HomeMy WebLinkAboutDP2010-100010 - Foxfire Ph. 2DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Name/Firm:
Address: is~\ -r~PC> A'11E-b'ti~1h-1 S-Ct-A
c~l..\.-F~ ~, \J"'-1 , -r 'f--r ~'--\ c
Date:
i
Phone: __,,(6jp=-i..=-~-~ __ ::>.::....39 __ _
Fax: <.o°1 > -c..rz_ '--\ ~
We are transmitting the follO\:ving for Development Services to review and conm1ent: (Check all that apply.):
0 Master Development Plan w1 D Redlines
0 Preliminary Plat w1 D Redlines
D Final Plat w!D Redlin es
D FEMA CLOMA/CLOMR/LOMA/LOMR w/ D Redlines
D Site Plan w1 D Redlines
D Grading Plan w1 0 Redlin es
0 Landscape Plan w1 D Redlin es
0 Irrigation Plan w1 D Red lines
D Building Construction Documents w1D Redlin es
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
0 Waterline Construction Documents w/ 0 Redlines
.l&1 Sewerline Construction Documents w/O Redlines
0 Drainage Construction Documents w/ D Redlines
D Street Construction Documents w/ D Redlines
0 Easement application with metes & bounds decsription
0 Drainage Letter o~ Report w/ D Redlines
D Fire Flow Analysis w/ D Redlines
Special Instructions:
TRANSMITTAL LEITER
TRANSMIT 12/5/2001
0 Devel.opment Permit App.
0 Conditional Use Permit
0 Rezoning Application
0 Variance Request
0 Other -Please specify
D TxDOT Driveway Permit
0 TxDOT Utility Permit
(83 Other -Please specify
012\JF-Lti'Pm '&ll1 ~ \'1
~--rEb ±~'!IL Aff.
w/ /;¥'P1.YLI rrNPNL~.
1 o f1
tUK UHlU:: USE ONLY
CASE NO.: --~ {J ~y DATE SUBMIITED:
'' ' ' ' '-OLU.Gl STATION
DEVELOPMENT PERMIT
ML'llMUM SUBMITTAL REQUIREMENTS
~\J~
__ $100.00 Development Permit Application Fee.
~Drainage and erosion control plan, with supporting Drainage Report two (2) copies each.
~Notice ofintent (N.O.I.) if disturbed area is greater than 5 acres.
LEGAL DESCRIPTION Ltrr l~r 6...-t)c...'-t.. /\J1~~ OF fu)<, R~ 1 ~ Tlf-.b
APPLICANT (Primary Contact for the Project):
Name Tu~ cvJs:llfe-F {rv'\uN\C.X~A\..... ~~'f'M1CN1 ~uP0
Street Address -ts?\ l§)(f6 Nie.. ~-l $-n;_ A City ~t..\..~ ~' ~1'.J
State /x Zip Code -r?B'-\ 0 E-Mail Address rrnB:"rcAl..-F @ MO('i!C.~. (.C)f'Y\
Phone Number ( e"lS-5~5'\ Fax Number __.(.:.t.o°P.:;)'-'-=::...-~4-=2.::...Y-=-~=-----------
PROPER1Y 0\\'1-.TER'S INFORL\1A TION :
Name A oc:o-M-e. ZAYLc ~o bH l
Street Address 2.~rl' FA01-"'8l. Pl2.
State TX
Phone Number
Zip Code 17'0 '-i 5 E-Mail Address -------------
Gfi '4 -2. '177 Fa.'< Number---------------
ARCHITECT OR ENGI0:EER'S INFORL\1ATION:
N arne 0~ Y\I\ 'E.. />fu A~'?> L\ c.ANf
· Street Address -----------------City -------------~
State Zip Code ______ E-Mail Address -------------
Phone Number Fa.x Number ------------------------------
Application is hereby made for the following development specific site/waterway alterations:
ACKNO\VLEDGME!'ITS:
I, M~ A. fV\t;::1 l.ALr design engineer/owner, hereby aclmowledge or affirm that:
The information and conclusions cont.1.incd in the above plans and supporting documents comply \\ith the current
requirements of the City of Co llege St:iti on, Tex:is City Code, Chapter 13 and its associated Drainage Policy and Design
Standards .
of this pem1it ::ipplic:ition, I agree to construct the improvements proposed in this application
nts :ind the requirements of Ch:ipter 13 of the College Station City Code.
