Loading...
HomeMy WebLinkAboutLetter of CompletionLETTER OF COMPLETION CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS DATE: RE: COMPLETION OF IA,i.. -_..P~A S Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to by %1ti~.,ec and by their subcontractors as indicated by signatures below. WORK COMPLETED GAj s WARRANTY DATE c Owner n o& ~y\G ,,,.e,,~ ~(-)Contractor: "A-6W Phone Number: Phone Number: el. -K" V Address: X16 Signature: ACCEPTANCE & APPROVAL City R6presentafive Ci E gineer Address: f U ('00 Signature: _ Revised 1139107 We Rent Storage Waterline Engineers Preliminary Quantity and Cost Estimate 5/3/2012 ITEM DESCRIPTION UNIT QUANTITY UNIT COST EXTENSION 1 PREPARATION: REMOVE AND REPLACE FENCE, RETURN AFFECTED AREA TO PRE-CONSTRUCTION CONDITION OR BETTER L.S. 1 $1,000.00 $1,000.00 2 CUT IN 81X6" TEES - COMPLETE IN PLACE EA 2 $5,000.00 $10,000.00 3 6"C900 WATERLINE CL200 DR14 L.F. 118 $25.00 $2,950.00 4 6"X11.25 DEG BEND EA. 1 $250.00 $250.00 5 6"X22.5 DEG BEND EA. 1 $250.00 $250.00 6 STANDARD FIRE HYDRANTS EA. 2 $2,750.00 $5,500.00 7 6" GATE VALVE EA. 2 $400.00 $800.00 8 8" GATE VALVE EA. 2 $500.00 $1,000.00 TOTAL ESTIMATED CONSTRUCTION COST = $21,750,00 THE SEAL APPEARNG ON THIS DOCUMENT WAS ~Pl t eq ~JY AUTHORIZED BY MICHAEL G. HESTER, P.E. ON May 3, 2012 RELEASED FOR RECORD MICHAEL G.~HESTER t 09104 s~ 1,v HESTER ENGINEERING COMPANY #f S!(a; -3476