Loading...
HomeMy WebLinkAboutCost EstimateTEXCON GENERAL CONTRACTORS 02- Sep -04 CONSTRUCTION COST ESTIMATE - PUBLIC INFRASTRUCTURE REPLAT OF L.O. BALL MEMORIAL SUBDIVISION, PHASE 2, LOT 8, BLOCK 3 COLLEGE STATION, TEXAS Item Estimated Unit Estimated No. Description Quantity Price Cost Water 1 6" Water PVC SDR 21 D -2241 - non - structural 123 LF $20.00 $2,460 2 6" Water PVC SDR 21 D -2241 - structural 49 LF $26.00 $1,274 3 8" Water PVC CL200 (C909) - non - structural 104 LF $22.00 $2,288 4 8" Water PVC CL200 (C909) - structural 57 LF $28.00 $1,596 5 Connect to existing line 1 LS $1,500.00 $1,500 6 8" M.J. Tee 1 EA $300.00 $300 7 Gate Valve - 6" 1 EA $400.00 $400 8 Gate Valve - 8" 2 EA $650.00 $1,300 9 8 "x6" M.J. Reducer 1 EA $300.00 $300 10 8 "x6" M.J. Tee 1 EA $300.00 $300 11 Fire Hydrant Assembly 1 EA $2,400.00 $2,400 12 2" Blow off Assembly 1 EA $500.00 500 Subtotal $14,618 Sanitary Sewer - On -Site 13 8" SDR 26 C -3034 Pipe - structural 15 LF $30.00 $450 14 8" SDR 26 C -3034 Pipe - non - structural 232 LF $20.00 $4,640 15 8" SDR 26 D -2241 Pressure Pipe - structural 20 LF $32.00 $640 16 Manholes - 4' diameter 1 EA $2,100.00 $2,100 17 Install Manhole on Existing Line 1 EA $2,500.00 $2,500 Subtotal $10,330 Total Water $14,618 Total Sanitary Sewer $10,330 TOTAL CONSTRUCTION $24,948 k � * ............................ JOSE P. SCHULT 2 _off