Loading...
HomeMy WebLinkAboutCorrespondenceMa ndi Alford - RE: SW Crossing Page 1 From: "Thomas Gessner" < tgessner @gessnerengineering.com> To: "'Natalie Ruiz "' <NRUIZ @cstx.gov> Date: 7/28/2004 5:49:33 PM Subject: RE: SW Crossing Natalie, 4 p.m. will be fine on 8/9. If anything opens up, please give us a call or email. Thanks for your help. Thomas Gessner, P.E. Gessner Engineering, LLP P.O. Box 10763 1712 SW Parkway, #105 College Station, Texas 77842 979.680.8840 (phone) 979.680.8841 (fax) www.gessnerengineering.com - - - -- Original Message---- - From: Natalie Ruiz [mailto:NRUIZ @cstx.gov] Sent: Wednesday, July 28, 2004 5:36 PM To: tgessner @gessnerengineering.com Subject: Re: SW Crossing Sorry Thomas. We're completely booked for 8/2. 1 have a 2, 3 or 4:00 available on 8/9. Which time will work best for you? Natalie Thomas Ruiz, AICP Development Manager City of College Station Phone (979) 764 -3570 Fax (979) 764 -3496 nruiz @cstx.gov www.cstx.gov College Station. Embracing the Past, Exploring the Future. >>> "Thomas Gessner" < tgessner @gessnerengineering.com> 7/28/2004 5:29:11 PM >>> Natalie, just emailing to get a confirmation on our predevelopment meeting Monday. Please let me know if you were able to fit us in. Man Alford - RE: SW Crossing P 2 Thanks, Thomas Gessner, P.E. Gessner Engineering, LLP P.O. Box 10763 1712 SW Parkway, #105 College Station, Texas 77842 979.680.8840 (phone) 979.680.8841 (fax) www.gessnerengineering.com Traditional Values, Progressive Thinking in the Heart of Research Valley my -*l 5� V h e-w*4 CITY OF COLLEGE STATION Planning & Development Services MEMORANDUM TO: Hunter Goodwin CC: Alton Rogers, P.E., Gessner Engineering Daniel Lunsford, Gessner Engineering Molly Hitchcock, AICP, Staff Planner Carol Cotter, Graduate Engineer FROM: Ken Fogle, P.E., Transportation Planner DATE: April 5, 2005 V `� RE: Southwest Crossing at Bee Creek - Drive - Through Lane Design Thank you for meeting with me on Friday to discuss the design of the drive - through lanes for the Southwest Crossing at Bee Creek development. To review our discussion, it is my understanding that there are two drive - through lanes planned in the first phase of the development. The first drive - through lane will be on the east end of Building A and will service a dry cleaners/ laundry business. The second drive - through lane will be on the north side of Building B and will service a drive - through alcohol sales business. Additionally, each of these drive - through facilities will operate with a single order /service window (i.e., no call box). We will approve the design of these drive - through lanes contingent on the planned uses for each of these buildings as stated above. Please be aware that if the use of these buildings change, the use of the drive - through lanes may not be allowed without significant modifications. For example, the drive- through lane on the east end of Building A will not be able to be used with a fast food restaurant because of an insufficient queue area outside of the drive aisle. The drive - through lane on the north end of Building B is also inadequate to be used with a fast food restaurant because of insufficient queue area outside of the fire lane. If there is a chance that the use of these buildings will change in the future, it would be a good idea to modify the design of these facilities at this time. If you would like to discuss this further, please contact me by e -mail ( kfo�e @cstx�) or phone (764.3570). P.O. BOX 9960 • 1101 TEXAS AVENUE COLLEGE STATION • TEXAS • 77842 979.764.3570 www.csb(.gov E -mail Correspondence From: Carol Cotter To: Lindsay Boyer; Molly Hitchcock Date: 10/18/2004 11:27:40 AM Subject: Fwd: RE: Southwest Crossing I was afraid of this. >>> "Alton Rogers" < arogers @gessnerengineering.com> 10/18/2004 11:17:12 AM >>> Carol: Thanks for the note. If you could, let me know the area in which the ordinance was not met that you were referring to. I have called for the landscape plan from the Land Design Group, but Alan has not returned the call. Alton G. Rogers - - - -- Original Message---- - From: Carol Cotter [mailto:Ccotter @cstx.gov] Sent: Monday, October 18, 2004 11:11 AM To: arogers @gessnerengineering.com Cc: Bridgette George; Gina Southerland; Lindsay Boyer; Molly Hitchcock; Susan Stanley Subject: Southwest Crossing Alton - Just a heads up. The Landscape Plan is a requirement for the Site Plan submittal, and the Drainage Report for the Development Permit. Therefore, your applications are not complete. We will hold on to the documents submitted until the outstanding documents are received, and they will then go on that week's review. A preliminary glance at the plans submitted showed items that don't meet Ordinance. You may want to revisit your plans and revise them, as you will have additional time since you did not make this week's review. Please call if you have any questions. Carol College Station. Heart of the Research Valley. Jennifer Reeves - S.W. Crossing Wellborn Road CO Request From: Jennifer Reeves To: Benjamin McCarty; Brittany Korthauer; Chris Haver; Gina Southerland; Kim Wolfe Date: 1/4/2006 9:28:54 AM Subject: S.W. Crossing Wellborn Road CO Request The following items need to be addressed prior to temp CO: 1. All debris will need to be removed from the entire site (boards, bricks concrete, trash, scaffolding) 2. The removal of job trailers, construction equipment and construction signs. 3. All trash dirt is to be removed from the rear of the site except for the dirt that is to be used for future pad sites. This dirt is to be relocated to the back of the future phase of the subject property (not to be piled higher than 8 -feet, not in flood plain and placed not to be visible from any public right -of -way). 4.Temporary curbing to be installed in the driveway cut that connects the future phase with no parking painted on the curb. A temporary CO can be issued for 45 days with the following items to be addressed in this time period: 1. Ground cover to be established 2. The stone that is located in the rear of the property is to be removed. This stone is for the construction of the sign. Jennifer Reeves Staff Planner City of College Station jreeves @cstx.gov (979) 764 -3570 (979) 764 -3496 FAX __.._............ Page 1 CC: Molly Hitchcock