Loading...
HomeMy WebLinkAboutSanitary Sewer ReportPreliminary Design Report Proposed Sanitary Sewer Line Improvements for Dove Crossing Subdivision Phases 1, 2, 3 & 4 College Station, Texas September 2004 Prepared By: TEXCON General Contractors 1707 Graham Road College Station, Texas 77845 (979) 764 -7743 OF i :� •oaes•;Xevn �� • • • ••!.O•••l3YYY9 G4 !• GiNGE� L. t���'O a•_ - 89503 9 1.0 INTRODUCTION & DESCRIPTION The purpose of this report is to provide a description of the proposed sanitary sewer to be constructed with the Dove Crossing Subdivision, and to provide the criteria used in the design of this sanitary sewer system. The project will include the construction of approximately 15,820 feet of sanitary sewer line. The sewer lines will service the proposed development of the Dove Crossing Subdivision (Phases 1 -4), as well as the future development of the adjacent parcels of land to the north and east of this development. The proposed sewer lines for Phase 1 will gravity drain to the existing 10" diameter sewer line located in the right -of -way of Graham Road. The proposed sewer lines for Phases 2, 3 & 4 will drain to the existing 15" diameter line along the south boundary of the project. The sewer lines to service Phase 2 of the subdivision will be constructed through Phases 3 and 4 of the subdivision in order to tie into the existing line. 2.0 SANITARY SEWER - Design Flow and Pipe Size Calculations The proposed sewer lines are to be constructed of 6" and 8" diameter SDR -26, PVC pipe which meets the requirements of ASTM- D3034. Until final design slopes are determined, sewer line slopes have been evaluated at the minimum allowable slope (0.4% for 8" line and 0.8% for 6" line) to determine the "worst case" scenario. The proposed manholes are 4' diameter manholes. The maximum distance between manholes is less than 500 feet, as required by the Texas Commission on Environmental Quality (TCEQ). All construction will meet the current City of College Station Standard Specifications for Sanitary Sewer Construction. The sewer line information is summarized in the attached tables, and the attached sketch shows manhole numbers and locations. 3.0 DETERMINATION OF PEAK FLOW VALUES The peak flows were based on using a daily use of 300 gallons per day for each dwelling unit. The design peak flow is determined by multiplying the average daily flow by 4.0, which results in the peak hourly flow. For the adjacent tracts of land, a density of 5 dwelling units per acre was used. Also, it is assumed that half of the Lee and Tolson tracts will be sewered to the north to the existing line along the North Fork of Lick Creek. The velocities for the lines were calculated using Manning's Equation (n= 0.013). According to the TCEQ, the minimum velocity for sewer systems flowing full is 2.0 feet per second. As shown in the attached tables, the minimum anticipated flow velocities for the proposed sewer lines at 50% full meet this requirement. The flow for 100% full will not be less than the flow for 50% full; therefore, the TCEQ requirement is met. The TCEQ requires that the maximum velocity for sewer systems flow full not exceed 10 feet per second. The values in the attached tables are well below this maximum velocity. 4.0 CONCLUSIONS It is our determination based on the criteria and data developed that the proposed sewer lines will provide sufficient capacity for the anticipated wastewater Flows generated by this development and the future development of the adjacent tracts to the north and east of this project. Dove Crossing Subdivision - Sewer Line Flow Data Manhole Number Size Length Slope No. of Dwelling Unit services Units From Merging Lines Cumulative Dwelling units Average Daily Flow Peak Flow Percent Full 50% Full Flow (cfs) Velocity (fps) From To (in) (ft) ( %) (gpm) (Cfs) (cfs) ( %) CO -2 3 8 59.9 0.40 2 2 0.42 0.0009 0.0037 5.0 0.3821 2.2 CO -3 3 8 