The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in.order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to
and by their subcontractors as indicated by signatures below. y r
WORK COMPLETED
~l -IQ 0E
AI
WARRANTY LATE
Owner:<t l
[~t~C
Phone Number.,
Contractor:f c}.._
Phone Number:
Address: S 2c~r~t ~St"`(dd~ss: (~c" 1
Signature. ~w-
AC4I3TANC L: & APPROVAL
City Representative
city *wtiner
t?r+viw-tt 1131/P77
LETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
DATE: r'
RE: COMPLETION O
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in .order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by_:~U,
and by their subcontractors as indicated by signatures below.
WORK COMPLETED
MI bu
WARRANTY DATE
i:;XAS
Owces~ l S_.._t _r Contractors ~l a r _ 'G
Photle Number: Phone Number:
Address-,A, t`
Address: 7-2~~
Stc nature: Signature
- -
YAL
ACCEPTANCE & APf'kQ
City Representative
" v
Ci ,y ~&76in~ or
Revised 1131107
ENGINEER'S OPINION OF PROBABLE CONSTRCI
GATEWAY PHASE 3- LOT 3C
PUBLIC INFRASTRUCTURE
April ill, 2013
EST.
IT EM NO. QTY. UNIT ITEM DESCRIPTION & PRICE IN WORDS
TION COS
1 187 LF ?Furnish and Install 6" PVC Water Main (AWWA C-909, DR 14, PC
0200) -Standard Depth 4' Bury complete and in place
x Dollars
Cents per linear foot,
(Structural Bedding and Baekfill)
UNIT TOTAL
PRICE IN 'RICE IN
FIGURES FIGURES
$25.001
2 1 EA =urnish and Install 6" Tapping Sleeve and Valve onto existing 12" $2,800.00
I'VC Waterline, Valve Box & Lid to be cast iron, direct traffic with
eckable lid complete and in place
Dollars
M Cents each.
$4,67
$2,8
3
3
EA 'Furnish and Install 6" Ductile Iron, M.J. 45° Bend, to include all
$300.00
$900.00
ecessary thrust blocking, complete and in place
r Dollars
~d. Gents each,
4
1
EA `Farnish and Install 6" Ductile Iron, M.J. 22.5° Bend, to include all
$300.00
$300.00
,ocessary thrust blocking, complete and in place
Dollars
Cents each.
5
1
EA urnish and Install 6" Gate Valve and Box with Lockable Lid, Valve
$800.00
$800.00
[ ox & Lid to be cast iron, direct traffic complete and in place
Dollars
Cents each.
WATERLINE SUBTOTAL: 9 475.00
(ITEMS 1-5)
00, 4
'0
b
15% CONTINGENCY: $1,421.25
ALFRED A. PAINE
972 ESTIMATED CONSTRUCTION COSTS: $10,896.25
1
06
,
,
l KLING ENGINEERING & SURVEYING
A Division of Civil Engineering Consultants
f l r i TBPE FIRM 4 F2214