Loading...
HomeMy WebLinkAboutSP2012-500253 - Strategic BehavioralLETTER OF COMPLETION CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS Dear Sir: DATE: S/21 /lY RE : COMPLETION OF 6~-~~ Ycc...\\\e_ D e ~--~fci....\ \\e<l-\-T\.:-.. DP l2-~ The purpose of our letter is to request that the following listed improvements be approved and accepted as be ing constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in .order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the lette r of guarantee for the listed improvements on the above referenced project. . . ~"{.-~<;"o-..,,\~ ~ \\. The one -year warranty is hereby affirmed and agreed to b rl ~-s C.ca 0 :;:>!S\:::L.::t'4!:>-G.'~ lLL. and by their subcontractors as indicated by signatures below. WORK COMPLETED Owner: Qe..c ¥.-Ys-c..,, ,=€..... ?>. \.1, Phone Number: \1°1 1D31S'64iS Address: ~SD vYcc ~ vr. Cb\\e ~e b.~,c,,o. »-S;s. ·1]'f;U.$ Sign.ature :<;J(C Revised 113 1107 WARRANTY DATE Phone Number:°\\°\. L\Y. 1e. t.;cp 5) Address: '"' IJV\\h -!c.,rl C 0-ko&C:-~­ S\-c.. 19\\ Signature : G ')_LL\ ~LAT FILED OFFSITE ESMTS FILED TEMP BLANKET ESllT F&ID NO OTHER EIMTl •IDl.D SOP: Filin of Final Plats -Letters of Com letion Engineering Inspector/Date: K~.fthT\nkar L/ 1//4 Project Engineer/Date: D@I elll Si~ 5jZ3//1f DP Number: D p Id.-~ 53 10/01/10 Inspectors shall acquire written (i.e. email) punchlist comments and subsequently written confirmation from the following contacts before forwarding Letter of Completion to development review engineer: vErosion/Drainage: Donnie Willis (0: 764-6375, C: 229-7632) ~S Water Services -General: Charles "Butch" Willis (0: 764-3435, C: 777-1202) • Water -coordinate fire flow analyses (or the design engineer for non-city utilities) and confirm test results meets min requirements with the dev review engineer (specific hydrants to test, if simultaneous, and min allowable flow) • Sanitary 11 ffc.s Water Service -Liftstation: Doug Wallace (0: 764-6333) rJr--CS Electric and Streetlights: Gilbert Martinez (0: 764-6255) l"'f//IBTU Electric and Streetlights: Sonia Creda (0: 821-5770) John Fontinoe or Randy Trimble (0: 821-5728) Confirm with development review engineer that service agreement is in place with BTU ~on-City Utility Service Providers: (Wellborn Water SUD, Brushy Creek SUD, Wickson I 1 /'i Creek SUD, etc) confirm with development review engineer that infrastructure is complete and for outstanding issues, o. D!!lital Constrution Pictures: From contractor on CD-R, Inspector to confirm and file ~ecord Drawings: (2 Red-Lined Copies) for all Public Infrastructure with the ( following attestation: "I, General Contractor for development, certify that the improvements shown on this sheet were actually built, and that said improvements are shown substantially hereon. I hereby certify that to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any are stated correctly hereon." General Contractor b-1lecord Drawings: (2 Red-Lined Copies) for Public Drainage Infrastructure including Private Detention Facilities with the following attestations: "I hereby attest that I am familiar with the approved drainage plan and associated construction drawings and furthermore, attest that the drainage facilities have been constructed within dimensional tolerances prescribed by the Bryan & College station Unified Stormwater Design Guidelines and in accordance with the approved construction plans or amendments thereto approved by the City of College Station." (affix seal) Licensed Professional Engineer State of Texas No. ___ _ "I certify that the subdivision improvements shown on this sheet were actually built, and that said improvements are substantially as shown hereon. I further certify, to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any, are stated correctly hereon." General Contractor Inspectors to review Red-lined Record Drawings, upon acceptable confirmation of drawings, inspector to: ~file one set of Record Drawings in Public Works files, and y orward one set of Record Drawings to Jeffery Speed (CSU) Inspectors should forward Letters of Completion to the development review engineer that reviewed and stamped the construction plans after confirming: t--the date on the Letter of Completion Warranty should reflect the date when all associated punchlist items are completed, and ~e Owner is shall be listed as the one affirming the one -year warranty Development review engineer to: o Add Dev Permit Number to Letter of Completion o stamp the Letter of Completion to confirm by initialing that the final plat is filed (or mylar is ready to be filed), all necessary easements (including offsite) have been filed, and blanket easement issues are resolved, and o initial and route the Final Plat mylar for filing. (Note if the developer provided surety the plat it may have been filed ahead of construction.) Deborah Grace-Rosier (Planning) to file the Final Plat utilizes a coversheet to confirm : o infrastructure is accepted by Letter of Completion -or-Surety is provided and acceptable, o signed and notarized mylar of final plat, o parkland dedication has been paid, o digital file of final plat is provided, o a current paid tax certificate has been submitted, and Development review engineer, upon the filing of Final Plat, stamp the Letter of Completion with the new stamp and verify-initial-n/a the Final Plat was filed, offsite easements have been filed, we have all necessary easements, etc -and then forward the Letter of Completion to Alan Gibbs (City Engineer) for final signature. Carol (Sr. Asst. City Engineer) to: o enter the engineer's estimate and Letter of Completion date into Inspection List o forward hard original of finalized Letter of Completion to Mandi Alford (P&DS). Mandi to: verify o signatures on the Letter of Completion, o forward scanned copy of Letter of Completion and associated Engineers Estimate to the owner, developer, contractor, Terry Boriskie (Building), Ben McCarty (Building), Janet Dudding (Accounting), Jeffery Speed (CSU), Stephen Maldonado Sr. (CSU), Diane Broadhurst (CSU), Charles "Butch" Willis (CSU), Sue Hosea (CSU), Carol Cotter (Engineering), Alan Gibbs (Engineering) and Deborah Grace-Rosier (Planning), o if don 't have email addresses, mail copies to the owner and contractor, and o place the original in Development Permit file. Deborah to place a hard copy of the Letter of Completion in the associated Planning Final Plat file. Keith Tinker From: Donnie Willis Sent: Tuesday, April 01 , 2014 1 :41 PM To: Donnie Will is; Gina Bosquez ; Alan Gibbs; Amber M. Johnson ; Artis Lawson ; Benjamin Mccarty; Brenda Godfrey; Bridgette George ; Brittany Caldwell ; Carol Cotter; Carol Rodr iquez ; Charles Butch . Willis ; Chris Haver; Crystal Derkowski ; Daniel Graalum ; Danielle Singh ; Eaphrame Thomas; Eric Dotson ; Eric Horton ; Erika Bridges ; Gale Watson ; Gilbert Martinez; Israel Koite ; James Boykin ; Jason Schubert ; Jenifer Paz ; Jennifer Prochazka ; Jerry Duffey ; Jim Giles; Joyce Duda; Keith Tinker; Kelli Schlicher; Lori Gove; Matthew Marek; Matthew Matcek; Morgan Hester; Norman Herrick; Patsy Wiley ; Paul Schoenfeld ; Pete Garcia ; Ray W . Argersinger; Raymond Olson ; Robin Krause ; Rodney Harris; Samuel D. Weido ; Sean Dwyer; Stephen A. Maldonado Jr.; Stephen Maldonado ; Stephen Smith; Teresa Rogers ; Tony Michalsky; Wally Urrutia; Walter J. Jones ; Weldon Davis Subject: RE : Calling for CO -Behavorial Health Center OK for TEMP CO . l. Need to establish grass on the site. 30 -45 days 2. Need to continue maintenance on storm drains and detention pond until grass can stabilize the area. 30-45 days. From: Donnie Willis Sent: Tuesday, March 25, 2014 12:18 PM To: Gina Bosquez; Alan Gibbs; Amber M. Johnson; Artis Lawson; Benjamin Mccarty; Brenda Godfrey; Bridgette George; Brittany caldwell; carol Cotter; carol Rodriquez; Charles Butch. Willis; Chris Haver; Crystal Derkowski; Daniel Graalum; Danielle Singh; Eaphrame Thomas; Eric Dotson; Eric Horton; Erika Bridges; Gale Watson; Gilbert Martinez; Israel Koite; James Boykin; Jason Schubert; Jenifer Paz; Jennifer Prochazka; Jerry Duffey; Jim Giles; Joyce Duda; Keith Tinker; Kelli Schlicher; Lori Gove; Matthew Marek; Matthew Matcek; Morgan Hester; Norman Herrick; Patsy Wiley; Paul Schoenfeld; Pete Garcia; Ray W. Argersinger; Raymond Olson; Robin Krause; Rodney Harris; Samuel D. Weido; Sean Dwyer; Stephen A. Maldonado Jr.; Stephen Maldonado; Stephen Smith; Teresa Rogers; Tony Michalsky; Wally Urrutia; Walter J. Jones; Weldon Davis Subject: RE: calling for CO -Behavorial Health Center No for CO. l. Normand and Arnold need to be swept. 2. Detention pond at the corner of Normand and Rock Prairie needs to be policed of trash. 3. On site detention pond flumes silted over. 4 . Need to remove silt fence from detention pond discharge and add rip -rap 5. Both storm drain inlets that direct charge to the detention pond have framing material still in boxes . 6. Parking lot drain behind building holding water. Suspect the drain line is plugged with silt. 7. In ground drain west of the building completely buried. 8. Storm drain inlet on south side of building contains trash . 9. Area has been hydro-seeded, need to establish vegetation. OK for Temp CO after items 1-8 are corrected . I discussed items 1-5 with contractor. Donnie R. Willis, CFM Environmental Engineering Technician City of College Station 979-764 -6375 1 From: Gina Bosquez Sent: Monday, March 24, 2014 3:05 PM To: Alan Gibbs; Amber M. Johnson; Artis Lawson; Benjamin Mccarty; Brenda Godfrey; Bridgette George; Brittany caldwell; Carol Cotter; carol Rodriquez; Charles Butch. Willis; Chris Haver; Crystal Derkowski; Daniel Graalum; Danielle Singh; Donnie Willis; Eaphrame Thomas; Eric Dotson; Eric Horton; Erika Bridges; Gale Watson; Gilbert Martinez; Gina Bosquez; Israel Koite; James Boykin; Jason Schubert; Jenifer Paz; Jennifer Prochazka; Jerry Duffey; Jim Giles; Joyce Duda; Keith Tinker; Kelli Schlicher; Lori Gove; Matthew Marek; Matthew Matcek; Morgan Hester; Norman Herrick; Patsy Wiley; Paul Schoenfeld; Pete Garcia; Ray W. Argersinger; Raymond Olson; Robin Krause; Rodney Harris; Samuel D. Weide; Sean Dwyer; Stephen A. Maldonado Jr.; Stephen Maldonado; Stephen Smith; Teresa Rogers; Tony Michalsky; Wally Urrutia; Walter J. Jones; Weldon Davis Subject: Calling for CO -Behavorial Health Center @ 3550 Normand Dr. Contact person is Curtis at 910-524-1987 with Thomas Construction Group. He would like to get a CO on Friday 03/28. BP# 13-770 Gina Bosquez Permit Technician Planning & Development Services City of College Station P.O . Box 9960 1101 Texas Avenue College Station, TX 77842 Office: 979.764.3570 Fax: 979.764 .3496 Email: gbosguez@cstx.gov Website: www.cstx.gov 2 Keith Tinker From: Sent: To: Subject: Attachments: Justin Tampl in Tuesday , January 14 , 2014 4 :03 PM Alan Gibbs ; Carol Cotter; Casey Rhodes ; Charles Butch . Willis ; Danielle Charbonnet; Danielle Singh ; Diane Broadhurst; Edward Mcdonald ; Emily Fisher; Erika Bridges ; Israel Koite ; Jeffrey Speed ; Keith Tinker; Philip Bargas ; Ray W . Argersinger ; Stephen Maldonado ; Walter J . Jones Strategic Health Q-203 14Jan14.xls Initial inspect ion of valves and hydrants completed, Q-204 needs raising and needs to be turned. Air Reliefs need to be finished . 1 Co ege Station Utilit·es Reliable, Affordable, Communit y Own . d Date test completed Tuesday January 14, 2014 Time completed 11 :00 A.M. Test completed by Justin Tamplin Witness Jeff Boriski FLOW HYDRANT Location Strategic Health Nozzle size 2.5 Hydrant number Q-203 Pitot reading in PSI 70 Flow in G.P.M. 1405 STATIC HYDRANT Location Strategic Health Hydrant number Q-204 Static PSI 97 Residual PSI 85 Comments Initial Keith Tinker From: Sent: To: Subject: Justin Tamplin Friday , January 31 , 2014 8:18 AM Alan Gibbs ; Carol Cotter; Casey Rhodes ; Charles Butch . Willis ; Danielle Charbonnet; Danielle Singh ; Diane Broadhurst; Edward Mcdonald ; Emily Fisher; Erika Bridges ; Israel Koite ; Jeffrey Speed ; Keith Tinker; Ray W . Argersinger ; Stephen Maldonado ; Walter J. Jones Strategic Health We went back and checked on problems we had found during initial, all had been taken care of and corrected . 1 ENGINEER'S ES Tl MA TE STRATEGIC BEHAVIORAL HEAL TH -PUBLIC INFRASTRUCTURE 11t:M NO. QUANTITY UNIT DESCRIPTION UNIT PRICE TOTAL COST Onsite Waterline 1 1 LS Prepare R.O .W . $ 2,500 .00 $ 2 ,500.00 2 1 LS Mobilization $ 1,000 .00 $ 1,000 .00 3 1 LS Silt Fencing & Associated Storm Water Runoff Prevention $ 1,000 .00 $ 1,000 .00 4 109 .7 LF 8" PVC Waterline (AWWA C909 CL 200) $ 40 .00 $ 4,388 .00 5 412 .2 LF 6" PVC Waterline (AWWA C909 CL 200) $ 30 .00 $ 12,366.00 6 65 .0 LF 16" Steel Casing w / Carrier pipe and spacers by Open Cut $ 350.00 $ 22 ,750 .00 7 1 EA 12"x8" M.J . Tee $ 850.00 $ 850 .00 8 1 EA 8" M.J . Gate Valve & Box $ 1,250 .00 $ 1,250 .00 9 1 EA 8"x6" M .J . Reducer $ 400 .00 $ 400 .00 10 5 EA 8"x45 Degree M .J . Bend $ 320 .00 $ 1,600 .00 11 1 EA 6" M.J . Gate Valve & Box $ 1,000 .00 $ 1,000 .00 12 1 EA 6"x6" M .J . Tee $ 600 .00 $ 600 .00 13 7 EA 6"x45 Degree M .J . Bend $ 350 .00 $ 2,450 .00 14 1 EA Connection .to existing system $ 2,000.00 $ 2,000 .00 15 2 EA Std . Fire Hydrant Assembly $ 3 ,265 .00 $ 6 ,530 .00 16 521 .9 LF Structural Backfill $ 8 .00 $ 4 , 175 .20 17 1 LS Bacteria Test $ 1,200 .00 $ 1,200 .00 18 1 LS Pressure Test $ 3 ,500 .00 $ 3 ,500 .00 19 2 EA Water Meter Connection Fittinos and Valves $ 650 .00 $ 1,300 .00 20 521 .9 LF Trench Protection $ 5 .00 $ 2 ,609 .50 Public Waterline Total : $ 73 ,468 .70 BRYAN TEXAS UTILITIES ************ THE ENERGY TO SERVE 'IOU SINCE 1919 December 27 , 2012 205 E. 28 111 St. <77803 > P.O. Box 1000 Bryan , TX 77805 Phone : 979 -821 -5715 FAX : 979 -821 -5795 . http ://www .btutilities .cphi • ' .. Veronica J.B. Morgan, P.E., C .F.M. Managing Partner Mitchell & Morgan 511 University Drive East, Suite 204 College Station , TX 77840 RE : Proposed Walking Trail and Landscaping Addition in BTU Easement at 1401 Arnold Road in College Station , Texas . Ms . Morgan , I have reviewed the technical drawings associated with the site located generally at 140 1 Arnold Road in College Station , TX (Exhibit A), and I have studied the corresponding transmission easements (Exhibit B). The planned walking trail and associated landscaping are acceptable to BTU as depicted in the Landscape Plan drawing (Exh ibit C) dated 11 /04/2012 if the closest edge of the walking trail is no less than 10 feet from BTU's existing transmission poles as noted in Exhibit D. Vegetation planted in the BTU easement must not exceed 8 feet in height, and BTU reserves the right to prune such vegetation to maintain appropriate local , state , and federal clearance requ irements . Please also ensure that if any plats are produced , they each reference the volume/page of the BTU easements that are applicable to said plat. Please let me know if any additional documentation is needed. Best Regards , James Tanneberger Div ision Manager Transmission Bryan Texas Utilities 979-821-5763 979-209-9799 ... i l I !· ' t I STATE OF TEXAS I COUNTY OF .SRAZOS I KNOW ALL MEN BY THESE PRESENTS: That I, Robert F. Spearman, for and in c onsideration of the sum o f TEN AND ·N0/100 ($10.00) DO LLARS, and other good and valuable consitlcrati to me in hand .paid by Leonard R. Bewle~, the rece ip t of ~hich is hereby ..... - acknowledged, have granted and conveyed and by these pres ents do grant and convey unto the said Leonard R . Bewley, his heirs and assigns, the free a nd uninterrupted use, liberty, provilege and easemen t of passing in and along a certain way across a certain tr act or land l ying and being situated in Brazos County, Texas, to,wit : Be ing all that certain tract or parcel of land in the S .W. Ro b ertson Loaguo and/or the ff.McGrew Survey , Brazos Co u nt y , Texas , being a part of the 76,252 acre tract of land in the S.W. Robertson Lcugue described as Second Tract in the deed to Leonard H. Bewley from Joe L . Al br i tton dated June 23, 1964, and recorded in Vol, 238 , pg. 229 , D~~d Records 0£ Brazos County, Texas; an.d a part of that 320 acre tract of land in tlw H. McGrew Su r v ey conveyed to Robert F. Spearman by G~orgc B. Huckeba by deed dated October 5, 1971, and recorded in Vo l~me 298 , pg . 351, Deed Records of Bra:t.os Co ·unty, Texas; the tract of land hereby described being ~ 32 foot wide strip of la nd lying adjacent to and to the East of a line on or near the conm1on bounda:ry of the aforesaid S.l'I . Robertson League and H. McGrew Survey., said. lin e being dcsc:ribed as follo1·1s: BEGINNING at a point about SO feet North of the N\·/ cor n er of the ;:;fore- said 76,252 acre Bewley tract, said point bein ~ on the West side of and at the end 0£ a .Presently existing public road and also being 0 1 ~ the Ecist line of the aforesaid 320 acre Spea r man Tract; THENCE S 00° 14.6' W for a distance of about 2260 feat to a point at or near the SW corner of the aforesaid S.N. Robertson Le age, for the end of this 32 ftiot wide strip of land; Together with free ingress, egress , regress to and fo r the said Leo nard R. Bewley , his heirs and assigns, and his and their tenants, by foot, with with carts, wagons, carriages, automobiles, and other vehicles , horses mules or livestock , as by him or t hem shall be necessar y or convenient at all times and &eas ons forever, in, along u~on and out o f said way , in common with me the said ilobert F. Spearman , my heirs , assigns, and my and their tenants to have antl to hold all si ngul ar the rights and privileges aforesaid to him , the said Leonard R. Bewley, his heirs and assigns , to their proper use and behoof, in COJllJJl<:_n with me, ;;be :sa i.ci Robert F. Spearman , iny :hcirs and assigns, and my and their tenants. WITNESS MY HANO thi' the q_. ,12._ d:~~~eh~'-'.;Y ,' 197 2 •. 1 r ,. / ii I · ' 1".r. (; t,. . , _....--v ~')1\.J -J I J\)v -V~ -~ o rt r.-··>:>pea m· 66415 428 426 Exhibit B R IGHT OF W AY E ASE ME N T THE STAT E OF TEXAS, COUNTY O F KNOW All MEN BY THESE PR ES ENTS1 'rHAT ___ H ~--------------------- ........ ·---<'>. ot Cow1ty, Texns, hc.rclnatter cnllcd t h e "Gran tor", wbrlher one or more, for 'a+ good a.nd valua.ble coasldera tlon, hereby grants to 'tHE ctTY 0 .P DRY AN, 'f.E.XA S, o. munlclp nl co rporntlon undi; the lawa ot the State o! Texas, its sueccssor.l and a..sslgna, h erclna!t er en.li ed "CITY", a n eucm ent and r lc ht 9f way tot tbt PU!J>OS'! of constructing, operating •.mi ma.Jn tafnlng an electrfe tra.ra~mJMlon or dlstrlbut1on lfnc on. CJYt}, and a~ _, . GrRntor's land tn~-Ra~h~a~rt~~·st=a~v~e~nunn~n~---------"""~ _Jl,,.r~a~z~Oa3~--------C0\.1 Dt)'. Tc.'"':n:J, rno-re p!.rtlcula.rly described in deed tro!·~------ _G~u~s~Gt:~o~r~g~e'--------------'w H. P. Lau ren t,_.]~-------- dat•~ A.D. 19--4!!-, and recorded Jn Volume 135 ', Page 6!)3 Deed Records o! .sai d County, and contalnlng: 17,06 ncrcs, more or lt!:s. The center line of sa1d electtia t r:ansm1ss1on or d15tr l but1on Hnc shall be located o.cros.."' .&:a ld land as tallows : nEGmNWG at a point on t be Northwest property ilia a pproximately 800 feet appro:z::I.-. 11'.ate],y South 43 degrees \'/ea t of the northernmost co m er o! the property , ' Then ce, approxl.mate],y 704 feet app r oxiJ!late l:y South 88 de gree s Ea.et to a point on tlto Southea st property line a pp:'OJd.matel.y JJO f eet ap pr aximnte],y So uth 43 degrees \lest of tho Easternmo st comer of t he prope rty , In conside r ation of grantl.n.g sai d easement and rl.ght-of-wq as defj,nod herein, t he · City will pay to s aid granter the oum of &20 .CO per pole or anchor placed in cul- tivat ed land and $10 .00 per polo or an chor pl.a ced i n past uni land, Such pa;yinent ohalJ. be made in due dispatch of business a fter such poles and/or an chora have been placed en grontor 1 s l a.,d and such pas:nent •hall constit ute the s ole coneide:rotioo of gr anging s aid easement and righ t-of -m:y . 1'!U Crcn •or t•.:c-tinla~, !bot ·~• fitntra ! coone cf nld ll'l t , 01 obove d1ucr ib4d, 11 boi'~d upon o prt llll'l lncry Ufl•Y• 11011 U la •d tt- ~looil thal J.o ld Oly 111cy t •lo,ol• 11;1\d lh1 1 in 1h• 1t1iri• genera l dlrcr;tto11 h1iore or ol Oii}' •~• 01 1•1 COR Jll utllo11. ros•lh •' ... 1th-;;, rl;hJ of lnqr•n o nd e fi'"' ovtr th G1 o ntor'• o dl o unl tond t I"> ot fro111 1016 rlshf of wo )' l or lh• ,.r po t t ol ~atwrf. INJ, 1 .. pt'O'l'ln;, reco1utr11rti119, ttpcltlng , hup•dl119, polloltlng, IP'alnlo ln lr.9, ond r.n~IYflrlfi 'old lln • 011d o,pVJl e nuuo 1h ril•t kt rtlK11!1 iold Pro In Iii• 'a n a ,.10H"1 pa1itlon to 011 y adloc~f rooo If an4 a. .,..lde .. d In !h • luhu•1 U:c rl;bt to Ilia or nt 4oW'ft lieu flt .~ ... ~;z ',: :~::!·~~ . .,:::·,',:~tr!: ~',:"~~! :0 ~111:!',.,~':',t·~~nc; .. ~1:_ 1~:,~':W:'a;, ~~.'oc~t!"r' ,:,!~ ~,:':°:~ ~=~t»~::a.~il ;·~:o~::ltr:Z ;~:;~:',:: o~1 o::;~ ~j:~;~~."~:;::~~:.oJ, -:.::;11;;,~:,',~!:~·~;, ~'!~,;~;d:~l<~~"YG,::f1~. ;;111:";h:l ·;~ ~::;o~i;!:' o'.:O'!.ll~:~t!' ~ prior wr lll•n t0nt.nt ol lh• City, !ho lht Gt)' dud l hove th• rt o h1 lo t e4"0'l'o 101:1• fr a11 11Jdl 1pou o nlll Orontor o;-re.1 to l'"T .. 1" °'1 lh 1•C1C1t1ohl• to1t o f 1-1tch ru1ovol, ood !hit Ofil ttfn l l'll, toge/her ,..Ith I~• oth•r pro._hlol'ls of t hh 9ront, ah:oll (on1tlt9t• • mnl)~ ~ "'"''ft 1th •he !ond for lilt l:iuelll of the 01y, lie wcuuou end oit l9"•· · Th• rlgll1 i1 reurv.d liy th G"'"lor lo uu lh• lo(od •lthln Ill• 40 lool •l'oa c bova <!udt:•d for QC!lt"rol a grlnUnel •II ~ ~ porpo1•1 , provld•d uch v1e 1hall no! fl)dud• lh• 9ro .. ln v or 1r .. s lh •1.on or u y other 11t1 wtilc~ 1tl9M lt1 l•rlu e with Jh.t utft111 !rt ,.., Cil r al !It• rli.1hh he r•by groftf1d. Tho Chy, haw•"•'· w•ll p•Y lo 11'• ow11u o l Ill • lo11d for od•el d cl!!C 0t1 to lt 11c111, lh Jo,.O Dlt d ,,..,..,_ In; uepi ,..hlch 111oy rt1 11!1 ln 1nhtlng 11pan the lnnd In !ht contlttCllon, 111oinlonuu or re11ovol of 1okf R:1 1. Th• Gra11)0f a9101u lhol c:ll ~ol.J, wlr e 1, i;GblH, fi 1ty.wfre . o~d o!ll er to<illli o lru tclful 011 l .. t. obon de1 crib1d hrndt ot Ill• t?••,. of tb1 Clfy , 1holl rt-,,.cfn lht prop1f lY of UI • Cit y, run oorohl t oJ rhe cplfon ol the City, 1h1 1~o~ ~~:"11~w~~~==~·:m~;a,a"'a;;:~~ ,::1~ h :a ~~~:::~~~, '~:~.~;:.:.0 ~::;1:d .~~,:~,"; !~~ ~~=r~'!f, d"a;o~~~ 1~b,:: :~ !:, ~ !: -.'' de.ltd of tn111, r.io1lga il •• 11.n, ch ct9t or lnc111ob1o nte lhertot\ n/f1cllng tn!d 011nni1n1, •.o•PI ton• or Qtlt H IU H ll 1101 ~11 1 ""°'· ' 1'0 HAV! AN D TO HOl.O lh• obov• d 11uib11I 111 1•inr.I rl ri11ll 1111!111 th e sold O ly ol l ry a n, T•xu . Ill t ll et•UOf l o MI 011lot11 fClftofflf, A.ttd !lie Gro"tor d ou hr1by bind MmHlf, 11h ll1lu ond l•oo l ro prea enta ll'l t l , ro Wo tfonl and r ortYe< D•ft 11d 11! n4 1l11t•kt 1\4 etbo•• 4 '"1 crllitd to11r11nf qnd righit 111110 ti•• ,akf Clly, lh 1vu•11 or1 ond aulc;n1, G;ctltul "1"111)' p11 u on .,..ho1'11 e•'l'tt l•wfwlty doi.ll)t et "":::::~~~:mi.~ ~--e-~£~ < -4¥t D/R Vo l. 187 ... r ,..;, :; ''.'i i ·" FI 19 Ft <l \talua. Ib o SI pllrpo Gt&nt The poi 49 Exhibit A All walkways must be at least 1 O feet from BTU power poles. Exhibit D ! FOR OFF1f~SE~Yr--:::;: , CASE NO .: ..\. ~ ~a I DATE SUBM ITTED: • ; I ::~, ;;~ ~¥-CITY oF Coil.EGE STATION Home ofT=s A&M Univmiry" SITE PLAN APPLICATION GENERAL MINIMUM SUBMITTAL REQUIREMENTS: $932 Site Plan Application Fee. $350 Non-Residential Architectural Standards Building Review Application Fee (if applicable). $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee . Fee is 1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600 , the balance is due prior to the issuance of any plans or development permit). Application completed in full . This application form provided by the City of College Station must be used and may not be adjusted or altered . Fourteen (14) folded copies of site plan. One (1) folded copy of the landscape plan . One (1) copy of the following for Non-Residential Architectural Standards building review or Northgate Building Review (if applicable). D D Building elevations to scale for all buildings . A list of building materials for all facade and screening . O Color samples for all buildings or list colors to be used from the approved color palette . / D Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov. {%] Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report . ,/'[ii Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). lfZ1A Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). @. The attached Site Plan Non-Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. Date of Optional Preapplication or Stormwater Management Conference ----------------- NAME OF PROJECT Strategic Behavioral Health, College Station ADDRESS 3550 Normand Drive, College Station, TX 77845 LEGAL DESCRIPTION (Lot, Block, Subdivision) Lot 3 . Block 1. College Station Medical & Senior Living Subdivision APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Mitchell & Morgan, LLP -Veronica Morgan E-mail __ v_@_m_1_· t_c_h_e_l_l_a_n_d_m_o_r~g,,_a_n_._c_o_m_ StreetAddress 511 University Drive East, Suite 204 City College Station State __ T_e_x_a_s _____ Zip Code 77840 Phone Number 979-260-6963 979-260-3564 PROPERTY OWNER'S INFORMATION : Name Jim Shaheen E-mail j shaheen@strategicbh.com StreetAddress 8295 Tournament Drive, Suite 201 City Memphis State ------'"--------------~ __ T_e_n_n_e_s_s_e_e __ Zip Code _3_8_1_2_5 ___ _ Phone Number 901-969-3100 Fax Number 901-969-3120 ---------------~ 1/11 Page 1of11 ARCHITECT OR ENGINEER'S INFORMATION: Name Joshua Aisenberg, LS3P E-mail j oshaisenberg@ls3p.com Street Address 434 Fayettville Street, Suite 1700 27601 City Raleigh State North Carolina Zip Code ---~~----------~ ------- Phone Number 704-333-6686 Fax Number 704 -333 -2926 OTHER CONTACTS (Please specify type of contact): Name Christopher Reid E-mail creid @thomasco ns tru c ti ong roup .com -----=------------------~ 1111 Military Cutoff Road S1iite 191 Street Address City Wilmington State NC Zip Code __ 2_8_4_0_5 __ _ Phone Number (910) 799-2295 FaxNumber (910) 799-2072 --'---'------------- Currentzoning __ P_D_D ________________________________ _ Present use of property Proposed use of property Vacant Behavioral Health Facility Number of parking spaces required xxx Number of parking spaces proposed Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? 114 I 5 HC =ll9 I Yes fX No This infonnation is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance . Notwithstanding any assertion made , vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law . Is this application a continuation of a project that has received prior City platting approval{s) and you are requesting the application be reviewed under previous ordinance as applicable? I Yes IX' No If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name: City Project Number (in known): Date I Timeframe when submitted: 1/11 Page 2of11 The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* A I, \j ~ j '£::> ~ oert;fy , as demonst'8ted in the attaohed drainage study, that the alterations or development covered by th is permit, shall not: (i) increase the Base Flood elevation ; (ii) create additional areas of Special Flood Hazard Area ; (iii} decrease the conveyance capacity to that part of the Specia l Flood Hazard Area that is not in the tloodway and where the velocity of flow in the Base Flood event is greater than one foot per second . Th is area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances . Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor rease Base Flood velocities . --"'t'of:"~i''\'' .:? ~ ............ ··~..qlS' ''• those areas exempted by ordinance in Section 5.11 . 3a of Chapter 1 3 Codt"~...:.ii*. · .... ii ''· ... '1:""11\J .. • ~ ~ * ... . ........ : ..... ~ ~ · .............. MQRGAN~ LI · 30---\Z, ~·vEP:o~~9.~.~:~: .......... :-··"~ \··.:o :. 11eB9 .: EE~ (v) l,_~... Q/~~ .,, o~ ... ~~G1sT~~~··:& .E fl~ Y\44; .,,,~SsioN'~(~..:=- '''''''''" D • If a platting-status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification . Date Initial Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: B. I, V tA'b l\iu., je,~ , cel1ify to the follOWing: (i) that any nonresidential or ~tructure on or proposed to be on this site as pa~._~tion is s ned to prevent damage to the structure or its contents as a result of flooding fro~ ~~"1f~ .:r;.~ .... *· ......... ,, ;* / ..... ~ l I it! : : ..... ,,. ·7>0117.-~*:" ..................... GAN~ fvERoNtCAJ .B:.~··'a: ~ Engineer Date 1/11 Page 5of1 1 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D. I, ~}Pr:: . certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation . Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour) and post construction . Engineer I Surveyor Date Commercial Structures: E. I, -~'--'--'"-'--"'"'(~"'-'--j_6 ___ ~----, certify that all new construction or any substantial improvement of any commercial, industrial, or non-residential structure are designed to have the lowest floor, including all iii ·es, ductwor1< and basements, elevated at least one foot above the Base Flood Elevation Date OR I, N/ A , certify that the structure with its attendant utility, ductwork , basement and saflitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction . Engineer I Surveyor Date Conditions or comments as part of approval: 1111 Page 6of11 CITY OF Cm.LEGE STATION Ho= ofTaJIS A&M UnivmilJ• SITE PLAN MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING : ~ Sheet size -24" x 36" (minimum). ~ A key map (not necessarily to scale). 1RJ Title block to include: KJ Name, address, location, and legal description ~ Name, address , and telephone number of applicant KJ Name , address , and telephone number of developer/owner (if differs from applicant) ~ Name, address , and telephone number of architect/engineer (if differs from applicant) ~ Date of submittal IX) Total site area ~ North arrow. IRJ Scale should be largest standard engineering scale possible on sheet. IBJ Ownership and current zoning of parcel and all abutting parcels . !-@The total number of multi-family buildings and units to be constructed on the proposed project site . !@The density of dwelling units per acre of the proposed project. ~ The gross square footage of all buildings and structures and the proposed use of each . If different uses are to be located in a single building, show the location and size of the uses within the building . Building separation is a minimum of 15 feet w/o additional fire protection . Locations of the following on or adjacent to the subject site: Designate between existing and proposed @The density of dwelling units per acre of the proposed project. @Phasing. Each phase must be able to stand alone to meet ordinance requirements. ~ Buildings (Existing and Proposed). ~ Setbacks according to UDO, Article 5. Geography @Water courses . g] 100 yr . floodplain and floodway (if applicable) on or adjacent to the proposed project site . Please note if there is none on the site with confirming FEMA/FIRM map number. ~ Existing topography (2' max or spot elevations) and other pertinent drainage information . (If plan has too much information, show drainage on separate sheet.) *~Proposed grading (1' max for proposed or spot elevations) and other pertinent drainage information . (If plan has too much information , show drainage on separate sheet.) *see grading plan 1/11 Page 7of11 Streets, Parking, and Sidewalks Kl Existing streets and sidewalks (R.O .W.). ~ Existing Driveways , both opposite and adjacent to the site according to UDO , Art ic le 7 . ~ Proposed drives. Min imum drive aisle width according to UDO , Art icle 7 ~ Ind icate proposed driveway throat length accord ing to UDO , Article 7 ~ Proposed curb cuts . ~ For each proposed curb cut (including driveways , streets, alleys , etc .) locate existing curb cuts on the same and opposite side of the street to determine separation d istances between existing and proposed curb cuts . 1iJ Proposed curb and pavement detail. ~ A 6 " raised curb is required around all edges of all parts of all paved areas without exception . (To inc lude island , planting areas. access ways, dumpster locations. utility pads , etc.) No exception will be made for area s designated as "reserved for Mure parking ". ~Proposed medians. Kl Proposed sidewalks (both public and private). ~ Proposed pedestrian/bike circulation and facilities for non-residential buildings (UDO , Article 7). ~ Off-Street parking areas with parking spaces drawn . tabu lated, and dimensioned. ~ Designate number of parking spaces required by ordinance and provided by proposal. Kl Handicap parking spaces. ~ Parking Islands drawn and dimensioned with square footage calculated according to UDO , Section 7 .2 or 7 .9 forno n- residen ti al buildings . ~ Parking setback from R.O.W. to curb of parking lot as required . N1Z) \Nheelstops may be required when cars overhang onto property no t owned by the applicant or where there may be conflict with pedestrian or bike facilities , handicap accessible routes or above g round utilities. signs or other confl icts . N ~ Secu ri ty gates , showing swing path and design specs w ith colors . l'@.Guardrails. Include design and colors. NO-Traffic Impact Analysis for non-residential development (UDO , Article 7). Kl Please note if none is required . ~ Will there be access from a TxDOT R.O.W.? O Yes 0 No If yes, then TxDOT permit must be submitted with this application . Easements and Utilities ~ Easements -clearly designate as existing or proposed and type (u ti lity , access. etc.) ~ Utilities (noting size and designate as existing or proposed) within or adjacent to t he proposed site , includ ing building transformer locations. above ground and underground service connect ions to bu ild ings , and drainage inlets . Nt'.]. Sewer Design Report (if applicable). NZA.Water Design Report and/or Fire Flow Report (if applicable). ~ Drainage Report with a Technical Design Summary . ~ Meter locations , existing and proposed (must be located in public R.O.W. or publ ic utility easement). ~ Provide a water and sanitary sewer legend to include !RI Minimum water demands [29 Maximum water demands ~ Average water demands in gallons per minute , and eg Maximum sewer loadings in gallons per day ~Wi ll there be access from a TxDOT R.O.W.? O Yes O No If yes , then TxDOT permit must be submitted with th is application . 1111 Page 8of11 .. Fire Protection ~ Show fire lanes . Fire lanes with a minimum of 20 feet in width w ith a minimum height clearance of 14 feet must be established if any portion of the proposed structure is more than 150 feet from the curb line or pavement edge of a public street or highway . ~ Show proposed and existing fire hydrants. Fire hydrants must be located on the same side of a major street as a project , and shall be in a location approved by the City Engineer . Any structure in any zoning district other than R-1 , R-1A, or R-2 must be within 300 feet of a fire hydrant as measured along a public street . highway or designated fire lane . NOTE: Fire hydrants must be operable and accepted by the City , and drives must have an all weather surface before a building permit can be issued . ~Will bu il ding be sprinkled? ~ Yes D No If the decision to sprinkle is made after the site plan has been approved , then the plan must be resubm itted . If Yes , ~ Show fire department connections . FDC 's should be within 150' of the fire hydrant. In no case shall they be any further than 300' apart, and they shall be accessible from the parking lot without being blocked by parked cars or a st ructure. Landscaping g:) Landscape plans as required in Article 7 of the Unified Development Ordinance . The landscaping plan can be shown on a separate sheet if too much information is on the original site plan . If requesting protected tree points. then those trees need to be shown appropr iately barricaded on the landscape plan . Attempt to reduce or el iminate plantings in easements . Include information on the plans such as: g] required point calculations ~ additional streetscape po ints required. Streetscape compliance is required on all streets . ~ calculations for # of street trees required and proposed (proposed street tree points will accrue toward total landscaping po ints.) g] proposed new plantings with points earned g] proposed locations of new plantings ~ screening of parking lots. 50% of all shrubs used for screening shall be evergreen. ~screening of dumpsters, concrete retaining walls , off street loading areas , utility connection po ints , or other areas potentially visually offensive . N!Z'.f\existing landscaping to remain Nrf-i. show existing trees to be barricaded and barricade plan . Protected points will only be awarded if barricades are u· up before the first development perm it is issued . N ~Buffer as required in Article 7 of the Unified Development Ordinance . ~how irrigation system plan . (or provide note on how irrigation system requirement will be met prior to issuance of C . 