HomeMy WebLinkAboutApplication 44,44-"IN OFR OFFICE USE ONLY
CASE NO.: �� '
DATE SUBMFTTE D. Y ���war
TIME:
CITY OF COLLEGE STATION Owl
Home of Texas AoMUnivnsitt SITE PLAN APPLICATION STAFF+ =
GENERAL
MINIMUM SUBMITTAL REQUIREMENTS:
$932 Site Plan Application Fee.
$350 Non - Residential Architectural Standards / Northgate Building Review Application Fee (if applicable).
I a $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is
' due prior to the issuance of any plans or development permit).
Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered.
Fourteen (14) folded copies of site plan.
1 A One (1) folded copy of the landscape plan.
Na, One (1) copy of the following for Non - Residential Architectural Standards building review or Northgate
Building Review (if applicable).
Na Building elevations to scale for all buildings.
N1, A list of building materials for all facade and screening.
Na Color samples for all buildings or list colors to be used from the approved color palette.
N7 Electronic copy of Site Plan e- mailed to csuelectdesign @cstx.gov
6 21 . Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
Lgi Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
Nla Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the
proposed request (if applicable).
NOik The attached Site Plan Non - Residential Architectural Standards Building Review and Northgate Building
Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not
check off.
Date of Optional Preapplication or Stormwater Management Conference N/A
NAME OF PROJECT LAKERIDGE TOWNHOMES Phase 1 C-R _
ADDRESS 1198 JONES - BUTLER ROAD
LEGAL DESCRIPTION (Lot, Block, Subdivision) Lot 1 Block 1 Lakeridge Subdivision
APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name Mitchell & Morgan, LLP C/O Veronica Morgan, PE E -mail v @mitchellandmorgan.com
Street Address 511 University Drive East, Suite 204
City College Station State Texas Zip Code 77840
Phone Number 979 - 260 -6963 Fax Number 979- 260 -3564
PROPERTY OWNER'S INFORMATION:
Name Lakeridge Living LP, A Texas Limited Partnership E -mail JIMBSTEWART @GMAIL.COM
Street Address P.O. BOX 10028
City College Station State Texas Zip Code 77840
Phone Number 979 - 739-9944 Fax Number 979- 694 -3774
1/11 Page 1 of 11
ARCHITECT OR ENGINEER'S INFORMATION:
Name Veronica Morgan, PE, CFM E -mail v@mitchellandmorgan.com
Street Address 511 University Drive East, Suite 204
City College Station State Texas Zip Code 77840
Phone Number 979-260 -6963 Fax Number 979 - 260 -3564
OTHER CONTACTS (Please specify type of contact):
Name NSA E -mail
Street Address NIA
City NSA _ _ _ _ _ State _ Zip Code _
Phone Number N/A Fax Number
Current zoning R -4 Multi- Family
Present use of property UNDEVELOPED - VACANT
Proposed use of property MULTI - FAMILY
Number of parking spaces required 0 _ Number of parking spaces proposed 19 PS
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? r Yes Ix No
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
� Yes
r No
If yes, provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name: LAKERIDGE SUBDIVISION
City Project Number (in known):
Date / Timeframe when submitted: ;mgt 2P,Q94"2 March 2 010
1/11 Page 2 of 11
MULTI- FAMILY RESIDENTIAL PARKLAND DEDICATION
(Fees due prior to the issuance of a Building Permit)
Total Acreage 16.4 Acres # of Multi - Family Dwelling Units
Floodplain Acreage 0 acres OK X $1646 = $
Housing Units 0
OK # of acres in floodplain
0 # of 1 Bedroom Units
OK # of acres in detention
O # of 2 Bedroom Units OK
# of acres in greenways
0 # of 3 Bedroom Units
OK Date dedication approved by Parks &
0 # of 4 Bedroom Units Recreation Advisory Board
COMMERCIAL
FOR 2 BEDROOM UNITS ONLY
Total Acreage N/A
O # Bedrooms = 132 sq. ft.
Budding Square Feet N/A
O # Bedrooms < 132 sq. ft.
Floodplain Acreage N/A
* Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government
Code may be assessed a different amount. Please contact city staff for additional information.
The applicant has prep : • d this application and certifies that the facts stated herein and exhibits attached hereto are true
and correct.
