Loading...
HomeMy WebLinkAboutLetter of CompletionLETTER OF COMPLETION CITY ENGINEER DATE: LA Z Le CITY OF COLLEGE STATION COLLEGE STATION, TEXAS RE: COMPLETION OF_Uo Dear Sir:. . The purpose of our letter is to request that the folio wing iste~ r~~rve ents be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. ls - The one-year warranty is hereby affirmed and agreed to by 5 f AT and by their subcontractors as indicated by signatures below. WORK COMPLETED ~ e . WARRANTY DATE -G- , ~ ~ ZC" - A" Owner: ; .°s ontractor: Phony umber Phone Number: '1 Address Address: Signatureyfi' ACCEPTANCE & APPROVAL City Representative 44411A, N~ Ci gineer Signature P Revised 1139107 SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 College Main Lofts Engineer's Estimate Summary Item Description Unit Price Projects 1 408 College Main Pavement & Sidewalk ConStrnetion $ 13,225.00 2 408 College Main Waterline Construction $ 9,962.00 3 403 College Main Pavement & Sidewalk Construction $ 10,634.00 4 403 College Main Waterline Construction $ 19,298.00 Project Total S 53,119.00 T F-12327 SCHULTZ ENGINEERING, LLC. I~Q S,I ~ SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 College Main Lofts 408 College Main Pavement & Sidewalk Construction Engineer's Estimate Item Description Unit Estimated Quanti Unit Price Total Demolition Items 1 ADA Ramp & Curb EA l $ 200.00 $200 2 5' Curb Inlet EA 1 $ 1,200.00 $1,200 3 24" RCP LF 5 $ 20.00 $100 4 Retaining Wall LF 30 $ 20.00 $600 5 Brick Pavers (Salavage Bricks) SF 455 $ 2.00 $910 6 Curb LF 44 $ 10.00 $440 7 Concrete Bench Pad (No Bench) SF 11 $ 5.00 $55 8 Concrete Pavement SF 66 $ 2.50 $165 Demolition Items Subtotal $3,670 Pavement, Sidewalk & Drainage Construction Items 9 Salvaged Tree & Grate EA 1 $ 1,000.00 $1,000 10 ADA Ramp EA 1 $ 500.00 $500 11 Junction Box with Grate Inlet EA 1 $ 5,000.00 $5,000 12 Bike Rack EA 1 $ 600.00 $600 13 Concrete Driveway w/ Curb SF 151 $ 5.00 $755 14 Retaining Wall LF 70 $ 8.00 $560 15 Brick Pavers (w/salvaged) SF 285 $ 4.00 $1,140 Pavement, Sidewalk & Drainage Items Subtotal $91555 TOTAL CONSTRU(:°I ON $13,225 ,q,5--f Z V F-12327 SCHULTZ ENGINEERING, LLC. SCHULTZ ENGINEERING, LLC, 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 College Main Lofts 908 College Main Waterline Construction Engineer's Estimate Item Description Unit Estimated uanti Unit Price Total General Construction Items I Mobilization, Overhead, Construction Staking LS 1 $ 2,000.00 $2,000 2 Traffic Control LS 1 $ 1,500.00 $1,500 3 Pavement Removal & Replacement SF 160 $ 12.00 $1,920 General Items Total $5,420 Waterline Construction Items 4 6" PVC Pipe EA 14 $ 28.00 $392 5 12" X 6" Tapping Sleeve EA 1 $ 1,250.00 $1,250 6 6" M.J. Gate Valve EA 2 $ 950.00 $1,900 7 1" Service EA 1 $ 500.00 $500 8 Waterline Testing EA 1 $ 500.00 $500 Waterline Items Total $4,542 Waterline Construction Total 59,962 107 SCHULTZ ENGINEERING, L.LC. SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 College Main Lofts 403 College Main Pavement & Sidewalk Construction Engineer's Estimate Item Description Unit Estimated Quantity Unit Price Total Demolition Items I 5' Curb Inlet EA 1 $ 1,200.00 $1,200 2 24" RCP LF 5 $ 20.00 $100 3 Concrete Pavement SF 155 $ 2.50 $388 4 Brick Pavers (Salavage Bricks) SF 425 $ 2.00 $850 5 Concrete Bench Pad (No Bench) SF 13 $ 5.00 $65 6 Tree & Grates EA 2 $ 500.00 $1,000 7 Curb LF 92 $ 10,00 $920 Demolition Items Subtotal $4,523 Pavement, Sidewalk & Drainage Construction Items 8 Brick Pavers (w/salvaged) SF 388 $ 4.00 $1,552 9 Curbing LF 19 $ 15.00 $278 10 Concrete Bench Pad w/Salvaged Bench SF 13 $ 12.00 $150 11 Junction Box with Grate EA 1 $ 2,600.00 $2,600 12 Bike Rack EA 1 $ 500.00 $500 13 Concrete Driveway w/ Curb SF 172 $ 6.00 $1,032 Pavement, Sidewalk & Drainage Items Subtotal $6,112 TOTAL CONSTRUCTION $10,634 I=~paia YwAHby,~~A \F 4i M,t•Ni YYf....♦ 'a JOSEPH P. SCHULTZ ,iii Ri Ri.tl w4sa. a~..,n. ns ♦a~(,e♦ F-12327 SCHULTZ ENGINEERING. LLC. SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 SCHULTZ ENGINEERING, LLC. 403 College Main Waterline Construction Engineer's Estimate Item Description Unit Estimated Quantity Unit Price Total General Construction Items 1 Mobilization, Overhead, Construction Staking LS 1 $ 2,000.00 $2,000 2 Traffic Control LS 1 $ 1,500.00 $1,500 3 Pavement Removal & Replacement SF 520 $ 12.00 $6,240 General Items Total $9,740 Waterline Construction Items 4 6" PVC Pipe EA 36 $ 28.00 $1,008 5 12" X 6" Tapping Sleeve EA 1 $ 1,250.00 $1,250 6 6" M.J. Gate Valve EA 2 $ 950.00 $1,900 7 6"x2" Tapped Tee EA 1 $ 300.00 $300 8 6" M.J. Tee EA 1 $ 400.00 $400 9 6" M,J. Bends - 22.5 deg. 2 $ 350.00 $700 10 Fire Hydrant Assembly L 1 t $ 3,500.00 $3,500 11 Waterline Testing EA 1 $ 500.00 $500 Waterline Items Total $9,558 I Waterline Construction Total $19,298 .............♦.r. JOSEPH P. SCHULTZ -.ask 6atf tk 13i~ki ♦a58aRR. e,ay,tki{ ;k~k V9 F'-12327 ~~J t 2