Loading...
HomeMy WebLinkAboutMP2013-900029 (2)C ITY OF C OLLEGE S TATION Home of Texas A&M Univmity 0 FOR OFFICE USE ONLY CASE NO .: )~·~ DATE SUBM~TT ED : ~·.30'B TIME :~' STAFF : ,..___.,,._._,,~~~~~~~ FINAL PLAT APPLICATION (Check one) [g] Minor ($700 ) D Amending ($700) D Final ($932 ) D Vacating ($932) 0Replat ($932) Is this plat in the ET J? D Yes D No Is this plat Commercial D or Residential D MINIMUM SUBMITTAL REQUIREMENTS: ~700-$932 Final Plat Application Fee (see above). ~ $233 Waiver Request to Subdivision Regulations Fee (if applicable). ~ \liJt $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee . Fee is ~ 1 % of acceptable Engineer's Estimate for public infrastructure , $600 minimum (if fee is > $600 , the balance is _,,.d ue prior to the issuance of any plans or development permit). ~ Application completed in full. This application form provided by the City of College Station must be used and ~ay not be adjusted or altered . Please attach pages if additional information is provided . ~ Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) ~Two (2) copies of the grading , drainage , and erosion control plans with supporting drainage report . ~Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). ·~opy of original deed restrictions/covenants for replats (if applicable). ~ Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current w ithin ninety (90) days. The report must include applicable information such as ownership , liens , ~ncumbrances, etc. ~ f aid tax certificates from City of College Station , Brazos County and College Station l.S.D . «"The attached Final Plat checklist w ith all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved pre liminary plan must be on file before a final plat application will be considered complete . If the mylar is submitted with the final plat application , it shall be considered a submittal for the preliminary plan project and processed and reviewed as such . Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Date of Optional Preapplication or Stormwater Management Conference February 22, 2012 ~~~~~~~~~~~~~~~~ NAME oF PROJ ECT :r1vts St:J bdi ovstaR · M"UJ\2h¥ 0Ltbd .iv0iOh ADDRESS 805-901 Montclair Ave, College Station, TX 77840 SPECIFIED LOCAT ION OF PROPOSED PLAT: 805-901 Montclair Ave, College Station, TX 77840 APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name TMFIVE Properties, LLC E-mail TerrenceRealtor@gmail.com Street Address 3091 Un i versity Dr. East Ste . 230 Ci ty College Station s tate Texas ~~~~~~~~- Zip Code _7 _78_0_2 __ _ Phone Number 979-703-1979 Fax Number ~~~~~~~~~~~~~~~~ 1/11 Page 1 of 9 PROPERTY OWNER'S INFORMATION (All owners must be identified . Please attach an additional sheet for multiple owners): Name TMFIVE Properties, LLC E-mail TerrenceRealtor@gmail.com Street Address 3091 University Dr. East Ste . 230 State Texas City College Station --------Zip Code 77802 ------- Phone Number 979-703-1979 Fax Number ----------------- ARCHITECT OR ENGINEER'S INFORMATION : Name Schultz Engineering, LLC -Joe Schultz E-mail ;oeschultz84@verizon.net Street Address 2730 Longmire Drive , Suite A City College Station State Texas Zip Code _7_78_4_5 ___ _ Phone Number (979) 764-3900 Fax Number (979) 764-3910 ----------------- Do any deed restrictions or covenants exist for this property? D Yes [gJ No Is there a temporary blanket easement on this property? If so , please provide the Volu me ____ and Page No. __ _ Total Acreage _0_.7_3 _______ _ Total No. of Lots 4 ------R-0-W Acreage 0 -------- Existing use _R_e_s1_·d_e_n_tia_1 __________ _ Proposed Use Residential ----------------- Number of Lots By Zoning District 4 R-2 Average Acreage Of Each Residential Lot By Zoning District: 0.183 I R-2 Floodplain Acreage _o __________________________________ _ Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes IX No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made , vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? I Yes IX No If yes , provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name : City Project Number (if known): Date I Timeframe when submitted: 1/11 Page 2 of 9 A statemen t address ing any differences between the Final Plat and Prel iminary Plan (if appl icable): Requested waiver to subdivision requlations and reason for same (if applicable): Regarding the waiver request , expla in how: 1. There are special c ircumstances or conditions affecting the land involved such that strict application of the subdivis ion regulations will deprive the applicant of the reasonable use of his land . 2. The waive r is necessary for the preservation and enjoyment of a substantial property right of the appl icant. 3. The granting of the waiver will not be detrimental to the public health, safety , or welfare , or injurious to other property in the area , or to the City in administering subdivision regulations. 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance. Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): 1. I An alternative pedestrian way or multi-use path has been or will be provided outside the right-of-way; 2 . I The presence of unique or unusual topographic , vegetative, or other natural conditions exist so that strict adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the purposes and goals of the UDO or the City's comprehensive Plan; 3 . I A cap it al improvement project is imminent that will include construction of the required sidewalk. Imm inent shall mean the project is funded or projected to commence within twelve (12) months; 4 . I Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate I rural context; 5. [": When a sidewalk is required along a street where a multi-use path is shown on the Bicycle , Pedestrian , and Greenways Master Plan ; 1/1 1 Pa ge 3 of 9 6 . I The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO; or 7 . I The proposed development contains frontage on a Freeway I Expressway as designated by Map 6 .6 , Thoroughfare Plan -Functional Classification , in the City's Comprehensive Plan . Detailed explanation of condition identified above: NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by t he Planning & Zoning Commission . Total Linear Footage of Proposed Public : 0 Street s () Sidewalks 0. Sanitary Sewer Lines a Wat er Lines 0 Channels 0 Storm Sewers D. Bike Lanes I Pat hs Parkland Dedication due prior to filing the Final Plat: ACREAGE : No . of acres to be dedicated + $ development fee ------- ___ No . of acres in floodplain ___ No . of acres in detention ---No . of acres in greenways OR FEE IN LIEU OF LAND : \ No . of SF Dwelling Units X $ l'LC. \ = $ )L C I.~ (date) Approved by Parks & Recreation Advisory Board ---- NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true , correct, and complete . IF THIS APPL/CATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, th is application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS ide ntified in the title report are also considered owners and the appropriate signatures must be provided as described above . Date I I 1/11 Page 4 of 9 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein . 