OBJECTIVE ONE Develop niversity Town Center under June 13, 2003
- LIDO � - / (�� '7
OBJECTIVE TWO Deliver the multi- tenant bldg
ASAP - Phase 1 - infrastructure, paving, bldgs.
OBJECTIVE THREE Deliver remaining restaurants, i.e. infrastructure, paving,
bldgs. � K*
TO ACCOMPLISH OBJECTIVE TWO:
On December 3 submit:
water report for entire UTC project
sanitary sewer report for multi- tenant bldg
amended drainage report for May 12, 2003 - Replat of Henton - Lincoln
Subdivisions to revise per Phase 1 Development
changes to site plans per staff comments #1
cloud all changes (staff requested an d developer initiated)
The intent is for a complete submittal on Phase 1 on December 3.
Request Development Permit to install Phase 1 utilities and site grading on December 10th.
?05. C
A
_ S�� 1-o uM I�6
— S06 MiT (0 R Aty-Q !tY "Ao
X02
gV
S ��� f � 1 221 (AvNGI L
7
&A ti M11
0
F* S( T6
WAT P" S) $CAPE W(AT �
a I M"& NW AtCeP rr n vwm_ 9-"UtT F4 L
011m pl1T
OMT ( P1 W
6MT Asm*^ rr .
WSW Nom
JEFF MILBURN ENGINEERING
Jeffrey T. Milburn, P.P.
P.O. Box 10240, College Station, Texas 77842
Phone 979 - 690 -2560 Fax 979 - 690 -2540
January 14, 2005
Mr. Bryan Alan Wood, P.E.
District Engineer, Bryan District
Texas Department of Transportation
1300 N. Texas Avenue
Br-yan, Texas 77803 -2760
Re: Signal at FM 60 and University Town Center
Dear Mr. Wood:
i am in receipt of your letter to Mr. Brymer regarding the above traffic signal. Thank you for
Your willingness to consider this signal and the time you have taken to communicate with us at our
recent meeting and in correspondence. Having read the letter, l would like to make sure that l
understand the provisions and conditions that have been placed on this potential signal location. 1
have outlined my understanding below in a series of points correlating to those made in your letter.
If any of lily points are incorrect, or partially incorrect, please let me know in writing at your earliest
convenience. Mr. Scamardo has a number of clients who are relying on this information andwe
need to be sure we correctly communicate the position.
TxDOT will permit the installation of the signal, as proposed by the developer and City, at
the existing driveway and median opening between Tarrow and Lincoln, given the following
ewiditions are met:
a. The drivewwv for this development at Tarrow East must be designed, and built, as the
main driveway for the development and will be served by a modified signal
arrangement at Tal ow East.
b. This signal at the existing driveway into University Town Center between "farrow
and Lincoln must meet the MUTCD eight hour or four hour volume warrants from
actual generated traffic (not just projected), or the Crash Experience warrant.
The signal. may be designed and constructed but the heads must be covered or left on
flash until actual traffic meets warrants.
d. Coordination of the signals along FM 60 from Texas Avenue to SH 6 will be
maintained for progression by the City of College Station, includnig the installation
of any required interconnect and re- timing of the system.
e. Ifthese conditions are met TxDOT will give its written approval for this new signaJ
Civil Engineering Transportation Engineering Accident Reconstruction
University Town Center
Traffic Signal
Page 2
installation at the median. opening between. Tarrow East and Lincoln.
Again, thank you for this consideration. Please direct any correspondence regarding this
master to Mr. Bryiner, or m.yself..
Sincerely;
Jeffrey T. Milburn, P.E.
President
cc: Mr. 'Tom Brymer, City Manager, City of College Station
David Scamardo
Chuck Ellison
f�k Ll — ZS
Texas Department of Transportation
1300 N. TEXAS AVE. • BRYAN, TEXAS 77803 -2760 • (979) 778 -2165
January 3, 2005
Mr. Alan Gibbs, P.E.
Senior Assistant City Engineer
City of College Station
1101 Texas Avenue
College Station, Texas 77842
RE: FM 60 (South ROW)
East Tarrow to Quality Suites Hotel
Unit/ T, �w� - pntpr_
800 University Drive East
College Station, Texas
Access Driveways (2) Permit
Dear Mr.Gibbs:
We have reviewed and are returning the Access Driveways (2) Permit submitted November 15,
2004, for the referenced site with the following remarks.
It is noted that comments were submitted by TxDOT concerning these improvements for the
August 20 & September 7 Site Development Meetings. Additionally, several meetings were held
at this office & at the District Headquarters to discuss traffic concerns along University Drive for
this site.
