From: Stephen Cast <wsud.sc @verizon.net>
Sent: Monday, April 29, 2013 9:59 AM
To: Joe Schultz
Subject: Re: Saddle Creek Subdivision - Phase 4
Joe Schultz
Wellborn Special Utility District has inspected and approved the water line in Saddle Creek Phase 4.
Stephen Cast
General Manager
Wellborn Special Utility District
-- Original Message - --
Firbrrt �€�� 5clautkz
To: Stephen Cast
Sent: Wednesday, April 24, 2013 4:03 PM
Subject: Saddle Creek Subdivision - Phase 4
Stephen,
Can I please get a letter of acceptance for the waterlines for Saddle Creek— Phase 4?
Thanks
Joe
Joe Schultz, P.E.
Schultz Engineering, LLC
2730 Longmire, Suite A
College Station, TX 77845
Office 979.764.3900
Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
April 30, 2013
Alan Gibbs, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
RE: Letter Acknowledging Culvert Backfill Requirements — Saddle Creek Subdivision —
Phase 4
Dear Mr. Gibbs:
The purpose of this letter is to acknowledge that the construction of the storm sewer
culverts for the above - referenced project was done in accordance with the approved plans
and the HDPE culvert pipe was embedded and backfilled with cement stabilized sand.
Sincerely,
J eph P. Schultz, P.E.
Civil Engineer
r /_5
P.O. Box 11995 • College Station, Texas 77842
schultzengineeringllc.com
F-1 2327
SCHULTZ ENGINEERING, LLC.
o���•�
Ty 6F 9
BRAZOSCOUNTY
ROAD AND BRIDGE DEPARTMENT
R Alan Munger, PE, CFM, County Engineer
Lloyd Wassermann, Commissioner Precinct 1
Sammy Catalena, Commissioner Precinct 2
Duane Peters, County Judge
May 1, 2013
Schultz Engineering LLC
2730 Longmire Drive, Suite A
College Station, Texas 77845
Re: Final Plat of Saddle Creek Subdivision Phase 4
19.804 Acres, James C. Stuteville League, A -216
College Station ETJ, Brazos County, Texas
Dear Sir:
Kenny Mallard, Commissioner Precinct 3
Irma Cauley, Commissioner Precinct 4
On Tuesday, April 30, 2013, the Brazos County Commissioners' Court approved the referenced
plat as submitted.
If further information is required please contact us at (979)822 -2127.
Best :
-�� "
4 / PC .
R. Alan Munger, P.E.
Brazos County Engineer
Saddle Creek Ph 4 -final plat
cc: Office File(s)
2617 Highway 21 West Bryan, Texas 77803 Office (979)822 -2127 / Fax (979)775 -0453
Danielle Sinqh
From: Joe Schultz Doeschultz84 @verizon.net]
Sent: Tuesday, May 07, 2013 12:01 PM
To: Danielle Singh
Cc: Deborah Grace - Rosier
Subject: FW: Saddle Creek - Phase 4
Danielle,
Please let me know if you need us to make an official transmittal of the approval letter and emails. Let me know if you
need anything else.
Thanks
Joe
From: David Hering [ mailto:dhering @btutilities.com]
Sent: Tuesday, May 07, 2013 11:29 AM
To: Joe Schultz
Subject: RE: Saddle Creek - Phase 4
Joe,
BTU has completed the installation of electrical service and street lighting in Saddle Creek Phase 4. Should anyone at the
City of College Station has any further questions please forward them my contact info.
Thanks,
David Hering
Line Designer
Bryan Texas Utilities
p. 979.821.5865
c. 979.450.3519
From: Joe Schultz [ mailtoJoeschultz84(�bverizon .net
Sent: Tuesday, May 07, 2013 11:21 AM
To: David Hering
Subject: Saddle Creek - Phase 4
David,
Please confirm the BTU electrical service for Saddle Creek 4 has been installed and accepted by BTU.
Thanks
Joe
Joe Schultz, P.E.
Schultz Engineering, LLC
1
4 Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
May 8, 2012
Alan Gibbs, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
RE: Letter Acknowledging City Standards — Saddle Creek Subdivision — Phase 4
Dear Mr. Gibbs:
The purpose of this letter is to acknowledge that the construction plans for the water line,
roadway and drainage construction for the above - referenced project, to the best of my
knowledge, do not deviate from the B /CS Design Guideline Manual, except as follows:
The culvert pipes will be HDPE pipe meeting the requirements of AASHTO M294, Type
S with watertight joints. The pipe shall be embedded and backfilled with cement
stabilized sand meeting the specifications and in accordance with the detail provided on
the plans. In addition, the design engineer shall inspect the installation of the HDPE pipe
culverts and cement stabilized sand embedment and backfill and provide a sealed
confirmation letter verifying the use of cement stabilized sand backfill in accordance with
the detail provided on the plans.
HDPE pipe culverts have been successfully installed, approved and accepted by the
Brazos County Road and Bridge Department in the previous phases of the Saddle Creek
Subdivision.
I also acknowledge that, to the best of my knowledge, the water line construction details
provided in the construction plans are in accordance with the B /CS Standard Details.
h P. Schultz, P.E.
Engineer