Loading...
HomeMy WebLinkAboutStaff CommentsCITY OF COLLEGE STATION Planning &Development Services 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM January 25, 2005 TO: Greg Taggart, MDG, via fax 979.693.4243 FROM: Jennifer Prochazka, Staff Planner SUBJECT: HORSE HAVEN PH 3 (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and resubmit the following information. Once all comments have been addressed and the Right-of-Way and easement abandonments have been processed and approved by the City Council, your project will be scheduled for the next available Planning and Zoning Commission meeting. Two (2) copies of the revised final plat and construction documents Upon receipt of the required documents for the Planning & Zoning meeting and approval of the R.O.W. and easement abandonments has been granted, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Josh Norton, Alan Gibbs or myself at 979.764.3570. Attachments: Staff review comments cc: Oakwood Custom Homes Group, LTD., via fax 979.690.2504 Case file #04-0050028 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 2 Project: HORSE HAVEN PH 3 (FP) - 04-00500283 PLANNING/ENGINEERING Comments 1 and 2 specifically apply to Phase 3 Final Plat At/1 eminder to show all existing easements that affect this property. Existing easements should be formerly abandoned thru council prior to forwarding to P & Z if not depicted. 4Yv-vide..Proposed Variable Width P.U.E. near inlet (1-3) allowing enough clearance such that there is a minimum of 5ft. from the utility to the edge of the easement or ROW, much like the Proposed Variable Width P.U.E. near inlet (1-4), same issue with Fire Hydrant 3. Comments) -specifically apply to Phase 2 and 3 Construction Plans #140OIrlease prepare and submit construction plans for Phase 2 separately from Phase 3. tt must,providp.Ronstruction drawings for the portion of Appomattox existing on.4,k the property with this plat submittal. If you do not wish to build it at this time you., a{. must provide a constr ion cost estimate and provide a bon for the c nstr tion cost. h ~Iflg w all existing easements that affect this property and utilities on constr tion plans. Existing easements should be formerly abandoned thru council prior to forwarding to P & Z if not depicted. rovide proposed street grades throughout, as well as a reference explaining L1 ~ a L2. Y-x-,e / ovide proposed n all utility profiles. CI D I: Sidewalk is rwon both sides of Horse Haven Lane. Current plans show existing sidewalks, whereas previous plans did not. minder that water lines should be C909 not C900. 0,L # Cprovide surface access to storm junction box (J-2). L (21,J 4 . _ A C7, check T/RIM bust at (J-2). 4 z1, eet C8; for street bore across Horse Haven Lane and provide call out of m teri I/ d3 ,and 14" steel casing is required. ~6 6 :#A heet C8, clarify flow line out for manhole at Sta. 3+74.00. . &44 et C10, show design slope of water and sewer lines. et C12, show detail of Asphalt Base Temporary Turn Around. a et C1~4, provide grading contours for area between Sta. 1+00.00 and 6+29.43:--- et C14, provide drainage and sewer easement extending to Sta. 6+29.43.. et C14, provide drainage calculations for drainage from Sta. 1+00.00 and 29.43 ~~!~eet-C14, for open channel flow at least 0.4% grade required. eet C14, missing FL IN at Sta. 0+00.00 Manhole, please number manholes. Reviewed by: Josh Norton and Alan Gibbs Date: January 24, 2004 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of rigid conduit for riser poles. Developer installs first 10' City installs remainder. 3. Developer installs pull boxes, secondary pedestal and transformer pads per city specs and design.(pull boxes, secondary pedestal and transformer pads provided by the city). 4. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 5. Developer will need to provide a temporary blanket easement on property to cover existing electric lines. (This is needed so existing easements can be abandon before the lines are moved or relocated.) Once project is complete and /or final plat is filed temporary blanket easement will be released. Overhead electric lines cannot be removed until underground conduit is installed by developer. 6. College Station Utilities will provide an electric design plan to the developer for the installation of conduit and for necessary easement to be added to final plat. 7. To obtain a copy of the design plan and discuss any of the above electrical comments, please contact Tony Michalsky at 979-764-3438. Reviewed by: Tony Michalsky C4, us X /44-k,~ +3 ( Date: 12-17-04 Revised Date. 1-6-05 of p4clr- 2 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 3 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM August 16, 2004 TO: Alton E. Ofczarzak, Oakwood Custom Homes, via fax: 979.690.2504 ✓ FROM: Jennifer Prochazka, Staff Planner SUBJECT: HORSE HAVEN ESTATES PH 2 (PP) - Preliminary Plat Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the information