Attached is a copy of a letter sent to Mr. Tom Brymer, City Manager, outlining various requirements
needed in order to install / activate a proposed Traffic Signal Light to be located approximately 0.2
mile east of the East Tarrow Street intersection at an existing driveway. With regards to the
conditions indicated in this letter please review the proposed Driveway Permit Site #1 to insure the
overall plan dimensions & traffic movements desired will accommodate the required improvements.
Also, the location of proposed Driveway Permit Site #2 , although not meeting the required spacing,
will be satisfactory with the following recommendations:
1) Recommend a right -turn deceleration lane @ the existing driveway where the proposed Traffic
Signal Light is to be installed;
2) Recommend a right -in, right -out designated entrance @ Driveway Permit Site # 2 with a
painted island divider and a one -way sign to be placed in the University Drive median @ this
location.
After consideration of our remarks, please resubmit this permit for approval.
If you have any questions concerning this matter, please call.
Sincerely,
Karl Nelson, P.E.
Bryan Area Engineer
An Equal Opportunity Employer
TEXAS DEPT OF TRANS Fax:979- 778 -1375 Apr 18 2005 13:26 P.04
December 13, 2004
Mr. Tom Bry r
City Manag
City of College Station
P.O. Box 9960
College Station, Texas 77840
SIGNAL AT FM 60 AND UNIVERSITY TOWN CENTER
Dear Mr. Brymer:
Thank you for taking the time to meet with me to discuss your concerns about the request to
install a traffic signal at the intersection of FM 60 and the University Town Center development.
The Municipal Maintenance Agreement between TxDOT and the City of College Station requires
TxDOT's written approval for any traffic control device which would affect or influence the use
of State maintained highways.
After careful review of the site and the surrounding facilities, and the past discussions about this
location, TxDOT will permit the installation of a traffic signal tinder curtain conditions. The
signal can �e but not turned operational until the following contingencies are met:
• The developer must fully design and build the driveway at the modified signalized
intersection at East Tarrow to be used as the main driveway.
• The intersection will need to meet either Warrant 1: Eight -Hour Vehicular Volume, 1
Warrant 2: Four -Hour Vehicular Volume or Warrant 7: Crash Experience.
• j The coordination of the signals along FM 60 from Texas Avenue to the SH 6 frontage `
!) roads will need to be maintained to provide a favorable progression platoon for vehicles 1
d to travel and minimize the number of stops in the system. 1
The proposed signal will be allowed to be installed; however, the signal heads must be covered r'
turned on flashing only until these conditions are met. If the signal is turned on without meeting
these criteria, we will.instruct the City to comply with these instructions or the signal will be
removed from service by State forces.
If you wish to discuss this issue further, please call me at (979) 778 -9714.
Sincerely,
Bryan Alan Wood, P.E.
District Engineer
cc: Mr. Karl Nelson, P.E.
Ms. Catherine Hejl, P.E.
.1/2005 09:28 9796902540 JEFF MILBURN ENGR. PAGE 02
I F Texas Department of Transportation
1300.N. TEXAS AVE, • BRYAN, TEXAS 77803 -2760 • (979) 778 -2165
January 31, 2005
Mr. Jeffrey T. Milburn, P.E.
Jeff Milburn Engineering
P.O. Box 10240
College Station, Texas 77842
Dear Mr, Millburn:
I have been asked to respond to your January 14, 2005 letter to Mr. Bryan Alan Wood,
P.E., concerning the City of College Station's request to signalize the intersection of
FM 60 and the University Town Center Development. Your assessment of TxDOT's
provisions and conditions is correct.
If you have any further questions, please call me at (979) 778 -9756.
Sineerel r
Kirk E. Barnes, P.E.
Director of Transportation Operations
Bryan District
An Eoue/ OppoRUn;ry Employer
z
The City of
Colleg Station, Texas
Embracing the Past, Exploring the Future.
P.O. Box 9960 • 1101 Texas Avenue 0 College Station, TX 77842 (979) 764 -3500
www.ci.college-station.tx.us
October 28, 2004
Mr. Charles A Ellison
Charles A. Ellison, P.C. — Attorneys at Law
2501 Ashford Drive, Suite 100
College Station, TX 77840 -4698
Re: University Town Center Development
Mr. Ellison:
I received a copy of the letters you sent to Ken Fogle, Transportation Planner, and he
asked that I respond to you. As you know, University Drive (FM 60) is a state owned
facility and thus, the Texas Department of Transportation (TxDOT) makes the final
decision regarding issues along their roadways. I have contacted TxDOT regarding the
signalization of the median opening in front of the proposed University Town Center
development as well as the proposed signal modifications at the driveway on University
Drive aligned with Tarrow Street East.
