HomeMy WebLinkAboutCOST ESTIMATESCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
Saddle Creek Subdivision, Phase 4
Engineer's Estimate of Street Construction
Item ! Description Unit Estimated Unit Price Total
Q uanti ty
Sitework & Pavement
I 'Mobilization/Construction Staking
LS
1
12,500.00
12,500
2 Site Preparation/Clearing and Grubbing
AC
5
2,500.00
12,500
3 Topsoil Removal & Replacement
LS
1
12,000.00
12,000
4 Excavation/Grading
LS
1
35,000.00
35,000
5 Mixing & incorporation of lime, 6" deep
SY
8,350
2.20
18,370
6 ;Hydrated Lime (27 lb /sy)
Ton
113
165.00
18,645
7 6" Crushed Limest one Base
SY
7,380
11.00
81,180
8 1.5" Hot Mix Asphaltic Concrete
SY
5,930
11.00
65,230
9 End of Street Signs
EA
6
100.00
600
10 ' Seeding edge of Pavement to easements
SY
1 18,1901
0.30
5,457
Sitework and Paving Subtotal! $261,482
Drainage S stem
11 24" HDPE Culvert - structural backfill
LF
66
40.00
2,640
12 .36" HDPE Culvert - structural backfill
LF
240
60.00
14,400
13 Hay Bale or Rock Riprap Check Dam
EA
4
100.00
400
14 Silt Fe_ nce
LF
360
2.50
900
15 Rock Riprap
SY
108
'21
40.00
4,320
16 Construction Exit
EA
1,000.00
2,000
17 SWPPP Im lementation & Maintenance
LS
11
1,000.00
1,000
Drainage Subtotal
$25,660
STREET ESTIMATED CONSTRUCTION TOTAL $287142'
(2
F- 12327
SCHULTZ ENGINEERING. LLC.