0 .) All plans must include irrigation systems for landscaping. Irrigation meters are separate from the regular wate r systems for buildings and will be sized by city according to irrigation demand submitted by applicant and must incl ude backflow prevention protection . ~ Is there any landscaping in TxDOT R.O.W.? O Yes g:] No If yes , then TxDOT permit must be submitted at the time of application . Other ~Common open spaces sites Kl Loading docks g:] Detention ponds !@.Retaining walls Kl Sites for solid waste containers with screening . Locations of dumpsters are accessible but not visible from streets or residential areas . Gates are discouraged and visual screening is required. (M inimum 12 x 12 pad requ ired .) ~ Are there impact fees associated with this development? O Yes EJ No NOTE: Signs are to be permitted separately. 1111 Page 9of1 1 DEVELOPMENT PERMIT PERMIT NO . DP 12-253 CrTY OF COLL£(;£ ST,\TION P/.4nni~ & ["kivl1Jpmt'11t Stn:iM FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: St rategic Behavioral Health College Station Med ical & Senior Living Lo t 3 DATE OF ISSUE: 2/27/2013 OWNER: LS3P Associates Ltd . 434 Fayetteville Street Suite 1700 Raleigh , North Carolina 27601 SITE ADDRESS: 1401 Arnold Road DRAINAGE BASIN: Lick Creek VALID FOR 24 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized . 2. The perm it may be revoked if any false statements are made herein . If revoked , all work must cease unt il pe rm it is re- issued . 3. Development shall not be used or occupied until Certificate of Occupancy is issued . 4 . The permit will expire if no significant work is progressing within 24 months of issuance . 5. If required , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pou r) and post construction . 6. Other permits may have been required to fulfill local, state and federal requirements . Construction w ill be in compliance with all necessary State and Federal Permits. 7. Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project. 8. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities . Construction Site Notice or Notice of Intent (NOi) along w ith Stormwater Pollution Prevention Plan (SWP3) w ill be kept and maintained on-site during construction as per TPDES permitting requirements . If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site , it is the Contractor's responsibil ity to implement measures that will meet City , State , and Federal requ irements . 9. All disturbed areas w ill be re-vegetated prior to Letter of Completion or Certificate of Occupancy . 10 . All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance , prior to any operat io ns of th is permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint , oil , solvents , asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . 11. All construction shall be in accordance with the stamped approved plans and spec ifications for the above -named project and all of the codes and ordinances of the City of College Station , as well as State and Federal Regulations that apply . Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically requested and approved will be allowed . 12. Special Conditions : Utility Permit Only. *** TCEQ PHASE II RULES IN EFFECT *** I, _______________ , the Contractor, hereby agree to comply with all conditions here in. Contractor Date I hereby grant this permit for development. Contact -t(e)\\ \\\n\(Qr qi-q-J -·f"1..-0J-.q2, the Publ ic Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections . D//__,ib.i )_ ~-~T-G:, City Engineer/RelJretative Date Danielle Singh, P .E. City of College Station Planning & Development Services PO Box 9960 College Station, TX 77842 MITCHELL MM MORGAN February 11 , 2013 RE: LETTER OF ACKNOWLEDGEMENT FOR THE STRATEGIC BEHAVIORAL HEALTH HOSPITAL PROJECT AT COLLEGE STATION Dear Jason: The purpose of this letter is to acknowledge that the construction plans for The Strategic Behavioral Health Hospital project, to the best of my knowledge do not deviate from the B/CS Design Guidelines Manual. I also acknowledge, to the best of my knowledge that the details provided in the construction plans are in accordance with the Bryan/College Station Standard Details. If you have any comments , or would like to discuss this further, please feel free to contact me. Veronica J.B. or , PE, CFM Manag ing Partner cc: file 511 UNIVERSITY DRIVE EAST. SUITE 204 • COLLEGE STATION, TX 77840 • T 979 .260.6963 • F 979 .260.3 564 CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS info@mitche llandmDrgan .com • www.mitchellandmorgan .com T/G •309.50 / D D .,_._ SW •JOB.38 SILT FENCE ""-.,, ~~~~t~ ARNOLD ..... R-D ·~ -···------------------------------"--;~:;·:·:~-:-.-----------------'~-----------~---<--...... '--'L->-<-.L.->-.---'---'-'--'-"---'---"-----r-------------t / ~ ~ -; ,_ -... -.. -.. --o• ".A' .. ,0 -.. 0 W.: ·-·'-· """ PARTIAL GRADING PLAN · . C02 DEVELOPMENT PERMIT PERMIT NO . DP 12-253 Crrv OF COLLEGE STATION JlLtmsi1tf & llrwlop1'1n'lt .Sn1:im FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Strategic Behavioral Health College Station Medical & Senior Living Lot 3 DATE OF ISSUE: 3/22/13 OWNER: LS3P Associates Ltd . 434 Fayetteville Street Suite 1700 Raleigh , North Carolina 27601 SITE ADDRESS: 1401 Arnold Road DRAINAGE BASIN: Lick Creek VALID FOR 24 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized . 2 . The permit may be revoked if any false statements are made herein. If revoked , all work must cease until permit is re- issued . 3. Development shall not be used or occupied until Certificate of Occupancy is issued. 4 . The permit will expire if no significant work is progressing within 24 months of issuance. 5. If required , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-p9ur) and post construction. , 6 . Other permits may have been required to fulfill local, state and federal requirements . Construction will be in compliance with all necessary State and Federal Permits . 7. Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project. 8. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion, and sedimentation shall not be deposited in city streets , or existing drainage facilities . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements . 9. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 10 . All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance , prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as, but not limited to, paint, oil , solvents, asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . 11 . All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply . Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically requested and approved will be allowed. 12 . Special Conditions :*** TCEQ PHASE II RULES IN EFFECT*** I, _______________ , the Contractor, hereby agree to comply with all conditions herein . Contractor Date I hereby grant this permit for development. Contact , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. Date r I CIT Y OF C OLLE GE STATI ON Mr. Rob Elsner Executive Director of Environmental Services Strategic Behavioral Health, LLC 8295 Tournament Drive, Suite 201 Memphis, Tennessee 38125 Dear Mr. Elsner, June 24, 2013 Please accept this letter as permission for your contractor on the Strategic Behavioral Health (SBH) hospital project to clear and do minor grading work in the existing ditch on the City of College Station Parks property. An exhibit showing where this work will be accomplished as well as the extent of this work is attached. We understand that the contractor will be removing the low spots in the ditch and grading a continuous flowline from the SBH detention pond outfall to Rock Prairie Road and cutting a 6" v-notch in the concrete headwall . This is in an effort to provide a positive outfall for the existing ditch which currently holds water after rain events . We understand that the ditch will be fine graded and reseeded with native plant materials upon completion and that the contractor will prevent silt from migrating downstream during this construction. Please do not hesitate to contact me if you have any questions. Sincerely, o~~· >~~ David Sc itz City o~ ollege Statio Parks & Recreation Director Cc: Veronica Morgan, Mitchell & Morgan,LLP Ryan Clark, Thomas Construction Group Laura Miller, LS3P th e heart of the ReserJrc h Valley PO. BOX 9960 llO l T EXAS AVE NUE C OLLEGE STATION· T EXAS · 77842 979.764 .3510 w ww.cstx.gov 1320 SOUTH UNIV ERSITY DRIVE SUITE lOO FORT WORTH TEXAS 76107 PHONE 617.806.1700 FAX 817.870.2~36 T8P€ f ;rm No. I l ENVIRONMEN TAL ENG INEERS AND SCIE NT ISTS 892-000-00 June 4 , 2013 Mr. Rob Elsner Strategic Behavioral Health , LLC 8295 Tournament Drive, S uite 201 Memphis, Tennessee 38125 C el ebra ti ng 35 Yea rs of Se rvirt 197 8-2013 Re: Preliminary Waters of the United States Detem1ination for a Drainage Ditch adjacent to the Strategic Behavioral Health Facility -College Station, Texas Dear Mr. Elsner: I was contacted by Veronica Morgan with Mitchell and Morgan, LP to evaluate an earthen drainage ditch south of Rock Prairie Road between the College Station Medical Center and the City of College Station 's Brian Bachman City Park. The purpose for this eva luation was to discern if the ditch wou ld be subject to Clean Water Act (CWA) jurisdiction specifically Section 404 of the CW A Ms. Morgan and I visited. the site on May 30, 2013. The follow ing is my profossional opinion on the drainage ditch's CW A jurisdictional status. For an aquatic resource to be subject to CW A jurisdiction, it has to have a "significant nexus" to a traditionally navigable water of the United States (US). The closest tra ditionaJly navigable water to the proposed project site is the Brazos River. As currently proposed, the drainage ditch would be itnpacted by the construction of a detention pond associated with the Strategic Behavioral Health facility. It is my understanding that the drainage ditch woul d be lowered to provide positive drainage from the proposed detention facility to an existing concrete lined drainage ditch located north of Rock Prai1ie Road. Prior to the on-site investigation, h istorical and current aerial photography (from 1995 through 2012), and available maps including the US Geological Survey (USGS) topographic map (Wellborn, Texas Quadrangle), the National Wetland Inventory (NWI) map, and soil survey data for the area were reviewed. This data is included as figures in Attachment A. Photographs from the on-site assessment are included in Attachment B. Mr. Rob Elsner Page 2 June 4 , 2013 In reviewing the aer ial photography and available mapping data, the drainage ditch did not replace , modify, or extend an existing stream channel. The drainage ditch appears to have been constructed to provide storm drainage following rain events from the adjacent medical center property and City of College Station park property. In reviewing the USGS topographic map (Figure A-1), which was photo-revised in 1980, the contours suggest a preferential flow path in the general vicinity of the drainage ditch ; however, the map did not identify a defined stream channel. This finding was also supported on the NWI map (Figure A-2), which was produced in 1982; subsequent to the USGS map 's publication. Further, the NWJ map did not identify any potential wetland areas in the general vicinity of the drainage ditch. The first readily available data source that shows the drainage ditch is the 1995 aerial photograph (Figure A-3). It is my opinion that the drainage ditch was constructed between 1980 and 1995. The general project area, which includes the Strategic Behavioral Health facility property, is located on or immediately adjacent to the topographic divide between Bee Creek and L ick Creek. The drainage ditch in question conveys drainage toward the Bee Creek watershed. It is my opinion that the slope of the area surrounding the ditch was insufficient to create a natural , defined stream channel displaying an ordinary high water mark. It is not until further downstream (approximately 1,350 linear feet from the Strategic Behavioral Health property) that the slope was sufficient enough to create adequate scour to support the formation of a defined ordinary high water mark. Therefore, historically, the area currently occupied by the drainage ditch would have been considered an upland area -a swale at most. During the May 30, 2013 on-site investigation, cattail (Typha spp.) were observed within the ditch . It is my opinion that when the ditch was constructed, it had inadequate slope, which caused the ditch to retain water. Consequently, water within the ditch is retained with sufficient frequency and duration to support the colonization of cattail (Typha spp.). If the ditch were constructed properly with sufficient slope, water would not be retained within the channel and therefore the cattail would not have the opportunity to colonize. Regardless , the cattail currently occupy a man-made feature. To conclude, despite the presence of cattail and the conveyance of excess storm water to an unnamed tributary to Bee Creek, the drainage ditch south of Rock Prairie Road should not be con s idered a water of the US subject to Section 404 of the CWA. It is my opinion that the drainage ditch does not have a significant nexu s to the Brazos Mr . Rob Elsner Page 3 June 4, 2013 River. It is simply a man-made feature that was constructed in uplands . Thus , there would be no requirement for a Section 404 of the CWA permit from the U.S. Army Corps of Engineers (USACE) for the minor grading work proposed. Further, the detention pond , under construction , is also located in uplands and therefore would not require USACE review. If you have any questions regarding the determination , please feel free to contact me at (979) 694-7619 (office) or (817) 845-3280 (mobi le). Sincerely, ALAN PLUMMER ASSOClA TES , INC. Loretta E. Mokry, PWS Attachments cc: Ms. Veronica Morgan , P.E., Mitche ll and Morgan , LP Ryan Clark, Thomas Construction Group Laura Miller, LS3P ATTACHMENT A FIGURES ~ DRAINAGE DITCH D PROJECT AREA DATE: 6/4/2013 400 200 0 Feet FIGURE A-1 U.S. GEOLOGICAL SURVEY WELLBORN, TEXAS TOPOGRAPHIC QUADRANGLE STRATEGIC BEHAVIORAL HEALTH PROJECT SITE DRAINAGE DITCH CWA STATUS COLLEGE STATION, BRAZOS COUNTY, TEXAS SOURCE: TNRIS/USDA NAIP • 2012 AERIAL PHOTOGRAPH 1320 S. UNIVERSITY DRIVE SUITE 300 FORT WORTH, TEXAS 76107 PHONE: (817) 806-1700 FAX: (817) 870-2536 FIGURE 1OF7 DRAINAGE DITCH D PROJECT AREA DATE : 6/4/2013 400 200 O Feet FIGURE A -2 NATIONAL WETLAND INVENTORY MAP WELLBORN , TEXAS TOPOGRAPHIC QUADRANGLE STRATEGIC BEHAVIORAL HEALTH PROJECT SITE DRAINAGE DITCH CWA STATUS COLLEGE STATION, BRAZOS COUN T Y, TEXAS SOURCE : TN RIS/USDA NAIP · 201 2 A ER IAL PH OTOGR A PH 1320 S . UNIVERSITY DRIVE SUITE 300 FORT WORTH, TEXAS 76107 PHONE : (817) 806-1700 FAX : (817) 870-2536 FIGU RE 2 OF 7 D PROJECT AREA DATE: 6/4/201 3 400 200 0 Fe et FIGURE A-3 1995 AERIAL PHOTOGRAPH STRATEGIC BEHAVIORAL HEALTH PROJECT SITE DRAINAGE DITCH CWA STATUS COLLEGE STATION, BRAZOS COUNTY, TEXAS SOUR CE : TNRIS/USDA NAIP -1995 AERIAL PHOTOGRAPH 1320 S . UNI VERSITY DRIV E SU ITE 300 FORT WORTH, TEXAS 76 107 PHONE : (817) 806-17 00 FAX : (81 7) 870-2536 FIGUR E 3 OF 7 D PROJECT AREA DATE : 6/4/2 013 400 200 0 Feet FIGURE A-4 2005 AERIAL PHOTOGRAPH STRATEGIC BEHAVIORAL HEALTH PROJECT SITE DRAINAGE DITCH CWA STATUS COLLEG E STATION , BRAZOS COUNTY, TEXAS SOUR CE TNRI S/USD A NAIP -2005 A ER IAL PHOTO G RAP H 1320 S . U NIVERS IT Y DRIVE SUITE 300 FORT WORTH. TEXAS 76107 PHONE : (8 17 ) 806-1700 FAX : (8 17) 870-2536 FIGURE 4 OF 7 D PROJ ECT AREA DATE : 6/4/2 01 3 400 200 0 Fee t FIGURE A-5 2009 AERIAL PHOTOGRAPH STRATEGIC BEHAVIORAL HEALTH PROJECT SITE DRAINAGE DITCH CWA STATUS COLLEGE STATION, BRAZOS COUNTY, T EXAS SOURCE : TN RIS/USDA NAI P -20 09 A ER IAL PHOTO GRAPH 1320 S . UNIVERSITY DRIV E SUITE 300 FORT WORTH. TEXAS 76 107 PHONE : (8 17 ) 806-1700 FAX : (817) 870-2536 FIGURE 5 OF 7 D PROJECT AREA DATE : 6/4/2013 400 200 0 Fe et FIGURE A-6 2012 AERIAL PHOTOGRAPH STRATEGIC BEHAVIORAL HEALTH PROJECT SITE DRAINAGE DITCH CWA STATUS COLLEGE STATION , BRAZOS COUNTY, TEXAS SOURCE : TNRI S/B IN G -201 2 AERIAL PHOTOGRA PH 1320 S . UNIVERSITY DRIVE SUITE 300 FORT WORTH, TEXAS 76107 PHONE : (8 17 ) 806-1700 FAX : (817) 870-2536 FIGURE 6 OF 7 Soil Map-Brazos County , Te xas (Dra inage Ditch_Strategic Be havioral Health) ;... f-. "' F I GURE A-7 f.- ill 1o O> 8 758900 759000 759100 759200 759300 759400 759500 759600 759700 759800 759900 760000 760100 760200 760300 760400 30' 35' 5" ,._ 30' 35' 4" :g "' "' 0 0 0 0 <O <O <O <O ., ., "' "' "' "' 0 0 0 0 "' "' <O <O ., ., "' "' "' "' 0 0 0 0 .., .., <O "' ., !!l "' "' "' 0 0 0 0 "' "' <O <O ., ., "' "' "' "' 0 0 0 0 ~ N :g "' "' "' "' § 0 ~ <O :g ., "' "' "' "' 0 0 0 0 0 0 :g <O "' i!l "' "' 0 0 0 0 ~ O> "' ., ., "' "' "' "' 0 ~ 0 0 0 ., ., "' "' ., "' "' "' "' "' 0 0 0 0 ,._ ,._ "' "' "' i!l "' "' "' 30" 34' 31 " 30" 34' 30'' 758900 759000 759100 759200 759300 759400 759500 759600 759700 759800 759900 760000 760100 760200 7603 00 760400 f-. Ma p Scale: 1:7 ,570 if printed on A size (8 .5" x 11 ") s heet. ;., "' f.