HomeMy WebLinkAbout16 Venessa Garza 16( :rr v OF C<'t t H~F STt1t.'110N Item Description Unit Quantity No. Texas to George Bush I Mobilization EA I 2 Traffic Control EA I 3 Stonnwater Pollution Pre vention Plan EA I 5 Remove Existing Concrete (al l fl atwork) SF 9 11 7 Concrete Sidewalk SF 3983 8 Concrete Pavement (5" driveway w/monolithi c curb) SF 9 11 9 Ambulatory Ramp (all types) EA 8 10 T><DOT Type C l Curb (H:-0 to 24") w/masonry fascia LF 60 11 Dowel to existing s idewalk or driveway EA 8 12 Saw cut existing co ncrete LF 8 13 Sidewalk drain EA I 22 Relocate fir e hydrant EA I 23 Adjust manhole lid EA I 24 Adjust water vaJve box EA 2 25 Adjust sewer clean-out EA I 29 Relocate signs/obstructions EA 4 31 Bermuda Grass Sod SY 400 SECTION TOTAL George Bush to Stallings I Mobil ization EA I 2 Traffic Control EA I 3 Stonnwater Po llution Prevention Plan EA I 4 Rem ove Exis ting Concrete (curb & gutter) LF 106 5 Remove Exis ting Concrete (all flatwork) SF 4239 6 ST 1-0 I Concrete Curb and Gutter LF 100 7 Concrete Sidewalk SF 71 65 8 Concrete Pavement ( 5 • driveway w/monol ithic curb) SF 2102 9 Amb ulatory Ramp (al l types) EA 12 10 TxDOT Type CI Curb (H:-0 to 24 ") w/masonry fa scia LF 105 II Dowel to existing sidewalk or drive\vay EA 5 12 Saw cut existing concrete LF I 16 SW 1-01 Pedestrian Guardrai l LF 36 18 Remove & replace headwall fo r 66' RCP w/dissaptor ib!ock<\ LS 1 19 Concrete channel lining SF 11 5 20 Rock rip-rap SF 4 10 24 Adjust water va1ve box EA I 29 Re locate s igns/obstructions EA 2 3 1 Bermuda Grass Sod SY 635 SECTION TOTAL City of Coll ege Stati on· Purchas ing Division Bid Tabulation for #14-048 "2014 C DBG Nei ghbo rh oo d Sid ewalk Project " Open Date: Thursday, April 4, 2014 @ 2 :00 p.m . Dudley Cons tructio n, LTD Palo m a res Cons tru cti o n, lnc Unit Pri ce Total Price Unit Pri ce Total Price $3 ,052.36 $3 ,052 .36 $6,000.00 $6,000.00 $1,220.95 $1 ,220.95 $1 ,500.00 $1,500.00 $610.47 $6 10.47 $700.00 $700.00 $1.1 6 $1 ,056.76 $3.00 $2,733.00 $5 .29 $21,070.07 $4 .85 $1 9,3 17.55 $9.14 $8 ,326.54 $5 .95 $5 ,420.45 $396.81 $3 , 174.48 $500.00 $4,000.00 $97 .68 $5 ,860.80 $40.00 $2,400.00 $61.05 $488 .40 $80.00 $640.00 $6 10 $48 .80 $10.00 $80.00 $6,104 .73 $6,104.73 $500.00 $50000 $2,600.40 $2 ,600.40 $2,000.00 $2,000.00 $427 .33 $427 .33 $200.00 $200.00 $9 1.57 $183 .14 $50.00 $100.00 $152 .62 $152.62 $50.00 $50.00 $122 .09 $488 .36 $50.00 $20000 $3 .99 $1 ,596.00 $14.50 $5 ,800.00 $56,462.2 1 $51 ,6 41.00 $3 ,052 .36 $3 ,052.36 $11,000.00 $11 ,000.00 $1,220.95 $1 ,220.95 $1 ,500.00 $1,500.00 $6 10.47 $610.47 $700.00 $700.00 $4 .27 $452.62 $6.00 $636.00 $1.22 $5,171.58 $3 .00 $12,7 17.00 $14 .65 $1 ,465 .00 $12.00 $1,200.00 $5 .29 $37,902.85 $4.85 $34,750.25 $9.14 $19,2 12.28 $6.00 $12,6 12.00 $3 96 81 $4,761.72 $500.00 $6,000.00 $97 .68 $10,256.40 $40.00 $4,200.00 $61.05 $305 .25 $80.00 $400.00 $6.10 $6.10 $10.00 $10.00 $134 .30 $4,834.80 $90.00 $3 ,240 .00 $12,209.45 $12,209.45 $16,420.00 $1 6,420.00 $8.55 $983 .25 $10.00 $1,150.00 $6.10 $2 ,501.00 $18 00 $7 ,380.00 $183 .14 $183 .14 $50.00 $50.00 $122.09 $244.18 $50.00 $100.00 $3 .99 $2,533 .65 $14.50 $9,207.50 $107,907.05 $123,272.75 VOX Constructio n, LLC Ma rek Broth ers RNL Homebuild ers, LLC Cons tru ction, In c. Unit Pri ce Total Price Unit Price Total Price Unit Price Total Price $4 ,993 .00 $4 ,993 .00 $5 ,500.00 $5 ,500 .00 $3 ,620.80 $3 ,620.80 $500.00 $500.00 $250.00 $250.00 $1 ,262.32 $1 ,262.32 $200.00 $200.00 $0 .00 $0 .00 $427 .80 $427 .80 $5 .35 $4 ,873 .85 $2 .75 $2 ,505 .25 $3 .19 $2 ,906.09 $2.70 $10,754.10 $4 .95 $19,7 15.85 $4 .30 $17,126 .90 $2.84 $2 ,587.24 $5 .30 $4 ,828 .30 $5.59 $5 ,092.49 $347. 75 $2,782 .00 $495 .00 $3 ,960.00 $609.08 $4 ,872.64 $26.32 $1 ,579.20 $57 .20 $3 ,432.00 $31.00 $1,860.00 $111.28 $890.24 $38.50 $308 .00 $11.97 $95 .76 $3 .75 $30.00 $2 .75 $22 .00 $9.73 $77.84 $1 ,265 .00 $1 ,265 .00 $385 .00 $385 00 $3,238 .86 $3,238.86 $3,210.00 $3 ,2 10 .00 $6,050.00 $6,050.00 $4 ,712.00 $4 ,712.00 $56.18 $56.18 $275 .00 $275 .00 $145 .08 $145 .08 $56.18 $112 .36 $165 .00 $330.00 $145 .08 $290 .16 $56.18 $56.18 $165 .00 $165 .00 $145 .08 $145 08 $133 .75 $535 .00 $165 .00 $660.00 $106.64 $426.56 $3 .14 $1 ,256.00 $3 .35 $1,340 .00 $3 .14 $1 ,256.00 $35,680.35 $49,726.40 $47,556.38 $8,497.00 $8,497 .00 $5 ,500.00 $5 ,500.00 $7 ,418.92 $7,418.92 $750 00 $750.00 $250.00 $250.00 $2 ,587 .88 $2,587 .88 $1 ,200 .00 $1 ,200.00 $000 $0.00 $1 ,156.92 $1 ,156.92 $7 .95 $842.70 $5 .50 $583.00 $4 .98 $527.88 $5.35 $22,678 .65 $2 .75 $11,657 .25 $3 .19 $13,522.4 1 $5 .35 $535 .00 $13 . 75 $1,375 .00 $16.37 $1,637.00 $2.70 $19,345.50 $4.95 $35 ,466.75 $4.30 $30,809.50 $2 .84 $5,969 .68 $5 .28 $11 ,098.56 $5 .59 $11 ,75 0 .18 $347 .75 $4,173 .00 $495 .00 $5,940.00 $609.08 $7 ,308.96 $26.32 $2,763 .60 $57.20 $6,006.00 $3 1.00 $3 ,255 .00 $111.28 $556.40 $38.50 $192.50 $11 .97 $59.85 $3 .75 $3 .75 $2 .75 $2.75 $9.73 $9.73 $7 .12 $256.32 $11 2.20 $4 ,039 .20 $155 .00 $5 ,580.00 $3 ,424.00 $3,424 .00 $5 ,280.00 $5 ,280.00 $3,176.88 $3,176 .88 $803 $923.45 $5 .50 $632.50 $19.9 1 $2,289.65 $20.87 $8,556.70 $2 .20 $902.00 $9.39 $3 ,849.90 $56.18 $56.18 $165 .00 $165 .00 $145 .08 $145 .08 $133 . 