HomeMy WebLinkAbout5 Development Permit 552 GTE SwitchstationT ,., Mr. Ray Havens Electric Transmission & Distribution Superintendent City of College Station P. 0. Box 9960 College Station, Texas 77842 McCORD ENGINEERING, INC. December 6, 1994 RE: GTE Switch Station -University Drive & Glenhaven Dear Ray: In accordance with your request, we have reviewed the load and service requirements for the GTE Switch Station proposed for construction at University Drive and Glenhaven. We have planned the on-site electric distribution layout to serve this project to be underground, in accordance with the requirements of your City's line extension policy. Enclosed herewith for your review and use are five (5) copies of our proposed electric distribution layout for this facility. A Project Cost Estimate and a Bill of Material for the above referenced project are also enclosed. A diskette has been provided which includes this project electrical layout for your use. A 25 kVA, single-phase, 7,200 volt primary to 240/120 volt secondary pad-mounted transformer has been planned for installation to provide the requested service utiliz.ation voltage level for the GTE Switch Station. Metering for the GTE Switch Station is proposed to be accomplished at the GTE Switch Station using a 200 ampere, self-contained demand meter. In accordance with your City policy, GTE should plan to furnish and install, in compliance with City specifications, all required electrical conduit and pour the required concrete pad for said 25 kVA transformer. The electric layout drawing enclosed provides details regarding the required number and sizes of conduit, installation depth, proposed conduit locations, riser pole conduit requirements, etc; the transformer pad details should be furnished when the dimensions of the transformer proposed to be used are known. In accordance with the new policy of your City, GTE is responsible for reimbursing your City for 20% of the cost of installation, including labor, materials, and standard fee percentages for engineering and overhead cost for the proposed electric layout. We compute that the 20% contribution required for the GTE Switch Station Portion computes to be $526.00. This cost estimate was calculated based on a total project cost estimate of $2,630.00. The total underground cost includes a standard allowance of 30% to cover your City's labor related 0 ,99~ RECENEO DE c 7 I> __ City of College Station December 6, 1994 Page Two overhead costs, 7% material handling costs, and 8.5% to cover your City's administrative and engineering costs. I trust we have provided herein the information you need on this project. If not, or if questions arise, please let us know. DW/mw Enclosures Yours very truly, McCORD ENGINEERING, INC. David Witte Engineering Assistant cc: Ms. Veronica Morgan (w/enclosure) Mr. Bob Pohl ... McCord Engineering, Inc. 11/29/94 CS -13-G.10 \JORK ORDER NO. ---- LETTER COOE ------------ UD#1/0 URD UD#1/0 TPX UG7-25 UJ2-6-B UJ2-6-I UM6-1 UM6-6 UM6-10 CITY OF COLLEGE STATION GTE S\JITCH STATION PROJECT COST ESTIMATE -NEW CONSTRUCTION COST ($) PER 1 ASSEMBLY -------------------------ASSEMBLY DESCRIPTION QTY LABOR MAT. TOTAL . ----------------------------------------------------------- 1/0 PRIMARY URD CABLE .420 550.00 1189.00 1739.00 UG 1/0 TRIPLEX CONDUCTOR .030 1278.00 568.20 1846.20 UG 25 KVA 1 PHASE LOOP FEED 1 154.96 946.79 1101.75 BARE SECONDARY CONNECTOR BLOCK 1 15.00 15.54 30.54 INSULATED SECONDARY CONNECTOR BL 2 15.00 25.15 40.15 LOAD BREAK ELBO\il 1 47.75 55.19 102.94 GROUND ROO ASSEMBLY 1 15.00 9.05 24.05 INSULATED PROTECTIVE CAP 200 AMP 1 10.00 13.91 23.91 TOTAL LABOR = TOTAL MATERIAL = TOTAL = LABOR OVERHEAD 30% = MATERIAL HANDLING 7% = TOTAL ENGINEERING & OVERHEAD 8.5% = GRAND TOTAL ROUNDED TO DEVELOPERS CONTRIBUTION 20% = * DENOTES HOT WORK TOTAL COST $ --------- 730.38 55.39 1101.75 30.54 80.30 102.94 24.05 23.91 ---------2149.26 542.05 1607.21 ---------2149.26 162.62 112.50 ---------- 2424.38 206.07 ---------- 2630.45 $2,630.00 ----------$526.00 McCord Engineering, Inc. cs-13-G.10 M A T E R I A L CODE ITEM NO. ---------- 29 Uf z 33 29 Ufz 34 28 Ul 50 27 bu 64 25 ai 150 25 aj 156 27 Uhp 230 Uhb 274 28 Uhb 276 28 Uan 400 27 Uhv 523 28 an 780 Uhs 27 868 Ugo 27 869 27 Uhv 871 CITY OF COLLEGE STATION GTE SUITCH STATION B I L L 0 F M A T E R I A L CATALOG MATERIAL DESCRIPTION REF. NO. ------------------------------------UTILCO BARE TERMINATOR 28500800006 UTILCO INSULATED CONN. 28500800007 UG EQUIPMENT LOCK 832040 1/0 H-TAP COPPER CONN 28502200003 8 1 COPPERUELD GROUND ROD 28503800001 5/811 GROUND ROD CLAMP 28504700025 1/0 LOADBREAK ELBOU 28508200001 URD DUST CAP ASSBLY. 28509500004 URD BUSHING INSERT 28509500006 25 KVA PADMOUNT 120/240 28508600031 1/0 URD AL. PRIMARY 28008000001 TRANSFORMER GROUND LUG 28502200026 COLD SHRINK SLEEVE 28508200019 FAULT INDICATOR 1/0 URD ALIHINUM TRIPLEX 28008000014 11/29/94 \.JORK ORDER NO. ---- TOTAL UNIT TOTAL QTY. COST $ COST $ ----------------------- 1 15.54 15.54 2 25.15 50.30 1 6.00 6.00 1 1. 74 1.74 1 8.33 8.33 1 .72 .72 1 45.00 45.00 1 13.91 13.91 2 17.99 35.98 1 826.77 826.77 .420 1189.00 499.38 1 1.30 1.30 1 10. 19 10. 19 1 75.00 75.00 .030 568.20 17.05 --------- 1607.21