- 1o N Me te rs ill O> A 0 100 200 400 600 Fee t 0 4 00 800 1,600 2 ,4 00 US DA Natural Resources Web So il Survey 6/4/2013 ~ Conservation Service National Cooperative Soil Survey Page 1 of 3 USDA :iiiii Soil Map-Brazos County , Texas (Drainage Ditch_Strategic Behavioral Health) MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils LJ Soil Map Un its Spec ial Po int Features (!) Blowout ~ Borrow Pit * Clay Spot • Closed Depress ion x Gravel Pit .. Gravelly Spot @ Landfill /\. Lava Flow ~ Marsh or swamp 11'-Mine or Quarry @ Miscellaneous Water @ Perennial Water v Rock Outcrop + Saline Spot .. Sandy Spot -Severely Eroded Spot ¢ Sink ho le p Slide or Slip " Sodic Spot ·= Spoi l Area 0 Stony Spot Natural Resources Conservation Service (l) Very Stony Spot f We t Spot .t. Other Special Line Features ~ Gully Short Steep Slope other Political Features 0 Cities Water Features Streams and Canals Transportation m Rails -Interstate Highways -~ ~ US Routes Major Roads Lo ca l Roads Web Soil Survey National Cooperative So il Survey Map Scale: 1 :7 ,570 if printed on A size (8.5" x 11 ") sheet. The soi l surveys that comprise your AOI were mapped at 1 :20 ,000 . Warning : So il Map may not be valid at this scale . Enlargement of maps beyond the scale of mapping can cause misunderstand ing of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for accurate map measurements. Source of Map : Natural Resources Conservation Service Web So il Survey URL: http ://websoilsurvey.nrcs .usda.gov Coordinate System : UTM Zone 14N NAD83 This product is generated from the USDA-NRCS certified data as of the vers ion date(s) listed below. Soil Survey Area : Survey Area Data : Brazos County , Texas Version 10 , Sep 20 , 2012 Date (s) aerial images were photographed : Data not available . The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result , some minor shifting of map un it boundaries may be evident. 6/4/2013 Page 2 of 3 So il Map-Brazos County, Texas Map Unit Legend US DA ""iiiF Map Unit Symbol BoA BrB RsC Sa TaA TuA ZuB Totals for Area of Interest Natural Resources Conservation Service ,, Brazos County, Texas (TX041) Map Unit Name Acres In AOI Boonville fine sandy loam , 0 to 1 percent slopes Boonville-Urban land complex , O to 3 percent slopes Rosanky fine sandy loam , 2 to 5 percent slopes Sandow loam , frequently flooded Tabor fine sandy loam , 0 to 2 percent slopes Tabor-Urban land complex , 0 to 2 percent slopes Zulch fine sandy loam , 1 to 3 percent slopes Web Soil Survey National Cooperative Soil Survey 20 .7 6.0 11 .3 10.6 2.5 187.0 3.0 241 .2 Drainage Ditch_Strategic Behavioral Health Percent of AOI 8.6 % 2.5 % 4.7 % 4.4% 1.0% 77 .5% 1.3% 100.0% 6/4/2013 Page 3 of 3 ATTACHMENT B PHOTOGRAPHS 't • , Pl . Looking south along drainage ditch from Rock Prairie Road P2 . Sub-drainage pipe below drainage ditch south of Rock Prairie Road P3. Concrete lined drainage ditch and culvert drainage inlet north of Rock Prairie Road P4 . Concrete-lined drainage ditch which provides storm drainage for residential development north of Rock Prairie Road. Danielle Singh, P.E. Assistant City Engineer City of College Station Planning and Development Services P.O . Box 1100 College Station, TX 77840 MITCHELL M M ·-· MORGAN July 12, 2013 RE: Proposed Rock Prairie Road 'V'-Notch Weir for Strategic Behavioral Health Danielle , Thanks for talking with me yesterday regarding the 'v' -notch weir that we need to cut in the headwall at the Rock Prairie Road drainage structure. As construction progressed on the SBH project, we realized that the detention pond outfall was below the flowline of the adjacent overgrown channel. To remedy the situation we will need to regrade this ditch from the SBH pond outfall to Rock Prair ie Road . The existing ditch is very overgrown , does not drain we l l and has numerous low points which collect water continuously from irrigation runoff. A picture of th is drainage structure in which we need to notch the top by 6 inches is shown below. A 12-inch pipe is what can be seen coming through the wall, wh ich should give you a frame of reference for the height of the wall. I have attached the grading sheet showing the grading proposed and the location of the 'v' -notch weir in the wall. Please note that I we have performed our necessary due dil igence for any potential wetland issues. (see attached letter from Alan Plummer & Associates) We also have obtained permission from College Station Parks and Rec r eation Department head, David Schmitz, and The MED, Frank Hartman, to do the necessary grading on their properties (see attached correspondence). Please let me know if notching this wall is acceptable to the City of College Station . As always please do not hesitate to call if you have any questions . sj;1v , Veron ica J.B. or Managing Partner 5 11 UN IVER Si Y ORM EASI, SUi l! 204 • COLL EGf SfATI ON, TX 7784 0 • 1 979260.696 3 • r 9 79 260 3~&J Mr. Rob Elsner Executive Director of Environmental Services Strategic Behavioral Health, LLC 8295 Tournament Drive, Suite 201 Memphis, Tennessee 38125 Dear Mr. Elsner, June 24, 20 13 Please accept this letter as permission for your contractor on the Strategic Behavioral Health (SBH) hospital project to clear and do minor grading work on the MED property . An exhibit showing where this work will be accomplished as well as the extent of this work is attached. We understand that the con tr actor will be removing a bank of dirt that may have originated as spoils from an old sanitary sewer line project constructed years ago . It appears that the spoils were discarded and not removed from the site . Removal of this mound wi ll allow the SBH detention pond outfall to have access to the existing downstream ditch on the City of College Station Parks property . We understand that the ar ea to be regraded will be fine graded and reseeded with native plant materi als upon completion and that the contractor will prevent si lt from migrating downstrean1 durin g th is construction. Please do not hesitate to contact me if yo u ha v e any qu estions. Sincerely, Frank Hartman Director of Property & Facilities The MED Cc : Veronica Morgan, Mitchell & Morgan,LLP Ryan Clark , Thomas Construction Group La ura Miller, LS3P r ... NOTICE OF CONFIDENTIALITY RIGHTS: IF YOU ARE A NATURAL PERSON, YOU MAY REMOVE OR STRIKE ANY OR ALL OF THE FOLLOWING INFORMATION FROM ANY INSTRUMENT THAT TRANSFERS AN INTEREST IN REAL PROPERTY BEFORE IT IS FILED FOR RECORD IN THE PUBLIC RECORDS: YOUR SOCIAL SECURITY NUMBER OR YOUR DRIVER'S LICENSE NUMBER. DATE : GRANTOR: TEMPORARY BLANKET UTILITY EASEMENT _, 2013 STRATEGIC BH--COLLEGE STATION, LLC , a Delaware limited liability company GRANTOR'S MAILING ADDRESS: . (including County) 3550 Normand Drive Brazos County Da e Bk Vol Ps 01151193 OR 11257 23 5 College Station, Texas 77845 GRANTEE: CITY OF COLLEGE STATION, TEXAS GRANTEE'S MAILING ADDRESS: (including County) 1101 Texas Avenue Brazos County College Station, Texas 77842 CONSIDERATION: Ten Dollars ($10 .00) and other good and valuable consideration. PROPERTY: All that certain lot, tract or parcel of land lying and being situated in Brazos County, Texas, being Lot Tlu·ee (3), of COLLEGE STATION MEDICAL + SENIOR LIVING Subdivision to the City of College Station, Brazos County, Texas, according to the Plat recorded in Volume 11071 , Page 177 , Offic.ial Records of Brazos County, Texas. Page 1 0 : 5 EASEMENTS/Stra tegic EH-College Station/te mporm y blanket utility easement.docx 03115120 13 ESTATE GRANTED: Doc Bk Vo l pg 01 1511 93 OR 11 257 236 1. GRANTOR grants to GRANTEE an undefined or "blanket" easement for various utilities, to be restricted hereafter to the as-built area, and defined by subsequent survey or plat. 2 . GRANTOR does hereby grant, bargain, sell and convey unto GRANTEE, its successors and assigns, an undefined easement in and to the above-described parcel of land; GRANTEE to install, maintain, repair , rebuild, operate, inspect , improve and remove all utility facilities, including conduits, duct lines , vault s, fittings , appliances and equipment, upon, ov er, across and /or under the above - described property. RESERVATIONS AND RESTRICTIONS: 1. This conveyance is only for the right, privilege and easement for the aforesaid purposes. GRANTOR and its successors and assigns shall have the right to use and to grant to others the right to use the easement area for any purpose which will not umeasonably interfere with the safe and reasonable maintenance and operation of installations to be made by GRANTEE therein. 2. GRANTEE covenants and agrees to interfere as little as possible with the normal flow of vehicular and pedestrian traffic over and upon the site, and to restore the surface of the site, whenever and wherever disturbed by GRANTEE, to as good a condition as existed at the time of such disturbance. 3. GRANTEE hereby covenants and agrees that in the event the future development or expansion of either the site or adjacent land, or both, requires the relocation of the facilities already constructed and installed in the easement area , GRANTEE will relocate such facilities, at the request and expense of GRANTOR, provided such relocation is sound and feasible from an engineering standpoint as reasonably determined by GRANTEE, and provided further that GRANTOR shall grant to GRANTEE a substitute easement, by instrument in recordable form providing for such relocation. 4. The easement is intended to be temporary, but the rights granted hereunder shall not terminate unless GRANTOR shall deliver a final "As Built" survey or plat, as approved by GRANTEE, showing the location of all necessary utility services , equipment, and facilities as determined by GRANTEE. The "As Built" survey or plat shall delineate all proposed permanent easement areas to enable GRANTEE to maintain, repair, rebuild, and operate the equipment and perform all other activities described in paragraph 2 above, and GRANTOR or its successors shall thereafter execute an instrument in recordable form perfecting the rights existing hereunder in and to the "As Built" area. Page2 0 : 5 EA SEMENTS/Strategic EH-College Station/tempormy blanket utility eas ement.docx 0311512 013 Do c Bk Vol pg 0115119 3 OR 11 25 7 237 5. GRANTOR wanants the rights and interests herein described unto the GRANTEE, and its successors and assigns, forever, and GRANTOR does hereby bind itself, its successors and assigns, to warrant and forever defend, all and singular, these rights and interests unto the GRANTEE, and its successors and assigns, against every person whomsoever lawfully claiming, or to claim same, or any pa11 thereof. STRATEGIC BH--COLLEGE STATION, LLC, a Delaware limited liability company By : (l-___ ------6-rA'tffi'+-E-,~-S-T-.-S-H_A_HE_•E_N_,-JR-.,-M-a-n-ag-er By:£~~ EDWARDi.D~er CONSENT A.ND SUBORDINATION BY LIENHOLDER Lienli er, as the holder of liens(s) on the fee simple title to the Easement Property, con ts to the above ·ant of an easement, including the terms and conditions of such grant, an 1enholder subordinates i ien(s) to the rights and interests of the easement, such that a :D closure of the lien(s) will not extl uish the rights and interests of the easement. corporation APPROVED AS TO FORM. THIS DOCUMENT MA OT BE CHANGED WI UT RE-SUBMISSIO OR APPROVAL Page 3 0 : 5 EASEMENTS/Strategic EH-College Station /temporary blanket utility easement . docx 0311512013 5 Do c Bk Vol Ps 01 15 1193 OR 11257 238 GR ANTQR warrants the rights and interests herein described unto GRANTEE, and its successors and assigns , forever, and GRANTOR does he y bind itself, its successors and assigns, to warr ant and forever defen all and ingular, these rights and interests unto the GRANTEE, and its cesso rs and ass s, against every person whomsoever la wfully claiming o cl aim s am e, or any part reof. CONSENT AND SUBORDINATION BY LIENHOLDER, Lienholder, as the holder of liens(s) on the fee simple title to the Easement Propetty, consents to the above grant of an easement, including the tenns and conditions of such grant, and Lienholder subordinates its lien(s) to the rights and interests of the easement, such that a foreclosure of the lien(s) will not extinguish the rights and interests of the easement. APPROVED AS TO FORM. THIS DOCUMENT MAY NOT BE CHANGED WITHOUT RE-SUBMISSION FOR APPROVAL FIFTH THIRD BANK, an Ohio state banking corporation Page 3 0 : 5 EA SEMENTS/Strategic EH-College Statio11 /1emporary blanket utility e asem ent.doc.~ 0311512013 THE STA TE OF TENNESSEE § Doc Bk Vol P~ 01 1511 93 OR 11 257 239 § ACKNOWLEDGMENT COUNTY OF Shlb<tf § This instrument was aclmowledged before me on this ~day of (\fl .OJ"L c};J , 2013 , by JAMES T. SHAHEEN, JR., Manager of STRATEGIC BH --COLLEGE STATION, LLC, a Delaware limited liability company, on behalf of said STRATE GIC BH --COLLEGE STATION, LLC , a Delaware limited liability company. ,,,111111111111111. s-'~' ~~ E. tc.l 1111, $-~",..-.;, ......... !$/,~ $Q:-.V.:,·' STAT E ··.~% ~l OF··* j f TE NN ESS EE l ~ ~ \ NOTARY ! ~ ~ '• PUBllC : ~ ~l~··· ~· .... ·\~ ~;;7),t-\''•····· ~ ~111.~-lBY ·\~" 11111111111111111111<~ MY COMMISSION EXRIA ES: THE STATE Q¥101J'ENlQJ.EssEE COUNTY OF 5h e J,)2'·.f I § § § ublic in and for the State of Te!U1esse e ACKNOWLEDGMENT This instrument was aclmowledged before me on this c2Js./ day of /Yla~·c )1 , 2013, by JOHN H. DOBBS , JR, Manager of STRATEGIC BH --COLLE GE STATION, LLC , a Delaware limited liability company, on behalf of said STRATEGIC BH --COLLEGE STATION, LLC, a Delaware limited liability company. THE STATE OF TENNESSEE COUNTY OF JJ~ § § § Notary Public in and for the State of Tennessee ACKNOWLEDGMENT This instrument was aclmowledged before me on this d. t P day of Jf){).)...C.( , 2013 , by W. CHRISTOPHER CROSBY, Manager of STRATEGIC BH --COLLEGE STATION, LLC, a Delaware limited liability company, on behalf of said STRATEGIC BH -- COLLEGE STATION, LLC, a Delaware limited liability company. Notary Public in and for the State of T e!U1ess ee Page4 0 : 5 EASEMENTS/Str ategic EH-College Station /tempora1 y blanke t utility ease men t.docx 0311512 01 3 THE STATE OF TENNESSEE § § ACKNOWLEDGMENT Doc Bk Vol Pe 0115119 3 OR 11 257 24 0 COUNTY OF J~ § (}4 '\ ~!: This instmment was acknowledged before me on this a<_(_ day of J1afldv , 2013, by EDWARDS J. DOBBS, Manager of STRATEGIC BH --COLLEGE STATION, LLC, a Delaware limited liability company, on behalf of said STRATEGIC BH --COLLEGE STATION, LLC , a Delaware limited liability company. ~\\\\\llll/111~ ~ ~H., ~ ~~ STATE Q~~ ::::~l Of ~ :::: ~ rtMesaE ::: ~o ~.f.OW?V ..,._::; ~o PlQlc ~;:::: ~(;..~ @i~ ~ ~/,i!YO F ~~ ~ ~ oo,, ~l/f//ff \\\\\\~ .')~ r./f , .~ .. ~ I •"' 4,~ THE STATE OF ----- COUNTY OF ____ _ § § § Notary Public in and for the State of Tennessee ACKNOWLEDGMENT This instrument was aclmowledged before me on this __ day of ______ _ 2013, by , , of FIFTH THIRD BANK, an Ohio state banking corporation, on behalf of said FIFTH THIRD BANK, an Ohio state banking corporation. PREPARED IN THE OFFICE OF: City of College Station Legal Department P.O. Box 9960 College Station, Texas 77842-9960 Notary Public in and for the State of ____ _ Page 5 RETURN ORIGINAL DOCUMENT TO: City of College Station Legal Department P.O. Box 9960 College Station, Texas 77842-9960 0 : 5 EASEMENTS/Strategic EH-College Station/temporary blanket utility easement.docx 03 11512013 THE STATE OF TENNESSEE COUNTY OF ___ _ § § § Doi:: Bl: Vol. f'9 01151 193 OR 11 257 24 1 ACKNOWLEDGMENT This instrument was acknowledged before me on this __ day of------~ 2013, by EDWARDS J. DOBBS, Manager of STRATEGIC BH --COLLEGE STATION, LLC, a Delaware limited liability company, on behalf of said STRATEGIC BH --COLLEGE STATION, LLC, a Delaware limited liability company. . THE STATE OF ') r--) COUNTY OF .Dttv 1D~ o,..J § § § -------·-·-· Notary Public in and for the State of Tennessee ACKNOWLEDGMENT This instrument was acknowledged before me on this ;J/ff°day of /llo,at_ 2013, by 15'; ii 1Jv-..-d I , El. i~tA-"'-1-f,p, tr , of FIFTH-T~H-IR~D-B_A_N_K_,_an Ohio state banking corporation, on behalf of said FIFTH THIRD BANK, an Ohio state banking corporation. PREPARED IN THE OFFICE OF: City of College Station Legal Department P.O. Box 9960 College Station, Texas 77842-9960 Page 5 My Commlt»lon Exp/rN Jfmullry I, 2014 RETURN ORIGINAL DOCUMENT TO: City of College Station Legal Department P.O. Box 9960 College Station, Texas 77842-9960 O: 5 EASEMENTS/Strategic BR-College Stationltemporary blanket utility easemen t.doc.r 0311512013 Doc Bk Vol P!l . 01151193 OR 11257 2U riled ror Record In: e.RAZOS COUtnY on: APr 0512013 at 03:49P Amount As a f\ecord i n9s 011.51193 .l,4,1)0 Rer.eiPt ttu1~ber -'i6671B B!!r F'atsY l1o ntalbo.no STATE OF TEXAS COUMTY OF BRAZOS I hereb !I certif!I thut this instrument uas filed on the date and t i111e sta1dPed hereon b!l w~ nod was dul!l recorded in the \lolu111e o.nd pu~e of the Official Public records of: BRAZOS COUNTY as stati1 Ped hereon b!l tie. APr 0512013 Karen M1:Queen1 Brazos Count!-! Clerk BRAZOS COUMTY STRATEGIC BEHAVIORAL HEAL TH, LLC WATER LINE ANALYSIS February 2012 PREPARED FOR: STRATEGIC BEHAVIORAL HEAL TH , LLC JIM SHAHEEN 8295 TOURNAMENT DR . SUITE 201 MEMPHIS , TENNESSEE 38125 Submitted to CITY OF COLLEGE STATION the heart oftht Research Valley By MITCHELL MM MORGAN ENGINEERS & CONSTRUCTORS 511 UNIVERSITY DRIVE , SUITE 204 COLLEGE STATION , TX 77840 OFFICE (979) 260-6963 FAX(979)260-3564 CERTIFICATION This report for the water design for Strategic Behavioral Health of College Station Site was prepared under my supervision in accordance with provisions of the Bryan/College Station Unified Design Guidelines for.J.b..~ers of the property . ~011 I':,,,, :-~'\fl-············ ~..f: '•• .:,. ..... *~· . .,"'1\S" ,, :: ... ... "· .., '· .... "' . . .. .,................... \*~ ~ VERONICA is ................. ~ ~ ..... ! ............. : .. :.~QRGAN ~ ?. ~ ~ n689 "'Tii: .. , ... ~ /<ii~ 11 ~"·~r:>isrE~~~·"#; .Ir. AA..'"2 •1, U".s-~ ........... :..,6-.:ten n ,~:c.....h-r~ ''\ ONAL €.\~---r l'"'V\ T Veronica J.B. M gan, P.E., ~~-..,. 2/l/1? Registered Professional Engineer State of Texas No. 77689 Strategic Behavioral Health Page 1 " ,.,. ·' i) ' ~ j ; ~·', ~ •" ·. ,.,,, INTRODUCTION WATERLINE ANALYSIS STRATEGIC BEHAVORIAL HEAL TH FEBRUARY 2013 Strategic Behavioral Health (SBH) will be located in College Station, Texas, southeast of the College Station Skate Park and at the future intersection of Arnold Rd . and Normand Dr., across from the College Station Medical Center. The new extensions of Arnold Rd . and Normand Dr. will be built concurrently with the SBH by others. The proposed development will be a single medical facility housing a cafeteria, gymnasium, multiple courtyards , offices, common gathering areas and patient rooms. The overall site plan is provided in Exhibit 1. FIREFLOW DESIGN CRITERIA The updated City of College Station system MikeNET model created for the SBH's waterline analysis (Mitchell & Morgan -March 2009) was used. In order to determine if this model was calibrated two runs were performed . 