TxDOT h as indi that they do not object to a
on University Drive
owever, to ensure 1
wi th Tarrow Stri
;ast, creating a 4-
negatively
ass section allowi;
impacted, the driveway
minor arterial
two lanes entering th development and at least two t o es and one left -turn lane
exiting tie development. TxDOT and the City of College Station will require the
developer to pay for the traffic signal modifications for this approach. Additionally,
TxDOT and the City of College Station must review and approve the design before the
city will allow construction to begin.
Regarding the proposed signal l� n on University Drive between Tarrow Street East
and Spring Loop, TxDOT will not grant permission for another signal to be installed
between these two signa lze intersections. In order to keep signals operating efficiently, '
TxDOT has begun requiring a signal spacing of Y2 mile, and installing a signal between
these two intersections will violate this spacing requirement. Additionally,: TxDOT will
not allow the installation of a traffic signal when the signal warrants are�satisfied based
on projec ted traffic volumes; signals should be warranted based on exit traffic
ume n
vold/or crash experience.
Home of Texas A &M University
Home of the George Bush Presidential Library and Museum
If you would like to discuss this further or have any questions, please contact me at (979)
764 -3691 or trother a,cstx.gov
Sincerely,
Troy A. Roth r, P.E.
City Traffic Engineer
City of College Station
cc: Mark Smith, P.E., Director of Public Works
Kim Foutz, Economic Development Director
Charles McLemore, Assistant Director of Public Works
Bob Mosley, P.E., City Engineer
Alan Gibbs, P.E., Senor Assistant City Engineer
Ken Fogle, P.E., Transportation Planner
7 � T
KLING ENGINEERING & SURVEYING'
Consulting Engineers • Land Surveyors
4101 Texas Avenue, Suite A Post Office Box 4234
Bryan, Texas 77802 Bryan, Texas 77805
Telephone 979/846 -6212
Fax 979/846 -8252
B.J. Kling, P.E., R.P.L.S.
S.M. Kling, R.P.L.S.
Memo:
To: City of College Station
Development Services
c/o Allen Gibbs
From: Fred Paine
Re: University Town Center
City Case File #04- 00500259
Response to Engineering Comments
ENGINEERING
1. Acknowledged - TxDOT permit applications were submitted at preliminary review.
2. Acknowledged - Written agreement will be submitted prior to construction of Phase 2.
3. Revision - Cement stabilization extends 12" beyond pipe joints of sanitary sewer lines, and
associate waterline has been noted to center joint over crossing.
4. Clarification - Headwall has been redesigned to be a flush headwall, and it will no longer cross
the existing sanitary sewer line.
5. Revision - Cement stabilized trench backfill and ductile iron pipe have been used in all areas
with less than 3.5' of cover.
6. Clarification - Waterline has been deflected at all possible locations. Instances noted on C6.2
and C6.7 cannot be deflected due to the need to have a complete joint into or out of a fitting and
maintaining the necessary 4' minimum cover.
7. Clarification - Overall utility layout has been revised to show waterline labels.
8. Revision - Air Release Valves have been provided at noted areas on the waterline.
9. Clarification - There are too many easement boundaries to place expansion joints at all boundary
locations.
pgIofI
05/17/2006 14:05 9798468252
KUNG ENGINEERING & SURVEYING
Cotj$,Ating Etxgincers • J and Sutvcyors
4101 Texas Avenue, Shiite A
Bryan, Texas 77802
Telephone 979/84G -621
Fax $79/846 -8252
S.J'. Ii lilag, V.E►., ILF.L.S.
S.M. Ming, R.P.L.S.
Memo;
To: City of College Station
Development Services
Alan Gibbs, P.E., Reeves
From: Fred Pave
RE: Items req r .. uelo's Certificate of Occupancy
PAGE 02/02
Post Office Sox 4234
Bryan, Texas 77805
May 1'7, 2006
The following is the list of items & their status as discussed at the Marcb.17, 2006 meeting regarding building
C/O requirements.
Item Status:
1. Landscaping & irrigation - Provide Letter of Credit for To be submitted pnor to U/ V
portions not completed Request
2, All Fire Lanes marked - Lanes providing fire service to To be complete /submitted prior to
Abuelo's to be marked; Lanes in Phase 213 bonded for with C/o Request
Item 1 above.