_:::::::;ff-;;-1:_'--L_
DEVELOP~!E:"T PER.\l!T
DPER.\!IT.DOC 3124 .'99
Contractor
I of:?
CERT FICATIONS: (for proposed alterations within designated flood hazard areas .)
~
A. I, WA certify that any nonresidential structure on or proposed to be on this site as part
of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year
storm .
Engineer Date
B. L wA , certify that the finished floor elevation of the lowest floor, including any
basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established
in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended .
Engineer Date
C . L N/A , certify that the alterations or development covered by this permit shall not
diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or
development are consistent v:ith requirements of the City of College Station City Code, Chapter 13 concerning
encroachments of flood ways and of floodway fringes.
Engineer Date
D . I, Nffe , do certify that the proposed alterations do not raise the level of the 100 year
flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study .
Engineer Date
Conditions or comments as part of approval:----------------------------
In accordance \vi th Chapter 13 of the Code of Ordinanc es of the City of College Station, measures shall be taken to insure
that debris from cons truction , erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities .
All developm ent shall be in :lccordancc with the plans and specifications submitted to and approved by the City Engineer
for the above named project. All of the applicable codes and ordinances of the City of College St'.ltion shall apply.
DEVELOP\:E:-.1 PER.\!IT
DPER:-.!IT.DOC J :2.i ;99
'.! of2
2551 Texas Ave. South, Ste . A, College Station, TX 77840
Ofc: 979 .693.5359 Fax: 979.693.4243 Email : mdgcs@mdgcs.com Web: www .mdgcs .com
February 13, 2002
Ted Mayo, P.E.
Assistant City Engineer
Development Services
City of College Station
Re: Fox Fire, Phase Two-Sanitary Sewer Line "J" Extensio n
MDG Jo b N o . 000 094-34 92
Dear Ted:
Please find attached the following information for the above referenced project:
•!• Water and Sewer Main Application;
•!• Development Permit Application;
•!• Construction Plans ;
•!• Engineer's Cost Estimate ;
•!• Master Sanitary Sewer Plan;
•!• Vicinity Map-Exhibit "A ";
•!• Ownership/Legal Map-Exhibit "B"
The design of the sewer extension is in conformance with the Master Sanitary Sewer Plan . Specifically,
so that lots along Finney and Fontaine may be sewered in the future. Also , as previously discussed , the
Development Permit Fee ($200), Public Infrastructure Inspection Fee ($600) and Sewer Tap Fee ($350)
have been waived for this project and are not enclosed.
Please fee l free to call if you have any questions.
Rabon A. Metcalf, P .E.
Project Manager
000094-c.09(3492)
,. " . •
CITY OF COLLEGE STATION
PLANNING DIVISION
POST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77842-9960
January 30, 2002
Asghar Zardkoohi
2417 Faulkner
College Station, Texas 77840
(409) 764 -3570
RE: City sanitary sewer service; Line "J" Extension
Dear Mr. Zardkoohi,
This morning you called and asked me to clarify the City's position as to the City fees that will be
required for connecting to the City's sanitary sewer system in Foxfire Subdivision by extension of
Line "J". Normally the City requires a $200 application fee, a $200 development permit fee, a
$600 public infrastructure plan review and inspection fee and a $350 tap fee . The City is willing to
waive all of these fees with the exception of the $350 tap fee . Earlier I had informed you that the
City would handle the bore under Faulkner and charge $15 per foot for this work. It is your option
to have your contractor do this work in lieu of the City doing the bore. Hopefully this addresses
your request. If you need clarification, please call me at 979-764-3763.
Sincerely,
~Zl.4~~
Teddy D . Mayo , P .E .
Asst. City Engineer
CC: Raybon Metcalf, P.E.
