Loading...
HomeMy WebLinkAboutCOST ESTIMATESCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Saddle Creek Subdivision, Phase 4 Engineer's Estimate of Street Construction Item ! Description Unit Estimated Unit Price Total Q uanti ty Sitework & Pavement I 'Mobilization/Construction Staking LS 1 12,500.00 12,500 2 Site Preparation/Clearing and Grubbing AC 5 2,500.00 12,500 3 Topsoil Removal & Replacement LS 1 12,000.00 12,000 4 Excavation/Grading LS 1 35,000.00 35,000 5 Mixing & incorporation of lime, 6" deep SY 8,350 2.20 18,370 6 ;Hydrated Lime (27 lb /sy) Ton 113 165.00 18,645 7 6" Crushed Limest one Base SY 7,380 11.00 81,180 8 1.5" Hot Mix Asphaltic Concrete SY 5,930 11.00 65,230 9 End of Street Signs EA 6 100.00 600 10 ' Seeding edge of Pavement to easements SY 1 18,1901 0.30 5,457 Sitework and Paving Subtotal! $261,482 Drainage S stem 11 24" HDPE Culvert - structural backfill LF 66 40.00 2,640 12 .36" HDPE Culvert - structural backfill LF 240 60.00 14,400 13 Hay Bale or Rock Riprap Check Dam EA 4 100.00 400 14 Silt Fe_ nce LF 360 2.50 900 15 Rock Riprap SY 108 '21 40.00 4,320 16 Construction Exit EA 1,000.00 2,000 17 SWPPP Im lementation & Maintenance LS 11 1,000.00 1,000 Drainage Subtotal $25,660 STREET ESTIMATED CONSTRUCTION TOTAL $287142' (2 F- 12327 SCHULTZ ENGINEERING. LLC.