3. If revoked , all work must cease until permit is re-issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued . 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP . 7. If required , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction . 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance . 9. If, stormwater mitigation is requ i red , including detention ponds proposed as part of this project , it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station , Texas City Code , Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details . All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations . 12 . Release of plans to (name or firm) is authorized for bidding purposes only . I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATIACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION , ARE , TO THE BEST OF MY KNOWLEDGE, TRUE , AND ACCURATE :__, /,,, I L e-------; ~M= ---/ 3 () { 3 Property Owner ?r ~ ! Date c........ Engineer Certification: 1/11 1. The project has been designed to ensure that stormwater mitigation, including detention ponds , proposed as part of the project will be constructed first in the construction sequence . 2 . I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOi and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station , Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines . All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations . 4. I, THE ENGINEER , AGREE T ~~J"IFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPME ~~ .~ ATION, ARE , TO THE BEST OF MY KNOWLEDGE , TRUE, AND AC URATE. c_, ., •• ••*•• ·····.:cS> ·~ # •• * 0 ~ : .................... : •• >! •• \ I -7 a -r 1 i'!{i':"''''"'"''"'"'"''··::f 1 ~ ':P \ L'\ 65889 "" / ~ di Date f 0 ·~T. ~· .4 Page 5 of 9 The following CERTIFICATIONS apply to development in Special Flood Haza rd Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* cert ify , as demonstrated in the attached drainage study, that the alterations or development covered by this permit , shall not: (i) increase the Base Flood elevation ; (ii) create additiona l areas of Special Flood Hazard Area ; (iii) decrease the conveyance capacity to that part of the Spec ial Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second . This area can also be approx i mated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) redu ce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ord inances , Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood veloc ities . beyond th ose areas exempted by ordinance in Section 5.11 .3a of Chapter 13 Code of Ord inances. Eng i neer Date Initial D * If a platt ing -status exemption to this requirement is asserted , provide written justification under sepa rate letter in li eu of certification. Required for Site Plans , Final Plats, Construction Plans, and Fill / Grading Permits: B. I, , certify to the following: (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm . Engineer Date Additional certification for Floodway Encroachments: C. I, , certify that the construction , improvement , or fill covered by th is ~~~~~~~~~~~~~~~~· permit sha ll not increase the base flood elevation . I will apply for a variance to the Zoning Board of Ad j ustments. Engineer Date 1/11 Pag e 6 of 9 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D. I, , certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour) and post construction . Engineer I Surveyor Date Commercial Structures : E. I, ________________ , certify that all new construct ion or any substantial improvement of any commercial , industrial , or other non-residential structure are designed to have the lowest floor, including all ut i lities , ductwork and basements, elevated at least one foot above the Base Flood Elevation Engineer I Surveyor Date OR I, , certify that the structure w ith its attendant util ity , ductwork, basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation , and shall resist the structural loads and buoyancy effects from the hydrostatic and hyd rodynamic conditions . Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post const ruction . Engineer I Surveyor Date Conditions or comments as part of approval : 1/11 Page 7 of 9 FINAL PLAT MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: (Requirements based on field survey and marked by monuments and markers.) Drawn on 24" x 36" sheet to scale of 100' per inch . Vicinity map which includes enough of surrounding area to show general location of subject property in relationship to College Station and its City Limits. No scale required but include north arrow. [8] lritle Block with the following information : [8] Name and address of subdivider, recorded owner, planner, engineer and surveyor. V (g] Proposed name of subdivision. (Subdivision name & street names will be approved through Brazos County 911 .) ~[8] Date of preparation . ~ [8] Engineer's scale in feet. .j [8] Total area intended to be developed . V [8] North Arrow. ~ Subdivision boundary indicated by heavy lines . If more than 1 sheet, an index sheet showing larger. entire subdivision at a scale of 500 feet per inch or All applicable certifications based on the type of final plat. [8] Ownership and Dedication v " [8] Surveyor and/or Engineer [8] City Engineer (and City Planner, if a minor plat) [8] Planning and Zoning Commission (delete if minor plat) [8] Brazos County Clerk Brazos County Commissioners Court Approval (ET J Plats only} \;/D If submitting a replat where there are existing improvements, submit a survey of the subject property showing the improvements to ensure that no encroachments will be created . If using private septic systems, add a general note on the plat that no private sewage facility may be installed on any lot in this subdivision without the issuance of a license by the Brazos County Health Unit under the provisions of the private facility regulations adopted by the Commissioner's Court of Brazos County , pursuant to the provisions of Section 21.084 of the Texas Water Code. J D Location of the 100-Year Floodplain and floodway, if applicable, according to the most recent available data. \.f.