Municipal Development Group
Natalie Ruiz
Development Review Manager
l!ed ¥~YP-~417 FAULKNER : . . .
From:
To:
Date:
Subject:
Joe Garcia
Gayla Messarra
1/30/02 3:12PM
2417 FAULKNER
I spoke with Rabon, with MDG today concerning sewer service for 2417 Faulkner. He informed me that
the property owner is paying to extend the sewer main some 200 + ft ., and boring the street to provide
service for his property . He also said that the owner was paying the contractor to tie the 4" service coming
across the street to his house service line . Upon discussing this with Edwin Savage, (WI WW
Superintendant ) we have agreed to wave the nornal $350 .00 tap fee with the following conditions: The
owner must install a cleanout at the property line that the city can access in case of a sewer stoppage ,
and that we (WI WW Division personnel) be allowed to inspect the tie in before it is backfilled . JMG
CC: Lance Simms ; Spencer Thompson ; Ted Mayo
Page 11
APPLICATION FORM FOR
'WATER & SEWER MAIN REIMBURSEMENT
~HA'fl ZAtt> \l..oort 1
Applicant's Name
2Y\I rA0l-'ILel-p~ I Cc'-'-~~ 5-vi-11~N I IY.._ /78 ~s-
Mailing Address
L-..cl \5, ~oc..~ N\N~
fox F,·'(2.£ , ·ft\-A~ lw'tl
Location of Proj ect
~\~ ~e,!_ L1N~ 1 ~" F-X(~\~tJ
Project Titl e
Length of Main: 20s L·F.
Type/Size of Main: (p"rp P'\/~ , SP~ -2J~ 1 D?:>~'?=>~
Estim ated Construction 'f!I"
Cost of Main: ~:5":~1 eo 00 lbf>"CJt:>~~ z,-z./"""'l,..
Estimated Engineering
Cost of Main: 4> IS-6(:) e2.
Is the main located wholly within dedicated public easement/right-of-way? "'
YES~ NOD
If the answer is no, all neces sary easement instruments must be attached.
Is oversize participation being requested?
YESD NO~
In order to process the application, the following items must be attached. Please indicate
whether or not these are attached.
1) Map showing location of water/sewer main. YES~ NOD
2) Map showing properties that may be served
by this main with legal description and size of
each (in acres) lot and current ownership
with address YES l/i NOD
f(tQ.._ \\ £~!--\ \ ~l I f-)
Prior to calculation of line charges the following must be submitted to the City Engineer's
Office.
AN APPLICATION CANNOT BE PROCESSED AND CHARGES ASSESSED UNTIL
THIS AFFIDAVIT IS SUBMITTED.
1) Affidavit of actual bills paid (bid tab) for
engineering cost and construct ion cost upon
completion and acceptance by City Engineer
of the main. YESO NOD
If Sewer Main is Not Accepted Ily City, Applicant Must Enter Into A Franchise Agreement To Operate In
Public Right of Way .
,-
Table 1: NAMES AND ADDRESSES OF LOT OWNERS SERVED BY THIS LINE.
LO T BLOCK PHASE OWNER STREET ADDRES S CITY, STATE, ZIP PHONE
I? 9 Two A.1q1,t;,. J.,./1:-J,; Z.t.//7 hfv/b,4,.,-t;d_. '51L-,;11Dh 'f 'lt/_ ~9t.1-2t/7 , /
, ,
IC-. ~ 71..uo /'].,,,; I/ i.fi;'C..n z t//t ravl~ /J.1L_ ).£Lk.77/efJ; 9-7U9!~
pf.Je,,~n { r
TOTAL ACREAG E SERVED =
For your infonnation, the charge for each lot is detennined by using the following formul a:
Rate = Engineering + Construction Cost
Total Acreage Served
(See page 3, Paragraph D #2 of City Ordinance)
Charge = Acreage Owned X Rate
(See page 4 , Paragraph E #4 of City Ordinance)
~76,,.;4-.,..r ti'
//,-G"'"' +/r~ -=
Table 2: NON-PARTICIPATING LINE USERS AND THEIR CHARGES.
