HomeMy WebLinkAbout35 Development Permit 594 Levtex HotelDEVELOPMENT PERMIT
PERMIT NO . 594
LEVIBX HOTEL
FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 1, Block 1 of the Wheeler Subdivision Phase II
OWNER:
/
Any trees required to be protected by ordinan or as part of the landscape plan must be completely fenced
before any operations of this permit can be · .
This permit, being temporary, is vali only within sixty (60) days of the date shown below, and is not
intended to allow the complete dev opment of the site as proposed. Any work performed after the
expiration of this permit is not cov ed, and is considered unauthorized .
In accordance with Chapter of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris om construction, erosion, and sedimentation shall not be deposited in city
facilities .
rmit for development of an area inside the special flood hazard area. All
in accordance with the plans and specifications submitted to and approved by the
development permit application for the above named project and all of the codes and
I hereby grant this
development shall
City Engineer in
ordinances i of ollege Station that apply.
Date
Owner Date
Contractor Date
..
DATE:
TO:
FROM:
TRANSMITTAL LETTER
McCLURE ENGINEERING, INC.
1722 Broadmoor, Suite 210
Bryan, Texas 77802
(409) 776-6700
Fax: (409) 776-6699
February 3, 1999
Mrs. Natalie Ruiz
Development Coordinator
CITY OF COLLEGE STATION
Michael R. McClure, P.E., R.P.L.S.
PROJECT NAME: BA YMONT INN & SUITES
COMMENTS:
Attached please find the following items for the above referenced project:
1. Letter to Veronica Morgan, P .E. concerning fire flow analysis
2. 2 Staff redlined sets of Civil/Site Plans , •
3. 6 Sets of Revised Civil/Site Plans -I ...,,}; 96-UUW-• ciJt}_,~
4. 2 Additional copies of Site Plan only
5. 2 Additional sets of o:ffsite water line plans
j
•
• McCLURE ENGINEERING, INC.-------
February 2, 1999
Mrs . Veronica Morgan, P .E .
Assistant City Engineer
City of College Station
P.O . Box 9960
College Station, TX 77842
RE : Baymont Hotel Fire Flow Analysis
Dear Veronica:
We are presently working with the developer of the Baymont Hotel that will be located
between Tarrow and Lincoln Avenue on the south side of University Drive. The proposed site
is adjacent to the Quality Suites Hotel. The College Station Public Utilities Department
recently ran a flow test on the fire hydrant located at the comer of Lincoln and University
Drive. This hydrant produced a flowrate of 1095 gpm under a static pressure of 88 psi with a
residual pressure of 80 psi .
The water system between the fire hydrant and the hotel site will have 607 linear feet of
8" PVC pipe . U sing a Hazen-Williams "C" value of 150 and a flowrate of 1185 gpm (1000
gpm-fire, 170 gpm-domestic, and 15 gpm-irrigation) the computed frictional head loss for the
system is 6 psi . Minor head losses in the line are negligible . There is a 10 ft . vertical rise in
elevation from the hydrant to the proposed building . These factors combine to produce a
residual pressure of 74.4 psi at the foundation of the building under fire flow conditions .
If you have questions regarding may calculations I will be happy to address them with
you . This information has been conveyed to the mechanical engineer that is designing the
sprinkler system for this building .
Sincerely,
1722 Broadmoor , Suite 210 • Bryan , Texas 77802 • (409) 776-6700 • FAX (409) 776-6699
DATE:
TO:
TRANSMITTAL LETTER
McCLURE ENGINEERING, INC.
1722 Broadmoor, Suite 210
Bryan , Texas 77802
(409) 776-6700
Fax: (409) 776-6699
October 22, 1998
Mrs. Natalie Ruiz
Assistant Development Coordinator
CITY OF COLLEGE STATION
FROM: Michael R. McClure, P.E., R.P.L.S.
PROJECT NAME: BA YMONT INN AND SUITES
Lot 1, Block 1, Wheeler Subdivision, Phase Two
COMMENTS:
Attached please find the following:
1. Three ~ s~ts of Civil Site Construction Plans with revised Site Plan and Grading Plan
included.
2. Two (2) copies of Drainage Report
3.:::-Staff R e d-lj ned. Sit e Platt:
·.