[g] Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data . ~ Matches the approved preliminary plan or qualifies as minor amendments (UDO Section 3.3.E.2). J [8] The location and description with accurate dimensions , bearings or deflection angles and radii, area, center angle, degree of curvature , tangent distance and length of all curves for all of the following : (Show existing items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision , as well as , those within the subdivision). ExistingV Proposed rxi . D ~ Streets. Continuous or end in a cul-de-sac , stubbed out streets must end into a temp \/ D V D 1/11 turn around unless they are shorter than 100 feet. Public and private R.O.W. locations and widths . (All existing and proposed R.O.W.'s sufficient to meet Thoroughfare Plan.) Street offsets and/or intersection angles meet ordinance . Page 8 of 9 Existing TI- /--~ !; ~ _o Proposed D Alleys . D Easements . D A number or letter to identify each lot or site and each block (numbered sequentially}. D Parkland dedication/greenbelt area/park linkages . All proposed dedications must be reviewed by the Parks and Recreation Advisory Board and documentation of their recommendation provided prior to being scheduled for P&Z Commission consideration . 0 Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly sealed by a Licensed Texas Professional Engineer that include the following: 0 Street , alley and sidewalk plans , profiles and sections . One sheet must show the overall street , alley and/or sidewalk layout of the subdivision. (may be combined with other utilities). D Sewer Design Report . O Sanitary sewer plan and profile showing depth and grades. One sheet must show the overall sewer layout of the subdivision . (Utilities of sufficient size/depth to meet the utility master plan and any future growth areas .) D Water Design Report and/or Fire Flow Report. O Water line plan showing fire hydrants , valves , etc. with plan and profile lines showing depth and grades . One sheet must show the overall water layout of the subdivision . (Utilities of sufficient size/depth to meet the utility master plan and any future growth areas .) O Storm drainage system plan with contours , street profile, inlets, storm sewer and drainage channels , with profiles and sections. Drainage and runoff areas , and runoff based on 5 , 10 , 25 , 50 and 100 year rain intensity . Detailed drainage structure design , channel lining design & detention if used . One sheet must show the overall drainage layout of the subdivis ion . 0 Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E. 0 Letter of completion for public infrastructure or guarantee I surety in accordance with UDO Section 8 .6. D Drainage Report with a Technical Des ign Summary. D Eros ion Control Plan (must be included in construction plans). [gj All off-site easements necessary for infrastructure construction must be shown on the final plat with a volume and page listed to indicate where the separate instrument easements were filed . Separate instrument easements must be provided in recordable form to the City prior to being scheduled for P&Z Commission cons ideration . [g] Are there impact fees associated with this development? 0 Yes [gj No Impact fees must be paid prior to building perm it. Will any construction occur in TxDOT rights-of-way? D Yes ~ No If yes, TxDOT permit must be submitted along with the construction documents . NOTE: 1. We will be requesting the corrected Final Plat to be submitted in digital form if available pr ior to filing the plat at the Courthouse . 1/11 2. If the construction area is greater than 5 acres, EPA Notice of Intent (NOi) must be submitted prior to issuance of a deve lopment permit. Print Form Page 9 or 9 CITY OF COT.LEGE S TAT ION Home a/Texas A&M Univmity• FOR OFFICE USE ONLY CASE NO .: DATE SUBMITTED: _____ _ TIME : STAFF : PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. [g] New Project Submitta l D Incomplete Project Submittal -documents needed to complete an application . Case No .: D Existing Project Submittal. Case No .: Project Name TM5 Subdivision Con ta ct Name Joe Schultz --------------~ Phone Number 764-3900 -------------- We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Non-Residential Architectural Standards D Rezoning Application D Irrigation Plan D Conditional Use Permit D Variance Request D Preliminary Plan D Development Permit [g] Final Plat D Development Exaction Appeal D Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR D Site Plan D Grading Plan D Special Dis tri ct Site Plan D Other -Please specify below D Special District Building I Sign D Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D Tx DOT Utility Permit D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions : 10/10 Print Form Through Tax Year 2012 TAX CERTIFICATE Certificate # 27013 Issued By: KRISTEEN ROE , RTA , CTA PH# (979) 361-4470 BRAZOS COUNTY TAX ASSESSOR COLLECTOR 300 E. WM . J BRYAN PKWY BRYAN , TX 77803 Owner ID: 242675 100 .00% TMFIVE PROPERTIES LLC PO BOX 11865 COLLEGE STATION , TX 77842-1865 Property ID : Legal Acres : Legal Desc : Situs : OBA : Exemotions : Property Information 18861 Geo ID : 147000-0005-0140 0 .0000 BREEZY HEIGHTS , BLOCK 5, LOT 14 & 15 805 MONTCLAIR AVE , For Entities BRAZOS COUNTY Value Information CITY OF COLL. STAT. COLLEGE STATION ISO Z REFUND ENTITY Improvement HS : Improvement NHS : Land HS : Land NHS : Productivity Market: Productivity Use : Assessed Valu e 0 58,630 0 98,320 0 0 156,950 Current/Delinquent Taxes This is to certify that, after a careful check of the tax records of this office, the following delinquent taxes, penalties , interesl and any known costs and expenses as provided by Tax Code §33.48, are due on the described property for the following taxing unit(s): Year Entity 20 12 COLLEGE STATION ISO 2012 BRAZOS COUNTY 2012 CITY OF COLL. STAT . Totals: Effective Date : 01/28/2013 Tax Certificate Issued for: CITY OF COLL. STAT . BRAZOS COUNTY COLLEGE STATION ISO Taxable 156 ,950 156,950 156 ,950 Taxes Paid in 2012 337 .98 380 .60 1,047 .67 Tax Due 1,047 .66 380 .60 337 .98 1,766.24 Disc./P&I 0.00 0.00 0.00 0.00 Attorney Fee 0.00 0.00 0.00 0 .00 Total Due if paid by : 01/31/2013 This certificate is issued or~ rea l es.tate only. It does not in dude rrnnerals and/or personal prope rt~ Total Due 1,047 .66 380.60 337 .98 1,766.24 1,766 .24 If applicable, the above-described property has/is receiving special appraisal based on its use, and additional rollback taxes may become due based on the provisions of the special appraisal (Comptroller Rule 9.3040) or property omitted from the appraisal roll as described under Tax Code Section 25.21 is not included in this certificate [Tax Code Section 31.0S(b)]. Pursuant to Tax Code Section 31.08, if a person transfers property accompanied by a tax certificate that erroneously indicates that no delinquent taxes, penalties or interest are due a taxing unit on the property or that fails to include property because of its omission from an appraisal roll, the unit's tax lien on the property is extinguished and the purchaser of the property is absolved of liability to the unit for delinquent taxes , penalties or interest on the property or for taxes based on omitted property. The person who was liable for the tax for the vear the tax was imoosed or the orooertv was omitted remains personally liable for the tax and for any penalties or interest. A tax certificate issued through fraud or collusion is void. This certificate does not clear abuse of granted exemptions as defined in