submitted by Monday, August 23, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for September 2, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised preliminary plat; and, One (1) Mylar original of the revised preliminary plat. One (1) copy of the digital file of the preliminary plat on diskette or e-mail to nmanhart@cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Spencer Thompson or myself at 979.764.3570. Attachments: Staff review comments #1 cc: Michael Hester, P.E., via fax: 979.693.1075 Burt Hermann, via fax: 979.680.0466 Case file #04-00500193 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 1 of 3 STAFF REVIEW COMMENTS NO. 1 Project: HORSE HAVEN ESTATES PH 2 (PP) - 04-00500193 ENGINEERING 1. Please show the boundary of the R-1 zoning district. 2. Please call the eastern portion of the property (behind Lots 19-28) "Proposed Greenway" and call out the acreage. Please also label the greenway to the south (behind lots 46-51) this same way. 3. Please show property to the north of Phase 2 as "Proposed Phase 3." 4. Lots 9&10 may need to be included in Phase 3. A manhole on the sewer and a temporary turn around on the street will be required with the platting of these two lots. In addition, it appears a fire hydrant is needed to supply coverage, depending on where the hydrant is relocated to the east. 5. Please be aware that the current easements shown on the property encumbers the buildable area of several lots and will need to be abandoned by the City before a Final Plat can be approved. Please fill out Abandonment Application. 6. Please show location where the fire hydrant is to be relocated (currently at the end of the Horse Haven Lane cul-de-sac). 7. Please show the location of the existing private access easement to the Kolbe tract. Please label as "to be abandoned" if this is the case. 8. Please show the oil well site boundary and label as "Reserve Tract." 9. The existing 20' PUE that begins on lot 7 is also a drainage easement. Please label. 10. Please label the property to the west of Appomattox Drive as a "Reserve Tract" This tract can not be final platted in the current configuration. 11. The Parks Board required that access be provided to Switch Station Road in order to allow residents access to Windwood Park. Please add a note to the Plat that this will be accomplished by either Phase 3 of this development or by the extension of Appomattox Drive, which ever comes first. 12. Please show existing water line that crosses Horse Haven Drive per construction plans. Reviewed by: Spencer Thompson & Jennifer Prochazka Date: 8-13-04 ELECTRICAL NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2of3 1. Proposed easements to be abandoned have existing power lines that will need to be relocated. Developer is responsible for the cost of relocations. 2. Developer provides digital AutoCAD 2000 version of plat and/or site plan. Email to tmichals@cstx.gov. 3. Developer installs conduit as per city specs and design. 4. Developer provides 30' of rigid conduit for riser pole(s). Developer installs first 10'. City installs remainder. 5. Developer installs street lighting per city specs and design. 6. Developer provides easements for electric infrastructure as installed for electric lines (including street lighting). 7. College Station Utilities will provide a design plan to developer for the installation of electric conduit and street lighting. 8. Contact Tony Michalsky at 979-764-3438 to coordinate above comments. Reviewed by: Tony Michalsky Date: 8-13-04 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3of3 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM August 24, 2004 / TO: Alton E. Ofczarzak, Oakwood Custom Homes, via fax: 979.690.2504 V/ FROM: Jennifer Prochazka, Staff Planner SUBJECT: HORSE HAVEN ESTATES PH 2 (PP) - Preliminary Plat Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Staff Comments #2 will be included with the Staff Report to the Planning & Zoning Commission. One (1) Mylar original of the revised preliminary plat. If you have any questions or need additional information, please call me or Spencer Thompson at 979.764.3570. Attachments: Staff review comments #2 cc: Michael Hester, P.E., via fax: 979.693.1 5 Burt Hermann, via fax: 979.680.0466 Case file #04-00500193 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 1 of 2 STAFF REVIEW COMMENTS NO. 2 Project: HORSE HAVEN ESTATES PH 2 (PP) - 04-00500193 ENGINEERING 1. A temporary turnaround is required at the end of Horse Shoe Drive. Please show on the Preliminary Plat. 2. The 6" proposed sewer line along Horse Shoe Drive must end in a manhole, per TCEQ requirements. Please show on the Preliminary Plat. 3. Please be aware that the abandonment process must be underway before Final Plat. 4. A water report is required to show that water is designed per City regulations. Line sizes shown on plat are preliminary. 