Figure XU
Development Permit
City oC College Station, Texas
.Site Legal Description : WHEELER SUBDIVISION, PHASE II, Lot 1 , Block 1
766Q Wcx:x:1way Or., Suite 460
Site Owner: LEVTEX HOI'EI,VENTURES, INC. Address: Houston, 'I< T1063
Engineer: McClure Engineering, Inc.
Date Application Filed : ---------
Tel .ephone : 71 J 268-371 3
· · 1 722 Broaaincor, Suite 21 0
Address: Brvan. TX 77802
Telephone No : _.!..77.!..6,,_-_,6~7,_,0"'0,__ ____ _
Add ress : -------------
Telephone No:-----------
Approved: ------------
App lication is hereby made for the followi ng development specific waterway alterations :
Erosion control olan only. No alterations to the waterway or flccdolain
are included wit.1-i this phase. of the project.
~ Applicationfee ($100.00)
~ Signed Certifications
51 Drainage and erosion control plan, with supporting Drainage Report two (2) copies each.
0 Site and Construction Plans, with supporting Drainage Report two (2) copies each.
0 Other:----------------------------
ACKNOWLEDGrvtENTS:
I, L~ , ~~owner, hereby acknowledge or affirm that:
The information and conclusions contained in the abo.:,,e plans and supporting documen ts c c mply
with the curren.t requirements of the Ci ty of College Station, Texas City Co d e, Chapter 13 and its
associated Drainage Policy and Design Standards.
As a condition of approval of this pe:-m it a p pliCJ.tio n., I agree to construct the improveme n ts
proposed in . s a.pp~t i on according to thes e do cuments and th e requirements of Chapter l J of
~:r~e
(/P~ clwner(s) Contractor
Figure XrI Continued
CERTrFlCA TlONS : (for proposed alterations within designated flood hazard areas.)
A. I, certify that any nonresidential structure on or proposed
to be on this site as part of this application is designated· to prevent damage to the structure or its
contents as a result of flooding from the 100 year storm .
Engineer
B. I. certify that the finished floor eleva tion of the lowest
floor, including any basement, of any residential structure, proposed as part of this application is
at or above the base flood elevation established in the latest Feder:il Insurance Administration
Flood HJ.z:i.r d Study and maps, as amended .
Engineer Date
C. I, Fa1t. M. Ia.za certify that the alterations or development covered by
this permit shall not diminish the floqd-carrying capacity of the waterway adjoining or crossing
this permitted site and that such alterations or development are consistent with requirements of
· the City of College Station City Code, Chapter 13 concerning encroachments of flood ways and of
floodgges j ,~;f ~
Engineer () Date
r. do certify that the proposed alterations do not raise t he level
of the 100 year flood above elevation establ ished in the latest Federal Insurance Administration
Flood Hazard Study.
Engineer Date
Conditions or comments as part of appro val:--------------------
I n a cco rdance w ith Chapter 13 of the Code of Ordinances of t he C ity of College Station,
meJ.sures shall be taken to insure that debris from construct ion, erosion, and sedimentation s hall
not be deposited in city streets, or existing drainage facilities .
[hereby g ran t t his permit fo r development. All development sha ll be in ac c ord:ince with the plans
and speciticJ.tions submitted to and approved by the City Engineer for the above named project.
Al l o f the a pp lic J.ble codes and ordi nan ce:; o f the City of College Station shall apply .
1 .... .., .. .,..,.. .... ..._,1w .·11
LTHV #1, L.P. (COLLEGE STATION)
7660 WOODWAY, SUITE 460
HOUSTON , TEXAS 77063
COMERICA BANK· TEXAS
HOU STON, TEXAS
32-75-1110
'PAY**ONE HUNDRED DOLLARS AND 00/100 **********
TO THE DATE
ORDER OF
CITY .OF COLLEGE STATION
07/16/98
APPLICATION FEE /DEVELOPMENT PERMIT
·::.-'.-51
AMOUNT
**$100.00*'
···-·---------------·---·-··· ... ---~
LTl-iV #1, L.P. (COLLEGE STATJON)
51;
07/16/98 APPLICATION FEE / DEVELOPMENT PERMIT
LTHV #1, LP. (COLLEGE STATION)
Sey~
LEVTEX HOTEL VENTURES, INC.
