Loading...
HomeMy WebLinkAboutSTAFF REVIEW COMMENTS(*O F"" CITY OF COI,I,I`,G}i STATION Home of Texas A6 Uniuenity° Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 ME MORANDUM February 4, 2012 TO: Adam Wallace via email: adam @atmsurveying.com FROM: Lauren A. Hovde, AICP, Staff Planner SUBJECT: West Park Lots 2R -5R, Block 2 - Minor Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24 "x36" copy of the revised final plat; Parkland Dedication in the amount of $2522 must be submitted prior to the filing of the final plat; Easement dedication sheets; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to: pdsdigitalsubmittaIRcstx.gov If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. Once your item has been scheduled for the P &Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P &Z meeting. http://www.cstx.gov/pz Please note that a Mylar original of the revised final plat will be required after P &Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: Lawrence Guseman via email: tguseman @gmail.com Case file #13- 00900008 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 1 of 3 7. 10' easement along the back lot lines in common with the Floyd tract and the 15' alley. 8. 5' easement on each side of every interior lot line. 9. 10' easement on each side of the center line of the existing CSU overhead electrical line. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact or Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis Date: January 30, 2013 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: February 1, 2013 NOTE: Any changes made to the plans, that have not been reques�pd by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 3 " kicy CITE' Or COLLEGE ST!VFTON Home of Texas Ad-M University' MEMORANDUM January 24, 2013 TO: Adam Wallace; via: adama- atmsurveying.com FROM: Jason Schubert, AICP Principal Planner SUBJECT: WEST PARK LOTS 2R -5R, SILK 2 (FP- REPLAT) Thank you for the submittal of the required documents for your FINAL PLAT - RESIDENTIAL application. This project will be distributed to staff next week for their review. cc: Lawrence Guseman; via: tguseman@gmail.com Case file no. 13- 00900008 Plarzrting & Developmeia Services PA), BOX 9960 • 1101 TE),1S ykVE.\I OE • C OLLEGE S I: NON • IEXAS • 17 ,S I'EL. 9'1 7 9. 7 '64.3 57 70 • 1,1X. 97`9.- -64.3496 cstx.gov/devservices CITY OP COl.lJ ;GF1 STATION Home of Texas A&M University' MEMORANDUM January 17, 2013 TO: Adam Wallace; via: adam @atmsurveying.com FROM: Jason Schubert, AICP Principal Planner SUBJECT: WEST PARK ADDITION, LOTS 2R -5R, BLK 2 (FP- REPLAT) I reviewed the above - mentioned FINAL PLAT - RESIDENTIAL application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal so that staff may conduct a thorough review. Please submit the following information by 10 a.m. on any Monday for review that week (with Monday, Jan. 21 being a holiday, please resubmit by 10 a.m. this Friday to make next week's review): Provide a owner's signature from Virginia Kettler for the part of Lots 4 and 5, or provide a copy of a deed showing the property has been sold to Lawrence Guseman III. Please be aware that if this application is not completed before Monday, March 4, 2013, it will expire and a new application and fees will be necessary to continue the replatting process. If you have any questions or need additional information, please call me at 979.764.3570. cc: Lawrence Guseman; via: tguseman @gmail.comv Case file No. 13- 00900008 Plarining e- Dr velopmerrt Services Il.O. RoX 4960 - 1 101 TFXAS ,AtiTNUF: - C01.1 (d" STATION • "IT.XAS . cstx.govldevservices STAFF REVIEW COMMENTS NO. 1 Project: WEST PARK LOTS 2R -5R, BLK 2 - 13- 00900008 PLANNING 1. The plat will be processed as a Minor Plat. A refund will be given to you in the amount of $232. 2. The existing structures must be removed prior to filing the plat for record at the County Courthouse. 3. Please show a right -of -way dedication at the intersection of Fidelity and Highlands to round the lots at the corners and provide area for possible street signage. 4. Please revise the Ownership and Dedication Certificate to reference the correct property. 5. The legal description on the plat does not match the plat graphic. The title report of 300 Fidelity has the same description as found on the plat (also not matching the graphic). For clarification since this likely a difference in survey information, please show both calls on the plat graphic. 6. Please add West Park Addition to the title block following "Final Plat of'. 7. The title report and deed do not have a legal description of 603 Highlands. Please consult the appropriate entities and provide amended documentation. 8. Thank you for showing existing improvements. This information can be removed for the next submittal. 9. Parkland dedication will be due prior to filing the plat for record. 10. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. 11. The construction documents and reports are still under review and may affect the plat. 12. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Lauren A. Hovde, AICP, Staff Planner Date: January 31, 2013 ENGINEERING COMMENTS NO. 1 1. Please remove the pavement on the replat side of the drawing. Reviewed by: Danielle Singh Date: January 31, 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN /PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: wdavis(a)-cstx.gov 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 3. EASEMENTS: Developer will provide descriptive easements for electric infrastructure as designed by CSU, as shown on plat or site plan. 4. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. 5. The following easements will be required: 6. 10' easement along Highlands and Fidelity Streets. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3