HomeMy WebLinkAboutPAC Info.<0- -3 o -oct
c b0PLCk_
CITY OF COLLEGE STATION
Development Services
1101 Texas Avenue
979.764.3570
Pre - Application Conference (PAC)
Request Form
The purpose of a pre- application conference is to meet the City staff that will be involved
with your development and identify general issues that need further analysis. Along with
the discussion of these major issues, staff will talk about the development process,
distribute necessary information and discuss what permits will be required for your
particular development. This meeting is in no way a complete review of your project.
Staff will perform a formal thorough review once the minimum requirements are
submitted for your particular development.
Contact Information:
Name 1 E -Mail Address
Phone Number 27&O -Log (li3 Fax Number A 19 3 d
Development proposes for subject property (type of business, square footage, etc.,):
Property Owner:
Address / Locatic
Legal Description
Minimum Submittal Requirements by the Wednesday before the PAC.
1. Site plan, if applicable (2 copies).
2. Survey of property or key map showing location.
Please fax form to 979.764.3496 or e-mail to bgeorge(a)_cstx.gov
Upon receipt you will be contacted to schedule a pre - application conference.
i
PREAPPLICATION CONFERENCE
The purpose of a preapplication conference is to meet the City staff that will be involved with
your development and identify general issues that need further analysis. Along with the
discussion of these major issues, staff will talk about the development process, distribute
necessary information and discuss what permits will be required for your particular
development. This meeting is in noway a complete review of your project. Staff will perform a
formal thorough review once the minimum requirements are submitted for your particular
Date of Meeting:
k
City aff Present:
Natalie Ruiz
• Bridgette George
• Deborah Grace
• Susan Hazlett
Project Location:
rol
olly Hitchcock
• Jennifer Reeves
• Jennifer Prochazka
• Lauren Harrell
■ -, :.
❑ Jerry Duffey
❑ Raymond Olsen
❑ Steve Smith
❑E'cHurt
Land Use /Zoning (ie: Residential /R3) ii'
Special zoning district information:
Applicant(s): Phone Number:
Subdivision/ Platting Issues:
T -Fart clan / Street Issues:
1
Parking:
A
Landscaping: .A�e 4 ]Dumpster:
r Fire Hydrant:
�( Signs:
. Screening / Bui
Easements:
Parkland /Greenways Dedication:
. -
Drainage Issues:
UtilyEv Issues:
Weker Availability/ Capacity:
Sanitary Sewer Availability/ Capacity:
Electrical:
Variance Requests:
Permits required for this development:
Building Permit Conditional Use Permit
Development Permit TxDOT Utility Permit for work in State ROW
TxDOT Driveway Permit for work in State ROW
Special Review required by:
ZBA Design Review Board
City Council Parks and Recreation Board
Planning and Zoning Commission
Information Provided:
Zoning Ordinance Development Resource Guide
Subdivision Regulations Guide to Building & Development
Northgate Design Guidelines Drainage Policy & Design Standards
Specifications for Street Construction
Water & Sewer Specifications Manual
Driveway Access Location & Design Policy
CS Business Center Covenants & Restrictions
Fire Department Construction & Development Guide
CS Building Regulations (Local Amendments to the Building Code)
Impact Fees:
Article S. District Purpose Statements and Supplemental Standards
Section 5.8. Overlay Districts
1 ' S. Sign Regulations:
Only attached building signs and low profile signs meeting the requirements of
the UDO shall be permitted. Building signs shall not obscure other building
elements such as windows, cornices, decorative details, etc.
Design Standards:
The following standards apply specifically to single family and townhome residential
development along the Krenek Tap Corridor in addition to other design standards
contained within the UDO applicable to single family development.
1. Front Setback:
Residential lots adjacent to Krenek Tap right -of -way shall be oriented so that the
front facades of individual units or dwellings face Krenek Tap Road, if there is
sufficient property frontage to do so. The front setback of these units shall not
exceed fifteen feet (15'). This does not preclude residential street access to
Krenek or pedestrian access.
2. Front porches:
Every front fagade visible from Krenek Tap Road shall contain a front porch
extending along at least one half of the front fagade. These porches shall be
large enough and useable for outdoor seating and not solely decorative.
3. Parking:
No driveways or locations for parking shall be allowed in the yard areas facing
Krenek Tap Road or along Krenek Tap Road itself. Rear parking and access shall
be required.
4. Architectural Design:
All exterior walls visible from the public ROW shall be finished in the following
materials: brick, native stone, cast stone, textured concrete masonry units,
fiber /cement board, solid wood planking, stucco or synthetic stucco. Metal siding
Is prohibited on all exterior walls. Alternative materials may be approved by the
Design Review Board, if the alternative materials meet or exceed the standards
of the materials listed above. The primary material shall not exceed seventy -five
percent (75 %) of the fagade. The fagade calculation excludes windows and
doors. There shall be no flat roofs.
(Per Ordinance No.� ated April 8, 2004)
5 -21
Unified Development Ordinance 6/13/03 City of College Station, Texas