OWNER LOT BLOCK PHASE ACREAGE RATE CHARGE
C,11''" e1 K,,~-1?~ /r g Tw~ /,t)11c:> J~ .;-4) " ~ ~tf)t:)
{/ /
*Participant **Non-partici pant
ACREAGE
' /, t!!:?de?
h e?t?t9
z,lf7-'°
NO.
1
2
3
4
5
ENGINEER'S COST ESTIMATE
FOXFIRE, PHASE TWO
LOT 15, BLOCK NINE
SANITARY SEWER LINE "J" EXTENSION
DESCRIPTION QUANTITY UNIT
Mobilization & Trench Safety 1 LS
6" PVC SDR-26 (03034) Sanitary Sewer Line 208 LF w/Class "D" Embedment
Tie Into Existing 6" Sewer & Remove Cleanout 1 LS
Standard Cleanout 1 EA
Driveway Bore 71 LF
UNIT
COST
$1 ,127 .00
$36 .00
$200 .00
$200 .00
$35 .00
TOTAL ESTIMATED CONSTRUCTION COST =
This Engineer's Cost Estimate was prepared in my office ,
at the date shown , and is released for the purpose of
public infrastructure cost projections .
000094-e .03-CD1 (34 92 )
TOTAL
COST
$1 , 127 .00
$7 ,488 .00
$200 .00
$200 .00
$2,485 .00
$11,500.00
1 of 1
1994 AERIAL AND TOPO INDEX
3492X01A
PROJECT SITE
2417 FAULKNER
ENGINEERS. CO.VSULTAN TS, MA."IAGERS
HI ~
VICINITY MAP
FOR
SANITARY SEWER -LINE • J' EXTENSION
FOXFIRE, PHASE lWO
LOT 15, BLOCK EIGHT c!c LOT 15, BLOCK NINE
THOMA S CAR UTHERS, A-9 &: MORGAN RECTOR, A-46
COLLEGE STATION, BRAZOS COUNTY, TEXAS
Scale : 1"=1 MILE Sh e et : A
Da t e: FEBRU ARY, 2002
' . . .
'
"' I ' I
"' LOT 16, BLOCK TWO I A (1.68 ACRE) I
, ' I
/' '" ~y
I
I
I
I I LOT 2 , BLOCK TH REE
I (1 .87 ACRE)
I
I ,' ',PO l\t ,
,/ ~o~~ / ;''--..........__
/
"'', NO W OR FORMERLY ~~~~ ,' I '......._ ASGHAR ZARDKOOHI ~ ~ L:-. "'-"
,' " (VOLUME 2263, PAGE 53) ~-~,' • 1' ,0° ',,
/ ', LOT 15 , BLOCK NINE ' ~~~ "{
' (l.00 ACRE) A , .... -7/ ' " , ~~,~~ ,
' '
', ~/, ~~¥
" ri,:, ;{v ~~~~
LOT 1 , BLOCK THRE E
(1.49 ACRE )
LOT 14, BLOCK NINE ', / ~ , />~~
(1.00 ACRE) \, <:::>' , ?"'Q ', - _
/, "~«-, , 1" "'----------------
' ,' ~v / I/I '
', / • ~ ' NOW OR FORMERLY "' "-~ /'\.. CRAIG & KAREN A PETERSON ,
', ~ ~ , ""\., (VOLUME 2190 , PAGE 22) ~
/
, ',LOT 15, BLOCK EIGHT
' " (1 .00 ACRE) ,
/ '," // '"-,
,' 1
1
LOT 14, BLOCK EIGHT ', ,' )'
(1.08 ACRE) ~/
3492X02A
,
ENGINEERS. CONSULTANTS, NANAGERS
HIBIT
OWNERSHIP /LEGAL MAP
F'OR
SANITARY SEWER -LINE • J' EXTENSION
FOXFIRE, PHASE lWO
LOT 15, BLOCK EIGHT & LOT 15, BLOCK NINE
THOMAS CARUTHERS, A-9 &: 140RGAN RECTOR, A-46
COLLEGE STATION , BRAZOS COUNTY, TEXAS
Scale: 1 "=100' Sheet: B
Dote: FEBRUARY , 2002
· •..
