Loading...
HomeMy WebLinkAboutCorrespondenceCITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 FACSIMILE COVER SHEET Date: Z1 Z V13-- # of pages including cover: If you did not receive a complete fax, please call our office immediately for a new transmittal, TO: FAX: (y71) Oq- W35- COMPANY: RE: r'-1 .S4 '~y► FROM: ~S4 r COMPANY: City of College Station Development Services REMARKS: ❑ Urgent ❑ For your review ❑ Replay ASAP 54FYI (y7y) 00-/soy . #Pe -g•s l+e%r Josh Norton - Horse Haven Phase 2 Clarifications Page 1 From: Josh Norton To: mdgcstx@yahoo.com Date: 2/3/2005 7:49:12 PM Subject: Horse Haven Phase 2 Clarifications Lee, Listed below are the comments that Alan and I mentioned earlier on the phone. Hopefully, we can clear up these issues and get this phase going. Let me know before making any more submittal, so that we can coordinate exactly what we need. Thanks - Josh Norton (764-6221) 1. Clearly define construction items needed for Phase 2. This should be provided by notes, consistent ? with the hatching on the Erosion and Sedimentation Control Plan, and consistent with the engineer's cost estimate. The phasing is more appropria ely hatched on an overall utility plan rather than a erosion plan. W W-- a, More specifically, Horse Shoe Dr and the cul-da-sac, sanitary sewer line that runs south to the existing line, and the fire hydrant on the corner of Horse Haven and Horseback need to be obviously identified as part of Phase 2. ~G+J~ Additionally, the engineer oEaprox. for Phase 2 is missing two entire sections of samitary sew („(approx. 1200ft), a-sectierr-e 170ft}~ - , a-2'Wlew-eft, e- ~ e to abandon and cap existing water line crossing Horse Haven Lane, as it is not shown on the construction documents, ' L,3-fhe northern termination of the waterline along Horse Shoe Drive needs a 2" blow off. ry Shift water service connection on the main line at Sta. 14+58.30 as not to be under pavement upon nstruction of Horseback Drive, possibly to Lot 3, Block 3, Phase 3. 0 y rovide a check in the amount of the apron of Appomattox to be built by others at a future date. The will pass on these funds to the future developer. Additional P current linear footage and linear price is not adequate. 7 provide a temp cul-da-sac easement for Horse Shoe Dr. by separate instrument as the plat can not ` edicate anything beyond it's bounds. i v CC: i S) ide an easement for the off site sanitary sewer line by separate instrument. Gibbs, Alan rice- A,, AlAldn ka~~ olo Wkhr wr-~f-- so- led-44"