1. Run 1 -Average Day Conditions without SBH's Development (Exhibit 3A/38) 2 . Run 2 -Average Day Conditions without SBH's Development and Fire Flow at Node 59923 (Exhibit (9A/98) The results from these runs were compared to a fire flow pressure test performed by City of College Station Utilities (Exhibit 11). Based on the output it was determine that the model used underestimated pressures measured in the field . As a result the model is considered to be conservative in predicting pressures of modeled water distribution system. A comparison of measured and modeled values can be found in Table 1. Table 1 -Calibration Results FLOW HYDRANT Measured Modeled Node Number 59923 Nozzle size 2 .5 Pitot readina in PSI 75 89 .4 Flow in G.P.M. 1455 STATIC HYDRANT Measured Modeled Node Number 2073 Static PSI 95 90 .7 Residual PSI 92 90 Strategic Behavioral Health Page 2 I I t I t I .. ·1. I I' ~ I ' . I The demands utilized for this analysis were based upon the flow demands estimated by the MEP engineer using fixture units within the building. Table 2 illustrates how the water demands were calculated. Table 2 -Water Line Demand Data Avg Peak Use Area (SF) Demand Demand (lpm) (gpm) Medical 52,574 30 120 .0 These water demands were allocated to Node 59926 in the model, while Table 3 shows the water line information (size, length, connectivity) for the model. The corresponding MikeNET line and node identifiers are provided in Exhibit 2 and 3 . Table 3 -Water Line Length Data Pipe Number From Node To Node Length (ft) Size (in) 4245 59917 59918 224 .8 6 4246 59918 59919 67.0 6 4247 59919 59920 65 .3 6 4248 59920 59921 32 .1 6 4249 59921 59922 26.5 8 4250 59922 59923 146.6 8 4251 59920 59924 22 .8 6 4252 59925 59926 316.4 12 4253 59926 59927 764.1 12 4254 59927 59928 185 .3 12 4255 59928 2149 72 .2 12 SBH hospital is a total of 52,574 square feet and will be built using Type VA construction. SBH will have a maximum fire area of 30,633 square feet given internal fire walls constructed within the building . The facility will contain a fire suppression system. Based upon Table 8105.1 of the 2012 International Fire Code (Exhibit 10) the required fire flow for this facility is 3,250 gpm. This flow can be reduced by 50 percent due to of the presence of a fire suppression system, resulting in a required fire flow of 1625 gpm. The following Runs were tested to observe the system behavior during various loading conditions: 3. Run 3 -Peak Day with Fire Flow split between the Normand Dr. and Arnold Rd. Hydrants Nodes 59924 & 59926. (Exhibit 7 A/78) Strategic Behavioral Health Page 3 ,_ . .. . ) I 4 . Run 4 -Peak Day with Fire Flow split between the Normand Dr. and SHB Hydrants Nodes 59942 & 59917. (Exhibit BA/88) The results from these runs show that the current waterlines will sufficiently serve the fire flow needs of SBH, keeping pressures in the proposed waterlines above 20 psi, and velocities at or below 12 fps . It is important to note that where nodes/lines have unusual flow and pressure numbers in the results tables is due to their being disconnected from the model. This was caused when lines were closed within the mode. Strategic Behavioral Health Page4 I I ', • ATTACHMENTS EXHIBIT 1: EXHIBIT 2A: EXHIBIT 28: EXHIBIT2C: EXHIBIT 3A: EXHIBIT 38: EXHIBIT 4A: EXHIBIT48: EXHIBIT SA: EXHIBIT 58: EXHIBIT SA: EXHIBIT68: EXHIBIT7A: EXHIBIT78: EXHIBIT 8A: EXHIBIT 88: EXHIBIT 9A: EXHIBIT 98: EXHIBIT 10 : EXHIBIT 11: Overall Site Layout MikeNET Site Layout MikeNET Node Identifier Map MikeNET Link Identifier Map Existing Average Day Conditions without SSH -Junction Results Existing Average Day Conditions without SSH -Pipe Results Existing Peak Day Conditions without SSH -Junction Results Existing Peak Day Conditions without SBH -Pipe Results Proposed Average Day Conditions with SHB-Junction Results Proposed Average Day Conditions with SHB -Pipe Results Proposed Peak Day Conditions with SHB-Junction Results Proposed Peak Day Conditions with SHB -Pipe Results Future Peak Day Demand with Fireflow spilt between Normand Dr. and Arnold Rd. -Junction Results Future Peak Day Demand with Fireflow spilt between Normand Dr. and Arnold Rd. -Pipe Results Future Peak Day Demand with Fireflow spilt between Normand Dr. and SSH Rear Hydrants -Junction Results Future Peak Day Demand with Fireflow spilt between Normand Dr. and SSH Rear Hydrants -Pipe Results Calibration Run -Junction Results Calibration Run -Pipe Results Table 8105.1 of the 2012 International Fire Code College Station Hydrant Data Strategic Behavioral Health Pages • EXHIBIT2A MikeNET Site Layout t t t t t t .. ' EXHIBIT2B MikeNET Node Identifiers I I I I I I • EXHIBIT2B MikeNET Node Identifiers I I I I I a EXHIBIT2C MikeNET Link Identifiers • • • • • • • .. ' EXHIBIT2C MikeNET Link Identifiers I I I I I EXHIBIT3A MikeNET Link Identifiers Description: Steady State Analysis Existing Average Day Demand on System Results -Junctions Number of Junctions: 27(Selection) I Junction ID Description Elevation Demand Grade Pressure (ft] (gpm) (ft) (psi] 2022 WPIPEFIT 300.862 16.787 515.518 93 .011 2033 WPJPEFIT 302.907 1.361 515.472 92.104 2041 WPIPEFIT 307.258 2 .993 515.483 90.224 I 2061 WPIPEFIT 311.033 2.507 515.491 88.592 I 2073 WPIPEFIT 306.000 40.650 515.408 90.736 I 2076 WPIPEFIT 317.572 0.630 515.495 85.760 I 2078 WPIPEFIT 308.000 0.000 515.480 89.901 2080 WPIPEFIT 318 .000 0.401 515.496 85.575 2091 WPIPEFIT 316 .000 0.000 515.560 86.469 I 2102 WPIPEFIT 315.418 0 .000 515 .560 86.722 2149 WVALVE 308 .000 2.607 514.785 89.600 2157 WPIPEFIT 308 .000 2 .965 514.785 89.600 2162 WPIPEFIT 305 .000 0.330 515.747 91.317 2179 WPIPEFIT 304 .000 1.704 515 .706 91.732 : 2185 WV AL VE 298.022 3.022 514.784 93.923 59917 310.870 0 .000 461.259 65.163 59918 308.520 0.000 461.259 66.182 1 59919 307.880 0.000 461.259 66.459 1 59920 307.760 0 .000 461.259 66.511 I 59921 307.330 0.000 461.259 66.697 Exhibit 3A 1 Junction ID Description Elevation Demand Grade Pressure I I (ft] (gpm) (ft] (psi] I 59922 306 .670 0.000 461.259 66 .983 1 59923 307.000 0.000 515.497 90.342 I 1 59924 307.330 0.000 461.259 66.697 I 59925 307.400 0 .000 515.483 90.162 I 59926 308.800 30.000 -3341499.75 -144800 5 .62 I 59927 307.800 0.000 -3341499 .75 -1448005 .25 1 59928 307.400 0 .000 -3341499.75 -1448005 .00 Exhibit 3A 2 EXHIBIT 3B MikeNET Link Identifiers Description: Steady State Analysis Existing Average Day Demand on System Results -Pipes Number of Pipes: 25(Selection) I Pipe ID Description Node 1 Node2 Diameter Length Roughness I [in] [ft] [millift] I 224 WMAfN 2162 2179 2.000 370.211 135.000 I 294 WMAIN 2149 2157 12 .000 122.322 140.000 I 295 WMAIN 2157 2185 6.000 868.914 140.000 ) 1135 WMAfN 2078 2073 8.000 249.020 135 .000 I 1759 WMAfN 2076 2061 12 .000 279.079 125.000 I 1160 WMAfN 2041 2033 12 .000 267.124 125.000 I 1762 WMAIN 2061 2041 12.000 276.290 125.000 I 2112 WMAfN 2022 59923 12 .000 418.816 135.000 I 2113 WMAIN 2102 2091 8.000 319.550 140 .000 1 2623 WMAfN 2102 2162 6.000 977.433 125 .000 I 2624 WMAlN 2080 2102 6.000 336.323 125.000 1 3917 WMAfN 2076 2080 12.000 53 .770 125 .000 I 4243 WMAIN 59923 59925 12 .000 272.949 135.000 I 4244 WMAlN 59925 2078 12.000 64.049 135.000 I 4245 59917 59918 6.000 224 .850 150 .000 1 4246 59918 59919 6.000 67.020 150.000 1 4247 59919 59920 6.000 65.310 150.000 1 4248 59920 59921 6.000 32.180 150.000 I 4249 59921 59922 8.000 26.520 150 .000 1 4250 59922 59923 8.000 146 .620 150.000 Exhibit 3B Flow Velocity Headloss [gpm] [ft/s) [ft) 1.704 0.174 0 .040 -17.607 -0.050 0.000 3.022 0.034 0.001 111.168 0.710 0.073 64.836 0.184 0.005 102 .977 0.292 0.011 85.453 0 .242 0.008 126.168 0 .358 0.021 0 .001 0 .000 0.000 -38.691 -0.439 0.187 I -38.691 -0.439 0 .064 -38.290 -0.109 0.000 126.168 0.358 0 .014 111.168 0.315 0.003 -0.000 -0.000 0 .000 -0 .000 -0.000 0.000 I 0 .000 0 .000 0 .000 I 0 .000 0.000 0.000 I -0.000 -0.000 0 .000 I 0 .000 0 .000 0.000 I • t t t t t \Pipe ID Description Node 1 Node2 Diameter Length Roughness Flow Velocity Head loss [in) [ft) [millift) [gpm) [ft/s) [ft) 1 4251 59921 59924 6 .000 22.800 150 .000 0.000 0.000 0.000 4252 59925 59926 12.000 316.480 150.000 0 .000 0 .000 0.000 4253 59926 59927 12.000 764 .110 150 .000 -15 .000 -0 .043 0 .000 4254 59927 59928 12.000 185.340 150 .000 -15 .000 -0 .043 0.000 4255 59928 2149 12.000 72 .280 150.000 0 .000 0 .000 0.000 Exhibit 3B 2 EXHIBIT4A MikeNET Link Identifiers Description: Steady State Analysis Existing Peak Day Demand on System Results -Junctions Number of Junctions: 27(Selection) \ Junction ID Description Elevation Demand Grade Pressure I [ft] [gpm] [ft] [psi] I 2022 WPIPEFIT 300.862 67.148 487.143 80.715 I 2033 WPIPEFIT 302.907 5.443 486.866 79.710 2041 WPIPEFIT 307 .258 11.974 486.801 77.796 2061 WPIPEFIT 311.033 10.026 486.771 76.147 I 2073 WPIPEFIT 306.000 162.600 487.131 78.484 I 2076 WPIPEFIT 317.572 2.521 486.763 73.310 I 2078 WPIPEFIT 308.000 0.000 487.132 77.618 I 2080 WPIPEFIT 318.000 1.604 486 .763 73 .125 I 2091 WPIPEFIT 316.000 0.000 486.758 73 .989 I 2102 WPIPEFIT 315.418 0.000 486.758 74.242 ) 2149 WV AL VE 308 .000 10.428 486 .301 77.258 I 2157 WPIPEFIT 308 .000 11.860 486.303 77.259 l 2162 WPIPEFIT 305.000 1.318 486 .744 78 .750 I 2179 WPIPEFIT 304.000 6.818 486.218 78.955 ) 2185 WV AL VE 298 .022 12.089 486 .287 81.575 I 59917 310 .870 0.000 486.566 76.129 I 59918 308.520 0.000 486.566 77.147 ) 59919 307.880 0 .000 486.566 77.425 I 59920 307.760 0.000 486.566 77.477 I 59921 307.330 0 .000 486.566 77.663 Exhibit 4A l I Junction ID Description Elevation Demand Grade Pressure l [ft) [gpm) [ft) [psi) I 59922 306.670 0.000 486.566 77.949 1 59923 307.000 0 .000 487.136 78.053 J 59924 307.330 0 .000 486 .566 77.663 I 59925 307.400 0.000 487.132 77.878 1 59926 308.800 120.000 -13367573 .0 -5792303.00 1 59927 307.800 0.000 -13367573 .0 -5792303 .00 1 59928 307.400 0 .000 -13 3675 73 .0 -5792302.50 Exhibit4A 2 EXHIBIT4B MikeNET Link Identifiers Description: Steady State Analysis Existing Peak Day Demand on System Results -Pipes Number of Pipes: 25(Selection) I Pipe ID Description Node 1 Node2 Diameter Length Roughness I [in] [ft] [millift] I 224 WMAIN 2162 2179 2.000 370.211 135 .000 I 294 WMAIN 2149 2157 12.000 122.322 140.000 I 295 WMAIN 2157 2185 6.000 868 .914 140.000 I 1135 WMAIN 2078 2073 8.000 249.020 135 .000 I 1159 WMAIN 2076 2061 12.000 279.079 125.000 I 1760 WMAIN 2041 2033 12.000 267.124 125.000 I 1762 WMAIN 2061 2041 12.000 276.290 125.000 I 2112 WMAIN 2022 59923 12.000 418.816 135 .000 I 2113 WMAIN 2102 2091 8.000 319.550 140 .000 2623 WMAIN 2102 2162 6.000 977.433 125.000 2624 WMAIN 2080 2102 6.000 336.323 125 .000 I 3917 WMAIN 2076 2080 12.000 53.770 125 .000 I 4243 WMAIN 59923 59925 12.000 272.949 135.000 1 4244 WMAIN 59925 2078 12 .000 64.049 135.000 \ 4245 59917 59918 6 .000 224.850 150 .000 I 4246 59918 59919 6.000 67.020 150.000 1 4247 59919 59920 6.000 65.310 150.000 1 4248 59920 59921 6.000 32.180 150 .000 I 4249 59921 59922 8.000 26.520 150.000 1 4250 59922 59923 8 .000 146.620 150.000 Exhibit 4B Flow Velocity Headloss j [gpm] [ft/s] [ft] 6 .818 0 .696 0.525 -70.428 -0.200 0 .002 12.089 0.137 0.016 6.990 0.045 0 .000 -87.594 -0.248 0 .008 -271.250 -0.769 0 .065 -175 .792 -0.499 0.030 66.990 0.190 0.007 -0.000 0.000 0.000 9.574 0 .109 0 .014 9.574 0.109 0.005 11.178 0.032 0.000 66.990 0.190 0.004 6 .990 0.020 0.000 -0.000 -0.000 0 .000 -0.000 -0.000 0.000 -0.000 -0 .000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 .000 0 .000 0.000 1 I . Pipe ID Description Node 1 Node2 Diameter Length Roughness Flow Velocity Headloss I [in) [ft) [millift) (gpm) [ft/s) [ft) 1 4251 59921 59924 6 .000 22.800 150.000 0 .000 0.000 0.000 I 4252 59925 59926 12 .000 316.480 150.000 0.000 0.000 0 .000 1 4253 59926 59927 12 .000 764.110 150.000 -60.000 -0 .170 0 .000 1 4254 59927 59928 12 .000 185.340 150.000 -60 .000 -0.170 0.000 1 4255 59928 2149 12.000 72.280 150.000 0.000 0 .000 0.000 Exhibit 4B 2 EXHIBIT SA MikeNET Link Identifiers Description: Steady State Analysis Proposed Average Day Demand on System Results -Junctions Number of Junctions: 27(Selection) I Junction ID Description Elevation Demand Grade Pressure Quality I [ft] [gpm] [ft] [psi) I 2022 WPIPEFIT 300.862 16.787 515.470 92.990 0.000 I 2033 WPIPEFIT 302.907 1.361 515.437 92.089 0.000 I 2041 WPIPEFIT 307.258 2.993 515.449 90.209 0 .000 2061 WPIPEFIT 311.033 2 .507 515.458 88.577 0.000 2073 WPIPEFIT 306.000 40.650 515.302 90.691 0.000 I 2076 WPIPEFIT 317.572 0.630 515.463 85.746 0 .000 I 2018 I WPIPEFrT 1 308.000 I o.ooo 1 515.335 1 89.838 0.000 2080 WPIPEFIT 318.000 0.401 515.463 85 .561 0 .000 2091 WPIPEFIT 316.000 0.000 515.530 86.456 0 .000 I 2102 WPIPEFIT 315.418 0.000 515.530 86.709 0 .000 : 2149 WV AL VE 308.000 2.607 515 .247 89.800 0 .000 I 2157 WPIPEFIT 308.000 2.965 515 .238 89.796 0 .000 l 2162 WPIPEFIT 305 .000 0.330 515 .725 91.307 0 .000 I 2179 WPIPEFIT 304.000 1.704 515.684 91.723 0.000 1 2185 WV AL VE 298.022 3.022 515.237 94.119 0.000 ) 59917 310.870 0.000 515.389 88 .618 0 .000 I 59918 308 .520 0.000 515.389 89.636 0 .000 I 59919 307.880 0.000 515.389 89.914 0 .000 I 59920 307.760 0 .000 515.389 89.966 0 .000 ) 59921 307.330 0.000 515.389 90.152 0.000 Exhibit 5A 1 I Junction ID Description Elevation Demand Grade Pressure Quality I (ft] (gpm] (ft] (psi] I 59922 306 .670 0.000 515 .389 90.438 0.000 \ 59923 307.000 0.000 515.389 90.295 0.000 1 59924 307.330 0.000 515.389 90.152 0.000 \ 59925 307.400 0 .000 515 .337 90 .099 0.000 1 59926 308.800 30.000 515.310 89.481 0.000 I 59927 307.800 0 .000 515 .263 89.894 0.000 \ 59928 307.400 0.000 515 .251 90.062 0.000 Exhibit 5A 2 EXHIBIT5B MikeNET Link Identifiers Description: Steady State Analysis Proposed Average Day Demand on System Results -Pipes Number of Pipes: 25(Selection) I Pipe ID Description Nodel Node2 Diameter Length Roughness I (in] [ft] (millift] I 224 WMAIN 2162 2179 2 .000 370.211 135.000 I 294 WMAIN 2149 2157 12.000 122.322 140.000 I 295 WMAIN 2157 2185 6.000 868.914 140.000 I 1135 WMAIN 2078 2073 8.000 249.020 135.000 I 1759 WMAIN 2076 2061 12.000 279.079 125.000 I 1760 WMAIN 2041 2033 12.000 267.124 125.000 I 1162 WMAIN 2061 2041 12 .000 276.290 125.000 I 2112 WMAIN 2022 59923 12.000 418.816 135.000 I 2113 WMAIN 2102 2091 8.000 319.550 140.000 I 2623 WMAIN 2102 2162 6.000 977.433 125.000 I I 2624 WMAIN 2080 2102 6.000 336.323 125.000 I 3917 WMAIN 2076 2080 12.000 53.770 125.000 1 4243 WMAIN 59923 59925 12.000 272.949 135.000 I 4244 WMAIN 59925 2078 12.000 64.049 135 .000 1 4245 59917 59918 6.000 224.850 150 .000 1 4246 59918 59919 6 .000 67.020 150 .000 \ 4247 59919 59920 6.000 65.310 150 .000 1 4248 59920 59921 6.000 32.180 150.000 1 4249 59921 59922 8.000 26.520 150.000 \ 4250 59922 59923 8.000 146 .620 150.000 Exhibit 5B Flow Velocity Headloss [gpm] [ft/s] [ft] 1.704 0.174 0 .040 152.344 0.432 0 .008 3.022 0.034 0.001 73.099 0.467 0 .033 67.312 0.191 0 .005 109.322 0.310 0 .012 89.696 0 .254 0 .009 258.050 0.732 0.081 0.000 0.000 0 .000 -39.650 -0.450 0 .195 -39.650 -0.450 0 .067 -39.249 -0.111 0 .000 258 .050 0 .732 0 .052 73 .099 0 .207 0.001 0.000 0.000 0.000 -0.000 -0 .000 0.000 -0 .000 -0.000 0.000 0 .000 0.000 0.000 -0.000 -0.000 0 .000 -0 .001 -0.000 0 .000 1 I Pipe ID Description Node 1 Node2 Diameter Length Roughness Flow Velocity Head loss I [in) (ft) (millift) (gpm) (Ws) (ft) 1 4251 59921 59924 6 .000 22.800 150 .000 0.001 0.000 0.000 I 4252 59925 59926 12 .000 316.480 150 .000 184.951 0.525 0 .027 \ 4253 59926 59927 12 .000 764.110 150 .000 154.951 0.440 0.047 \ 4254 59927 59928 12 .000 185.340 150.000 154.951 0.440 0 .011 \ 4255 59928 2149 12 .000 72.280 150 .000 154.951 0.440 0 .004 Exhibit SB 2 EXHIBIT6A MikeNET Link Identifiers Description: Steady State Analysis Proposed Peak Day Demand on System Results -Junctions Number of Junctions: 27(Selection) 1 Junction ID Description Elevation Demand Grade Pressure I [ft] [gpm] [ft) [psi) I 2022 WPIPEFIT 300.862 67.148 487.072 80.685 I 2033 WPIPEFIT 302.907 5.443 486.823 79.691 I 2041 WPIPEFIT 307.258 11.974 486 .762 77.779 I 2061 WPIPEFIT 311.033 10.026 486 .735 76.132 I 2073 WPIPEFIT 306.000 162.600 486.954 78.407 I 2076 WPIPEFIT 317.572 2.521 486.728 73.295 l 2078 WPIPEFIT 308.000 0.000 486 .952 77.540 I 2080 WPIPEFIT 318.000 1.604 486 .728 73.110 I 2091 WPIPEFIT 316 .000 0.000 486.728 73.976 I 2102 WPIPEFIT 315.418 0.000 486.728 74.229 I 2149 WVALVE 308 .000 10.428 486.848 77.495 I 2157 WPIPEFIT 308 .000 11.860 486 .842 77.492 l 2162 WPIPEFIT 305.000 1.318 486.728 78.743 I 2179 WPIPEFIT 304.000 6.818 486.203 78.948 I 2185 WVALVE 298 .022 12.089 486.826 81.809 I 59917 310 .870 0.000 486.999 76.317 ) 59918 308 .520 0.000 486.999 77.335 I 59919 307.880 0.000 486.999 77.612 I 59920 307.760 0.000 486.999 77.664 1 59921 307.330 0.000 486.999 77.851 Exhibit6A Junction ID Description Elevation Demand Grade Pressure [ft] [gpm) [ft] [psi) I 59922 306.670 0.000 486.999 78.137 1 59923 307.000 0 .000 486.999 77.994 I 59924 307.330 0.000 486.999 77.851 I 59925 307.400 0.000 486.952 77.800 1 59926 308.800 120.000 486.900 77.171 1 59927 307.800 0 .000 486 .861 77.587 1 59928 307.400 0.000 486.852 77 .756 Exhibit 6A 2 EXHIBIT6B MikeNET Link Identifiers Description: Steady State Analysis Proposed Peak Day Demand on System Results -Pipes Number of Pipes: 25(Selection) I Pipe ID Description Node 1 Node2 Diameter Length Roughness I (in] [ft] [millift] I 224 WMAIN 2162 2179 2.000 370.211 135.000 I 294 WMAIN 2149 2157 12 .000 122.322 140.000 '295 WMAIN 2157 2185 6 .000 868.914 140.000 I 1135 WMAIN 2078 2073 8.000 249.020 135.000 1759 WMAIN 2076 2061 12.000 279.079 125.000 1760 WMAIN 2041 2033 12 .000 267.124 125 .000 I 1162 I WMAIN I 2061 1 2041 I 12.000 276.290 125.000 1 2112 WMAIN 2022 59923 12.000 418.816 135 .000 I 2113 WMAIN 2102 2091 8.000 319.550 140.000 I 2623 WMAIN 2102 2162 6.000 977.433 125.000 2624 WMAIN 2080 2102 