Memo
Toe Natalie Ruiz
From: Mike Harp
CC: Mike Mcaure
Data: 12107198
Re: Site Plan requirements for Baymont Inn & Suites
Natalie, I am erdosing a check for three hundred dollars for the inspection fee as per the requirements
of your letter dated October 16, 1998.
I am also sending you a oopy of the Del/eloµnent Permit Application signed by the 01M1er of our
company which you should have on file. We have already sent a one hundred dcilar check 'Mth the
application (see COfJ11 of check).
We are 'M)OOng on all the requirements to achieve Site Plan approval. We should have these
completed very soon.
Thanks!
?b°1!cf~oU w:iy Drive #460, l-lvuscon Tc::<Js 7/l)nj • 7lJ/'26:i-37l6 • F:i :c 7lJ/'268-J7'2J . E -m:iil: mhJrp@lcvco r .com
• McCLURE ENGINEERING, INC.
July 31 , 1998
Mr. Paul Kaspar
Department of Development Services
City of College Station
P .O . Box 9960
College Station, Texas 77842
Re : Resubmittal for Levtex Hotel Development Permit
Dear Paul :
Enclosed are two revised drawings for the temporary development permit for the
Levtex Hotel on University Drive. When making the corrections you requested last time,
we discovered there were two versions of the site plan that did not match . We had to
change our drawing accordingly. The plan you see with this submittal is taken from the
final plat prepared by Kling Engineering. I believe I have included the comments you
requested . Call me if you have questions .
SIZ-:J:o
Kent Laza, P .E.
1722 Broadmoor, Suite 21 O • Bryan , Te x as 77802 • (409) 776-6700 • FAX (409) 776-6699
-v"(~Slf
McCLURE ENGINEERING, INC.---------...
July 17 , 1998
Mr. Paul Kaspar
City of College Station
P .O . Box 9960
College Station, Texas 77842
Re : Levtex Hotel Development
Dear Paul:
Enclosed is a development permit application for the Levtex Hotel Development
on University Drive . Along with the application are two drawings of the erosion control
plan and a check for $100 . We are requesting a temporary development permit to allow
the developer to begin site clearing . As the project evolves, the site plan and construction
draw ings will be submitted showing more detailed information about the development.
Please contact me if you have questions or when the permit is issued . Thank you .
s2'-l
Kent Laza, P .E . r
Project Manag er
attachment s
xc : Larry Levine
1722 Broadmoor, Suite 210 • Bryan , Texas 77802 • (409) 776-6700 • FAX (409) 776-6699
. I.
-~ .
Figure Xli
Development Permit
City of College Station, Texas
Site Legal Description: WHEELER SUBDIVISION, PHASE II, .. Lot 1, Block 1
766Q Wcx::xlway Dr., Suite 460
Site Owner: LEVTEX HOI'ELVENTURES, INC. Address : Houston, 'I:{ 7"1063
Engineer: Mc'Clure Engineering; Inc.
Date Application Filed : ________ _
Telephone: 713 268-3713
1722 Broadrroor, Suite 210
Address: Bryan, TX 77802
Telephone No : _ _._77-'-'6"--_,6~7~0~0 _____ _
Address : -------------
Te I e phone No : ------~----
Approved : ___________ _
Application is he reby made for the following development specific waterway alteration s :
Erosion control plan only. No alterations to the waterway or floodplain
are included with this pl)ase.of the project.
!» Application Fee ( $1 00. 00)
Qi Signed Certifications
ra Drainage and erosion control plan, with supporting Drainag e Report two (2) copies each .
0 Site and Construction Plans, with supporting Drainage Report two (2) copies each .
0 Other: -------------------------------
ACKNOWLEDGMENTS :
, ~owner, hereby acknowledge or affirm that :
The information and conclusions contained in the above plans and supporting documents comply
with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its
associated Drainage Policy and Design Standards.
As a condition of approval of this permit application, I agree to construct the improve ments
proposed in . pr tion according to these documents and the requirem e nt s of Chapter 13 o f
t Co ge S ity Code .
Contractor
Figure Xfl Continued
CERTrFfCATlONS : (for proposed alterations within designated flood hazard areas.)
