HomeMy WebLinkAboutSTAFF REVIEW COMMENTSL�
STAFF REVIEW COMMENTS NO. 1
Project: Castlegate Sec 2 Ph 2 B2 L16 &16a,17 &17a (13- 00900075)
PLANNING
1. Add Certificate of City Engineer.
2. Revise lot numbers to signify that lots have been amended (i.e. 16A1, 16A2)
3. Amend note #6 — to state that the lots must be held in common ownership.
4. Amend notes 4 and 6 to reflect the updated lot designations.
5. Update Certificate of Ownership and Dedication to reflect updated lot designations.
6. Revise title block to read as follows:
Final Plat of Lots xxx, block 2
Castlegate Subdivision
Being an Amending Plat of
Lots 16, 16A, 17 & 17a, block 2
Castlegate Subdivision
7. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
8. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Reviewed by: Matt Robinson
Date: 4/12/13
ENGINEERING COMMENTS NO. 1
1. Please tie a corner to a City of College Station Monument.
2. Please specify if the drainage easements are public or private.
Reviewed by: Danielle Singh Date: 4/11/13
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. EASEMENTS: No additional easements will be required. If it is determined that additional
electric facilities are required they will be designed within existing easements.
2. The developer will be responsible for locating existing easements on site to insure that
electrical infrastructure is installed within easement boundaries.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. If necessary CSU will provide drawings for electrical installation.
3. Developer will intercept existing conduit at designated transformers or other existing devices
or locations and extend as required.
4. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout or recommendations..
5. Developer installs secondary pedestals per CSU specs and design. Secondary pedestals
provided by CSU.
6. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing
as designed by CSU.
7. To discuss any of the above electrical comments please contact Gilbert Martinez at
979.764.6255.
Reviewed by: Gilbert Martinez Date: 4/11/13
STAFF REVIEW COMMENTS NO. 1
Project: Castlegate Sec 2 Ph 2 B2 L16 &16a,17 &17a (13- 00900075)
PLANNING
1. Add Certificate of City Engineer.
CITY Engineer Certificate has been added to the plat.
2. Revise lot numbers to signify that lots have been amended (i.e. 16A1, 16A2)
Lot numbers have been revised.
3. Amend note #6 — to state that the lots must be held in common ownership.
Note #6 has been revised as requested. In addition the following sentence was
added to the note. "Lots 16 -R & 16A -R and lots 17 -R & 17A -R must each have
common ownership."
4. Amend notes 4 and 6 to reflect the updated lot designations.
Notes #4 and #6 have been updated.
5. Update Certificate of Ownership and Dedication to reflect updated lot designations.
Ownership and Dedication has been updated.
6. Revise title block to read as follows:
Final Plat of Lots xxx, block 2
Castlegate Subdivision
Being an Amending Plat of
Lots 16, 16A, 17 & 17a, block 2
Castlegate Subdivision
Title block has been updated.
7. Please note that any changes made to the plans that have not been requested by the
City of College Station must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made
aware of will constitute a completely new review.
Noted.
8. Please note that you may be required to submit paid tax certificates if they are not
current prior to the filing of your plat.
Noted.
Reviewed by: Matt Robinson Date: 4/12/13
ENGINEERING COMMENTS NO. 1
1. Please tie a corner to a City of College Station Monument.
Property corner has been tied to City of College Station Monument #137.
2. Please specify if the drainage easements are public or private.
Note #4 has been updated to specify that the drainage easements are private.
Reviewed by: Danielle Singh
Date: 4/11/13
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. EASEMENTS: No additional easements will be required. If it is determined that
additional electric facilities are required they will be designed within existing easements.
Noted.
2. The developer will be responsible for locating existing easements on site to insure that
electrical infrastructure is installed within easement boundaries. Noted.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
Noted.
2. If necessary CSU will provide drawings for electrical installation.
Noted.
3. Developer will intercept existing conduit at designated transformers or other existing
devices or locations and extend as required.
Noted.