6.000 336.323 125.000 3917 WMAIN 2076 2080 12.000 53 .770 125.000 \ 4243 WMAIN 59923 59925 12.000 272.949 135.000 I 4244 WMAIN 59925 2078 12.000 64.049 135.000 4245 59917 59918 6.000 224.850 150.000 I 4246 59918 59919 6.000 67.020 150.000 1 4247 59919 59920 6.000 65.310 150.000 1 4248 59920 59921 6.000 32.180 150.000 4249 59921 59922 8.000 26.520 150.000 I 4250 59922 59923 8.000 146 .620 150.000 Exhibit 6B Flow Velocity Headloss (gpm] [ft/s] [ft] 6.818 0 .696 0 .52 5 130.386 0.370 0.006 12.089 0.137 0.016 -16.280 -0.104 0.002 -79.095 -0.224 0.007 -260.904 -0.740 0.060 -166.422 -0.472 0.027 244.534 0 .694 0.073 0.000 0.000 0.000 1.913 0.022 0.000 I 1.913 0.022 0.000 3.517 0.010 0.000 244.534 0.694 0 .048 I -16.280 -0 .046 0.000 -0.000 -0.000 0.000 -0.000 -0.000 0 .000 -0.000 -0.000 0 .000 -0.000 -0.000 0.000 -0.000 -0.000 0.000 -0.000 -0.000 0.000 1 I Pipe ID Description Node 1 Node2 Diameter Length Roughness Flow Velocity Headloss I [in] [ft] [millift) (gpm) [Ws] [ft) 1 4251 59921 59924 6.000 22.800 150.000 0 .000 0 .000 0.000 \ 4252 59925 59926 12 .000 316.480 150 .000 260.814 0 .740 0 .051 1 4253 59926 59927 12 .000 764.110 150 .000 140.814 0.399 0 .039 \ 4254 59927 59928 12.000 185.340 150 .000 140.814 0 .3 99 0.010 1 4255 59928 2149 12.000 72.280 150.000 140.814 0 .3 99 0.004 Exhibit 6B 2 EXHIBIT7A MikeNET Link Identifiers Description: Steady State Analysis Future Peak Day Demand with Strategic Behavioral Health and Fireflow placed at Normand Dr. (Node 59924) and Arnold Rd. (Node 59926). Results -Junctions Number of Junctions: 27(Selection) 1 Junction ID Description Elevation Demand Grade Pressure 1 [ft] [gpm] [ft) [psi] I 2022 WPIPEFIT 300.862 67.148 481.722 78.367 I 2033 WPIPEFIT 302 .907 5.443 481.642 77.446 I 2041 WPIPEFIT 307.258 11.974 481.598 75.542 I 2061 WPIPEFIT 311.033 10.026 481.580 73.898 l 2073 WPIPEFIT 306.000 162.600 480.345 75 .544 l 2016 WPIPEFIT 317.572 2.521 481.575 71.063 2078 WPIPEFIT 308 .000 0.000 480.134 74.585 2080 WPIPEFIT 318.000 1.604 481.575 70.877 I 2091 WPIPEFIT 316.000 0.000 481.576 71.744 I 2102 WPIPEFIT 315.418 0.000 481.576 71.996 I 2149 WVALVE 308.000 10.428 480.099 74 .571 I 2157 WPIPEFIT 308.000 11.860 480.133 74.585 I 2162 WPIPEFIT 305.000 1.318 481.577 76.511 I 2179 WPIPEFIT 304.000 6.818 481.052 76.717 I 2185 WV AL VE 298 .022 12.089 480.117 78.902 1 59917 310.870 0.000 478.606 72.680 1 59918 308.520 0.000 478.606 73.698 1 59919 307.880 0.000 478 .606 73.975 \ 59920 307.760 0.000 478.606 74.027 Exhibit 7A 1 I Pressure I Junction ID Description Elevation Demand Grade I I [ft] [gpm] [ft] [psi) I 59921 307.330 0 .000 478 .606 74.214 I 59922 306.670 0 .000 478.859 74.609 1 5992 3 307.000 0 .000 480 .2 57 75.072 I 59924 307.330 812.500 477.722 73.831 1 59925 307.400 0.000 480.126 74.842 I 59926 308.800 932.500 479.871 74.125 1 59927 307.800 0.000 480.042 74.632 I 59928 307.400 0.000 480.083 74 .824 Exhibit 7A 2 ., EXHIBIT7B MikeNET Link Identifiers Description: Steady State Analysis Future Peak Day Demand with Strategic Behavioral Health and Fireflow placed at Normand Dr. (Node 59924) and Arnold Rd. (Node 59926). Results -Pipes Number of Pipes: 25(Selection) I Pipe ID Description Nodel Node2 Diameter Length Roughness Flow Velocity Headloss I (in] [ft] [millift] [gpm] (ft/s) [ft] I 224 WMA1N 2162 21 79 2.000 370.211 135 .000 6.818 0 .696 0 .525 I 294 WMA1N 2149 2157 12.000 122.322 140.000 -321.463 -0.912 0 .033 I 295 WMA1N 2157 2185 6.000 868.914 140.000 12.089 0 .137 0.016 I 1135 WMAIN 2078 2073 8.000 249.020 135 .000 -198 .164 -1.265 0.212 I I 1759 WMA1N 2076 2061 12.000 279.079 125.000 -61.396 -0.174 0.004 I 1160 WMA1N 2041 2033 12 .000 267.124 125 .000 -218.146 -0.619 0.043 1762 WMAJN 2061 2041 12.000 276.290 125 .000 -136.097 -0.386 0.019 2112 WMA1N 2022 59923 12.000 418.816 135 .000 1235.801 3.506 1.465 l 2113 WMA1N 2102 2091 8 .000 319.550 140.000 -0.000 0 .000 0.000 I 2623 WMAIN 2102 2162 6.000 977.433 125.000 -3.965 -0.045 0.001 I 2624 WMAJN 2080 2102 6.000 336.323 125.000 -3.965 -0.045 0.000 1 3917 WMA1N 2076 2080 12.000 53.770 125.000 -2.36 1 -0.007 0.000 \ 4243 WMAIN 59923 59925 12 .000 272.949 135.000 423.301 1.201 0.131 1 4244 WMA1N 59925 2078 12.000 64.049 135 .000 -198.164 -0.562 0.008 J 4245 59917 59918 6.000 224.850 150.000 -0.000 -0.000 0.000 1 4246 59918 59919 6.000 67.020 150.000 -0.000 -0.000 0.000 \ 4247 59919 59920 6.000 65.310 150.000 0.000 0 .000 0.000 1 4248 59920 59921 6.000 32.180 150.000 0.000 0 .000 0.000 1 4249 59921 59922 8.000 26.520 150 .000 -812 .500 -5 .186 0.253 Exhibit 7B ' ) Pipe ID Description Node 1 Node2 Diameter Length Roughness Flow Velocity Headloss I (in] [ft] (millift] (gpm) [ft/s) [ft) 1 4250 59922 59923 8.000 146.620 150.000 -812.500 -5.186 1.399 ) 4251 59921 59924 6.000 22 .800 150 .000 812.500 9.220 0.883 4252 59925 59926 12.000 316.480 150 .000 621.465 1.763 0.255 4253 59926 59927 12.000 764 .110 150.000 -311.035 -0 .882 0.171 4254 59927 59928 12.000 185.340 150.000 -311.035 -0.882 0.041 \ 4255 59928 2149 12.000 72.280 150.000 -311.035 -0.882 0 .016 Exhibit 7B 2 EXHIBIT SA MikeNET Link Identifiers Description: Steady State Analysis Future Peak Day Demand with Strategic Behavioral Health and Fireflow placed at Normand Dr. (Node 59924) and Strategic Behavioral Health internal Hydrant (Node 59917). Results -Junctions Number of Junctions: 27(Selection) Junction ID Description Elevation Demand Grade Pressure [ft] [gpm] [ft) [psi) 2022 WPIPEFIT 300.862 67.148 481.706 78.360 2033 WPIPEFIT 302.907 5.443 481.631 77.441 2041 WPIPEFIT 307.258 11.974 481.588 75.537 2061 WPIPEFIT 311.033 10.026 481.569 73.893 2073 WPIPEFIT 306 .000 162.600 480.408 75.571 I 2076 WPIPEFIT 317 .572 2.521 481.565 71 .058 2078 WPIPEFIT 308.000 0 .000 480.211 74.619 2080 WPIPEFIT 318.000 1.604 481.565 70.873 2091 WPIPEFIT 316 .000 0.000 481.566 71.740 2102 WPIPEFIT 315.418 0.000 481.566 71.992 2149 WV AL VE 308 .000 10.428 480.390 74.697 I 2157 WPIPEFIT 308.000 11.860 480.415 74.707 2162 WPIPEFIT 305.000 1.318 481.568 76 .507 2179 WPIPEFIT 304.000 6.818 481.043 76 .713 2185 WVALVE 298.022 12 .089 480 .399 79 .024 59917 310.870 812 .500 459.074 64.217 59918 308.520 0.000 467.784 69.009 59919 307.880 0.000 470.380 70.411 59920 307.760 0.000 472 .910 71.559 EXHIBIT SA • Junction ID Description Elevation Demand Grade Pressure [ft] (gpm) [ft] [psi] 59921 307.330 0.000 474.156 72.286 59922 306 .670 0.000 475 .070 72.968 59923 307 .000 0 .000 480.119 75.012 59924 307.330 812.500 473 .273 71.903 59925 307.400 0.000 480.204 74.876 59926 308.800 120.000 480.221 74 .277 59927 307.800 0.000 480.347 74.765 59928 307.400 0.000 480.378 74 .951 2 EXHIBIT8A EXHIBIT SB MikeNET Link Identifiers Description: Steady State Analysis Future Peak Day Demand with Strategic Behavioral Health and Fireflow placed at Normand Dr. (Node 59924) and Strategic Behavioral Health internal Hydrant (Node 59917). Results -Pipes Number of Pipes: 25(Selection) Pipe Description Node Node Diameter Length Roughness Flow Velocity Headloss ID 1 2 (in] [ft) [millift] [gpm] [ft/s) [ftl 224 WMAIN 2162 2179 2 .000 370 .211 135.000 6 .818 0 .696 0.525 294 WMAIN 2149 2157 12.000 122.322 140.000 -274 .621 -0 .779 0.025 295 WMAIN 2157 2185 6.000 868.914 140.000 12.089 0.137 0 .016 1135 WMAIN 2078 2073 8.000 249.020 135.000 -190 .676 -1.217 0.197 1759 WMAIN 2076 2061 12 .000 279.079 125 .000 -60.787 -0 .172 0.004 1760 WMAIN 2041 2033 12.000 267.124 125.000 -216.860 -0.615 0 .043 1762 WMAIN 2061 2041 12.000 276 .290 125 .000 -135.321 -0.384 0.019 1 2112 WMAIN 2022 59923 12.000 418.816 135.000 1290.131 3.660 1.587 2113 WMAIN 2102 2091 8.000 319.550 140 .000 -0.000 0.000 0.000 2623 WMAIN 2102 2162 6.000 977.433 125.000 -4.407 -0 .050 0.002 2624 WMAIN 2080 2102 6.000 336.323 125.000 -4.407 -0 .050 0 .001 3917 WMAIN 2076 2080 12.000 53 .770 125 .000 -2.803 -0.008 0.000 4243 WMAIN 59923 59925 12.000 272.949 135 .000 -334.869 0.950 0 .085 4244 WMAIN 59925 2078 12 .000 64.049 135 .000 -190.676 -0.541 0.007 4245 59917 59918 6.000 224 .850 150 .000 -812.500 -9.220 8.710 4246 59918 59919 6.000 67.020 150.000 -812 .500 -9.220 2.596 4247 59919 59920 6.000 65 .310 150.000 -812.500 -9.220 2.530 4248 59920 59921 6.000 32.180 150.000 -812.500 -9.220 1.247 1 EXHIBIT 8B • Pipe Description Node Node Diameter Length Roughness Flow Velocity Headloss ID 1 2 [in) [ft) [millift) [gpm[ [ft/s) [ft) -4249 59921 59922 8.000 26.520 150.000 1625 .000 -10.372 0.913 -4250 59922 59923 8.0 00 146.620 150.000 1625.000 -10.372 5.049 4251 59921 59924 6.000 22.800 150.000 812 .500 9.220 0 .883 4252 59925 59926 12.000 316.480 150.000 -144.193 -0.409 0.017 4253 59926 59927 12.000 764 .110 150.000 -264 .193 -0.749 0.126 4254 59927 59928 12.000 185.340 150.000 -264.193 -0.749 0 .031 4255 59928 2149 12.000 72.280 150.000 -264 .193 -0 .749 0.012 2 EXIDBIT 8B • EXHIBIT9A MikeNET Link Identifiers Description: Steady State Analysis Average Day Demand with Fireflow placed at Node 59923 to Calibrate System. Results -Junctions Number of Junctions: 5(Selection) Junction ID Description Elevation Demand Grade Pressure [ft] [gpm) [ft] [psi] 2022 WPIPEFIT 300 .862 16.787 514.974 92.775 2073 WPIPEFIT 306.000 40.650 513 .790 90.035 2078 WPIPEFIT 308.000 0.000 513.544 89.062 59923 307.000 1455 .000 513.498 89.476 59925 307.400 0.000 513.536 89.319 EXHIBIT9A I ' EXHIBIT9B MikeNET Link Identifiers Description: Steady State Analysis Average Day Demand with Fireflow placed at Node 59923 to Calibrate System. Results -Pipes Number of Pipes: 4(Selection) I Pipe ID Description Node 1 Node2 Diameter Length Roughness Flow Velocity Headloss I (in] (ft) (millift] [gpm] (Ws) (ft] I 1135 WMAIN 2078 2073 8.000 249.020 135.000 -214.482 -1.369 0.245 I 2112 WMAIN 2022 59923 12.000 418.816 135.000 1240.518 3 .519 1.475 I 4243 WMAIN 59923 59925 12.000 272.949 135.000 -214.482 0 .608 0.037 I 4244 WMAIN 59925 2078 12.000 64.049 135 .000 -214.482 -0 .608 0.009 1 EXHIBIT9B APPENDIX B TABLE B1Cll.1 MINIMUM REOUtRID AM-A.OW AND FlOW DURATION FOR BUILDINGS F1RHLOW CAUIULATDI AMA t...-1M1t1 f1AE.f'l.OW FLOW DURATION Type IA -" .. Type llA _. u· Typel'llndY-A· Type • lftd -· ry,.v..-(gmllotlei-tnlnul91' ~) 0-22 ,700 0-12 ,700 0-8,200 0-5,900 0-3,600 l.SOO 22,701-30,200 12,701-17,000 8,20l·10.900 S,901-7,900 3,601-4,800 1,750 30 ,201-31.700 17,001-21,800 10,901-12,900 7,901-9,800 4,801~200 2,000 21,IOl-lA,lOO 12,901-17,«JO 9,801-12,600 6,201-7,700 2 38.701-41.300 2,250 48.301-59.000 24.201-33.200 17.401-21.300 12,601-lS,400 7.701-9,400 2.SOO 59,001-70,900 33.201-39.700 21.301-lS,500 lS,401-18,400 9.401-11,300 2,750 70,901-13. 'JOO l9,701-47,IOO 2S-'Ol-30, 100 18,401-21,800 11,JOl-13,400 3,000 IS, '101-97 ;JQO 4'7,101-54,900 30,101-15,lllO 21,101-lS,900 13,401-IS,600 3,2SO 97,'101-tU.• MJOl.Q.400 35,l0l-40,Ml0 lS,901-29,JIO ISMl-11,000 3,500 3 112,'101-121,'JIO ' G,401-12,400 40,lll ..... ........ IU,Dl-:IDAOO 3,7SO 128,701-14',!IOO '72.401-12.100 . 46,401 -n,D 33,JOl-37,., JO,Ml-?3,lOO -4,000 I 4S. 90 l-164.200 12.101•92.400 52,SOl-'9.100 37 .901-42,700 23,301-26.JOO 4,2SO 164,201-183,.400 92.«>l-103,100 59,IOl-t6,000 42. 701-47,700 26,JO 1-29,300 4,SOO 183,401-lOl,700-1m,101-114.600 66,001-73,300 47,701-53.000 19,JOl-32,600 4,7SO 203,701-225,lOO 114,601 -126,700 73,301-11,100 SJ,OOl·Sl.400 32,601-36.000 5,0CX) 22S,201 -lA7,700 126,701-139,400 81,101-39,200 Sl,601-M,400 36,001-39,600 S.2SO 247 ,701 -271,lOO 1)9,401-152.600 89.201-97,700 65 ,401-70AOO 39,601-43,G 5,500 271,201-~ • l 52,601-166,SOO 97,701-106,500 70,601 -77.000 43,401-47,..00 5,7SO 29S,9014-er 166.sol-GreMer 106-'C)l-115,IOO 77,001-b,700 47,401-Sl,SOO 6,0CX) 4 --I IS,IOl-llS.SOO 13 ,701-tO,lllO 51-'0l-SS,700 6,2SO --12S.501-13S.SOO 90,601-97 ·"'° 55,701~.200 6,500 --135-'01-145,IOO 97,901-t ... 60,»t-64,800 6,7SO --145,IOl-156,700 106,IOl-113,200 64,IOl -69.600 1,0CX) --156,701-167,llOO 113,201 -121.300 69,601-74 ,600 7;2SO -167,901· 179,«JO 121.301 -l?UOO 74,601-79,800 7.SOO I --179,401-191,400 129,601-1--Jta14,KIO 7,7SO I --191 ,401-0realtt 138,301 -0ruler BS .10 I -Grca1er 8,000 Par SI: I ..-S ........ m1. I ... !Ill'--• 3.71S Um, I pollllld per.-inch• U9S Id's . a. Typa ~ ...-1c1Mit-llwdoa • IllU~ IWltM1 Ct*. b. Ml!Ulled • 20 pJi r9lldml piallft. EXHIBIT 10 2012 INTERNATIONAL FIRE COOi!' EXHIBIT 11 Description: Calibration data for Node 59923 from College Station Utilities College Station Utilities Reliable, Affordable, Community Owned Date test completed Wednesday September 5, 2012 Time completed 1:30 P.M. Test completed by Justin Tamplin Witness Floyd Anderson FLOW HYDRANT Location 1602 Rock Prairie Nozzle size - Hydrant number Q-032 Pitot reading in PSI 75 Flow in G.P .M. 1455 STATIC HYDRANT Location Hydrant number Static PSI Residual PSI - 1602 Rock Prairie Q-030 95 92 STRATEGIC BEHAVIORAL HEALTH, LLC DRAINAGE ANALYSIS Dec 2012 Prepared for: JIM SHAHEEN 8295 TOURNAMENT DR. SUITE 201 MEMPHIS, TENNESSEE 38125 Submitted to COLLE · TATI N ti. e he arr of the Reuarrl. Vall~ By MITCHELL MM MORGAN ENGINEERS & CONSTRUCTORS 511 UNIVERSITY DRIVE, SUITE 204 COLLEGE STATION, TX 77840 OFFICE (979) 260-6963 FAX(979)260-3564 - CERTIFICATION This report for the drainage design for Strategic Behavio ral Health Development was p repared u nder my superv ision in accordance with provisions of the Bryan/College Stat ion Unified Drainage Design Guidelines for the owners of the property . All licenses and permits required by any and all state and federal regulatory agencies fo r the proposed dra inage improvements have been issued . ~''''"'' ---""._~~OF r '''' .: c:,,"<.~ •• ···········'.~-t-1. ••• ;-,.. .·· * · ... IS',, #;,.... ... • ~ ~ ..... ·......... \ * ~ ~VERO ·······················~ ~ ..... , .... ~!g~-~.B . MORGAN ~ \.1 \ n6ii9·······7/i;""l Ii--l ~ · [ 'Z vvw-.:·l~ · •. ~ Q .• • {lf ~ ft ~~·-~~!~~~~~"&:.f-fAO,j ,;I F°.--\443 '"~ONAL €.~---r '4"""' Ve ron ica J .B. organ , P .~~'e~M . Registered Profess ional Eng ineer State of Texas No . 77689 - Strategic Behavioral Health Drainage Analysis INTRODUCTION The purpose of this drainage report is to analyze existing and proposed conditions of drainage for the proposed Strategic Behavioral Health hospital development. The new medical site will be located on 6 .03 acres in College Station , Texas, southeast of the Brian Bachmann Community Park at the future intersection of Arnold Rd. and Normand Dr., adjacent to and west of the College Station Medical Center ("The Med"). The new extensions of Arnold Rd . and Normand Dr. will be constructed concurrently with the Strategic Behavioral Health facility by others . This drainage report provides analysis for the infrastructure required to facilitate temporary detention and removal of onsite flow from the 6 .03 acre property . GENERAL LOCATION & DESCRIPTION The Strategic Behavioral Health hospital development will be located in south College Station , Texas , southeast of the Brian Bachmann Community Park. The site is currently undeveloped with no thoroughfare access . The development is situated in both the Lick and Bee Creek Drainage Basins just south of Rock Prairie Road as seen on Exhibit 1. The site will gain driveway access from the extensions of Arnold Rd . and Normand Dr . which will be located on the northeast and southeast sides of the site . The proposed development will be a single medical facility housing a cafeteria , gymnasium , multiple courtyards, offices , common gathering areas and patient rooms. Exhibit 2 illustrates the proposed site plan for the facility. This site , all underground utilities, and the detention pond will be constructed in a single phase . The proposed stormwater systems will be used to convey runoff from the site to an onsite detention pond that will provide detention storage for the project. The majority of the site will drain to this newly constructed pond with a minor portion of the site being released undetained to the southwest into the Lick Creek drainage basin in Arnold Road and a small amount releasing undetained to Bee Creek. DRAINAGE DESIGN CRITERIA All drainage design is in accordance with the Bryan/College Station USDG . As such : • Flow calculations for the onsite storm sewers are based upon the Rational Method . • Design rainstorm events consist of the 5-, 10-, 25-, 50-and 100-year, 24 hour duration hypothetical frequency storm events in order to analyze the effectiveness of the detention facilities as well as capture conservative peak flow values . • Flow calculations for the detention pond sizing are based on the Soil Conservation Service Curve Number Loss Method . Curve Numbers are based on soil type and land use in the subbasins and impervious cover data was used to calculate percent impervious. • The target peak runoff rate for the post-development condition is that of the pre - development peak flow rates analyzed at the study points . The analysis locations for this study are identified as Study Point A draining to Bee Creek and Study Point B draining to Lick Creek to the southwest. The effects of the proposed development outflow compared to existing outflow conditions will be evaluated to determine whether the design objectives were satisfied . PRIMARY DRAINAGE BASIN DESCRIPTION -PRE & POST DEVELOPMENT The proposed project site is located between Bee Creek and Lick Creek Drainage Basin . As demonstrated in Exhibit 1, the property does not lie within the regulatory 100-year floodplain Strategic Behavioral Health Page 1 - - per the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) panel 0310E , with a revised date of May 16 , 2012 . Currently under existing cond itions there are no drainage areas from offs ite that contribute to the property . However, under proposed conditions the Normand Drive construction which is being designed by others is going to reduce the capacity of the adjacent "The Med " detention pond . Through an agreement with the City of College Station , a portion of the runoff from "The Med " parking lot and a portion of the new extension of Normand Drive and Arnold Road are being added to the Strategic Behavioral Health (SBH) detention pond as compensation for the lost detention storage at 'The Med " site. This analysis presented herein simply illustrates that with this add itional flow added to the SBH detention pond , post-developed flows are still