Section 11.43 Paragraph(1) of the Texas Property Tax Code. May Be Subject to Court Costs if Suit is Pending Date of Issue : Requested By : ~~ Fee Amount: Reference #: Signature of Authoriz ed Officer of Collecting Office 01/28/2013 SCHULTZ JOE 10.00 Page : 1OF1 True Automation , Inc. Through Tax Year 2012 TAX CERTIFICATE Certificate # 27014 Issued By: KRISTEEN ROE , RTA , CTA PH# (979) 361-4470 BRAZOS COUNTY TAX ASSESSOR COLLECTOR 300 E. WM. J BRYAN PKWY BRYAN , TX 77803 Owner ID: 242675 100 .00% TMFIVE PROPERTIES LLC PO BOX 11865 COLLEGE STATION , TX 77842-1865 Property ID : Legal Acres : Legal Desc: Situs : OBA : Exemptions : Property Information 18862 Geo ID : 147000-0005-0160 0 .0000 BREEZY HEIGHTS , BLOCK 5 , LOT 16 & 17 809 MONTCLAIR AVE , For Entities BRAZOS COUNTY Value Information CITY OF COLL. STAT. COLLEGE STATION ISO Z REFUND ENTITY Improvement HS : Improvement NHS : Land HS: Land NHS : Productivity Market: Productivity Use : Assessed Value 0 61 ,860 0 100 ,070 0 0 161 ,930 Current/Delinquent Taxes This is to certify that, after a careful check of the tax records of this office, the following delinquent taxes, penalties, interes1 and any known costs and expenses as provided by Tax Code §33.48, are due on the described property for the following taxing unit(s): Year Entity 2012 COLLEGE STATION ISO 2012 BRAZOS COUNTY 2012 CITY OF COLL. STAT. Totals: Effective Date : 01 /28/2013 Tax Certificate Issued for: CITY OF COLL . STAT . BRAZOS COUNTY COLLEGE STATION ISO Taxable 161 ,930 161 ,930 161 ,930 Taxes Paid in 2012 348 .71 392.68 1,080 .91 Tax Due 1,080 .91 392 .68 348 .70 1,822.29 Disc./P&I 0 .00 0 .00 0 .00 0.00 Attorney Fee 0 .00 0.00 0 .00 0.00 Total Due if paid by : 01/31/2013 This certificate is issued 00 reai ~tate only. It does not include rr.tnerals and/or personal proper!) Total Due 1,080 .91 392 .68 348.70 1,822.29 1,822.29 If applicable, the above-described property has/is receiving special appraisal based on its use, and additional rollback taxes may become due based on the provisions of the special appraisal (Comptroller Rule 9.3040) or property omitted from the appraisal roll as described under Tax Code Section 25.21 is not included in this certificate [Tax Code Section 31.0S(b)]. Pursuant to Tax Code Section 31.08, if a person transfers property accompanied by a tax certificate that erroneously indicates that no delinquent taxes, penalties or interest are due a taxing unit on the property or that fails to include property because of its omission from an appraisal roll, the unit's tax lien on the property is extinguished and the purchaser of the property is absolved of liability to the unit for delinquent taxes, penalties or interest on the property or for taxes based on omitted property. The person who was liable for the tax for the vear the tax was imposed or the orooertv was omitted remains oersonallv liable for the tax and for anv oenalties or interest. A tax certificate issued through fraud or collusion is void. This certificate does not clear abuse of granted exemptions as defined in Section 11.43 Paragraph(1) of the Texas Property Tax Code. May Be Subject to Court Costs if Suit is Pending Date of Issue : Requested By: Fee Amount: ~~ Signature of Authorized Officer of Collecting Office Reference #: 01/28/2013 SCHULTZ JOE 10.00 Page : 1OF 1 True Automltion, Inc. .?c ... Through Tax Year 2012 TAX CERTIFICATE Certificate # 27015 Issued By: KRISTEEN ROE , RTA , CTA PH# (97 9) 361-4470 BRAZOS COUNTY TAX ASSESSOR COLLECTOR 300 E. WM . J BRYAN PKWY BRYAN, TX 77803 Owner ID: 242675 100.00% TMFIVE PROPERTIES LLC PO BOX 11865 COLLEGE STATION , TX 77842-1865 Property Information Property ID : 18863 Geo ID : 147000-0005-0180 Legal Acres : 0.0000 Legal Desc: Situs : BREEZY HEIGHTS, BLOCK 5, LOT 18 & 30' OF 19 901 MONTCLAIR AVE , OBA : Exemptions: For Entities BRAZOS COUNTY CITY OF COLL. STAT. COLLEGE STATION ISD Z REFUND ENTITY Value Information Improvement HS : Improvement NHS : Land HS : Land NHS: Productiv ity Market: Productiv it y Use : Assessed Value 39,430 0 78 ,010 0 0 0 117,440 Current/Delinquent Taxes This is to certify that, after a careful check of the tax records of this office, the following delinquent taxes, penalties, interest and any known costs and expenses as provided by Tax Code §33 .48, are due on the described property for the following taxing unit(s): Year Entity 2012 COLLEGE STATION ISO 2012 BRAZOS COUNTY 2012 CITY OF COLL. STAT. Totals: Effective Date : 01/28/2013 Tax Certificate Issued for: CITY OF COLL. STAT. BRAZOS COUNTY COLLEGE STATION ISO Taxable 117 ,440 117,440 117 ,440 Taxes Paid in 2012 0.00 0.00 0.00 Tax Due 1,567 .87 569 .59 505 .80 2,643.26 Disc./P&I 0.00 0 .00 0.00 0.00 Attorney Fee 0.00 0.00 0.00 0 .00 Total Due if paid by: 01/31/2013 T~is certificate is issued Oft real es. ate onfy. It does not lndude mmeraJs and/or personal property Total Due 1,567 .87 569 .59 505 .80 2,643.26 2 ,643 .26 If applicable, the above-described property has/is receiving special appraisal based on its use, and additional rollback taxes may become due based on the provisions of the special appraisal (Comptroller Rule 9.3040) or property omitted from the appraisal roll as described under Tax Code Section 25 .21 is not included in this certificate [Tax Code Section 31 .0S(b)]. Pursuant to Tax Code Section 31.08, if a person transfers property accompanied by a tax certificate that erroneously indicates that no delinquent taxes , penalties or interest are due a taxing unit on the property or that fails to include property because of its omission from an appraisal roll, the unit's tax lien on the property is extinguished and the purchaser of the property is absolved of liability to the unit for delinquent taxes, penalties or interest on the property or for taxes based on omitted property. The person who was liable for the tax for the vear the tax was imoosed or the orooertv was omitted remains cersonallv liable for the tax and for anv oenalties or interest. A tax certificate issued through fraud or collusion is void. This certificate does not clear abuse of granted exemptions as defined in Section 11 .43 Paragraph(1) of the Texas Property Tax Code. Date of Issue : Requested By : May Be Subject to Court Costs if Suit is Pending Fee Amount: Reference #: ~ Vn~ Signature of Authorized Officer of Collecting Office 01/28/2013 SCHULTZ JOE 10.00 Page : 1 OF 1 True Automation . Inc . ~· . ... •, r ~~ '! ' ·' .. TITLE REPORT GF No.: 130366 Certification Date: January 13, 2013 Examiner: ARB Property Description: METES AND BOUNDS DESCRIPTION OF ALL THAT CERTAIN TRACT OR PARCEL OF LAND LYING AND BEING SITUATED IN THE C . BURNETI SURVEY, ABSTRACT NO. 7, COLLEGE STATION , BRAZOS COUNTY, TEXAS . SAID TRACT BEING A PORTION OF A CALLED 0 .967 ACRE TRACT AS DESCRIBED BY A DEED TO TMFIVE PROPERTIES , LLC, RECORDED IN VOLUME 8742, PAGE 170 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS . SAID TRACT BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: BEGINNING AT A 1/2 INCH IRON ROD FOUND ON THE NORTHEAST LINE OF MONTCLAIR AVENUE (50' R.O.W .) MARKING THE SOUTH CORNER OF SAID 0 .967 ACRE TRACT AND THE WEST CORNER OF A CALLED 0.17 ACRE TRACT AS DESCRIBED BY A DEED TO TMFIVE PROPERTIES, LLC RECORDED IN VOLUME 9418 , PAGE 202 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS; THENCE : N 48 ' 22' 51" W ALONG THE NORTHEAST LINE OF MONTCLAIR AVENUE FOR A DISTANCE OF 81 .10 FEET TO A 1/2 INCH IRON ROD FOUND ; THENCE : N 48 ' 04' 53" W CONTINUING ALONG THE NORTHEAST LINE OF MONTCLAIR AVENUE FOR A DISTANCE OF 98 .16 FEET TO A 1/2 INCH IRON ROD FOUND; THENCE : N 48' 13' 52 " W CONT INUING ALONG THE NORTHEAST LINE OF MONTCLAIR AVENUE FOR A DISTANCE OF 102 .92 FEET TO A 1/2 INCH IRON ROD SET MARKING THE WEST CORNER OF THIS HERE IN DESCRIBED TRACT, FOR REFERENCE A 1/2 INCH IRON ROD FOUND AT THE INTERSECT ION OF THE NORTHEAST LINE OF MONTCLAIR AVENUE WITH THE SOUTHEAST LINE OF LUTHER STREET MARKING THE WEST CORNER OF SAID 0 .967 ACRE TRACT BEARS : N 48 ' 13' 52" W FOR A DISTANCE OF 99 .24 FEET; THENCE : N 41 ' 46' 08" E THROUGH SAID 0 .967 ACRE TRACT FOR A DISTANCE OF 103.38 FEET TO A 1/2 INCH IRON ROD FOUND MARKING THE SOUTH CORNER OF LOT 1 B, BLOCK 5, RESUBDIVISION OF BREEZY HEIGHTS ADDITION , SECOND INSTALLMENT , ACCORDING TO THE PLAT RECORDED IN VOLUME 408 , PAGE 323 OF THE DEED RECORDS OF BRAZOS COUNTY, TEXAS , AND THE WEST CORNER OF LOT 2, BLOCK 5, BREEZV HEIGHTS ADDITION, SECOND INSTALLMENT , ACCORDING TO THE PLAT RECORDED IN VOLUME 156, PAGE 409 OF THE DEED RECORDS OF BRAZOS COUNTY, TEXAS; THENCE : S 48' 02' 47" E ALONG THE COMMON LINE OF SAID 0.967 ACRE TRACT AND SAID LOT 2 AND THE REMAINDER OF LOT 3, BLOCK 5, FOR A DISTANCE OF 101.21 FEET TO A 1/2 INCH IRON ROD FOUND MARKING THE SOUTH CORNER OF SAID REMAINDER OF LOT 3 , BLOCK 5; THENCE : N 40 ' 48' 56" E ALONG THE COMMON LINE OF SAID 0 .967 ACRE TRACT AND SAID REMAINDER OF LOT 3 , BLOCK 5, FOR A DISTANCE OF 25 .00 FEET TO A 5/8 INCH IRON ROD FOUND; THENCE : S 48 ' 53' 46" E ALONG THE COMMON LINE OF SAID 0 .967 ACRE TRACT AND THE REMAINDER OF LOTS 3 , 4 AND 5, BLOCK 5, FOR A DISTANCE OF 100.42 FEET TO A 5/8 INCH IRON ROD FOUND; THENCE : S 41 ° 49' 24" W ALONG THE COMMON LINE OF SAID 0.967 ACRE TRACT AND SAID REMAINDER OF LOT 5, BLOCK 5, FOR A DISTANCE OF 25 .00 FEET TO A 1/2 INCH IRON ROD FOUND; THENCE: S 48 ' 13' 45" E ALONG THE COMMON LINE OF SAID 0 .967 ACRE TRACT AND SAID REMAINDER OF LOT 5 FOR A DISTANCE OF 81 .13 FEET TO A 5/8 INCH IRON ROD FOUND ON THE SOUTHWEST LINE OF LOT 6 , BLOCK 5, MARKING THE EAST CORNER OF SAID 0.967 ACRE TRACT AND THE NORTH CORNER OF THE AFOREMENTIONED 0 .17 ACRE TRACT; THENCE: S 41 ° 50' 20" W ALONG THE COMMON LINE OF SAID 0.967 ACRE TRACT AND SAID 0 .17 ACRE TRACT FOR A DISTANCE OF 104.26 FEET TO THE POINT OF BEGINNING CONTAINING 0 .730 OF AN ACRE OF LAND, MORE OF LESS . BEARING SYSTEM SHOWN HEREIN IS BASED ON GRID NORTH AS ESTABLISHED FROM GPS OBSERVATION. NOTE: The Company is prohibited from insuring the area or quantity of land described herein. Any statement in the above legal description of the area or quantity of land is not a representation that such area or quantity is correct, but is made only for Informational and/or identification purposes. Title Vested lo: TMFive Properties , LLC , a Texas Limited Liability Company Vesting Deed to owners shown herein was dated August 1, 2008 and recorded in Volume 87 42 , Page 170 , Official Records , Brazos County, Texas. Subject to: Deed of Trust to secure a Note : Granter : TMF ive Properties, LLC, a Texas Limited Liability Company Trustee : Ben Hayes Riggs Beneficiary: Compass Bank Amount: $873,600 .00 Dated: August 1, 2008 Recorded : Volume 8742, Page 176, Official Records, Brazos County, Texas. Restrictions: None of Record Exceptions: Terms , Cond itions, and Stipulations in the Agreement by and between : Parties : Choctaw-Montclair Properties, LLC and D.O. Wiersig , et ux Dated : October 14, 1999 Recorded : Volume 3640, Page 53, Official Records, Brazos County, Texas. Mineral Reservation in Deed By: Boyd G . Hall To: Michael G . Holt Dated : August 26, 1983 Recorded : Volume 598 , Page 248, Deed Records , Brazos County, Texas . Title to said interest has not been investigated subsequent to the date of the aforesaid instrument. Oil and Gas Lease , and all terms, conditions and stipulations there in: Lessor : Boyd G . Hall Lessee : Chaparral Minerals , Inc . Dated : Apri l 3, 1984 Recorded : Volume 680 , Page 708, Official Records, Brazos County, Texas . Title to said interest has not been investigated subsequent to the date of the aforesaid instrument. Upon examination of the public records Brazos County, Texas, we find no exception to title of the subject property other than those shown above. This Title Report is issued with the express understanding, evidenced by acceptance of same, that the liability of the undersigned is limited to the actual monetary consideration paid for same. University Title Company CERTIFICATE OF FORMATION OF TMFIVE PROPERTIES, LLC A LIMITED LIABILITY COMP ANY This certificate of formation is submitted for filing pursuant to the applicable provisions of the Texas Business Organizations Code. Article I-Entity Name and Type The name and type of filing entity being formed are: TMFIVE Properties, LLC, a Texas limited liability company (hereinafter "Company"). Article II -Purpose The purpose for which the Company is organized is any lawful purpose which may be undertaken by the company in accordance with the applicable pr9visions of the Texas Business Organizations Code. Article ID -Registered Office and Registered Agent The initial registered agent is an individual resident of the state whose name is Terrence Murphy. The business address of the initial registered agent and the initial registered office is: 4411 Hearst, College Station, Texas 77845. Article IV -Principal Office The address of the Company's principal office in this state is:441 l Hearst, College Station, Texas 77845. Article V -Organizer The name and address of the organizer is: Name Address Terrence Murphy 4411 Hearst, College Station, Texas 77845 Article VI -Governing Authority The company shall be managed by its Managers. The name and address of the person who is to serve as a Manager until the first annual meeting of the company's Member or until successors are elected and qualified is: Name Terrence Murphy Address 4411 Hearst, College Station, Texas 77845 Article VII -Effective Date of Filing This certificate of formation becomes effective when the document is filed by the secretary of state. Article VIII -Execution This document is signed subject to the penalties imposed by law for the submission of a materially false or fraudulent instrument. Date : March Jo 2008 Z:\Cl ien ts\Mu rph y, Terre nc e (TMFIVE Investm ent Properties LLC)\Certificate ofForrnation LL N 112 11 B 5 6 .. ~ 1 Zoning