A. I, certify that any nonresidential structure on or proposed
to be on this site as part of this application is designated to prevent damage to the structure or its
contents as a result of flooding from the 100 year storm.
Engineer Date
B. I, certify that the finished floor elevation of the lowest
floor, including any basement, of any residential structure, proposed as part of this application is
at or above the base flood elevation established in the latest Federal Insurance Administration
Flood Hazard Study and maps, as amended .
Engineer Date
C. I, ~ M. I.az.a certify that the alterations or development covered by
this permit shall not diminish the floqd-carrying capacity of the watecway adjoining or crossing
this permitted site and that such alterations or development are consistent with requirements of
the City of College Station City Code, Chapter 13 concerning encroachments of flood ways and of
floodway r· ges .
Date
I, do certify that the proposed alterations do not raise the level
of the l 00 year flood above elevation established in the latest Federal Insurance Administration
Flood Hazard Study .
Engineer Date
Conditions or comments as part of approval :
~~~~~~~~~~~~~~~~~~~~
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station,
measures shall be taken to insure that debris from construction, erosion, and sedimentation shall
not be deposited in city streets, or existing drainage facilities .
I hereby grant this .permit for development. AJI development shall be in acrnrdance with the plans
and specification s submitted to and approved by the City Engineer for the above named project.
All of th e appli ca bl e codes and ordinances of th e City of College Station shall apply .
Figure XU-
Devdopment Permit
City _ of College Station, Tex:as
Site Legal Description: WHEELER SUBDIVISION, PHASE II , .. Lot 1, Block 1
766Q Wocx:lway Dr., Suite 460
Site Owner: LEVrEX HOI'ELVEN'IURES, INC. Address : Houston, 'LC Tt063
Telephone: -713 268-3713
Engineer: McClure Engineering; Inc.
Date Application Filed : ________ _
1722 Broadrocx:>r, Suite 210
Address: Bryan, TX 77802
Telephone No : _J_7_L76!.L-::ci6.u7~0""0'-------
Address: -------------
Te I e phone No : ------~----
Approved : ___________ _
Application is hereby made for the following development specific waterway alterations :
Erosion control plan only. No alterations to the waterway or flocx:lplain
are included with this pl}.ase.pf the project.
ra Application Fee ($100.00)
0 Signed Certifications
ra Drainage and erosion control plan, with supporting Drainage Report two (2) copies each _
0 Site and Construction Plans, with supporting Drainage Report two (2) copies each .
0 Other: -------------------------------
ACKNOWLEDGMENTS :
, ~owner, hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supporting documents comply
with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its
associated Drainage Policy and Design Standards.
As a condition of approval of this permit application, I agree to construct the improvements
proposed in . pl' tion according to these documents and the requirements of Chapter 13 of
t Co ge S ity Code _
Contractor
I ...
Figure XrI Continued
CERTIFICATlONS: (for proposed alterations within designated flood hazard areas.)
A. I, certify that any nonresidential structure on or proposed
to be on this site as part of this application is designated to prevent damage to the structure or its
contents as a result of flooding from the 100 year storm .
Engineer Date
B. I, certify that the finished floor elevation of the lowest
floor, including any basement, of any residential structure, proposed as part of this application is
at or above the base flood elevation established in the late st Federal Insurance Administration
Flood Hazard Study and maps , as amended .
Engineer Date
C. I, :&nl::. M. Laza certify that the alterations or development covered by
this pennit shal.l not diminish the floqd,carrying capacity of the waterway adjoining or crossing
this pennitted site and that such alterations or development are consistent with requirements of
·the City of College Station City Code, Chapter 13 concerning encroachments of flood ways and of
floodway r· ges .
Date
I, do certify that the proposed alterations do not raise the level
of the l 00 year flood above elevation established in the latest Federal Insurance Administration
Flood Hazard Study.
Engineer Date
Conditions or comments as part of approval : --------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station,
measures shall be taken to insure that debris from construction, erosion, and sedimentation shall
not be deposited in city streets, or existing drainage facilities .
I hereby grant this .permit for development. All development shall be in accordance with the plans
and specifications submitted to and approved by the City Engineer for the above named project.