Development Owner's Engineer
prepares construction
plans for main
,--~-~'·'~'/~~-----.~
Construction plans for Main 1--------------------"'' / approved by
City Engineer's Office
Application Form for reimbursement
submitted to City Engineer's (C.E .)
Office (MUST be done prior to
construction of Main)
I C .E. requests project I
number from Acct.
Construction of Main I City Inspection J ,~~~~~~~~'/~~~~~~
.----_...:~c=======::::;:----------------:,,,~ C .E. Office reviews application and
Submittal of Letter of completion
by developing owner to
City Engineer's Office
sets charges to each applicable line
user. Notifies Bldg . Dept of
Acreage Fee Declaration
/~ /
~-....----
City Engineer's Office
writes Letter of Acceptance
and begins 1 year
warranty period on main
City Attorney's Office
reviews easement
documents I C.E. Office I Bldg . Dep~
updates map I
Send letter of acceptance
& affidavit of bits paid
to Accounting
Line user pulls permit
to tie on to main
and pays tap fee
Building Dept. collects line
user fee to reimburse
developing owner
and submits request
for reimbursement
to Accounting
I F ill out work order
and send to utilities
'' Water I Sewer Dept. I
1 makes tap I .....__ __ ____,
/
Accounting processes
re imbursement payments
NO.
1
2
3
4
5
ENGINEER'S COST ESTIMATE
FOXFIRE, PHASE TWO
LOT 15, BLOCK NINE
SANITARY SEWER LINE "J" EXTENSION
DESCRIPTION QUANTITY UNIT
Mobilization & Trench Safety LS
6" PVC SDR-26 (03034) Sanitary Sewer Line 208 LF w/Class "D" Embedment
Tie Into Existing 6" Sewer & Remove Cleanout 1 LS
Standard Cleanout EA
Driveway Bore 20 LF
UNIT
·coST
$240 .00
$20 .00
$250 .00
$250 .00
$20 .00
LEST! D CONSTRUCTION COST =
TOTAL
COST .
$240 .00
$4 ,160 .00
$250 .00
$250 .00
$400 .00
$5,300.00
This Engineer's Cost Estimate was pre re in ~Y ~ffi )~'!J\rf1 /
at the date shown, and is released for th u pose~ 1f 1
public infrastructure cost jections . ~~'''"'\: ;::.'t-~~ ?t. r~~ ~,,
Date
000094-e .02 -CD1 (3492)
~~··· .b ···-~ii rrJ*: •••• ~ ........ :~
•••• ETCALF ti
'
RABON A-M ••••••··~ o••••••••••• :~ ~ f· -<> •• 88583 Q :ty 2 c,:.o~if.~~.s.\~&'l \\~!SIONA\..'(;,,.,::!"' .,,,~~ ....
1 of 1
((~ DEVELOPMENT PERMIT
PERMIT NO . 02-0100010
Project: Foxfire Sewer Extension to 2417 Faulkner
COLLEGE STATION FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 15 Blk. 9
Phase Two
Foxfire
DATE OF ISSUE: February 21, 2002
OWNER:
Asghar Zardhooki
2417 Faulkner
College , Station, Texas
SITE ADDRESS:
2417 Faulkner
DRAINAGE BASIN:
Carter's Creek
VALID FOR 12 MONTHS
CONTRACTOR:
TYPE OF DEVELOPMENT: Full Development Permit
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees must be barricaded , as shown on plans , prior to any construction . Any trees not barricaded will not
count towards landscaping points . Barricades must be 1' per caliper inch of the tree diameter.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria . If it is determined the prescribed erosion control measures are ineffective
to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State
and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and
establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and/or Conrractor shall also insure that any disturbed vegetation be returned to its original
condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to
adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion ,
siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin .
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion , and sedimentation shall not be deposited in city streets ,
or existing dra inage facilities .
I hereby grant this permit for development of an area outside the special flood hazard area . All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named project and all of the codes and ordinances of the City of
College Station that apply .
Date A Jn 2rZI z_
Date /