HomeMy WebLinkAboutLetter of CompletionLETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
DATE: RE: COMPLETION OF IA,i.. -_..P~A S
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by %1ti~.,ec
and by their subcontractors as indicated by signatures below.
WORK COMPLETED
GAj
s
WARRANTY DATE
c
Owner n o& ~y\G ,,,.e,,~ ~(-)Contractor: "A-6W
Phone Number: Phone Number: el. -K" V
Address: X16
Signature:
ACCEPTANCE & APPROVAL
City R6presentafive
Ci E gineer
Address: f U ('00
Signature: _ Revised 1139107
We Rent Storage
Waterline Engineers Preliminary Quantity and Cost Estimate
5/3/2012
ITEM
DESCRIPTION
UNIT
QUANTITY
UNIT COST
EXTENSION
1
PREPARATION: REMOVE AND REPLACE FENCE, RETURN
AFFECTED AREA TO PRE-CONSTRUCTION CONDITION OR
BETTER
L.S.
1
$1,000.00
$1,000.00
2
CUT IN 81X6" TEES - COMPLETE IN PLACE
EA
2
$5,000.00
$10,000.00
3
6"C900 WATERLINE CL200 DR14
L.F.
118
$25.00
$2,950.00
4
6"X11.25 DEG BEND
EA.
1
$250.00
$250.00
5
6"X22.5 DEG BEND
EA.
1
$250.00
$250.00
6
STANDARD FIRE HYDRANTS
EA.
2
$2,750.00
$5,500.00
7
6" GATE VALVE
EA.
2
$400.00
$800.00
8
8" GATE VALVE
EA.
2
$500.00
$1,000.00
TOTAL ESTIMATED CONSTRUCTION COST = $21,750,00
THE SEAL APPEARNG ON THIS DOCUMENT WAS ~Pl t eq ~JY
AUTHORIZED BY MICHAEL G. HESTER, P.E. ON May 3, 2012
RELEASED FOR RECORD
MICHAEL G.~HESTER t
09104
s~ 1,v
HESTER ENGINEERING COMPANY #f S!(a;
-3476