All of the applicable codes and ordinances of the C ity of College Station shall apply .
File Note I
For Additional Documentation On This Project
Check In The "CONFIDENTIAL BINDER"
KLING ENGINEERING AND SURVEYING
4103 Texas Avenue, Suite 212
Bryan , Texas 77802
ATTENTION
WE TRANSMIT :
0 Under Separate Cover
mnclosed
VIA :
O Mail
~essenger
0 Federal Express
0 Express Mail
0 Special Courier
0 Picked Up By Your Office
NO.
7 HO/..A ;VJ 111.)m......,
I
Consulting Engineers • Land Surveyors
Tel. (409) 846-6212
Fax (409) 846-8252
DATE 0
THE FOLLOWING :
0 Prints
O Copies
D Originals
O Plat
0 Field Notes
D Plans
fi(l_Report
0 Estimate
O Cut Sheets
PR O JECT NO.
PRO J ECT N AME
REFE RENCE
0 Computer Printou t
D File
0 Contract
0
DESCR IPTION
~ ~Aji6".:,:f--l?e--,-,, -
P.O. Box 4234
Bryan, Texas 77805
~j)/t/t SI utJ H.t Z
FOR :
0 Your Review & Approval
~our Review & Commen t
0 Your Review & Distribution
0 Your Review, Revision & Return
0 Your Signature & Return
0 Your File and /or Use
O As Request ed By :
0 Please Acknowl edge Rece ipt of
Enclosures
0 Please Return Enclosures To Us
0 Copies Of Th is Letter Of Transmittal
Sent To :
If Enclosures Are Not As Noted ,
Please Notify Us At Once .
PRELIMINARY DRAINAGE REPORT
FOR
LOT 1, BLOCK 1, WHEELER SUBDIVISION
PHASE 2
Richard Carter Survey, A-8
College Station, Brazos County, Texas
June 29, 1998
PREPARED FOR:
Bert Wheelers Inc.
10665 Richmond
Houston , Texas 77042
PREPARED BY:
Kling Engineering & Surveying
4013 Texas Ave., Suite 212
Bryan, Texas 77802
( 409) 846-6212
Preliminary Drainage Report
for
Lot 1, Block 1, Wheeler Subdivision -Phase 2
Richard Carter Survey, A-8
College Station, Brazos County, Texas
June 29, 1998
GENERAL LOCATION & DESCRIPTION:
Lot 1, Block 1 of the Wheeler Subdivision -Phase 2 consists of a two acre tract of land
lying adjacent to the southern right of way line for University Drive (F.M . 60) approximately 337'
west of the Lincoln Avenue I F.M . 60 intersection. Currently , the lot is vacant. Existing land
cover consists of field grasses and brush with a few trees. The site drains in a southeasterly
direction to the nearby East Tributary to Burton Creek (see Appendix 1 "General Location Map"
and 2 "Final Plat" for map). The site is currently within the 100 year floodplain according to the
FEMA Flood Insurance Rate Map (FIRM) for Brazos County , Texas and Incorporated Areas,
Community Number 480083, Panel Number 0142 C, Map Number 48041 C0142 C, effective date
July 2, 1992 (see Appendix 3 "Flood Insurance Rate Map"). It has a floodplain designation of,
"Zone A-Special Flood Hazard Areas Inundated By 100-Year Flood -No base flood elevations
determined". Current development plans involve a Letter of Map Revision for the East Tributary
to Burton Creek that will eliminate floodplain from Lot 1, Block 1 by the channelization of a
portion of the creek. Proposed improvements include a hotel/motel establishment of the same
character as currently developing projects within the University Drive Corridor.
Previous studies for the area include:
1) Kling Engineering & Surveying, Floodplain Analysis for East Tributary to Burton Creek
Just Above Confluence with Carters Creek, June, 1998 . The purpose of this study was to
establish the elevation of the 100 year floodplain water surface and define a floodway for the
East Tributary to Burton Creek. Included in this study was the analysis of proposed channel
improvement and its effect on the floodplain .