75 $267.50 $165 .00 $330.00 $106.64 $213 .28 $3 .14 $1 ,993 .90 $3 .35 $2, 127 .25 $3 .14 $1,993.90 $82,793.33 $91,547.76 $97,292.92 ( :rr v 01·: C<'t 1 tcF STA·noN Stallings to Munson I Mobilization EA I 2 Traffic Control EA I 3 Stormwater Pol luti on Preventio n Plan EA I 4 Remove Existing Concrete (curb & gutter) LF 25 5 Remove Existing Concrete (al l flatwork) SF 876 6 ST 1-0 1 Concrete Curb and Gutter LF 25 7 Concrete Sidewalk SF 6487 8 Concrete Pavement (5" driveway w/monolithic curb) SF 737 9 Ambulatory Ramp (all types) EA JO II Dowel to existing s idewalk or driveway EA 6 12 Saw cut existing concrete LF JO 13 Sidewalk drain EA I 14 TxDOT Type F2 Curb (H =24') w/masonry facia LF 60 15 TxDOT Type F3 Curb (H =60") w/masonry facia LF 12 16 SW 1-0 I Pedestrian Guardrail LF 72 23 Adjust manhole lid EA I 24 Adjust water valve box EA 2 26 Adjust water meter box EA I 27 Match & reconnect wooden walkways EA 4 28 Remove stumps and/or trees EA I 29 Relocate signs/obstructions EA 5 30 I' PVC Electrical Conduit (30' deep, structural backfill) LF 50 31 Bermuda Grass Sod SY 430 SECTION TOTAL Park Place at Texas Avenue I Mobilization EA I 2 Traffic Control EA I 3 Stormwater Pollution Prevention Plan EA I 7 Concrete Sidewalk SF 117 JO TxDOT Type Cl Curb (H=O to 24") w/masonry fascia LF 40 II Dowel to existing sidewalk or driveway EA 2 12 Saw cut existing concre te LF 8 2 1 Repair & repaint existing handrail LF I 24 Adjust water valve box EA I 29 Relocate signs/obstructions EA I 31 Bermuda Grass Sod SY 10 SECTION TOTAL City of College S tation -Purchasing Division Bid Tabu latio n for #14-048 "2014 CDBG Neighborhood Sidewalk Project " Open Date: Thursday, April 4, 2014 @ 2 :00 p.m. Dudley Construction, LTD Palo mares Construction, In c $2,992.51 $2,992.51 $6,000.00 $6,000.00 $1,220.95 $1 ,220.95 $1 ,500.00 $1 ,500.00 $610.47 $610.47 $700.00 $700.00 $4.27 $106.75 $18.00 $450.00 $1.22 Sl ,068 .72 $3 .00 $2 ,628.00 $14 .65 $366.25 $15 .00 $375 .00 $5 .29 $34,316.23 $4.85 $31 ,461.95 $9.14 $6,736.18 $6.00 $4 ,422.00 $3%.8 1 $3 ,968 . JO $500.00 $5,000.00 $61.05 $366.30 $80.00 $480.00 $6.10 $61.00 $10.00 $100.00 $6,104.73 $6,104 .73 $500.00 $500.00 $97 .68 $5 ,860.80 $80.00 $4 ,800.00 $183 .14 $2,197.68 $90.00 $1 ,080.00 $134.30 $9,669.60 $90.00 $6,480.00 $427 .33 $427 .33 $200.00 $200.00 $183 .14 $366 28 $5000 $100.00 $122.09 $122 .09 $50.00 $50.00 $544.79 $2,179.16 $150.00 $600.00 $9 15 .71 $9 15.71 $200.00 $200.00 $122.09 $6 10.45 $50.00 $250.00 $12 .2 1 $6 10 .50 $5 .00 $250.00 $3 86 $1 ,659.80 $14 .50 $6,235 .00 $82,537.59 $73,861.95 $3 ,052 .36 $3 ,052.36 $400.00 $400.00 $1,220.95 Sl ,220.95 $500.00 $500.00 $621.78 $621.78 $300.00 $300.00 $5.46 $638 .82 $17 .10 $2,000.70 $97 .68 $3 ,907 .20 $45 .00 $1 ,800.00 $61.05 $122.10 $75 .00 $150.00 $6.10 $48 .80 $10.00 $80.00 $85 .7 1 $85 .71 $800.00 $800.00 $183 .14 $183 .14 $75 .00 $75 .00 $122 .09 $122.09 $75 .00 $75 .00 $4 .00 $40.00 $10.00 $100.00 $10,042 .95 $6,280.70 VOX Construction, LLC Marek Bro th ers RNL Homebuilders, LLC Const ructio n, Inc. $9,372.00 $9,372.00 $5 ,500.00 $5 ,500.00 $4 ,922 .80 $4,922.80 $1,000.00 $1 ,000 .00 $250.00 $250.00 $1 ,717.40 $1 ,717 .40 $1 ,200.00 $1 ,200 .00 $0.00 $0.00 $698 . 12 $698 . 12 $7 .95 $198 .75 $5.50 $137.50 $4 .98 $124.50 $5 .35 $4.686.60 $2.75 $2,409.00 $3 .19 $2,794.44 $5 .35 $133 .75 $13 .75 $343 .75 $16.37 $409.25 $2.70 $17,514.90 $4 .95 $32, I 10.65 $4.30 $27,894.10 $2.84 $2,093 .08 $5 .28 $3 ,891.36 $5.59 $4,119.83 $347 75 $3 ,477 .50 $495 .00 $4 ,950.00 $609.08 $6,090.80 $1I1.28 $667 .68 $38 .50 $231.00 $11.97 $71.82 $3 .75 $37.50 $2 .75 $27 .50 $9.73 $97.33 $1 ,265 .81 $1,265 .81 $550.00 $550.00 $000 $0 .00 $131.61 $7,896.60 $82.50 $4 ,950 .00 $50.82 $3,049 .20 $131.6 1 $1 ,579.32 $137 .50 $1 ,650.00 $285 .20 $3 ,422.40 $7 .12 $512 .64 $112 .20 $8 ,078.40 $155 .00 $11 ,160 .00 $56.18 $56.18 $385 .00 $385 .00 $145 .08 $145 .08 $56.18 $112 .36 $165 .00 $330.00 $145 .08 $290.16 $56. 18 $56.18 $165 .00 $165 .00 $372.00 $372.00 $185 .1 I $740.44 $165 .00 $660.00 $178 .56 $714 .24 $160.50 $160.50 $165 .00 $165 .00 $612.56 $612.56 $133 .75 $668 .75 $165 .00 $825 .00 $106.64 $533 .20 $95 .23 $4,761.50 $7 .70 $385 .00 $10.84 $542 .00 $3 .14 $1 ,350.20 $3 .35 $1,440.50 $3 .14 $1 ,350.20 $59,542 .24 $69,434.66 $71 ,131.43 $915 .00 $9 15.00 $5 ,500.00 $5 ,500 .00 $291.40 $291 .40 $500.00 $500.00 $250.00 $250.00 $101.68 $10 1.68 $100.00 $100.00 $0.00 $0 .00 $69.44 $69.44 $2 .70 $315 .90 $4 .95 $579.15 $4.30 $503 . JO $26 .32 $1,052 .80 $57.20 $2 ,288.00 $31.00 $1 ,240.00 $1I1.28 $222.56 $38.50 $7 7.00 $11.97 $23 .94 $3 .75 $30.00 $2 .75 $22.00 $9.73 $77.84 $7 .79 $7 .79 $1 ,128 .00 $1 ,128.00 $1 ,240.00 $1,240.00 $56.18 $56.18 $165 .00 $165.00 $145 .08 $145 .08 $133 .75 $133 .75 $165 .00 $165 .00 $106 .64 $106.64 $3 .14 $31.40 $3 .35 $33 .50 $3 14 $31.40 $3,365.38 $10,207.65 $3,830.52 Westridge & San Pedro I Mobilization EA I 2 Traffic Control EA I 3 Stormwater Poll ution Preventi on Pl an EA I 5 Remove Existing Concrete (all fl atwork) SF 1141 7 7 Concrete Sidewalk SF 889 1 8 Concrete Pavement (5" driveway w/monolithic curb) SF 5752 9 Ambulatory Ramp (all types) EA 8 II Dowel to existing sidewalk o r driveway EA 12 12 Saw cut existing concrete LF 450 13 Sidewalk drain EA I 17 Rem ove exisitng headwall strucuture (West Ridge) LS l 24 Adjust water valve box EA l 31 Bemmda Grass Sod SY 450 SECTION TOTAL GRAND T OTAL Bid Certification Addendums Aclcnowledged Bid Bond Section 3 Certificate ARRA Certificati on City of College Station · Purchasing Division Bid Tabu latio n for #14-048 "2014 CDBG Neighborhood Sidewalk Project" Open Date: Thursday, April 4, 2014 @ 2 :00 p.m . Dudley Co nstruction, LTD Palomares Construction, Inc $3,052.36 $3.052 .36 $12,000.00 $12.000.00 $122.09 $122 .09 $2 ,500.00 $2,500.00 $6 10.47 $6 10.47 $700.00 $700.00 $1.22 $13,928 .74 $2 .75 $31,3%.75 $5.40 $48,011.40 $4 .85 $43 ,121.35 $9.14 $52,573.28 $6 .00 $34,512.00 $3%.8 1 $3 , 174.48 $500.00 $4 ,000.00 $61.05 $732 .60 $80.00 $960.00 $6.10 $2,745 .00 $3 .00 $1,350.00 $6,104.00 $6,104 .00 $600.00 $600.00 $2,500.00 $2,500.00 $800.00 $800.00 $185 .00 $18500 $50.00 $50.00 $4.00 $1 ,800.00 $14.50 $6,525.00 $135,539.42 $138,515.10 $392,489.22 $393,571.50 y y y y y y y y y y Note : Blue highlighted fie lds indicate a correction to the bid price using the unit price provide d. VOX Construction, LLC M_arek Broth ers RNL Homebuilders, LLC Construction, Inc. $23.083 .00 $23 ,083 .00 $5 ,500.00 $5,500.00 $11,406.08 $11 ,406.08 $750 .00 $750.00 $250.00 $250.00 $3 ,629.48 $3 ,629.48 $500.00 $500.00 $0.00 $0.00 $954 .80 $954 .80 $5 .35 $61 ,080.95 $2 .75 $3 1,396.75 $3 19 $36,420.23 $2 .70 $24,005 .70 $4.95 $44,010.45 $4.30 $38,231 .30 $2 .84 $16,335 .68 $5 .28 $30,370.56 $5 .59 $32,153.68 $4 17.0 1 $3 ,336.08 $495 .00 $3 ,%0.00 $609.08 $4,872.64 $111.28 $1 ,335 .36 $38.50 $462 .00 $11.97 $143 .64 $3 .75 $1 ,687 .50 $2 .75 $1 ,237.50 $9.75 $4 ,387.50 $1,265 .81 $1 ,265 .81 $385 .00 $385 .00 $3,238 .86 $3 ,238.86 $267.50 $267 .50 $165 .00 $165 .00 $0.00 $0.00 $56 .18 $56.18 $165 00 $165 .00 $145 08 $145 .0 8 $3 .14 $1 ,413 .00 $3 .35 $1 ,507.50 $3 .14 $1 ,4 13.00 $135,116 .76 $119,409. 76 $136,996.29 $316,498.06 $340,326.23 $356,807.54 y y y y y N y y y y N y y y y