—
S _.' re and title Date
" Ai '/� �
1/11 Page 3 of 11
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re- issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities_ All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to _ _ (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGR 4 TO AND CERTIFY -HAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELO N • - 'i IT APPLICA ON, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
AC d
I
Pro rty +wner(s) Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
3. The information and condusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Engineer Date
1/11 Page 4 of 11
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re- issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Property Owner(s) Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Lopi Regulations
4. HE ENGINEER, AGREE TO AND STATEMENTS HEREIN, AND IN ATTACHMENTS
*R THE DEVELOPMENT PERMIT OA I ,,. 1 TO THE BEST OF MY KNOWLEDGE, TRUE, AND
• ; CURATE. * i� *
t ill, jjE RONICA J B. MOR �� —� , . 71 ▪ La e 1 31/11
,I . 01 41 Engineer t '•, �FQisT1+? a te f +Q,1Ati4
%UfVP‘^ ▪ -
1/11 Page 4of11
The following CERTIFICATIONS apply to development In Special Flood Hazard Areas.
Required for Slte Plans, Final Plats, Construction Plans, Fill /Grading Permits, and Clearing Only
Permits:*
f� , fir¢v1 t d
A. I, v 3?? rV� / °�". A� v certify, as demonstrated in the a�tasl�ed� drainage study, that the
alterations or development covei�ei by this permit, shall not: �"t �e
(1) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 conceming encroachment into the Special Flood Hazard Area; nor
(v) crease Base Flood velocities. + 00
.s�~ OF r ‘
bey those areas •xem.ted by or ' irt' tibn.As1 fit of Chapter 13 Code of Ordinances.
* 46 I ii % w 1 * i. 2
1 .
�
ilk Mk r VERONICA J.B. MORGAN J ��
Engineer ■ II ` 1,1' 77689 ', I L ate r
lD AEG ve:',�O NA. f" 3
Initial +tit �SpNA :.? `a-
* If a platting- status exemption to this 1tement is asserted, provide written justification under separate
letter in lieu of certification.
Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits:
B. I, 110.AR)vv,4-4 J v Fi 4. ..,..„. 404 , 0 , to the following:
(i) ' . t any nonresidential or multi- gtibuf r�► roposed to be on this site as part of this application is
d: signed to prevent damage to t tcttir -��. r'its. kits as a result of flooding from the 100 -year storm.
i i I `, ++ � Nw 1 w � . _ VERONICA J.B. MORGAN r 14 21 l t 1
Engineer Iv) v Ig ..3,,,... �o m ate
# tit. ' �G /ST ��,.?= .iv&$ ►l 'k3
Additional certifica Floodway E 1 € ts:
C. I, _ NI _ _ , certify that the construction, improvement, or fill covered by this
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
Engineer Date
1/11 Page 5 of 11
Required for all protects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D. I, ►v 11 /A , certify that all new construction or any substantial improvement
of any residential str shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre -pour) and post construction.
Engineer / Surveyor Date
Commercial Structures:
E. I, , certify that all new construction or any substantial improvement
of any commercial, industrial, or other non - residential structure are designed to have the lowest floor, including all
utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation
Engineer / Surveyor Date
OR
I, �f , certify that the structure with its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood - proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
Engineer / Surveyor Date
Conditions or comments as part of approval:
1 111 Page 6 of 11
SITE PLAN MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
MI Sheet size - 24" x 38" (minimum).
IM A key map (not necessarily to scale).
MI Title block to include:
Name, address, location, and legal description
M Name, address, and telephone number of applicant
MI Name, address, and telephone number of developer /owner (if differs from applicant)
MI Name, address, and telephone number of architect/engineer (if differs from applicant)
MI Date of submittal
MI Total site area
MI North arrow.
MI Scale should be largest standard engineering scale possible on sheet.
El Ownership and current zoning of parcel and all abutting parcels.
N1The total number of multi - family buildings and units to be constructed on the proposed project site.
The density of dwelling units per acre of the proposed project.
NITA The gross square footage of all buildings and structures and the proposed use of each. If different uses are to be
located in a single building, show the location and size of the uses within the building. Building separation is a
minimum of 15 feet w/o additional fire protection.
Locations of the following on or adjacent to the subject site:
Designate between existing and proposed
p The density of dwelling units per acre of the proposed project.
NQZPhasing. Each phase must be able to stand alone to meet ordinance requirements.
MI Buildings (Existing and Proposed).
MI Setbacks according to UDO, Article 5.
Geography
Nis. Water courses.
MI 100 yr. floodplain and floodway (if applicable) on or adjacent to the proposed project site. Please note if there is none
on the site with confirming FEMA/FIRM map number.
MI Existing topography (2' max or spot elevations) and other pertinent drainage information. (If plan has too much
information, show drainage on separate sheet.)
MI Proposed grading (1' max for proposed or spot elevations) and other pertinent drainage information. (If plan has too
much information, show drainage on separate sheet.)
1/11 Page 7 011