Districts 1 A -0 Agricultural Open A-O R Rural R eside nti a l Subdivisio n R -1 S in gle Family Res id entia l R -1 B Sing le Family Residentia l R -2 Duplex Re s identia l 1 R-3 R-4 R -6 R-7 0 GC Cl DEVELOPMENT REVIEW Tow nh ouse Mu lti -Fam il y High Density Multi-Fami ly Manufactured Ho me Park Office General Commercia l Comme rc ia l-Industrial 26 27 8., 9 10 3 25 11 1 ~ , ~ ,• 12 " ' 15',y 5 3 · 4 1· 3 , &/ 2 '1i, 14 ··~a: 15 of-~ 4 16 u- 17 5 1819 6 4 7 8 9 2021' 22 7 23 20 10 21 22 11 22 2324 21 2829 30 3 ·~2 33 20 25 19 18 17 .16 , , 4 3 1 2 · 9 1 C-3 M -1 M-2 C-U R&D P-MUD POD Light Commerc ial Light In dustria l W PC NG -1 NG-2 NG-3 ov ROD KO Wolf Pen Creek Dev. Corridor Core Northgate Heavy Industri a l Coll ege and Unive rsity Research a nd Deve lopme nt Planned Mixed-Use Deve lopment Planned Development District Tran siti ona l No rt hgate Residentia l Northgate Co rrido r Ove rl ay Redeve lopment Distri ct Krenek Tap Ove rla y 11 TM5 SUBDIVISION I I Case: 13 -029 FINAL I PLAT . DEVELOPMENT REVIEW TM5 SUBDIVISION FINAL I PLAT 9 Scale = 1: 68 (Feet) 1 N 40 ° 48 ' 56" E 25 2 S 48 ° 53' 46" E 100.42 3 s 41 ° 49' 24" w 25 4 S48°13 '45"E81 .13 5 S41 °50 '20"W 104 .26 6 N48°22'51 "W81.10 8 7 4 6 7 N48°04'53"W98 .16 8 N 48 ° 13' 52" W 102 .92 9 N 41 ° 46' 08" E 103 .38 10 S 48 ° 02' 47" E 101.21 Teresa Rogers From: Sent: To: Cc: Subject: Joe, Teresa Rogers Monday , March 18 , 2013 5:21 PM 'Joe Schultz' 'terrencerealtor@gmail.com '; Erika Bridges Murphy Subdivision Approval Murphy Subdivision Minor Final Plat has been reviewed and approved by staff. When you are ready, you may bring in the mylar to be filed. As previously mentioned, any existing structures located in the newly created setbacks and PU Es will have to be removed before staff can file the mylar. This is a condition of approval of the minor plat . If you have any questions, please feel free to call me. Sincerely, Teresa Teresa Rogers Staff Planner Planning & Development Services City of College Station P.O. Box 9960 1101 Texas Avenue College Station, TX 77842 1 March 11 , 2013 Teresa Rogers Staff Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: MURPHY SUBDIVISION (FP-MINOR) -13-00900029 Dear Ms. Hovde: Attached is 1-24"x36" copy of the revised Final Plat and the response to staff comments. If you have any questions , please do not hesitate to call. Very truly yours, Schultz Engineering, LLC. Joe hultz, P.E. Ci · Engineer P.O . Box 11995 • College Station , Texas 77842 schultzengineeringllc.com Office : 979.764 .3900 Fax: 979 .764 .3910 STAFF REVIEW COMMENTS NO. 2 Project: MURPHY SUBDIVISION (FP-MINOR) -13-00900029 PLANNING J 1. Revise the Certificate of the City Planner to remove the "Chairman " label under the signature bar and replace it with "City Planner" This certification has been corrected. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Noted. ENGINEERING COMMENTS NO. 2 1. (Repeat) A 10-ft PUE is required at the rear of the lots. Please move the proposed 10-ft PUE along the rear of lots 2 &3 to make it adjacent with the existing PUE. This was changed so there is a gap at the rear of the lot. This changed was verified per an email conversation with Erika Bridges on Thursday March 7th 2. FYI ... As a condition of approval , all existing structures which will encroach into newly created PUEs will need to be removed prior to the final plat being filed . Noted. /ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital , AutoCAD dwg format , version of plat and I or site plan as soon as it is available. Email to: wdavis@cstx .gov Noted. 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available . This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements , could affect the final building footprint. Delivery time for transformers and other equ ipment not in stock is approximate 26 weeks. Noted. 3. EASEMENTS: The following easements will be required: 5 ' PUE along Montclair Street frontage of all lots 5 'PUE on each side of all interior lot lines 5 'PUE on west line of Lot 1 5 'PUE on east line of Lot 4 5 'PUE along called common line of Lots 1&2, that call being S48 degrees 02 minutes 47 seconds E 101.21 feet 5 'PUE along called common line of Lots 3&4, that call being S48 degrees 13 minutes 45 seconds E for a distance of 81.14 feet. These comments were answered in the previous submittal. CITY or: C o 1.r.r·:c;E STAT ION Home of Texas A&M University • 1101 Texas Avenue, P.O . Box 9960 College Station , Texas 77842 March 6 , 2013 / TO : TMFIVE Properties, LLC via email: terrencerealtor@gmail.com Phone 979 .764 .3570 I Fax 979 .764 .3496 ~ MEMORANDUM ~ FROM : Teresa Rogers, Staff Planner SUBJECT: MURPHY SUBDIVISION -Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed . If all comments have been addressed and the following information submitted on any Monday by 10 :00 a.m ., your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers , 1101 Texas Avenue . One (1) 24 "x36 " copy of the revised final plat ; One (1) Mylar original of the revised final plat (required after Staff approval); Parkland Dedication for duplexes will be assessed prior to the issuance of building permits; and One ( 1) copy of the digital file of the final plat on diskette or e-mail to pdsdigitalsubmittal@cstx .gov . Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station . Please note that this application will expire in 90 days from the date of this memo , if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein . Once your item has been scheduled for the P&Z meeting , the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http ://www .cstx.gov/pz Please note that a Mylar original of the revised final plat will be required after Staff approval and prior to the filing of the plat. If you have any questions or need additional information , please call me at 979 .764 .3570 . Attachments : Staff review comments / cc : Schultz Engineering , LLC via email : joeschultz84@verizon .net Case file no . 13-00900029 Home of Te x as A&M University STAFF REVIEW COMMENTS NO. 2 Project: MURPHY SUBDIVISION (FP-MINOR) -13 -00900029 PLANNING 1. Revise the Certificate of the City Planner to remove the "Chairman " label under the signature bar and replace it with "City Planner" 2 . Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by : Teresa Rogers Date : March 6, 2013 ENGINEERING COMMENTS NO. 2 1. (Repeat) A 10-ft PUE is required at the rear of the lots. Please move the proposed 10-ft PUE along the rear of lots 2 &3 to make it adjacent with the existing PUE. 2 . FYl ... As a condition of approval, all existing structures which will encroach into newly created PUEs will need to be removed prior to the final plat being filed . Reviewed by : Erika Bridges Date : March 4 , 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital , AutoCAD dwg format , version of plat and I or site plan as soon as it is available. Email to : wdavis@cstx.gov 2. LOAD DAT A: The developer w ill provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers , and other equipment, required to provide service to the project. Failure to provide load data will result in construction de lays and , due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 3. EASEMENTS: The following easements will be required: • 5' PUE along Montclair Street frontage of all lots • 5 'PUE on each side of all interior lot lines • 5'PUE on west line of Lot 1 • 5'PUE on east line of Lot 4 • 5'PUE along called common line of Lots 1&2 , that call being S48 degrees 02 minutes 47 seconds E 101 .21 feet • 5'PUE along called common li ne of Lots 3&4 , that call being S48 degrees 13 minutes 45 seconds E for a distance of 81.14 feet. Reviewed by : Weldon Davis Date: March 6 , 2013 Home of Te x as A&M Un i versity February 22, 2013 Lauren Hovde Staff Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: TMS SUBDIVISION (FP-MINOR) -13-00900029 Dear Ms. Hovde: Attached is l-24"x36" copy of the revised Final Plat and the response to staff comments. Noted that the plat name has been changed to Murphy Subdivision If you have any questions, please do not hesitate to call. Very truly yours, Schultz Engineering, LLC. P.O. Box 11995 • College Station , Texas 77842 schultzengineeringllc.com Office : 979 .764 .3900 Fax : 979 .764 .3910 STAFF REVIEW COMMENTS NO. 1 Project: TM5 SUBDIVISION (FP-MINOR) -13-00900029 PLANNING ;1. [J 2. /3. . rnEl / 5. J 6. J1. Structures that encroach into the setbacks of the proposed lot lines must be removed prior to filing the final plat for record at the court house. This s a condition of approval for the Minor Plat. Noted. Please note the existing structure located at 901 Montclair, proposed Lot 4, Block 1, does not encroach into the setbacks. The Certificate of Planning and Zoning Commission needs to be replace with the Certificate of City Planner since the plat is being processed as a Minor Plat. This certification has been changed. Though it appears there is not a file plat on record for these properties, please show the existing building plot configuration as if it were being processed as a replat. The existing building plot configuration has been added to the plat. The property line pop-out shown on the survey is not recogn ized by the Brazos County Appraisal District. Please contact SCAD to remedy the situation. The survey and deeds have been provided to BCAD for them to correct their mapping and they have changed their mapping to match the plat . Parkland dedication will be assessed prior to the issuance of a building permit for each duplex. Noted. Please label the streets on the vicinity map, show an update the submittal day, and revise the Certificate of Surveyor to match Section 8.8 of the UDO. The street labels have been added. The submittal date now says February 2013 and the Surveyors Certificate has been updated. Please note that you may be required to submit paid tax certificates prior to the filing of your plat. Noted. ENGINEERING COMMENTS NO. 1 1. Please add a 10-foot wide PUE along the rear of each proposed lot. The PUE has been added. 2 . Show the lot corners tied to the City of College Station horizontal control monument. ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital , AutoCAD dwg format, version of plat and I or site plan as soon as it is available. Email to: wdavis@cstx .gov Noted. 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks . Noted. ,, 3. EASEMENTS: The following easements will be required: J • 5' PUE along Montclair Street frontage of all lots The easements have been added . ../ • 5 'PUE on each side of all interior lot lines The easements have been added. j • 5'PUE on west line of Lot 1 The easements have been added. ,/ • 5'PUE on east line of Lot 4 The easements have been added. / • 5 'PUE along called common line of Lots 1 &2, that call being S48 degrees 02 minutes 47 seconds E 101.21 feet Included in 10' PUE. / • 5 'PUE along called common line of Lots 3&4, that call be ing S48 degrees 13 minutes 45 seconds E for a distance of 81 .14 feet. Included in 10' PUE. I GENERAL ELECTRICAL COMMENTS ' 1. Developer i nstalls conduit per CSU specs and des ign. Noted. 2. CSU will provide drawings for electrical installation . Noted. 3. Developer p rovides 30 ' of rigid or IMC conduit for each riser conduit. CSU installs riser. Noted. 4. Developer will intercept existing conduit at designated transformers or other ex isting devices and extend as required . Noted. 5. If conduit does not exist at designated transformer or other existing devices , developer w ill furnish and install condu it as shown on CSU electrical layout. Noted. 6. Developer pours electric device pads or footings , i.e . transformers, pull boxes, or other device, per CSU specs and design . Noted. 7 . Developer installs pull boxes and secondary pedestals per CSU specs and design , Pull boxes and secondary pedestals provided by CSU. Noted. 8. Final si te plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes , or switchgears, all meter locations, and conduit routing as designed by CSU. Noted. 9. To discuss any of the above electrical comments please contact Weldon Davis at 979 . 764.5027. Noted. SANITATION V 1. Sanitation is ok with this project. Noted. 3 . Developer provides 30 ' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices , developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings , i.e . transformers , pull boxes , or other device , per CSU specs and design . 7. Developer installs pull boxes and secondary pedestals per CSU specs and design , Pull boxes and secondary pedestals provided by CSU . 8 . Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e . transformers , pull boxes , or switchgears , all meter locations , and conduit routing as designed by CSU . 9 . To discuss any of the above electrical comments please contact Weldon Davis at 979 .764 .5027. Reviewed by : Weldon Davis SANITATION 1. San itation is ok with this project. Reviewed by : Wally Urrutia Date : February 6, 2013 Date : February 6 , 2013 NOTE: Any changes made to the plans , that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled " on your plans . Any additional changes on these plans that have not been pointed out to the City , will constitute a completely new review . 3 of 3 CITY OF COLLEGE S TAT ION Hom e of Texas A&M University " MEMORANDUM February 1, 2013 TO : FROM : SUBJECT: Terrence Realtor, TMFIVE Properties, LLC ; TerrenceRealtor@gmail.com &}/ Jason Schubert, AICP Principal Planner TM5 Subdivision -Minor Plat Thank you for the submittal of your FINAL PLAT -MINOR application . This project will be distributed to staff next week for their review. PC : Joe Schultz, P.E., Schultz Engineering , LLC ; via : joeschultz84@verizon .net V Case file no. 13-00900029 Plmmiug & D evelopmeut Services P 0. BOX 9960 • 1101 TEXAS AVENUE · COLLECE STATION · TEXAS • 7 73112 T EI.. 979.7<i4.3'i70 ·FAX. 979.764.:14% cst){.gov/devservices City of College Station Administrative Approval for Required Parkland Dedications of Less than Five Acres 1. Applicant Name: _______ --'T'-'e'"'"r'--'re'"'"n'""c~e -'-M-'-u=r""'p~h"'"""'y.