less than pre-developed flows currently leaving the SBH property . This analys is does not compare nor calculate any existing or post development condition flowrates from the modified 'The Med " detention facility . That analysis is being undertaken by others . STORMWATER RUNOFF ANALYSIS ON-SITE STORM SEWER SYSTEM Pre-Development Drainage Basin The existing site consists of grasslands and approximately 30% tree cove r. The pre - development analysis for the Strategic Behavioral Health development consists of 2 drainage basins (See Exhibit 3). These basins were used to create the drainage area divides and compute flows to Study Points A & B . Post-Development Drainage Basin The development of the SBH medical facility will result in a significant addition of impervious cover and a higher peak runoff rate from the site than currently exists . The post-developed analysis of SBH project includes 16 basins which drain through a proposed storm sewer system to the proposed detention pond to the northeast and 3 basins that are released undetained . Basin DA-P-09 releases undetained toward Arnold Road , while basin DA-P-1 1 releases to Normand Drive but is recaptured w ith a curb inlet and is directed back into the SBH detention pond and DA-P-10 releases undetained to Study Point A in the creek. Storm sewer infrastructure was sized based on Rational Method flows determined from proposed drainage areas as shown in Exhibit 4 . Exhibits 5 & 5A illustrate the pipe sizes calculated using the runoff from each of these drainage basins for the 10-and 50-yr storms . The blue highlighted values shown on Exhibit 5A denote the storm flow for the 50 -year storm event rather than the 10-year event. The larger storm event flows were used to size the courtyard pipes to ensure adequate capacity to transport the larger storm event out of the enclosed courtyards . Inlet and grate capacity calculations (Exhibits 6 & 7) were created for the 10-, 50-and 100- year storm events to size proposed curb and grate inlets . Peak runoff rates were calculated using the Rational Method (Exhibit 4) and used to size the inlets . Grates not located in enclosed courtya rds were sized for the 10 -year event and all grates located inside enclosed courtyards (with limited or non-existent 100-year overflow routes) were sized for a 50 -year event. Hydraulic grade lines (HGL) were calculated for each pipe sect ion (Figure 11 & 12 ). As seen on these exhibits the HGL is below the proposed grade at all inlets during the 10 -year storm event. During the 100-year event the inlet for DA -P-01 will experience ponding of 0.1ft wh ich is below the allowable 0.5ft. All other inlets will experience no ponding due to the HGL. All curb inlets will be standard 5-ft inlets , sized for the 10-year event. The results of these calculations are shown on Exhibits 6 & 7. Exhibit 7 shows the 100-year ponded water surface Strat e gic Behavi oral Health Pa ge 2 - ., - elevation at each of the curb inlets is lower than the curb at the recessed inlet , with one exception . Curb inlet DA-P-04 during a 100-year storm event will have a "y " of 0 .83 ft which requires an inlet size greater than 5 feet (calculated 5 .5ft) to keep the ponded depth below 0 .83 ft. This should not be of concern since this inlet is adjacent to the detention pond . When the water in the 100-year event reaches the height of the curb at this particular inlet it simply spills into the detention pond as shown in Exhibit 8 . HEC-1 -DETENTION SIZING General Information For the purpose of this analysis, storms were generated for all studied rainfall events using the depth-duration data taken from the National Weather Service TP-40. The storms generated were used for post-development analyses . Post-development hydraulic modeling was performed for all specified rainfall events and included the required 2-through 100-year rainfall events specified by Bryan/College Station USDG . Runoff losses due to infiltration and initial abstractions were calculated using the SCS (NRCS) Curve Number Loss Method . These parameters were calculated using the Curve Number, established from soil type in the Brazos County Soil Survey , and percentage of impervious cover in the basins. The project drainage basin consists of Type D soil with a Curve Number of 75 for Antecedent Moisture Condition (AMC) II. Direct runoff hydrographs were generated using the calculated runoff depths and the SCS dimensionless unit hydrograph . This analysis was performed for the two study points. Pre-Development Drainage Basin Basin runoff was computed for the flows exiting the site under current conditions . Total peak runoff for predeveloped conditions is shown below in Table 1. Post-Development Drainage Basin The increased runoff from the development is designed to drain to an onsite detention pond and is reduced with an outlet control structure . The outlet control structure for the detention pond consists of a 15 " RCP outlet pipe along with a 20 ' weir that will drain toward the Bee Creek tributary . The discharge pipe from the pond will directly discharge to the northeast to an existing creek and the weir will discharge to the same location. The weir will also act as the emergency overflow in the 100 year storm event. The berm will be graded with 4 :1 slopes for ease of maintenance with heights of 4 .50 feet. Exhibit 8 illustrates the berm as well as the pipe and weir outlet structures . The detention pond size was determined using the development of Strategic Behavioral Health as well as accommodating a portion of "The Med " parking lot and a portion of the extensions of Arnold Road and Normand Drive . The Med & Arnold/Normand Drive Drainage As discussed earlier in this report , SBH has agreed to allow for a portion of 'The Med " parking lot as well as a portion of the new extension of Normand Drive and Arnold Road to enter the SBH detention pond to compensate for a loss of storage in "The Med " detention pond . The HEC-1 runs included in Appendix A illustrate the addition of this area to the SBH pond . In the HEC-1 run , the basin called "Arnold, Normand & The Med " consisting of .0028 square miles or 78 ,059 square feet of drainage area was added into the pond as runoff. This area consists of areas M3 + P8 + Y:z P11 + Y:z P10 as seen on the Binkley & Barfield plans in Exhibit 10 . Exhibit 9 illustrates the Binkley & Barfield inlet location along the Normand Dr. extension Str ategic Behavioral Health Page 3 - to accomplish this additional flow . Because these drainage areas currently include a portion of "The Med " parking lot , the impervious cover value increases from 72% currently to 80% post development when the roads are constructed. Diversion of Drainage Area In addition to the flow coming from "The Med ", Arnold Rd . and Normand Dr., the site design diverted some runoff from the pre-development Drainage Area 1 (which currently flows to Lick Creek) to the Bee Creek basin . The HEC-1 runs (Appendix A) show this drainage area labeled as "Divert". This is indicating a diversion from the Lick Creek basin to the Bee Creek basin. The area being drainage area being diverted is 11 ,000 square feet or .0004 square miles . Because it did not flow to the Bee Creek basin in the pre-developed conditions it has been given a CN of 1 and a 0% impervious cover. A CN of 82 and a 73% impervious cover was assigned for the post-developed conditions . This will properly account for a full diversion of flow from 0 cfs in pre-developed conditions to 1 and 2 cfs (depending upon storm event) in post-developed conditions . As seen in Table 1 below , the detention pond has effectively reduced the runoff to pre- development levels even when including the small area diverted from the Lick Creek basin and the addition of flow from The Med parking lot and Arnold and Normand Drives . The detention pond has significant reductions in post-developed flowrates for each storm analyzed. Table 1: HEC-1 Results Study Study Study Study Point A Point A Point B Point B Existing Proposed Existing Proposed Storm Flow Flow Flow Flow Event (cfs) (cfs) (cfs) (cfs) 2 yr 13 10 2 2 5 yr 19 13 3 2 10 yr 23 15 4 3 25yr 28 20 5 3 50yr 31 25 5 4 100 yr 35 32 6 4 The pond was designed with sufficient freeboard to meet the City of College Station drainage design criteria . The water surface elevation within the pond for the individual storm events are listed in Table 2 below. Strategic Behavioral Health Page4 Table 2: Pond Water Surface Elevations Storm Pond Pond WS PondWS Event Details (ft) Elev (ft) Elev with Clogging (ft) Berm Ht 306.5 Weir Ht 304 .0 2 yr 302 .49 304 .31 5yr 303 .45 304 .75 10 yr 304 .10 304 .98 25yr 304.55 305 .18 50 yr 304 .79 305 .31 100 yr 305.03 305 .44 From the above table it can be illustrated that we have approximately 1.47ft of freeboard above the 100-year storm event, thus meeting the requirement of a 0 .5 ft freeboard . During the event that the outlet pipe is clogged there will be approximately 1.06ft of freeboard meeting minimum requirements . The pond discharges into an existing creek just downstream of the site and rip rap is specified on the downstream side of the outlet control structure to dissipate velocities before entering the downstream drainage facility . CONCLUSION Although the development of Strategic Behavioral Health facility will significantly increase volume of runoff from the site , the proposed on-site detention facilities have been designed to mitigate the effects of the SBH development. The changes in the drainage patterns that occur as the result of developing the tract will have no impact on the properties surrounding the site because of the project drainage infrastructure . Strategic Behavioral Health Page 5 ATTACHMENTS EXHIBIT 1: EXHIBIT 2 EXHIBIT 3: EXHIBIT 4 : EXHIBIT 5: EXHIBIT 5A: EXHIBIT 6 : EXHIBIT?: EXHIBIT 8: EXHIBIT 9: EXHIBIT 10: EXHIBIT 11 : EXHIBIT 12: Firmette -FEMA Map Panel 0310C (Revised May, 2012) Site Plan Map Drainage Area Map -Existing & Ultimate Development Rational Formula Drainage Area Calculations Pipe Capacity Calculations-10-Year Storm Pipe Capacity Calculations-50-Year Storm Inlet Capacity Calculations -10 & 50 Year Storm Grate Inlet Capacity Calculations -100 Year Stenn Grading Plan Binkley & Barfield Normand Drive plan sheet Binkley & Barfield drainage area map for Normand Drive storm system Hydraulic Grade Line Calculations-10-Year Storm Hydraulic Grade Line Calculations-100-Year Stenn APPENDIX 1: HEC-1 -Hydrologic Model (Detention Pond Sizing) Strategic Behavioral Health Page6 ' ~ 3r: 0 0:: -' < < c c LL w w z w I-c (!) 0:: :5 0.. z < z < < 0 w () :5 ~ z -' "' -' :&: -' < "' w w < 0:: (!) ~ I-~ > > I-Wz 0 w ~ 0 >w c I-(!) c I-0 -' NO. AC. 0.40 0 .7 0.95 ft. DA-E-0 1 1.16 1.16 0 .00 0 .00 0.46 610.4 DA-E-02 4 .90 4.90 0 .00 0 .00 1.96 609.7 DA-P-01 0 .44 0 .11 0 .00 0 .33 0 .35 307.6 DA-P-02 0 .17 0.10 0 .00 0 .07 0 .11 137.2 DA-P-03 0 .18 0 .12 0 .00 0.06 0 .11 131.6 DA-P-04 1.35 0.67 0 .00 0 .68 0 .91 201.7 DA-P-05 0 .85 0 .28 0 .00 0 .57 0 .65 252 .3 DA-P-06 0 .50 0 .06 0 .00 0 .44 0 .44 141.8 DA-P-07 0 .1 5 0 .01 0 .00 0 .14 0 .14 68 .9 DA-P-08 0.46 0.46 0 .00 0 .00 0 .18 1.0 DA-P-09 0 .87 0 .68 0 .00 0 .19 0.45 377 .6 DA-P-10 0 .08 0.08 0 .00 0 .00 0.03 181 .0 DA-P-11 0 .10 0 .10 0.00 0 .00 0 .04 161 .8 DA-P-110 0 .13 0 .05 0.00 0 .08 0 .10 67 .2 DA-P -111 0 .14 0 .05 0 .00 0.09 0 .11 72 .3 DA-P-112 0 .10 0 .05 0.00 0.05 0.07 64.1 DA-P-113 0 .11 0.03 0 .00 0 .08 0 .09 48.4 DA-P-114 0.11 0.05 0 .00 0 .06 0 .08 47 .9 DA-P-115 0 .09 0 .05 0 .00 0 .04 0 .06 57.4 DA-P-116 0 .11 0 .04 0 .00 0 .07 0.08 49.3 DA-P-117 0 .11 0 .04 0 .00 0 .07 0.08 55 .1 ~~-------- EXHIBIT 4 Rational Formula Drainage Area Calculations Strategic Behavioral Health 3r: 0 3r: 3r: -' LL 0 0 c -' -' z LL LL ~ :5 0:: :I: 0:: u w I-w (3 I-u 0:: -' I-(!) I--' 0 I-u w -' I-z I--' -' w >< ::> w ::> < w iii "' N 0 LL (!) -' (!) LL > () ::> !::! a !!? ft. ft. ft. ft/s min min ln!Hr cfs Inf Hr 6 .5 1.0 1.0 0 .7 14 .0 14 .0 5 .39 2.5 6 .6 7.5 1.0 1.0 0.8 13.0 13.0 5 .59 11.0 6.8 5 .6 1.0 1.0 1.0 5.4 10 .0 6 .33 2 .2 7 .7 1.9 1.0 1.0 0.8 2.8 10.0 6.33 0.7 7 .7 1.8 1.0 1.0 0 .8 2 .7 10.0 6 .33 0 .7 7 .7 5 .3 490.9 3.4 1.5 7.9 10.0 6 .33 5.8 7 .7 1.8 1.0 1.0 0.6 7 .0 10 .0 6 .33 4 .1 7.7 0.7 1.0 1.0 0.5 4 .7 10 .0 6 .33 2 .8 7.7 1.3 1.0 1.0 1.0 1.2 10 .0 6 .33 0 .9 7 .7 1.0 1.0 1.0 10.4 0 .0 10.0 6.33 1.2 7 .7 4 .8 1.0 1.0 0 .8 7.9 10.0 6 .33 2.9 7 .7 5 .5 1.0 1.0 1.2 2.4 10.0 6 .33 0.2 7.7 2 .5 1.0 1.0 0.9 3 .1 10 .0 6 .33 0 .3 7 .7 1.0 1.0 1.0 0 .9 1.3 10.0 6.33 0.6 7 .7 1.0 1.0 1.0 0 .9 1.4 10 .0 6 .33 0 .7 7 .7 1.0 1.0 1.0 0 .9 1.2 10 .0 6.33 0.4 7 .7 0 .7 1.0 1.0 0 .9 0 .9 10.0 6 .33 0 .6 7 .7 0 .7 1.0 1.0 0 .9 0 .9 10.0 6 .33 0 .5 7.7 1.0 1.0 1.0 1.0 1.0 10 .0 6 .33 7 .7 0 .8 1.0 1.0 0.9 0 .9 10.0 6 .33 7 .7 0 .7 1.0 1.0 0 .8 1.1 10 .0 6 .33 7.7 ll) 0 a :!: cfs Inf Hr 3 .1 7.4 13.4 7.7 2 .7 8 .6 0 .8 8 .6 0 .8 8 .6 7.0 8 .6 5 .0 8 .6 3.4 8.6 1.1 8 .6 1.4 8.6 3 .5 8 .6 0 .2 8 .6 0.3 8.6 0 .7 8.6 0 .8 8 .6 0 .5 8 .6 0.7 8 .6 0.6 8 .6 0.4 8 .6 0 .6 8 .6 0.6 8 .6 0 0 ll) 0 0 0 ,,.. ll) N 0 ll) 0 ,,.. a !::! a !!? a :!: a cfs Inf Hr cfs ln!Hr cfs Inf Hr cfs 3 .5 8.5 4 .0 9 .7 4 .5 10 .9 5 .0 15.1 8.8 17 .3 10.0 19 .6 11.2 22 .0 3 .1 9 .9 3 .5 11 .1 3 .9 12 .5 4.4 0 .9 9 .9 1.0 11 .1 1.2 12.5 1.3 0.9 9 .9 1.1 11 .1 1.2 12 .5 1.4 7 .9 9 .9 9 .0 11 .1 10 .2 12 .5 11.4 5 .6 9 .9 6.4 11 .1 7 .3 12.5 8 .2 3.8 9 .9 4 .3 11.1 4 .9 12 .5 5 .5 1.2 9.9 1.4 11 .1 1.6 12.5 1.7 1.6 9.9 1.8 11 .1 2.0 12 .5 2 .3 3 .9 9.9 4 .5 11 .1 5.1 12 .5 5 .7 0 .3 9.9 0 .3 11.1 0.4 12.5 0.4 0 .3 9 .9 0.4 11 .1 0.4 12 .5 0.5 0 .8 9 .9 0.9 11 .1 1.1 12.5 1.2 0 .9 9 .9 1.0 11 .1 1.2 12 .5 1.3 0 .6 9.9 0.7 11 .1 0.8 12 .5 0.8 0 .8 9.9 0 .9 11.1 1.0 12.5 1.1 0.7 9 .9 0 .8 11.1 0 .9 12.5 1.0 0 .5 9 .9 0.6 11 .1 0 .6 12 .5 0.7 0.7 9 .9 0.8 11.1 0 .9 12.5 1.0 0 .7 9 .9 0 .8 11 .1 0 .9 12.5 1.0 EXHIBIT 4 - 0 < 9 s.. E--u 0 z ~ -00 g ~ E--= ~ bl) g E--.... 0 0 ~ CJ E--E--E--Q # # Ac. min yr DA-P-01 DA-P-02 0.35 10.0 10 DA-P-02 DA-P-03 0.46 10.4 10 DA-P-03 J1 0.57 11.0 10 DA-P-04 DA-P-08 2.14 12.0 10 DA-P-05 DA-P-06 0.79 10.6 10 DA-P-06 DA-P-08 1.23 11.1 10 DA-P-07 DA-P-05 0.14 10.0 10 DA-P-110 DA-P-111 0.10 10.0 10 DA-P-111 DA-P-112 0.20 10.2 10 DA-P-112 DA-P-113 0.33 10.3 10 DA-P-113 DA-P-114 0.42 10.5 10 DA-P-114 J2 0.49 10.7 10 DA-P-115 DA-P-112 0.06 10.0 10 DA-P-116 DA-P-117 0.08 10.0 10 DA-P-117 J1 0.17 10.1 10 J1 J2 0.74 11.2 10 J2 DA-P-04 1.23 11.5 10 EXHIBIT 5. Pipe Capacity Calculations Strategic Behavioral Health 10-year Design Storm "C ~ ~ I'll ~ ~-"C-.e-~iii;; s.. ~~ ~ ~ = .:.. = ~ - = ,.... 0 "C bl) I'll bl) 0 .... ~ ~ .... = .... ~ ~ 't Q. = ~ ..... I'll Q 0 Q. ·-0 "C ~ fi: ~ s.. -~Q <Q z ~ 00 cfs cf s # cf s % 3.1 3.8 1 3.8 0.35 3.9 4.9 1 4.9 0.57 4.7 5.9 1 5.9 0.83 17.1 21.4 1 21.4 0.89 6.7 8.3 1 8.3 0.63 10.2 12.7 1 12.7 0.32 1.2 1.5 1 1.5 0.18 0.8 1.0 1 1.0 0.08 1.7 2.2 1 2.2 0.36 2.8 3.5 1 3.5 0.95 3.5 4.4 1 4.4 1.50 4.1 5.2 1 5.2 2.09 0.5 0.6 1 0.6 0.03 0.7 0.9 1 0.9 0.06 1.4 1.8 1 1.8 0.25 6.1 7.6 1 7.6 1.36 10.0 12.5 1 12.5 0.30 ~ ~ a Q. = .... "C ~ E--= 0 E--.... ~ 00 CJ IJ -~ .J ~ ~ @ ~ Q. z ~ Q. ~ ~ ~ ... ~ s.. CJ 00 u E--E--o % in. fps cfs ft. min min 0.350 15 3.1 3.8 80 0.43 10.43 0.570 15 4.0 4.9 134 0.56 10.99 0.840 15 4.8 5.9 75 0.26 11.25 0.950 24 7.0 22.1 17 0.04 12.03 1.450 18 7.2 12.7 205 0.48 11.08 0.350 24 4.3 13.4 13 0.05 11.13 0.650 12 3.7 2.9 132 0.60 10.60 1.500 12 5.6 4.4 71 0.21 10.21 1.500 12 5.6 4.4 39 0.12 10.33 1.500 12 5.6 4.4 70 0.21 10.54 2.200 12 6.7 5.3 54 0.13 10.67 2.100 12 6.6 5.2 45 0.11 10.79 2.300 12 6.9 5.4 71 0.17 10.17 3.000 12 7.9 6.2 53 0.11 10.11 4.000 12 9.1 7.1 46 0.08 10.19 1.370 15 6.2 7.6 92 0.25 11.50 0.300 24 4.0 12.4 118 0.50 11.99 ·,.,1;_,,.,_.,,··;_..,.>:.:';."-'.'·:,\•!'"~>~· .. _ ..... _.,.._. 0 < s ~ ... u 0 z r;;;'l .... 00 ~ ~ E-c ~ = r;;;'l ~ ~ E-c ·-0 0 VJ ~ tJ ~ E-c E-c E-c ~ # # Ac. min yr DA-P-01 DA-P-02 0.35 10.0 50 DA-P-02 DA-P-03 0.46 10.4 50 DA-P-03 J1 0.57 11.0 50 DA-P-04 DA-P-08 2.14 12.0 50 DA-P-05 DA-P-06 0.79 10.6 50 DA-P-06 DA-P-08 1.23 11.1 50 DA-P-07 DA-P-05 0.14 10.0 50 DA-P-110 DA-P-111 0.10 10.0 50 DA-P-111 DA-P-112 0.20 10.2 50 DA-P-112 DA-P-113 0.33 10.3 50 DA-P-113 DA-P-114 0.42 10.5 50 DA-P-114 J2 0.49 10.7 50 DA-P-115 DA-P-112 0.06 10.0 50 DA-P-116 DA-P-117 0.08 10.0 50 DA-P-117 J1 0.17 10.1 50 J1 J2 0.74 11.2 50 J2 DA-P-04 1.23 11.5 50 EXHIBIT SA. Pipe Capacity Calculations Strategic Behavioral Health 50-year Design Storm "C g g VJ ~ ~-"C -.e-~~ ... ~~ ~ ~ = .=:. = .... = """ ~ 0 "C ~ VJ ~ 0 t !. ~ ·-= ·-~ ~ = r; ..... VJ ~ 0 c. .... 0 "C ~ ~~ ... -~~ <~ ~ 00 cfs cfs # cf s % 3.7 4.7 1 4.7 0.52 4.8 6.0 1 6.0 0.85 5.8 7.2 1 7.2 1.24 21.0 26.2 1 26.2 1.33 8.2 10.2 1 10.2 0.94 12.5 15.6 1 15.6 0.47 1.5 1.8 1 1.8 0.26 1.0 1.3 1 1.3 0.13 2.1 2.6 1 2.6 0.55 3.4 4.3 1 4.3 1.42 4.3 5.4 1 5.4 2.26 5.1 6.3 1 6.3 3.14 0.6 0.8 1 0.8 0.05 0.9 1.1 1 1.1 0.10 1.8 2.2 1 2.2 0.38 7.4 9.3 1 9.3 2.05 12.3 15.3 1 15.3 0.46 ~ s ~ c. = E:: "C .ea = 0 E-c c;J ·y (,!) ~ r;;;'l ~ ~ ~ @ ~ c. z ~ c. ~ ~ .... ~ ~ ... tJ ~ 00 u E-c E-c % in. fps cfs ft. min min 0.350 15 3.1 3.8 80 0.43 10.43 0.570 15 4.0 4.9 134 0.56 10.99 0.840 15 4.8 5.9 75 0.26 11.25 0.950 24 7.0 22.1 17 0.04 12.03 1.450 18 7.2 12.7 205 0.48 11.08 0.350 24 4.3 13.4 13 0.05 11.13 0.650 12 3.7 2.9 132 0.60 10.60 1.500 12 5.6 4.4 71 0.21 10.21 1.500 12 5.6 4.4 39 0.12 10.33 1.500 12 5.6 4.4 70 0.21 10.54 2.200 12 6.7 5.3 54 0.13 10.67 2.100 12 6.6 5.2 45 0.11 10.79 2.300 12 6.9 5.4 71 0.17 10.17 3.000 12 7.9 6.2 53 0.11 10.11 4.000 12 9.1 7.1 46 0.08 10.19 1.370 15 6.2 7.6 92 0.25 11.50 0.300 24 4.0 12.4 118 0.50 11.99 •.. _ ,:i.t:.\,; ,;,_·._. ,!\-; ·''t.:..~,·?>:-i:-:<.'~:'. _.;;,". I c = = -g ~ 0 8. e o E E 0. .. "' ii: : -.. :S -., a..= "' "' 8. ..Jl: ..J • c .. 11. • 11. c .. 0 0. 