4. If conduit does not exist at designated transformer or other existing devices, developer
will furnish and install conduit as shown on CSU electrical layout or recommendations.
Noted.
5. Developer installs secondary pedestals per CSU specs and design. Secondary
pedestals provided by CSU.
Noted.
6. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit
routing as designed by CSU.
Noted.
7. To discuss any of the above electrical comments please contact Gilbert Martinez at
979.764.6255.
Noted.
Reviewed by: Gilbert Martinez Date: 4/11/13
STAFF REVIEW COMMENTS NO. 2
Project: Castlegate Sec 2 Ph 2 B2 L16 &16a,17 &17a (13- 00900075)
PLANNING
1. Amend note #6 —to change "must each have..." to "must each be held in..."
common ownership. Note 6 has been modified.
2. Please note that any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made
aware of will constitute a completely new review. Noted.
3. Please note that you may be required to submit paid tax certificates if they are not
current prior to the filing of your plat. Noted.
Reviewed by: Matt Robinson Date: 4/24/13
STAFF REVIEW COMMENTS NO. 2
Project: Castlegate Sec 2 Ph 2 B2 L16 &16a,17 &17a (13- 00900075)
PLANNING
1. Amend note #6 — to change "must each have..." to "must each be held in..." common
ownership.
2. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
3. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Reviewed by: Matt Robinson Date: 4/24/13
CITY OF COLLEGE STATION
Home of Texas A&M University"
MEMORANDUM
April 5, 2013
TO: Wallace Phillips; via: Wallace.phillips @verizon.net
FROM: Jason Schubert, AICP
Principal Planner
SUBJECT: CASTLEGATE SEC 2 PH 2 BLK 2 LOTS 16&16A, 17&17A
Thank you for the submittal of your FINAL PLAT - MINOR OR AMENDING application. This
project will be distributed to staff next week for their review.
CC' Schultz Engineering, LLC; via: joeschultz84 @verizon.net
Case file no. 13- 00900075
Planning & Development Services
P.O. BOY 9960 • 1101 TEX.-VS AVENUE • COLLEGE S'IXI` O. • "I'EXAS .77842
TEL.. 979.764.3570 • FAX. 979.764.3496
cstx.gov/devservices
C1TY OF' C0TJ.1 G.F" STATION
Home of'7exiu AtrM Univenity`
MEMORANDUM
April 15, 2013 /
TO: Wallace Phillips; via: wal lace. phi lli s verizon.net s✓
FROM: Matt Robinson, AICP, Senior Planner
SUBJECT: Castlegate Sec 2 Ph 2 B2 L16 &16a,17 &17a - Final Plat
Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed.
One (1) 24 "x36" copy of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e -mail to:
pdsdigitalsubmittal(o
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff Review Comments
cc: Schultz Engineering, LLC; via: joeschultz84(o tip
Case file No. 13- 00900075
Planning & Development Services
I'.O. BOX 991,0 • 1 101 TFAAS A4 I N11, • t 01,1 ?(E STM ION , 1 EXA:S • 778 , } 2 _
'111... 979.764.3170 • FAX. 971),
cstx.gov /devservices
Now
CITY(*
Home of kxas A6Af Univenity'
MEMORANDUM
April 25, 2013
TO: Wallace Phillips; via: wallace.phillips(aD-verizon.net
FROM: Matt Robinson, AICP, Senior Planner
SUBJECT: Castlegate Sec 2 Ph 2 B2 L16 &16a,17 &17a - Final Plat
Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed.
One (1) 24 "x36" copy of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e -mail to:
pdsdigitalsubmittal(d-)cstx.gov
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff Review Comments
CC' Schultz Engineering, LLC; via: IoeschultzK4 D_verizon.net
P &DS Project No. 13- 00900075
Planning & Development Services
P.O. BOX 9960 • 1 101 TEXAS AVENUT • (_,0LI..I:GE SIA"I'ION , JMAS • 77134'
'I El... 9979.764.3570 • FA.X. 979J64.3496
cstx.gov /devservices