5. A sewer report is required with the Final Plat submittal. Line sizes and capacities are determined at that time. 6. It appears that a drainage easement may be necessary for the storm sewer outfall to Wolf Pen Creek. Reviewed by: Spencer Thompson & Jennifer Prochazka Date:8-24-04 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2of2 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM August 16, 2004 TO: Alton E. Ofczarzak, Oakwood Custom Homes, via fax: 979.690.2504 FROM: Jennifer Prochazka, Staff Planner SUBJECT: HORSE HAVEN ESTATES PH 2 (PP) - Preliminary Plat Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the information submitted by Monday, August 23, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for September 2, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised preliminary plat; and, One (1) Mylar original of the revised preliminary plat. One (1) copy of the digital file of the preliminary plat on diskette or e-mail to nmanhart@cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Spencer Thompson or myself at 979.764.3570. Attachments: Staff review comments #1 cc: Michael Hester, P.E., via fax: 979.693.1075 Burt Hermann, via fax: 979.680.0466 Case file #04-00500193 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. I of 3 STAFF REVIEW COMMENTS NO. 1 Project: HORSE HAVEN ESTATES PH 2 (PP) - 04-00500193 ENGINEERING 1. Please show the boundary of the R-1 zoning district. 2. Please call the eastern portion of the property (behind Lots 19-28) "Proposed Greenway" and call out the acreage. Please also label the greenway to the south (behind lots 46-51) this same way. 3. Please show property to the north of Phase 2 as "Proposed Phase 3." 4. Lots 9&10 may need to be included in Phase 3. A manhole on the sewer and a temporary turn around on the street will be required with the platting of these two lots. In addition, it appears a fire hydrant is needed to supply coverage, depending on where the hydrant is relocated to the east. 5. Please be aware that the current easements shown on the property encumbers the buildable area of several lots and will need to be abandoned by the City before a Final Plat can be approved. Please fill out Abandonment Application. 6. Please show location where the fire hydrant is to be relocated (currently at the end of the Horse Haven Lane cul-de-sac). 7. Please show the location of the existing private access easement to the Kolbe tract. Please label as "to be abandoned" if this is the case. 8. Please show the oil well site boundary and label as "Reserve Tract." 9. The existing 20' PUE that begins on lot 7 is also a drainage easement. Please label. 10. Please label the property to the west of Appomattox Drive as a "Reserve Tract" This tract can not be final platted in the current configuration. 11. The Parks Board required that access be provided to Switch Station Road in order to allow residents access to Windwood Park. Please add a note to the Plat that this will be accomplished by either Phase 3 of this development or by the extension of Appomattox Drive, which ever comes first. 12. Please show existing water line that crosses Horse Haven Drive per construction plans. Reviewed by: Spencer Thompson & Jennifer Prochazka Date: 8-13-04 ELECTRICAL NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 1. Proposed easements to be abandoned have existing power lines that will need to be relocated. Developer is responsible for the cost of relocations. 2. Developer provides digital AutoCAD 2000 version of plat and/or site plan. Email to tmichals@cstx.gov. 3. Developer installs conduit as per city specs and design. 4. Developer provides 30' of rigid conduit for riser pole(s). Developer installs first 10'. City installs remainder. 5. Developer installs street lighting per city specs and design. 6. Developer provides easements for electric infrastructure as installed for electric lines (including street lighting). 7. College Station Utilities will provide a design plan to developer for the installation of electric conduit and street lighting. 8. Contact Tony Michalsky at 979-764-3438 to coordinate above comments. Reviewed by: Tony Michalsky Date: 8-13-04 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3of3 STAFF REVIEW COMMENTS NO. 2 Project: HORSE HAVEN ESTATES PH 2 (PP) - 04-00500193 ENGINEERING 1. A temporary turnaround is required at the end of Horse Shoe Drive. Please show on the Preliminary Plat. 2. The 6" proposed sewer line along Horse Shoe Drive must end in a manhole, per TCEQ requirements. Please show on the Preliminary Plat. 3. Please be aware that the abandonment process must be underway before Final Plat. 4. A water report is required to show that water is designed per City regulations. Line sizes shown on plat are preliminary. 5. A sewer report is required with the Final Plat submittal. Line sizes and capacities are determined at that time. 6. It appears that a drainage easement may be necessary for the storm sewer outfall to Wolf Pen Creek. Reviewed by: Spencer Thompson & Jennifer Prochazka Date:8-24-04