0. J ..J iii ii: ::i 0 0 Storm Sewer SO-A DA-P-07 I DA-P-05 305.54 304.41 132.0 0.0065 -DA-P-05 I DA-P-06 304.40 301.46 206.0 0.0145 DA-P-06 I POND 301.45 301.39 12.5 0.0035 Storm Sewer S0-8 J2 I DA-P-04 301.61 301.27 119.0 0.0030 DA-P-04 I POND 301.26 301.10 18.0 0.0095 Storm Sewer SD-C J1 I J2 302.88 301.62 93.0 0.0137 Storm Sewer SO-D DA-P-01 I DA-P-02 304.57 304.30 81.0 0.0035 DA-P-02 I DA-P-03 304.29 303.52 134.0 0.0057 DA-P-03 I J1 303.51 301.89 75.0 0.0084 Storm Sewer SD-E -DA-P-116 I DA-P-117 306.29 304.72 53.0 0.0300 DA-P-117 I J1 304.71 302.89 46.0 0.0400 Storm Sewer SD-F_ DA-P-112 I DA-P-113 304.81 303.77 71.0 0.0150 DA-P-113 I DA-P-114 303.76 302.57 55.0 0.0220 DA-P-114 I J2 302.56 301.62 46.0 0.0210 Storm Sewer S~ DA-P-110 I DA-P-111 306.46 305.43 70.0 0.0150 DA-P-111 I DA-P-112 305.42 304.82 40.0 0.0150 Storm Sewer SO-H DA-P-115 I DA-P-112 306.41 304.82 70.0 0.0230 EXHIBIT11 Strategic Behavioral Health ---10-YEAR HYDRAULIC GRADE LINE CALCULATIONS ;§: .. " -"'g :S 0. 0. ii: 0 0. ~ iii-"' .. 0 .. ; ~' g~ .E g o_ il -= 0. u g '5 ,._ E J-'ii-e ... .. £ -c: :I .. 0 i5 :r: 11. z 12 1.2 0.0011 0.1489 0.45 18 6.7 0.0040 --o:8336 ---o:78 24 10.2 0.0000 0.0004 0.62 24 10.0 0.0019 0.2313 1.36 24 17.1 0.0000 0.0000 0.63 18 6.1 0.0034 0.3119 0.75 15 1.2 0.0003 0.0278 0.48 15 6.7 0.0107 1.4338 1.25 15 10.2 0.0000 0.0000 0.47 12 0.7 0.0004 0.0203 0.23 12 1.4 0.0000 0.0000 0.09 15 2.8 0.0019 0.1327 0.52 15 3.5 0.0029 0.1606 0.52 15 4.1 0.0000 0.0000 0.20 12 0.8 0.0005 0.0351 0.29 12 1.7 0.0000 0.0000 0.13 12 0.5 0.0002 0.0137 0.21 _ .. g = .. ii = 0 -~->..• E e g e -0. _ii: ~ g' E .c g-• ~a~ 0 :S i ~E-.. 0 = _,-.. GC~ z ~ ! =-..J .... 31 !P~ >.., ! ..... -o:E. Cl c 0. c • .0 0 -.0 0 • :Cb :r: ~ii: :r: • c G !. ..J i :I a. :I J • ::i 0 Cl 0 0. 0 0 :r: ::i :r: 0 ::i ~ 305.18 305.99 304.86 305.99 305.181 304.93 304.10 305.18 302.24 305.18 304.101 304.10 304.10 302.07 302.01 304.10 304.10 304.33 304.10 302.97 302.63 304.33 304.101 304.10 304.10 301.89 301.73 304.10 304.10 -304.64 304.33 303.63 302.37 304.64 304.33 306.10 306.08 305.05 304.78 306.10 306.08 306.08 304.64 305.54 304.77 306.08 304.77 304.64 304.64 303.98 302.36 304.64 304.641 304.82 304.80 306.52 304.95 306.52 304.95 304.64 304.64 304.80 302.!l!i 304.80 304.64 304.62 304.49 305.33 304.29 305.33 304.49 304.49 304.33 304.28 303.W 304.49 304.33 304.33 304.33 302.76 301.82 304.33 304.33 305.59 305.55 306.75 305.72 306.75 305.721 305.33 305.33 305.55 304."" 305.55 305.33 305.34 305.33 306.62 305.03 306.62 305.33 c = g ~ " &. e ., E g E Cl Q. • .&; -. -.. .. a. .. a. = °' !. rn ...J = ...J .. c: " ...... .... ~ .. .2 Q. Q. ...J rn a: ::> 0 Storm s -r SD-A DA-P-07 I DA-P-05 305.54 304 .41 132.0 0.0065 DA -P-05 I DA-P-06 304.40 301 .46 206.0 0.0145 DA-P-06 I POND 301.45 301 .39 12 .5 0.0035 Storm Sewr SD-B J2 I DA-P-04 301 .61 301 .27 119.0 0.0030 DA-P-04 I POND 301 .26 301 .10 18.0 0 .0095 S torm Sewr SD-C J1 I J2 302 .88 301 .62 93 .0 0.0137 Storm Sewer SD-D DA..P -01 I DA-P-02 304.57 304.30 81 .0 0.0035 DA -P-02 I DA -P-03 304.29 303.52 134.0 0.0057 DA..P -03 I J1 303.51 301 .89 75.0 0.0084 Storm Sewer SD-E DA-P-116 I DA-P-117 306.29 304 .72 53.0 0.0300 DA-P -117 I J1 304 .71 302 .89 46.0 0.0400 Storm Sewr SD-F DA -P-112 I DA-P-11 3 304 .61 303.77 71.0 0.0150 DA ·P-11 3 I DA-P-114 303 .76 302 .57 55.0 0.0220 DA -P -114 I J2 302 .56 301 .62 46.0 0.0210 Storm s-r SD-G -~ DA..P -110 I DA..P -111 306.46 305.43 70.0 0.0150 DA-P-111 I DA -P -112 305.42 304.82 40.0 0.0150 Storm Sewer SD-H DA-P-115 I DA -P -112 306.41 304 .82 70.0 0.0230 --- EXHIBIT12 Strategic Behavioral Health 100-YEAR HYDRAULIC GRADE LINE CALCULATIONS :§: " .. _ .. g = Q. Q. a: 0 Q. ~ iii-Cl • " 8. ~ -E _; o _ ~ c: = .g E. -= E J -c: ... ~-. ... ... 0 0 0 i::: :Ii .. ii: .... :z: z 12 1.7 0.0023 0.2989 0.55 18 9.7 0.0085 1.7472 0.99 24 14 .8 0.0001 0.0008 0.80 24 14.5 0.0041 0.4863 2.00 24 24 .9 0.0000 0.0000 0.81 18 8.8 0.0070 0.6492 0.94 15 5.5 0.0072 0.5840 1.25 15 5.7 0.0077 1.0377 1.25 15 6.9 0.0000 0.0000 0.37 12 1.0 0.0008 0.0415 0.27 12 2.1 0.0000 0.0000 0.11 15 4.0 0.0038 0.2706 0.63 15 5.1 0.0062 0.3410 0.65 15 6 .0 0.0000 0.0000 0.25 12 1.2 0.0011 0.0790 0.36 12 2.5 0.0000 0.0000 0.16 12 0.7 0.0004 0 .0269 0.24 ... g ~ ga E ...J -• ~~~ :Ii a. ::> 307 .08 306.78 305.03 305.52 305.03 306 .17 307 .79 307 .20 306.17 306 .21 306.17 306.13 305.86 305.52 306 .21 306 .13 306.15 = ii g ii g " E ,..-"'e e e .2- -a. iii!£ ~ ~. ~~i 0 = i ~E -...J -.. z Q." i5 ~ &. ~i ~ >. • ! ,.. .. = C> : !:. "'0 -"'0 .. :I:= :I:~ a: ...J • ...J ~ .. :Ii J (!) Q. Q. 0 0 :I: ::> (!) 0 ::> 0 :I: 0 306.78 306 .09 304.96 307.08 306.78 1 305.03 305 .39 302 .4'1 306.78 305.03 305.03 302 .25 302 .rn 305.03 305.03 305.03 303.61 303.27 305.52 305.03 305.03 302.07 301 .91 305.03 305.03 305.52 303 .82 302.56 306.17 305.52 307 .20 305.82 305.55 307.79 307.20 306.17 305.54 304.77 307.20 306.1i 306.17 303.88 302.26 306.17 306.17 306.17 306.56 304.99 306.56 306.17 306.17 304.82 303.oc 306.17 306.17 305.66 305.44 304 .40 306.13 305.66 305.52 304.41 303.22 305.66 305.52 305.52 302 .61 301.87 305.52 305.52 306.13 306.82 305.79 306.82 306.13 306.13 305.58 304.98 306.13 306.13 306.13 306.65 305.1 .. 306.65 306.13 Appendix 1 December , 2012 Hydrologic Model Existing Conditions (Plan 0) Proposed Cond itions (Plan 1) Clogged Conditions (Plan 2) FLOOD HYDROGRAPH PACKAGE ( HEC-1) 0. S . ARMY CORPS OF ENGINEERS HYDROL<X;IC ENGINEERING CENTER 60 9 SECOND STREET JUN 1998 VERSION 4 .1 RON DATE 17DEC12 TIME 17 :21 :57 x x xxxxxxx x x x x x x xxxxxxx xxxx x x x x x x x x xxxxxxx xxxxx x x x x x x x xxxxx x xx x xxxxx x x x xxx DAVIS , CALI FORNIA 95616 (916) 756 -11 04 THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HECl (JAN 73), HEClGS, HEClDB , AND HEClKW . THE DEFINITIONS OF VARIABLES -RTIMP-AND -RTIOR-HAVE CHANGED FROM THOSE USED WI TH THE 1973-STYLE INPUT STRUCTURE . THE DEFINITION OF -AMSKK -ON RM-CARD WAS CHANGED WI TH REVISIONS DATED 28 SEP 81 . THIS IS THE FORTRAN77 VERSION NEW OPT I ONS : DAMBREAK OUTFLOW SUBMERGENCE , SINGLE EVENT DAMAGE CALCULATION , DSS:WRITE STAGE FREQUENCY, DSS: READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE: GREEN AND AMPT IN FI LTRATION KINEMATIC WAVE : NEW FINITE DIFFERENCE ALGORITHM HEC-1 INPOT PAGE LINE ID .•.•... 1. ...... 2 ....... 3 .....•. 4 ••..... 5 ..•.... 6 .•••... 7 ..••... 8 ...•••• 9 ..•... 10 ID H&M Project 1216 -Strategic Behavioral Health ID Detention Analysis ID All S torms IT 5 01JAN99 289 5 IO 5 0 6 JR PREC 4. 5 6 . 2 7 . 4 8 . 8 9 . 8 11 14 7 JP 3 * STORM YR YR 10 YR 25 YR 50 YR 100 YR 500 YR KK SSH Site BA 0 . 0073 19 10 PB 11 IN 01JAN99 0 12 PC 0 . 001 0 .002 0 . 003 0. 004 0. 005 0. 006 0 . 007 0 .008 0 .009 13 PC o . 01 0.011 0 . 012 0 . 013 0 .014 0 . 015 o. 016 0 .017 0 .018 0 .019 14 PC 0 . 02 0 . 021 0 .022 0. 0231 0 .0241 0 . 0252 0 . 0263 0 .027 4 0 . 0285 0 . 0296 15 PC 0. 0308 0. 0319 0. 033 1 0 . 0343 0 .0355 0 . 0367 0 . 0379 0 . 0392 0.0404 0 . 0417 16 PC 0 .043 0 .0443 0 .0456 0 .047 0 .0483 0 . 04 97 0 . 0511 0 . 0525 0 .0539 0 . 0553 17 PC 0. 0567 0 . 0582 0. 0597 0 . 0612 0 .0627 0 . 06 42 0 . 0657 0 . 0673 0 . 0688 0 . 0704 18 PC 0 .072 0 . 0736 0 .0753 0.077 0 . 0788 0. 0806 0 . 0825 0 . 0844 0 .0864 0 .0884 19 PC 0 . 0905 0 .0926 0 .0948 0 . 097 0 . 0993 0 .1016 0 .104 0 .1064 0.1089 0 .1114 20 PC 0.114 0.1167 0 .1194 0 .1223 0.1253 0 .128 4 0 .1317 0 .135 0 . 1385 0 .1421 21 PC 0 .14 58 0.1496 0 . 1535 0 .1575 0 . 1617 0.1659 0 .1703 0 .17 48 0 .1794 0 .18 4 2 22 PC 0 .189 0 .194 0.1993 0 . 20 48 0. 2105 0 . 2165 0.2227 0 . 2292 0 .2359 0 . 2428 23 PC 0 . 25 0.2578 0 .2664 0 . 27 6 0 .2866 0.298 0 . 3143 0 .3394 0 . 3733 0 .4166 2 4 PC 0.5 0 .58 4 0. 6267 0 . 6606 0 .6857 0 . 702 0 . 7134 o . 72 4 0 . 7336 0. 7422 25 PC 0 . 75 0. 7572 0 .7641 0. 7708 0 . 7773 0. 7835 0 . 7895 0 . 7952 0 . 8007 0 . 806 26 PC 0 .8 11 0. 8158 0 . 8206 0 . 8252 0 . 8297 0 .8 3 41 0 . 8383 0 .8425 0 . 8465 o . 8504 27 PC 0 . 8543 0.8579 0.8615 0. 865 0 .868 3 0 . 8716 0 . 8747 0. 8777 0 . 8806 0 . 8833 28 PC 0 .886 0 . 8886 0 . 8911 0 . 8936 0 . 896 0 . 8984 0. 9007 0 . 903 0 . 9052 0 . 907 4 29 PC 0 . 9095 0 . 9116 0 .9136 0. 9156 0 . 9175 0 . 9194 0 . 9212 0 . 923 0 . 924 7 0 . 9264 30 PC 0 .928 0.9296 0 . 9312 0 . 9327 0 . 9343 0 . 9358 0 . 9373 0 . 9388 0 .9403 0 . 9418 31 PC 0 .9433 0 .9447 0. 9461 0 . 9475 0. 9489 0 . 9503 0 . 9517 0 . 953 0 . 95 44 0 . 9557 32 PC 0 . 957 0 .9583 0. 9596 0 . 9609 0.9621 0 . 9634 0 . 964 6 0 . 9658 0. 967 0 .9682 33 PC 0 . 9694 0 . 9706 0 . 9718 0 . 9729 0 . 9741 0. 9752 0 . 9764 0. 9775 0 . 9786 0. 9797 34 PC 0 .9808 0. 98 18 0.9829 0 . 9839 0 . 985 0 . 986 0 . 987 0 . 988 0 . 989 0 . 99 35 PC 0 . 9909 0 . 9919 0 .9928 0 . 9938 0 . 9947 0 . 9956 0. 9965 0 .9974 0. 9983 0 . 9991 36 PC 1 37 LS 0 82 38 OD 0 . 31 39 KP 2 40 LS 82 73 41 UD 0 .14 42 zw A•DAl , B=-SBH, C-FLOW, E•2MIN , F-lOOYR Str ateg ic Behav io ral Hea lth , LLC 1 j Page - 43 44 45 46 41 48 49 Kl< BA LS UD KP LS UD Divert 0. 0004 0 0 . 31 2 0 0.14 Appendix 1 December, 2012 Hydrolog ic Model Existi ng Condi ti ons (Plan 0 ) Proposed Cond itions (Plan 1) Clogged Conditions (Plan 2) 52 1 82 13 HEC-1 INPUT PAGE 2 LINE ID ...•.•. 1. ••.... 2 ....... 3 ...•.•. 4 •...... 5 ....... 6 ....... 1 ....... 8 ....... 9 ...... 10 50 51 52 53 54 55 56 51 58 59 60 61 62 63 64 65 66 61 68 69 10 11 12 13 14 15 16 11 18 19 80 81 82 83 84 85 86 81 88 Kl< BA LS UD KP LS UD KP LS UD Kl< HC Kl< RN KP RS SA SE SL SS ST KP RS SA SE SL SS ST zw KO Kl< BA LS UD Kl< BA LS UD zz Arnold , Norman & 0. 0028 0 82 0.09 2 0 82 0. 09 82 0.09 All 3 POND on SBH 2 1 STOR 0.1881 0. 2152 300 301 300. 1 1. 23 304 6 305 . 5 50 STOR 0.1881 0.2152 300 301 300. 1 0. 001 304 6 305. 5 50 A•POND, BzSBH , LickE 0.0018 183014 82 0 . 33 LickP 0. 0013 662459 0 82 0 . 33 The Med 12 80 80 -1 0 . 244 0.2144 0. 3064 0. 3401 302 303 304 305 0 .1 0 .5 3 1. 5 3 1. 5 -1 0 .244 0 .2144 0. 3064 0. 3401 302 303 304 305 0 .1 0 .5 3 1. 5 1.5 C-FLOW , E=2HIN , F-lOOY R 21 24 1 * *** ** * ** ** * * * * *** * * ** * * * * * * *** * *** ** ** * * FLOOD HYDROGRAP H PACKAGE (HEC-1) JUN 1998 VERSION 4 .1 RUN DATE 17DEC12 TIME 17 :21 :57 H&M Project 1216 -Strategic Behavioral Health Detention Analysis 5 IO IT All Storms OUTPUT CONTROL VARIABLES IPRNT 5 I PLOT QSCAL HYDROGRAPH TIME DATA 0 0. NMIN 5 IDATE 1JAN99 ITIME 0000 NQ 289 PRINT CONTROL PLOT CONTROL HYDROGRAPH PLOT SCALE MINUTES IN COMPUTATION INTERVAL STARTING DATE STARTING TIME NUMBER OF HYDROGRAPH ORDINATES 0. 3154 0. 5 306 301 0. 3154 0 . 5 306 301 Strategic Behaviora l Health, LLC 21 Page U.S. ARMY CORPS OF ENGINEERS HYDROLOGIC ENGINEERING CENTER 609 SECOND STREET DAVIS , CALIFORNIA 95616 (916) 156-1104 1 Appendix 1 December, 2012 Hydrologic Model Existing Conditions (Plan 0) Proposed Conditions (Plan 1) Clogged Conditions (Plan 2) NDDATE NDTIME I CENT 2JAN99 ENDING DATE 0000 ENDING TIME 19 CENTURY MARK COMP UTATION INTERVAL . 08 HOURS TarAL TIME BASE 24. 00 HOURS ENGLISH UNITS DRAINAGE AREA SQUARE HILES PRECIPITATION DEPTH INCHES LENGTH , ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT JP MULTI -PLAN OPTION NPLAN 3 NUMBER or PLANS JR MULTI-RATIO OPTION RATIOS OF PRECIPITATION 4 .50 6 .20 7 .40 8 . 80 9 . 80 11. 00 -----DSS---ZOPEN: Existing File Opened , File: 1216-SBH.DSS Unit : 71 ; DSS Version : 6-JG -----oss---ZWRITE Unit 71 ; Vers. 20: I DAl I SBH I FLOW/ 31DEC19 9 8 / 5MIN / l 0 0 YR+ l / -----oss---ZWRITE Unit 71 ; Vers. 20: I OAl I SBH I FLOW I 0lJAN199 9 / 5MIN / l 0 0 YR+ l / -----oss---ZWRITE Unit 71 ; Vers . 20 : I DA l / SBH I FLOW/ 31DEC19 9 8 / 5MIN / l 0 OY R+2 / -----oss---ZWRITE Unit 71; Vers. 20: I DAl I SBH I FLOW/ 01JAN19 9 9 / 5MIN / l 0 OY R+ 2 / -----oss---ZWRITE Unit 71; Vers . 20 : I DAl I SBH I FLOW/ 31DEC19 9 8 / 5MIN / l 0 OY R+ 3 / -----oss ---ZWRITE Un it 71; Vers. 20 : /DA l / SBH I FLOW I 01JAN19 9 9 / 5MIN / l 0 OY R+ 3 / -----oss---ZWRITE Unit 71 ; Vers. 20: /OAl/SBH/FLOW/ 31DEC1998/5MIN/100YR+4 / -----oss---ZWRITE Unit 71; Vers. 20 : /OAl/SBH/FLOW/ OlJANl 999/5MIN /100YR+4 / -----oss---ZWRITE Uni t 71 ; Vers. 20 : I DAl I SBH/ FLOW/ 31 DEC l 998 / 5MIN / l OOYR+ 5 / -----DSS---ZWRITE Un it 71 ; Vers . 20 : I DAl I SBH I FLOW I 0 lJANl 99 9 / 5MIN / l 0 0YR+5 / -----oss---ZWRITE On it 71; Vers. 20 : I DAl I SBH I FLOW/ 31 DE Cl 998 / 5MIN / l 0 OYR+ 6 / -----oss---ZWRITE Unit 71 ; Vers. 20: I DAl I SBH I FLOW I 01JANl9 9 9 / 5MI N / l 0 0 YR+ 6/ -----oss---ZWRITE Un it 71 ; Vers . 20: /DAl /SBH/FLOW/ 310EC1998 /5MIN/100YR+ 7 / -----oss ---ZWRITE Un it 71 ; Vers. 20 : /OAl/SBH /FLOW/ 01JAN1999/5MIN/100YR+ 7 / 14 .00 *** *""* *** *** *** *** *** *** *** *** *** *** *** *** **"" *** *** *** *** '*** *** **'* *** *** *** *** *** *** *** *** *** *** *** 62 KK 7 9 KO -----oss---ZWRITE -----oss---ZWRITE -----oss---ZWRITE -----oss---ZWRITE -----oss---ZWRITE -----oss---ZWRITE -----oss ---ZWRITE -----oss---ZWRITE -----oss---ZWRITE -----oss---ZWRITE -----oss---ZWRITE -----oss---ZWRITE -----oss---ZW'RITE -----oss---ZWRITE POND on SSH OUTPUT CONTROL VARIABLES Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Onit Unit I PRNT 5 PRINT CONTROL IPLO'r QSCAL IPNCH IOUT ISAVl ISAV2 TIMINT 71; 71; 71 ; 71 ; 71; 71 ; 71; 71; 71; 71; 71; 71 ; 71 ; Vers . Vers . Ve rs . Vers. Vers . Vers . Vers . Vers . Vers . Vers . Vers. Vers . Vers. 71; Vers . 0 PLO'r CONTROL 0 . HYOROGRAPH PLar SCALE 0 PUNCH COMPUTED HYOROGRAPH 21 SAVE HYORcx;RAPH ON THIS UNIT FIRST ORDINAT E PUNCHED OR SAVED 289 LAST ORDINATE PUNCHED OR SAVED . 083 TIME INTERVAL IN HOURS 18: I PON D/S BH I FLOW/ 31 OE Cl 9 98 / 5MI N / l 0 0 Y 18 : I POND/ SBH I FLOW/ 01JAN19 99 / 5MIN / l 00 Y 18: /POND/SBH/ FLOW/ 31DECl998/ 5MIN/ 1 OOY 18 : I PONO/ SBH/ FLOW I 01JANl9 99 / 5MIN / l 00 Y 18 : I POND/ SBH /FLOW/ 31DECl998/5MIN/100 Y 18 : I PONO/ SBH/ FLOW I 01JANl9 99 / 5MI N / l 00 Y 18: / POND/SBH/FLOW/31DECl998/5MI N/1 OOY 18: I POND/ S BK/ FLOW I 01JAN19 9 9 / 5MIN / l 0 0 Y 18: I PONO/SBH/FLOW/31OECl998/ 5MIN/ 1 OOY 18: I POND/ SBH I FLOW I 01JANl9 99 / 5MI N / l 00 Y 18: I PONO/SBH/ FLOW/ 31DEC1 998 /5MIN/ lOOY 18: I PONO/ SBH /FLOW/ 0 lJANl 9 9 9 / SMI N / l OOY 18: I PO ND / SBH I FLOW/ 31 OE Cl 9 98 / 5MI N / l OOY 18: I PON 0/ SBH I FLOW/ 01 JAN l 999 / 5MIN / l 0 OY R+l/ R+l/ R+2/ R+2/ R+3/ R+3/ R+4/ R+4/ R+5/ R+5/ R+6/ R+6/ R+7/ R+7/ PEAK FLOW AND STAGE (END-OF-PERIOD) SUMMARY FOR MULTIPLE PLAN-RATIO ECONOMIC COMPUTATIONS FLOWS IN CUBIC FEET PER SECOND , AREA I N SQUARE MILES OPERATION STATION AREA PLAN TIME TO PEAK IN HOIJRS RATIOS APPLI ED TO PRECIPITATION RATIO 1 RATIO 2 RATIO 3 RATIO 4 RATIO 5 RATIO 6 RATIO 7 Strateg ic B e haviora l Hea lt h, LLC 3 I P age HYDROGRAPH AT HYDROGRAPH AT HYDROGRAP H AT + 3 COMBINED AT + ROUTED TO + HY DROGRAPH AT + HYDROGRAPH AT PLAN 2 - SBH Divert Arnold All PONO LickE LickP RATIO OF PMF 4 . 50 6. 20 7 . 40 8 . 80 9 . 80 11. 00 . 01 . 00 .00 . 0 1 . 01 . 00 . 00 ELEVATION STORA GE OUTFLOW MAXIMUM RESERVOIR W.S.ELEV 302. 4 9 303. 45 30 4 .10 304 . 55 304. 79 305 . 03 Appendix 1 December, 2012 Hydrologic Model Existing Conditions (Plan 0) Proposed Conditions (Plan 1) Clogged Conditions (Plan 2) FLOW TIME FLOW TIME FLOW TIME FLOW TIME FLOW TIME FLOW TIME FLOW TIME FLOW TIME FLOW TIME FLOW TIME FLOW TIME FLOW TIME FLOW TIME FLOW TIME FLOW TIME 4. 50 8 . 12. 33 13 . 12 .17 8 . 12 . 33 0. .00 1. 12 .17 0 . .00 6. 12. 08 6 . 12. 08 6. 12 .08 11. 12. 25 19. 12 .17 11. 1 2 . 25 11. 12. 25 9 . 12 .50 3 . 13.00 PEAK STAGES IN FEET STAGE . 00 TIME STAGE TIME STAGE TIME FLOW TIME FLOW TIME FLOW TIME FLOW TIME FLOW TIME FLOW TIME .00 302 . 49 1 2 . 50 304.31 13.00 2 . 1 2 . 42 2 . 12 .33 2 . 12 .33 2 . 12 . 42 2 . 12 . 33 2 . 12. 33 INITIAL VALUE 300. 70 0 . o. MAXIMUM DEPTH OVE R DAM MAXIMUM S TORAGE AC-FT .00 .00 .00 .00 .00 .00 1. 1. 1. 1. 1. 1. 6 .20 12. 12 . 33 19. 12 .17 12 . 12. 33 o . .00 1. 12.17 0 . .00 8 . 12. 08 8 . 12. 08 8 . 12. 08 17 . 12. 25 28. 12 .17 17 . 12. 25 17. 12 . 25 11. 12 . 50 12 . 12. 58 .00 . 00 303 . 45 12. 50 30 4 . 75 12. 58 3. 12. 4 2 3 . 12. 33 3 . 12. 33 2 . 12. 33 2 . 12. 33 2 . 12. 33 7. 4 0 16 . 12. 33 23 . 12 .17 1 6 . 12 . 33 o. .00 1. 1 2 .17 0 . . 00 9 . 12. 08 10. 1 2 . 08 10 . 12 . 08 21. 12. 25 33 . 12 .17 2 1. 12 . 25 21. 1 2 . 25 13. 1 2 . 50 17. 12 . 50 . 00 .00 30 4 .10 1 2 . 50 304 .98 12 . 50 4. 1 2 . 33 4. 1 2 . 33 4. 1 2 . 33 3 . 12 . 33 3 . 1 2 . 33 3. 12 . 33 SPILLWAY CREST 304. 00 1. 13. 8. 80 19 . 12. 33 28. 12 .17 19. 12. 33 o . .00 2 . 12 .17 0 . • 00 11. 12. 08 11. 12 . 08 11. 12 . 08 26 . 12 . 25 40. 12 .17 26 . 12 . 25 26 . 12 . 25 21. 12. 42 23 . 12 . 42 . 00 .00 30 4. 55 12. 42 305.18 12 . 42 5 . 12. 33 5. 12 . 33 5 . 12 .33 3 . 12 . 33 3 . 12 . 33 3. 12. 33 9 . 80 22 . 1 2 .33 31. 12 .17 22 . 12 . 33 0 . .00 2 . 1 2 .17 0. .00 1 3 . 12. 08 1 3 . 12 . 08 13 . 12 .08 30. 12 . 25 4 5 . 12 .17 30 . 12. 25 30 . 12 . 25 26 . 1 2 . 42 27 . 12. 42 .00 .00 304. 79 12. 42 305. 31 12. 42 5 . 12 .33 5 . 12. 33 5. 1 2 . 33 4. 12. 33 4. 12 .33 4 . 12 .33 TOP OF DAM 305 . 50 1. 4 8. 11.00 25 . 12 . 33 35 . 12 .17 25 . 12 .33 0 . .00 2 . 12.17 0 . .00 14. 12. 08 14 . 12. 08 14 . 12. 08 34 . 12 .25 50 . 12 .17 3 4. 12.25 34 . 12. 25 33 . 12. 33 31. 12 . 42 .00 .00 305 . 03 12 .33 305. 44 12. 42 6 . 12. 33 6 . 12. 33 6 . 12. 33 4. 12 . 33 4. 12 .33 4. 12 . 33 14 .00 33 . 12 . 33 45. 12 .17 33. 12 .33 o. .00 2 . 1 2 .1 7 0 . . 00 18 . 12. 08 19 . 12 . 08 19 . 12. 08 44 . 12 . 25 65 . 12 .17 4 4 . 1 2 . 25 44 . 12. 25 49. 12. 33 44. 12. 33 . 00 • 00 305 . 51 12. 33 305 . 62 12. 33 8 . 12. 33 8 . 12 . 33 8 . 12. 33 6 . 12 . 33 6 . 12 . 33 6 . 12. 33 MAXIMUM OUTFLOW CFS DURATION TIME OF T IME OF 9. 11. 13. 21. 26 . 33 . OVER TOP MAX OUTFLOW FAILURE HOURS HOURS HOURS .00 12.50 .00 .00 12.50 .00 . 00 12 . 50 . 00 .00 12 .4 2 .00 .00 12.42 .00 .00 12.33 .00 Strategic Behavioral Health , LLC 4 j Page 14 .00 PLAN 3 ...••..•••..••• RATIO OF PMF 4. 50 6. 20 7 . 40 8. 80 9. 80 11. 00 14 . 00 *** NORMAL END OF HEC-1 *** 305 . 51 ELEVATION STORAGE OUTFLOW MAXI MU M RESERVOIR W.S .ELEV 304 . 31 304 . 75 304 . 98 305.18 305. 31 305. 44 305 . 62 Appendix 1 December, 2012 Hydrologic Model Existing Conditions (Plan 0) Proposed Conditions (Plan 1) Clogged Conditions (Plan 2) . 01 1. 49 . .08 12 . 33 INITIAL VALUE SPILLWAY CREST TOP OF DAM 300 . 70 304 . 00 305 . 50 0 . 1. 1. o . 0 . 33 . MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW OVER DAM AC-FT CFS HOD RS HOO RS . 00 1. 3 . .00 13.00 .00 1. 12 . . 00 12 .58 . 00 1. 17 . .00 12 .50 . 00 1. 23 . .00 12. 42 . 00 1. 27 . .00 12. 42 .00 1. 31. . 00 12 . 42 .12 2 . 44 . . 42 12 . 33 -----DSS---ZCLOSE Unit : 71 , File: 1216-SBH. OSS Pointer Utilization : . 35 Number of Records : 91 File Size: 277 .0 Kbytes Perce n t Inactive: .O Strategic Behav io ral Hea lth, LLC 5 !Page . 00 TIME OF FAILURE HOURS .00 .00 . 00 . 00 .00 .00 .00