DRAINAGE BASINS & SUB-BASINS:
The primary drainage basin for the area is the Burton Creek drainage basin . The
Tributary drainage basin can be considered a sub-basin within the lower region of the Burton
Creek drainage basin . The Tributary drainage basin is broken into 7 sub-basins according to
flow patterns (refer to abovementioned Floodplain Analysis for further detail). Lot 1, Block 1 is
accounted for in the Floodplain Analysis in drainage area DA-II of Sub-basin 7. The two acre
site will be considered as a single drainage area with respect to stormwater runoff calculations
for this report.
DRAINAGE DESIGN CRITERIA:
The City of College Station requires attenuation of excess stormwater runoff through the
100 year return event. The Rational Method was used to determine the stormwater runoff for
existing and post-developed conditions. Detention requirements were calculated using the
difference in peak runoff discharges for existing and post-developed conditions, from the 2, 5,
10, 25, 50 , and 100 year return storm events, incorporated into the Modified Rational Method.
Detention pond routing was done using the Level Pool Routing Procedure combined with the
appropriate hydraulic equations to model the outlet device. Excess runoff due to development
will be attenuated off-site in a 0.39 acre private detention and drainage easement adjacent to the
south lot line of the property (see Appendix 2 "Final Plat"). This report will document the
management of stormwater runoff as a result of proposed development. Due to the lack of a final
site development plan, conservative assumptions with respect to runoff will be made . Upon
completion of a final site plan, an addendum to this drainage report will be submitted
documenting that final conditions are within design parameters as set forth in this report .
DRAINAGE ANALYSIS & DESIGN:
The area was analyzed under existing and post-developed conditions to determine total
peak runoff rate for the proposed improvements and total allowable peak runoff from the site
(existing conditions). Based on a time of concentration of 10 minutes, intensities for the varying
storm events were obtained using the Intensity-Duration-Frequency equation and coefficients
corresponding to Brazos County as defined by the U.S. Weather Bureau (NWS) Technical Paper
No. 40. Site area used is 2.001 acres with 'C' factors for existing and post-developed conditions
of 0.25 and 0.81 respectively. In absence of a final development site plan, post developed 'C'
was determined by assuming the entire two acre tract to be impervious with the exception of the
required 24' landscape reserve adjacent to the F.M . 60 right of way . This assumption is
conservative as it does not account for set-back or landscaped areas within the lot. The
following table summarizes the peak runoff rates derived from the Rational Method for pre and
post developed conditions.
Table 1
Storm Return (yr) 2 5 10 25 50 100
Pre a (cfs) 3.2 3.8 4 .3 4.9 5.6 5.8
Post a (cfs) 10 .2 12.5 14.0 16 .0 18 .0 18.9
Required Atten . a (cfs) 7.0 8.7 9 .7 11 .1 12 .4 13 .1
*See Appendix 4 "Hydrologic Calculations" for computation
As stated above, under proposed conditions, detention will be accomplished within an off-
site detention easement accommodating runoff through the 100 year event. The detention pond
will be adjacent to the improved channel for the Tributary with top of berm elevations at a
minimum of 1' above the 100 year water surface elevation in the channel. The outlet works for
the detention area will consist of a 1 O" PVC pipe at a 0.8% slope. The pipe outlet flowline will
be at 288.9 . Overflow will be accommodated using a 15' long, grassed emergency spillway at
elevation 291. 75 . Outfall for the 1 O" PVC pipe will be immediately adjacent to the improved
channel. Minimum outfall flowline elevation will be set at 288 .5, approximately 0.5' above the
100 year floodway water surface elevation in the channel at outfall location.
A post development, inflow hydrograph for the pond was generated using the Modified Rational
Method to determine a storm duration that would require the greatest amount of storage volume
(see Appendix 4 "Hydrologic Calculations" for summary print out). The Level Pool Routing
procedure with the appropriate hydraulic equations for modeling the outlet works was used to
route the design storm inflow hydrograph through the pond. Two scenarios were created to
model the various storm events . Scenario 1 models the pond with the outlet works functioning
properly as designed. Due to the small size of the outlet pipe, 1 O", the second scenario models
the pond with the outlet pipe completely clogged . The follow ing table summarizes the peak
elevations and discharges of the pond routing for each scenario .
Table 2
Scenario 1 Scenario 2
Storm Return Peak Inflow Allowable
Outflow Peak Outflow Peak Elev . Peak Outflow Peak Elev.