~T~M~F~IV'-'E~P-'--ro"""p~e'"'"rt~ie~s~.-=-L=L~C ___________ _ Address: ______ ~3~0-'-9_1__,U~n_iv_e~r~si~ty~D_ri _ve_E_a_st~._S_u_it_e_2_3_0~._C_o_lle_g~e_S_ta_ti_o_n~. T_X_7_7_8_02 ________ _ Phone: ____ _,(--=-9-'--79~)'--'7-=0-=-3--1~9-'-7~9 ____ _ E-Mail: _____ T~e~r~re~n~c-'-e_R~e~a-'-lto~r~@~g_._m~a~il.-'-co~m~---- 2. Development Name: _______ ~M~u~rp~h'-.J.y_S~u~b~d-'-iv-'-is~i-'-o-'-n ______ _ Project #: ___ 1__,3_-2_9~-- Development Location : ______ 8~0~5~-~9-'-0-'-1-'-M~o~n~tc~l~a-'-ir~A-'--v~e-'--n~u~e.~C~o-'--l__,le~g~e_S~t-'-a~tio-'--n~._T_X_7_78-'--4_0~------ 3. Dwelling Units: _Q_ Single Family ~3 __ Multi -family Un its , located in Neighborhood Park Zone _6~-- _o_ Single Fam ily 3 Multi-family Units , located in Community Park Zone B 4. Development Fees and Dedication Requirements: a. Land Dedication or Fee in Lieu of Land (Choose One): Neighborhood Community Total Single Fam ily : One (1 ) acre per 117 DU 's 0 ac One (1) acre per 128 DU 's 0 ac = 0 ac Multi -family : One (1 ) acre per 117 DU 's 0 ac One (1) acre per 128 DU 's 0 ac = 0 ac TOTAL = 0 Acres -OR- Fee Paid in Lieu of Land Dedication Neighborhood Community Single Fam il y : @ $274.00 per DU $ O @ $250.00 per DU $ __ __,Oo.__ = $ ___ -=-o __ _ Multi-family : @ $274 .00 per DU $ 822 .00 @ $250.00 per DU $ __ 75~0~.o~o_ = $_~1 ~5~72~.o~o~_ TOTAL (Neighborhood and Community) = $ __ 1"'""'",5""7'"""2""'.0'""0 __ b. Development Fee: Neighborhood Community Single Fam ily @ $362 .00 per DU $_~0 __ Single Family@ $375.00 per DU $ _Q__ = $ ___ -=-o __ Multi -family @ $362 .00 per DU $ 1 ,086 .00 Multi -family@ $750 .00 pe r DU $ 2 .250 .00 = $_--=3'--'-'3=3=6=.0=0- TOTAL (Neighborhood and Community) = $ _ __,3'-",3=3-=-6=.0-=-0- 5. Comments: There are five existing units on three lots . This plat will create four lots and allow for the addition of three new un its . The City of College Station agrees to accept: GRAND TOTAL (Neighborhood and Community)~ Units x $1,636.00 = $ ___ __;4~9~o~a~.o~o ____ _ Land Dedication --"-o ________ _ I ' CITY OF Co1 ,1,1 ~G1 ·: ST1\TION Home oJTexo> A&M Univers ity• Planning & Development Services 1101 Texas Avenue , P.O . Box 9960 College Station , Texas 77842 Phone 979 .764 .3570 I Fax 979 .764.3496 MEMORANDUM February 15, 2013 TO : FROM : SUBJECT: TMFIVE Properties , LLC via email : terrencerealtor@gmail.com Lauren A. Hovde , AICP , Staff Planner TM5 Subdivision -Final Plat Staff reviewed the above-mentioned final plat as requested . The following page is a list of staff review comments detailing items that need to be addressed . If all comments have been addressed and the following information submitted on any Monday by 10:00 a .m ., your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue . One (1) 24 "x36 " copy of the revised final plat ; Parkland Dedication for duplexes will be assessed prior to the issuance of building permits ; One (1) Mylar original of the revised final plat (required after Staff approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to : pdsdigitalsubmittal@cstx .gov . Upon receipt of the required documents for the Planning & Zoning meeting , your project will be considered formally filed with the City of College Station . Please note that this application will expire in 90 days from the date of this memo , if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein . Please note that a Mylar original of the revised final plat will be required after Staff approval and prior to the filing of the plat. If you have any questions or need additional information , please call me at 979 .764 .3570 . Attachments : Staff Review Comments cc : Schultz Engineering , LLC via email : joeschultz84@verizon .net Case file #13-00900029 NOTE : Any changes made to the plans , that have not been requested by the City of College Station , must be explained in your next transmittal letter and "bubbled " on your plans . Any add itional changes on these plans that have not been pointed out to the City , will constitute a comp letely new review . 1 of 3 STAFF REVIEW COMMENTS NO. 1 Project: TM5 SUBDIVISION (FP-MINOR) -13-00900029 PLANNING 1. Structures that encroach into the setbacks of the proposed lot lines must be removed prior to filing the final plat for record at the court house . This s a condition of approval for the Minor Plat. 2 . The Cert ificate of Planning and Zoning Commission needs to be replace with the Ce rt ificate of City Planner since the plat is being processed as a Minor Plat. 3. Though it appears there is not a file plat on record for these properties , please show the existing building plot configuration as if it were being processed as a replat. 4 . The property line pop-out shown on the survey is not recognized by the Brazos County Appraisal District. Please contact BCAD to remedy the situation . 5 . Parkland dedication will be assessed prior to the issuance of a building permit for each duplex. 6. Please labe l the streets on the vicinity map , show an update the submittal day , and revise the Certificate of Surveyor to match Section 8.8 of the UDO . 7 . Please note that you may be required to submit paid tax certificates prior to the filing of your plat. Reviewed by : Lauren A. Hovde , AICP , Staff Planner Date : February 11 , 20 13 ENGINEERING COMMENTS NO. 1 1. Please add a 10-foot wide PUE along the rear of each proposed lot. 2. Show the lot corners tied to the City of College Station horizontal control monument. Reviewed by : Erika Bridges Date : February 14 , 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital , AutoCAD dwg format , version of plat and I or site plan as soon as it is available . Email to : wdavis@cstx .gov 2 . LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers , and other equipment, requ i red to provide service to the project. Failure to provide load data will result in construction delays and , due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks . 3. EASEMENTS: The following easements will be required: • 5' PUE along Montclair Street frontage of all lots • 5'PUE on each side of all interior lot lines • 5'PUE on west line of Lot 1 • 5'PUE on east line of Lot 4 • 5 'PUE along called common line of Lots 1&2 , that call being S48 degrees 02 minutes 47 seconds E 101.21 feet • 5'PUE along called common line of Lots 3&4, that call being S48 degrees 13 minutes 45 seconds E for a distance of 81 .14 feet. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design . 2 . CSU will provide drawings for electrical installation . NOTE: Any changes made to the plans , that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled " on your plans . Any additional changes on these plans that have not been pointed out to the City , will constitute a completely new review . 2 of 3