HomeMy WebLinkAboutCORRESPONDENCEAlan Gibbs
City Engineer
City of College Station
1101 South Texas Avenue
February 12, 2013
Mr. Gibbs,
In regard to the design of the sewer line for Lots 14 and 15, Block 3, West Park Addition as shown on the
sewer line plans dated February 12, 2013, 1 acknowledge the current Bryan /College Station guidelines
for design and certify that these plans are in accordance with said guidelines. Furthermore the estimate
of the cost of the construction for the 6" sanitary sewer line is based on current prices for materials,
labor and equipment as of the date of this correspondence. I have also submitted the documentation to
obtain a firm registration number for a sole proprietorship from the Texas Board of Professional
Engineers and expect to hear back from them soon. Please let me know if there is anything else that
needs to be addressed in regard to these plans and this submission.
Sincerely,
Daniel Beamon P.E.