HomeMy WebLinkAboutLetter of CompletionLETTER OF COMPLETION
CITY ENGINEER DATE: LA Z Le
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
RE: COMPLETION OF_Uo
Dear Sir:. .
The purpose of our letter is to request that the folio wing iste~ r~~rve ents be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
ls -
The one-year warranty is hereby affirmed and agreed to by 5 f AT
and by their subcontractors as indicated by signatures below.
WORK COMPLETED
~ e .
WARRANTY DATE
-G- ,
~ ~ ZC" -
A"
Owner: ;
.°s ontractor:
Phony umber Phone Number:
'1
Address
Address:
Signatureyfi'
ACCEPTANCE & APPROVAL
City Representative
44411A, N~
Ci gineer
Signature
P
Revised 1139107
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
College Main Lofts
Engineer's Estimate Summary
Item
Description
Unit Price
Projects
1
408 College Main Pavement & Sidewalk ConStrnetion
$ 13,225.00
2
408 College Main Waterline Construction
$ 9,962.00
3
403 College Main Pavement & Sidewalk Construction
$ 10,634.00
4
403 College Main Waterline Construction
$ 19,298.00
Project Total
S 53,119.00
T F-12327
SCHULTZ ENGINEERING, LLC.
I~Q S,I ~
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
College Main Lofts
408 College Main
Pavement & Sidewalk Construction
Engineer's Estimate
Item
Description
Unit
Estimated
Quanti
Unit Price
Total
Demolition Items
1
ADA Ramp & Curb
EA
l
$ 200.00
$200
2
5' Curb Inlet
EA
1
$ 1,200.00
$1,200
3
24" RCP
LF
5
$ 20.00
$100
4
Retaining Wall
LF
30
$ 20.00
$600
5
Brick Pavers (Salavage Bricks)
SF
455
$ 2.00
$910
6
Curb
LF
44
$ 10.00
$440
7
Concrete Bench Pad (No Bench)
SF
11
$ 5.00
$55
8
Concrete Pavement
SF
66
$ 2.50
$165
Demolition Items Subtotal
$3,670
Pavement, Sidewalk & Drainage Construction Items
9
Salvaged Tree & Grate
EA
1
$ 1,000.00
$1,000
10
ADA Ramp
EA
1
$ 500.00
$500
11
Junction Box with Grate Inlet
EA
1
$ 5,000.00
$5,000
12
Bike Rack
EA
1
$ 600.00
$600
13
Concrete Driveway w/ Curb
SF
151
$ 5.00
$755
14
Retaining Wall
LF
70
$ 8.00
$560
15
Brick Pavers (w/salvaged)
SF
285
$ 4.00
$1,140
Pavement, Sidewalk & Drainage Items Subtotal
$91555
TOTAL CONSTRU(:°I ON $13,225
,q,5--f Z
V F-12327
SCHULTZ ENGINEERING, LLC.
SCHULTZ ENGINEERING, LLC,
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
College Main Lofts
908 College Main
Waterline Construction
Engineer's Estimate
Item
Description
Unit
Estimated
uanti
Unit Price
Total
General Construction Items
I
Mobilization, Overhead, Construction Staking
LS
1
$ 2,000.00
$2,000
2
Traffic Control
LS
1
$ 1,500.00
$1,500
3
Pavement Removal & Replacement
SF
160
$ 12.00
$1,920
General Items Total
$5,420
Waterline Construction Items
4
6" PVC Pipe
EA
14
$ 28.00
$392
5
12" X 6" Tapping Sleeve
EA
1
$ 1,250.00
$1,250
6
6" M.J. Gate Valve
EA
2
$ 950.00
$1,900
7
1" Service
EA
1
$ 500.00
$500
8
Waterline Testing
EA
1
$ 500.00
$500
Waterline Items Total
$4,542
Waterline Construction Total 59,962
107
SCHULTZ ENGINEERING, L.LC.
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
College Main Lofts
403 College Main
Pavement & Sidewalk Construction
Engineer's Estimate
Item
Description
Unit
Estimated
Quantity
Unit Price
Total
Demolition Items
I
5' Curb Inlet
EA
1
$ 1,200.00
$1,200
2
24" RCP
LF
5
$ 20.00
$100
3
Concrete Pavement
SF
155
$ 2.50
$388
4
Brick Pavers (Salavage Bricks)
SF
425
$ 2.00
$850
5
Concrete Bench Pad (No Bench)
SF
13
$ 5.00
$65
6
Tree & Grates
EA
2
$ 500.00
$1,000
7
Curb
LF
92
$ 10,00
$920
Demolition Items Subtotal
$4,523
Pavement, Sidewalk & Drainage Construction Items
8
Brick Pavers (w/salvaged)
SF
388
$ 4.00
$1,552
9
Curbing
LF
19
$ 15.00
$278
10
Concrete Bench Pad w/Salvaged Bench
SF
13
$ 12.00
$150
11
Junction Box with Grate
EA
1
$ 2,600.00
$2,600
12
Bike Rack
EA
1
$ 500.00
$500
13
Concrete Driveway w/ Curb
SF
172
$ 6.00
$1,032
Pavement, Sidewalk & Drainage Items Subtotal
$6,112
TOTAL CONSTRUCTION $10,634
I=~paia YwAHby,~~A \F
4i M,t•Ni YYf....♦ 'a
JOSEPH P. SCHULTZ
,iii Ri Ri.tl w4sa. a~..,n. ns ♦a~(,e♦
F-12327
SCHULTZ ENGINEERING. LLC.
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
SCHULTZ ENGINEERING, LLC.
403 College Main
Waterline Construction
Engineer's Estimate
Item
Description
Unit
Estimated
Quantity
Unit Price
Total
General Construction Items
1
Mobilization, Overhead, Construction Staking
LS
1
$ 2,000.00
$2,000
2
Traffic Control
LS
1
$ 1,500.00
$1,500
3
Pavement Removal & Replacement
SF
520
$ 12.00
$6,240
General Items Total
$9,740
Waterline Construction Items
4
6" PVC Pipe
EA
36
$ 28.00
$1,008
5
12" X 6" Tapping Sleeve
EA
1
$ 1,250.00
$1,250
6
6" M.J. Gate Valve
EA
2
$ 950.00
$1,900
7
6"x2" Tapped Tee
EA
1
$ 300.00
$300
8
6" M.J. Tee
EA
1
$ 400.00
$400
9
6" M,J. Bends - 22.5 deg.
2
$ 350.00
$700
10
Fire Hydrant Assembly
L
1
t
$ 3,500.00
$3,500
11
Waterline Testing
EA
1
$ 500.00
$500
Waterline Items Total
$9,558
I Waterline Construction Total $19,298
.............♦.r.
JOSEPH P. SCHULTZ
-.ask 6atf tk
13i~ki ♦a58aRR. e,ay,tki{ ;k~k
V9
F'-12327 ~~J t 2