209.5 0.40 5 5 1.04 0.0023 0.0093 7.7 0.3821 2.2 3 2 8 332.6 0.40 10 2 17 + 0.0079 0.0316 13.9 0.3821 2.2 2 1 8 224.9 0.40 8 - 25 5.21 0.0116 0.0464 16.7 0.3821 2.2 r 5 4 8 455.1 0.40 18 18 3.75 0.0084 0.0334 14.2 0.3821 2.2 m N L 7 6 8 278.2 0.40 12 12 2.50 0.0056 0.0223 11.7 0.3821 2.2 a 6 4 8 258.0 0.40 9 - 21 4.37 0.0097 0.0390 15.4 0.3821 2.2 4 1 8 317.0 0.40 0 18 39 8.12 0.0181 0.0724 20.8 0.3821 2.2 CO -1 11 8 290.5 0.40 10 - 10 2.08 0.0046 0.0186 10.8 0.3821 2.2 11 10 8 235.7 0.40 8 - 18 3.75 0.0084 0.0334 14.2 0.3821 2.2 10 9 8 316.4 0.40 10 - 28 5.83 0.0130 0.0520 17.7 0.3821 2.2 9 8 8 474.5 0.40 11 - 39 8.12 0.0181 0.0724 20.8 0.3821 2.2 8 1 8 479.8 0.40 16 - 55 11.46 0.0255 0.1021 24.7 0.3821 2.2 1 Existing 8 120.9 0.40 0 64 119 24.79 TO.0552 0.2209 36.8 0.3821 2.2 Existing Stub 10 - 0.25 0 119 24.79 1 0.0552 0.2209 30.5 0.5477 2.0 Dove Crossing Subdivision - Sewer Line Flow Data Manhole Number Size Length Slope No. of Dwelling Unit services Units From Merging Lines cumulative Dwelling units Average Daily Flow Peak Flow Percent Full 50% Flow (cfs) (in) (ft) N (gpm(cfs) N 18 16 6 293.5 0.80 10 10 2.08 0.0046 0.0186 13.2 0.2509 2.6 19 15 6 293.5 0.80 10 10 2.08 0.0046 0.0186 13.2 0.2509 2.6 20 14 6 293.6 0.80 10 10 2.08 0.0046 0.0186 13.2 0.2509 2.6 21 13 6 301.6 0.80 10 - 10 2.08 0.0046 0.0186 13.2 0.2509 2.6 17 16 6 137.5 0.80 5 5 1.04 0.0023 0.0093 9.4 0.2509 2.6 16 15 8 303.0 0.40 4 10 19 3.96 0.0088 0.0353 14.6 0.3821 2.2 15 14 8 274.0 0.40 5 10 34 7.08 0.0158 0.0631 19.4 0.3821 2.2 14 13 8 276.0 0.40 5 10 49 10.21 0.0227 0.0909 23.2 0.3821 2.2 13 1 12 8 169.1 1 0.40 1 2 1 10 61 12.71 0.0283 0.1132 26.0 0.3821 2.2 31 30 6 217.1 0.80 10 - 10 2.08 0.0046 0.0186 13.2 0.2509 2.6 30 29 6 381.7 0.80 14 - 24 5.00 0.0111 0.0445 20.1 0.2509 2.6 29 27 6 436.4 0.80 14 24 38 7.92 0.0176 0.0705 25.3 0.2509 2.6 33 32 6 325.7 0.80 14 14 2.92 0.0065 0.0260 15.5 0.2509 2.6 32 25 6 383.4 0.80 12 26 5.42 0.0121 0.0483 21.0 0.2509 2.6 Future 35 - - - 25 25 5.21 0.0116 0.0464 - - - 35 34 8 191.8 0.40 3 28 5.83 0.0130 0.0520 17.7 0.3821 2.2 Rt 34 26 8 455.1 0.40 14 42 8.75 0.0195 0.0780 21.6 0.3821 2.2 06 N 37 36 = 324.7 0.80 14 14 2.92 0.0065 0.0260 15.5 0.2509 2.6 CAI m 36 24 6 383.4 0.80 12 - 26 5.42 0.0121 0.0483 21.0 0.2509 2.6 N M a 39 38 6 388.3 0.80 16 16 3.33 0.0074 0.0297 16.5 0.2509 2.6 38 24 6 343.8 0.80 12 28 5.83 0.0130 0.0520 21.7 0.2509 2.6 41 40 6 323.5 0.80 14 14 2.92 0.0065 0.0260 15.5 0.2509 2.6 40 23 6 383.4 0.80 12 26 5.42 0.0121 0.0483 21.0 0.2509 2.6 43 42 6 331.5 0.80 15 15 3.12 0.0070 0.0278 16.0 0.2509 2.6 42 23 6 343.1 0.80 12 27 5.62 0.0125 0.0501 21.3 0.2509 2.6 45 44 6 326.0 0.80 14 - 14 2.92 0.0065 0.0260 15.5 0.2509 2.6 44 22 6 383.5 0.80 12 26 5.42 0.0121 0.0483 21.0 0.2509 2.6 Future 51 135 - 135 28.12 0.0626 0.2506 - - 51 48 8 108.5 0.40 0 135 28.12 0.0626 0.2506 39.4 0.3821 2.2 50 49 6 293.7 0.80 6 6 1.25 0.0028 0.0111 10.3 0.2509 2.6 49 48 6 404.2 0.80 8 14 2.92 0.0065 0.0260 15.5 0.2509 2.6 48 47 8 85.1 0.40 3 135 152 31.66 0.0705 0.2821 42.1 0.3821 2.2 47 46 8 381.4 0.40 14 - 166 34.58 0.0770 0.3081 44.2 0.3821 2.2 46 22 8 393.4 0.40 14 180 37.49 0.0835 0.3341 46.3 0.3821 2.2 28 27 6 208.1 0.80 5 - 5 1.04 0.0023 0.0093 9.4 0.2509 2.6 27 26 8 278.0 0.40 4 38 47 9.79 0.0218 0.0872 22.8 0.3821 2.2 26 25 8 327.8 0.40 12 42 101 21.04 0.0469 0.1875 33.7 0.3821 2.2 25 24 8 301.0 0.40 0 26 127 26.45 0.0589 0.2357 38.1 0.3821 2 2 24 23 8 276.0 0.40 0 54 181 37.70 0.0840 0.3359 46.4 0.3821 2.2 23 22 8 276.0 0.40 0 53 234 48.74 01086 0.4343 54.0 0.3821 2.2 22 Exist ng 8 169.2 0.40 0 206 440 91.65 0.2042 0.8166 90.6 0.3821 2. 2 Graham Road L 7 �, — — — "`� - �� Cry. Dnvc Avenue Ink — -- ---------- Tu.1. Dove Trail Tunlc Dove Trail le s4" 7 �Q W%4 10-oac. ti 100 50 0 100 SCALE IN FEET P.•s. � 1w *t) _ j *p**n t j L -L.P- 14.2- sores C a I t t I Lane SI -P O w- I I I i ( � � � 4 � s��•c ts�o�.l . . . . . . UWE, MoaJHti� -o now,