HomeMy WebLinkAbout78 Development Permit 542 Barry PoolsDEVELOPMENT PERMIT
PERMIT NO . 542
BARRY POOLS -2911 AZTEC CT.
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
OWNER:
CONTRACTOR:
Barry Pool Company
3114 Texas Ave. South
College Station, Texas 77845
693-8533
DRAINAGE BASIN:
Bee Creek Trib. A.
TYPE OF DEVELOPMENT:
SITE ADDRESS:
2911 Aztec Court
This permit is valid for access to 2911 Aztec Court via the City of College Station's Public Utility
Easement along the rear of the property line ONLY. Barry Pool Co. will enter the PUE from
Deacon St.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College
Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed
areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales
used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed
vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall
be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery
and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin .
This permit, being temporary, is valid only within sixty (60) days of the date shown below, and is not
intended to allow the complete development of the site as proposed. Any work performed after the
expiration of this permit is not covered, and is considered unauthorized.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city
streets, or existing drainage facilities .
I hereby grant this permit for development of an area outside the special flood hazard area. All
development shall be in accordance with the plans and specifications submitted to and approved by the
City Engineer in the development permit application for the above named project and all of the codes and
o~nan~ Ci of College Station that apply. ,;7. fa h
Date 7 7
~-11-1?
Date
Contractor Date
FEB-11-9 8 WED 09:44 G678
Barry Pool Company
3114 Texas Ave. South
College Station, Texas 77845
{ 409) 693-0533
(409 ) 764-7461 Fax
February 10, 1998
Poul Kaspa r
Graduate Engineer
1101 Texas l\ve.
City of Col l ege Station, Texas 77842
Deor Mr. Kaspar,
40976474 6 1 .f'. 0 1
Rarry Pool Comp;;iny i s constructing a guni te swj mming p o ol at t h e
address of 2911 Aztec Court. Barry Pool Company in t ends to use
the casement hehind this property to gain access t o Lhe backyard.
Barry Pool Company understands that th i s may be acc o mpl i she d if:
1 .) Any damage to City infrastructu r e ( ic. Manho J es, curl.>inq,
drainog e flumes, etc.) shall be replaced t o original conditi ~n
at the developer's expense.
2.) Any ground cover thaL is damag e d or d i sturbed during the
con:::1truct-.-l.on process, shall l.;e rep l aced at t:he deve l ope r':::> cost
and mainLained by the deve l oper until such time as t he gr o un d
co v er re tu rns t;o its original condition.
Darry Pool Company appreciates the cooperat ion w..i.th th e Cit.y of
College .Station.
Sinccr;/;
--:/f ~~~~!
Wil Ji a .m Barry
Barry PooJ . Company
Barry Pool Company
3114 Texas Ave. South
College Station, Texas 77845
( 4 0 9) 693-8 533
(409) 764-7461 Fax
February 10, 1998
Paul Kaspar
Graduate Engineer
1101 Texas Ave.
City of College Station, Texas 77842
Dear Mr. Kaspar,
Barry Pool Company is constructing a gunite swimming pool at the
address of 2911 Aztec Court. Barry Pool Company intends to use
the easement behind this property to gain access to the backyard.
Barry Pool Company understands that this may be accomplished if:
1.) Any damage to City infrastructure (ie. Manholes, curbing,
drainage flumes, etc.) shall be replaced to original condition
at the developer's expense.
2.) Any ground cover that is damaged or disturbed during the
construction process, shall be replaced at the developer's cost
and maintained by the developer until such time as the ground
cover returns to its original condition.
Barry Pool Company appreciates the cooperation with the City of
College Station.
William Barry
Barry Pool Company
)
,
)
)
)
3
-13~.oo--__ , --
ment for
~ht Service
135.00
42" 08' 25" E
1
I~
a>
I
I
lo
0
It)
1~
I
110.00 -.,,
So
Novemt ,
.,J'
1· · Owner-0....eloper ~
:-ossjl ·Mound Co~~~hf:
A .M . ___ P .M
RETURNED
YOUR CALL
PLEASE CALL
WILL CALL
AGAIN
Valley
24A
Pg. 221
th wood
ection
/sos,
CAM E TO
SEE YOU
WANT-6 TO
SEE YOU
d.. _, ~ /J' l.-1"--
By I D~~-----Q'~------------------
NQTES1
l. Subdivision o.reo. is 22 .08 o.cres .
·2 . D 1-sto.nces o. long curves a.re chords
uri l-ess spec I f I ed otherwise.
3. Bu ~l.c:il ng setbo.ck sha l l be the MlnlMUM
o. l towed by c 1-ty ord I no.nee unless
shown otherwise ,
4 . All Utt l lty Ea.serum ts shown on this
,plo.t a.re Pub l I c Ut I l I ty Eo.seMents .
I-
I
,..-
r~ \' I '.\C\ t 07
0
d ·Inc.
PHONED
OF~~~~~~~~~~~~~~~~~~~~~~~~-i.:__..;.~~~~--1
RETURNED
PH ON E---::-==:-:-:==----"'"'-,--,L--::'"-----"""''--"':.......!~~--1--1--Y-O_U_R_:C:_A_;:L.:.L....J
PLEASE CALL
WILL CALL
AGAIN
CAME TO
SEE YOU
WANTS TO
SEE YOU