3. Parking Lot Striping - Striping for Abuel.o's to be To be complete /submitted prior to
completed; Phase 213 bonded for with Item 1 above C/O Request
4. Fencing Plan with barricaded drive aisles Submitted 04/25/06 via email -
Installed
5.
]Fencing around Abuel.o's
To be complete prior to C/O Request
6.
Tarrow Entrance signed as "Construction Entrance only-
To be complete prior to C/O Request
prior to signal operation
(sign in progress)
7.
Erosion & Sediment control plan for pond area
Submitted 04/26/06 via email - Under
Construction
8,
Storm Sewer cleaned out
Completed 05 /04 /06
9,
Amendment to Drainage Report
Submitted 05/16/06
10.
Plat Filed
Completed
11.
Letter of Acceptance for Phase 2B Sanitary Sewer
To be submitted this week
1.2.
Dumpster pad with gates
A.buelo's only - complete
13.
Erosion Control for stock pile at south end of project
Installed
Excel
Landscaping & Lawns, Inc.
739 r"&.n Arm Rl'ud, Rrym , 7k 77.402
Mobile; (979) 412 -3186 Offm: (979) 846.770
A A A S
DWS Development
Vniversiity Tvwa Conner
College Station, TX
1. General Provisions
A Services
The Contractor Shall provide all materials, equipment, labor and supcivision
to perform all services.
B. Insurame
The Colmactor will at all times maintain general Mbility anal property
damage cove ge for the protection of Excel and the client,
Ix. Scope Of Work:
A. Installation of steel edging for border of beds.
B. installation of topsoil for final grade for sod.
C. Installation of bed mix into for building of all boils and islands areas.
D. Installation of Colorado hock into islands and for borders of 6►e&
E, lt"lation of mulcb into all beds.
F- Installation of , shrubbery and ground cover for project,
G Installation of sod,
H. Sttwng of all trees.
Cost for above: $14,500.00
M. ,litigation:
A- Irrigation system installed for twf and bed areas,
cost; $18,400.00
Tllallk you , I RG — ,
Kevin l►rleteilExccl lr►c. 3fi6
Via=
KLING ENGINEERING & SURVEYING
Consulting Engineers - Land Surveyors
4101 Texas Avenue, Suite A
Bryan, Texas 77802
Telephone 979/846 -6212
Fax 979/846 -8252
B.J. Kling, P.E., R.P.L.S.
S.M. Kling, R.P.L.S.
Memo:
To: City of College Station - Development Services
c/o JenniMwenter
From: Fred Pai
Re: Universit - Staff Review Comments No. 6
University Town Center - Request for Phase 2A Approval
Post Office Box 4234
Bryan, Texas 77805
October 21, 2005
The following is in response to September 2005 Staff review:
Planning
1. Notation added
2. Dumpster enclosures remained unchanged. Developer is coordinating with
City Officials regarding a final resolution on the matter.
With this submittal, we are requesting approval of Phase 2A. Phase 2A does not
contain either of the outstanding site issues (TXDOT drive way / Dumpster screening).
Please contact either Stewart Kling or myself at your earliest possible convenience should
you have any questions or comments.
07/11/2005 16:09 9798468252 KLING ENGR PAGE 02/04
KLING ENGINEERING & SURVEYING
Consulting Engineers • Land Surveyors
4101 Texm Avenue, Suite A
Bryan, Texas 77802
B.J. Kling, P.B. R.P.L.S.
S.M. Kling, R.P.L.S.
Memo:
To: City of College Station
Development Services
From: Fred Paine
Re: University Town Center
City Case File #04- 00500259
Summary of Phan. Revisions to Date
0 V tiT AN d
Post Mee Box 4234
Bryan, Texas 77805
July 11, 2005
S heet
Rev ision
Reason for Revision
1 C1.1
Existing SS Line to remain open & in
Revision to SS service route for
service as opposed to original, design to
TGJF building
abandon
2 C1.1
Revised Transformer Location for Phase
Moved laterally to eliminate confli
3 Building
with existing utilities
3 CIA
Revised retaining wall height & length at
Refined grading
south. side of Phase 3 building / Added
retaining wall at east side
4 C1.1
Changed portion of Phase 3 proposed
Revision due to parking requiremi
building usage from restaurant to retail.
