Loading...
HomeMy WebLinkAboutLetter of CompletionLETTER OF COMPLETION CITY ENGINEER DATE ' 3011 CITY OF COLLEGE STATION COLLEGE STATION, TEXAS RE: COMPLETION OF l ` c' I I t"A.(-1 Dear Sir. The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in.order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to and by their subcontractors as indicated by signatures below. y r WORK COMPLETED ~l -IQ 0E AI WARRANTY LATE Owner:<t l [~t~C Phone Number., Contractor:f c}.._ Phone Number: Address: S 2c~r~t ~St"`(dd~ss: (~c" 1 Signature. ~w- AC4I3TANC L: & APPROVAL City Representative city *wtiner t?r+viw-tt 1131/P77 LETTER OF COMPLETION CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS DATE: r' RE: COMPLETION O Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in .order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to by_:~U, and by their subcontractors as indicated by signatures below. WORK COMPLETED MI bu WARRANTY DATE i:;XAS Owces~ l S_.._t _r Contractors ~l a r _ 'G Photle Number: Phone Number: Address-,A, t` Address: 7-2~~ Stc nature: Signature - - YAL ACCEPTANCE & APf'kQ City Representative " v Ci ,y ~&76in~ or Revised 1131107 ENGINEER'S OPINION OF PROBABLE CONSTRCI GATEWAY PHASE 3- LOT 3C PUBLIC INFRASTRUCTURE April ill, 2013 EST. IT EM NO. QTY. UNIT ITEM DESCRIPTION & PRICE IN WORDS TION COS 1 187 LF ?Furnish and Install 6" PVC Water Main (AWWA C-909, DR 14, PC 0200) -Standard Depth 4' Bury complete and in place x Dollars Cents per linear foot, (Structural Bedding and Baekfill) UNIT TOTAL PRICE IN 'RICE IN FIGURES FIGURES $25.001 2 1 EA =urnish and Install 6" Tapping Sleeve and Valve onto existing 12" $2,800.00 I'VC Waterline, Valve Box & Lid to be cast iron, direct traffic with eckable lid complete and in place Dollars M Cents each. $4,67 $2,8 3 3 EA 'Furnish and Install 6" Ductile Iron, M.J. 45° Bend, to include all $300.00 $900.00 ecessary thrust blocking, complete and in place r Dollars ~d. Gents each, 4 1 EA `Farnish and Install 6" Ductile Iron, M.J. 22.5° Bend, to include all $300.00 $300.00 ,ocessary thrust blocking, complete and in place Dollars Cents each. 5 1 EA urnish and Install 6" Gate Valve and Box with Lockable Lid, Valve $800.00 $800.00 [ ox & Lid to be cast iron, direct traffic complete and in place Dollars Cents each. WATERLINE SUBTOTAL: 9 475.00 (ITEMS 1-5) 00, 4 '0 b 15% CONTINGENCY: $1,421.25 ALFRED A. PAINE 972 ESTIMATED CONSTRUCTION COSTS: $10,896.25 1 06 , , l KLING ENGINEERING & SURVEYING A Division of Civil Engineering Consultants f l r i TBPE FIRM 4 F2214