,Soo _ 3 6 Lime Stabilized Subgrade (6% by wetght) S Y ( 835 41 3,340; 4 4" Concrete Sidewalk SF 811 2,839i 3,51 5 6 Crushed Limestone Base S Y 771 _ 12.10p] 912521 6 2 I-MAC Surface Course (mcludingprime coat) S.Y. 647 11 00 7,117 Paving Subtotal( $25,548 Wtit l Syswm Construction 7 Fire Hydrant Assembly EACH 11 3,250.001 3,250 _ 8 Water Service, 1.5" short side (ASTIR D3035, includes 3 EACH 1 Casing) 850.00 850 9 Water Service, 1.5" long side (ASTM D3035, includes 3" EACH 1 3 1.600901 I.1tt70 Erosion Control Construction _ IErosiou Control Plan 8c Sedimentation Control (per Item 1061 10 (includes silt fencing, construction exits, straw bale barriers, 1 S 1 3,500.001 3,500 inlet protection, grass seeding, and any other sedimentation f 5:3 Construction Cost: $34,748 The above construction estimate is based on the engineer's preliminary opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During construction, additional features ma c tc apparent as the work progresses, which will result in an increase in cost. Jc: 1., lit bertson, PT"! Date I of2