5 C1.1, C3.1,
Storm Sewer re-design/re-route through
Avoid proposed pvmt Demo &
C3.2
Phase 3 to Existing detention pond
traffic disruption
6 C1.1
Revised Water, SS, & gas service line
Avoid conflict with revised storm
routes to Phase 3
7 C1.1 Moved grease trap behind Phase 3 bldg Conflicted with dumpster
8 C1.1, C1.2 Phase 3 Water, SS, and other utility Services to be provided when
services not to be constructed until time ofneeded
wilding construction.
9 C 1.1 Added small section. of curb behind Phase Area to be sidewalk paving
3 dum ster pad
Telephone 9791946-6212
F= 9791846 -8252
pgiof3
07/11/2005 16:09 9798468252 KLING ENGR PAGE 03/04
Sheet Revision Reason for Revision
10 C1.1, C1.2, Private Light Poles .relocated Eliminate conflicts with other
C1.3 changes to island locations
11 C1.1 -C1.4, Changed Private Storm Sewer. from RCP Cost effectiveness
C3.1, OA to ADS pipe
1 C1.2, C1.3, Parking Layout & Analysis Phase 2 Buildings size, use, &
CIA revised
1113 C1.2, C4.1
Gras line route, Electric line route -
Revisions approved by Atmos Gas &
College Station Utilities respectively
Portions of Storm Sewer Eliminated or
Modified, Parking islands regraded or
flume installed for drainage
Concrete Apron behind Phase 3
Indicated to be Demolished
TGTF Building size & layout revi
14 C1.2, C1.3,
C3.1 C3.3,
C3.4
15 C1.2
16 C1.2, C4.1,
17 j C1.2, C3.3
18 C1.2, C4.1
19 1.2, C3.3
1 20 C1.2, C3.3
21 C1,2, C1.3
22 C1.3
11 23 C1.3, Cd
24 C1.3
Revised for efficiency
Clarification to original plan
SS line shown on Phase 3 (SS Line `C') More efficient use of existing fa(
shifted —150' north to existing stubout on
Phase 2. Existing stubout on Phase 3 to
remain for future service to building
Revised parking, dumpster, & island Electric Transformer serving Ph
layout behind Phase 3 building 3 building in parking island over
existing gas line
Water & S S service line routes to TO TGIF Building size & layout rev
Friday's .revised
Added island with HC accessible route & TGIF layout revised/HC route from
ramp East of TUT Friday's University Dr_ revised
Driveway Entrance revised Per City of C.S. 06/15/05 comment
Building overhang/canopies shown Missed on previous submittal
Utility service line routes to "East" Building layout revised (previously
building around pond revised "Carrabba's" now changed user)
Parking adjacent to "East" building Building layout revised (previously
around pond revised "Carrabba's" now changed user)
Utility service line routes to "South East" Additional users proposed,
building around pond revised additional services added
pg2of3
07/11/2005 16:09 9798468252 KLING ENGR PAGE 04/04
Sheet RRevisig Reason for )E rdsion
25 C1.3, C3.4 /Parking adjacent to "South" building Building layout revised
around pond revised
26 C1.3 Utility service line routes to "South" Building layout revised
I j building around pond revised
27 C1.3 C3.4 Parking adjacent to "West" building Entrance drive eliminated
around pond revised
28 C1.3
29 Cl 1 3 C3.4
11 30 C1.3, C3,4
11 31 C1.3, C3.4
11 32 C1.3, MA
Utility service line routes to "West" Building changed (combined 2 into
building around pond revised 1) / Better future accessability
Dumpster location revised, parking layout Better access to dumpsters, gained
revised parking spaces
Pond information added Pond design complete - Pond desig
includes detention capacity for 4.5
acre Cox tract & majority of T5
acre Sahara Realty Tract adjacent t
Lincoln. Dr.
Culverts from BDC Properties tract Agreement with BDC Properties !
reduced from 2 -6x4 RCB to 2 -48" RCP design documented in. drainage
and alignment changed report
Headwall at UTC/BDC property line Agreement with BDC Properties /
eliminated / Storm Sewer continued design documented in drainage
across BDC tract .report / BDC storm sewer Plans
previously submitted under separa
cover
33 C1.3, C3.4 Pond dimensions changed, flowlines Change in drainage design concept
changed Documented in Drainage Report
34 C1.3, C3.4 `,/ Driveway Entrance at East Tarnow Per City of C.S, 06/15/05 comment
/ revised
35 C1.4 ( Revised as necessary including parking above mentioned changes
analysis
I� 36 C3.1 Inlet table revised Above mentioned revisions to
sewer
11 37 CT I -C7.3 Added notes, details, rearranged details Clarification to
pg 3 of 3