(yr) (cfs) (cfs) (cfs) (cfs)
2 7.1 3.2 2.8 290 .5 0.0 290.90
5 8.3 3.8 3.1 290 .8 0.0 291 .10
10 9.2 4 .3 3.2 290 .9 0.0 291.30
25 10 .6 4.9 3.4 291 .0 0.0 291.50
50 11.8 5.6 3.5 291 .2 0.0 291 .70
100 12.3 5.8 3.6 291.3 0.0 291 .70
*See Appendix 5 "Detention Pond Routing" for computation .
As shown above , peak outflow for Scenario 1 averages 3.3 cfs for the six design storm events .
All excess runoff as a result of development is attenuated under optimal design conditions . The
pond prov ides sufficient volume such that during completely clogged conditions, Scenario 2,
water surface elevations do not reach the emergency spillway for the six design storm events.
CONCLUSIONS:
Post developed runoff rates were determined using an assumed worst case scenario for
amount of impervious cover on the site . Design storm hydrographs were routed through a
proposed detention pond which attenuated above the required amounts for all storm events . Due
to the relatively small size of the outlet works , the design storm hydrographs were routed through
the pond assuming fully clogged conditions . Under this scenario, it is shown that the water
surface elevation in the pond does not exceed the elevation of the emergency spillway for any
design storm event. However, storm events and physical conditions that may occur during a
storm are variable and pond overtopping is possible due to the unbounded combinations of
particular attributes that may affect pond performance . The emergency spillway provides for the
controlled release of pond overflow. No adverse impact on downstream structures or property
owners is expected from proposed improvements .
APPENDICES
1) General Location Map -U.S.G.S. Quad
2) Final Plat -Wheeler Subdivision Phase 2
Lot 1, Block 1
3) Flood Insurance Rate Map - F.E.M.A.
4 ) Hydrologic Computations
5 ) Detention Pond Rout ing Computations
k:lprojectslwhee ler81ph21t I \It I blk I . wpd
APPENDIX 1
GENERAL LOCATION MAP -U.S.G.S. QUAD .
APPENDIX 4
HYDROLOGIC COMPUTATIONS
·c · ~----:-1 --~+2 -~ ~ -4 ~--~--~ p~.r ;; _O. 25 ~ -C.tZA~!lcJC _ +---A.! ... ~--~ . _ --A'-~ _____ .
I ' ' ' !
I
!--------
-lc.<JO~/N ,'. JQhf,N v:s'"° !----~~~-----=~------~-~~ i ----
,------------1Q.::c.c.. .
-----+-'-----------------------·
L.. % :-~.33 1-l /~
i 5 =-7, b9
. ~ ~ O, ZS' 'If '-· .3~ !f.-2, c>at =-. 3. Z
i ID : e.o3
;Qs ___ ..;; _p • Z ~ -~ 7 1 '-9 t-z., 00 1 ~ 3, t$
i..-z.,s = ~' e'-'.Qt0 _; ;: ""I 3
L5~ -=__;1 ~14 __ _
'.Q-zs -. : 4. 9
_ ___ Q~~-;;--~-
'Q.~ : i 1<AJ .:: //, ~4
~-"'"c. 4 ~~~IV)~-:-87% -/f'f'l f-~-'olt~i.J~------p.fi)7 1f-0~9-;;-----o. 78 -
I~ ~o (.,/lf-1'.JC~f~ _ O_J_ '-~ ~ O.ZS ~ 0 1 0 ~
---: -· --r' -r -lJ' B I
1-f()r=: A:~&ulflpT?o,J i:,~ c-N -~ JAt.J.!>$Ap~ ~vtS""
. -----__ Ai,,of...Xt ON1i/l't.s1 rr.r 1.s -'7H~-r:JN'-Y __ JJ~ -Ll'?"Jf>~".:us __
A-<Z<J;-.q w~t r.J n.t~ z_ ~ ~ -.
_c. C)~c...i.. A -
L z :: ~-3..J IN/J.-.. Q?_ -~--
':'.s = 7,~f . _ ;Qs . ~-
t..10 -~f._1'..3_ _____________ .Q \.L.....:'.~'----·----
' -~ I /) >-v-z..s -7t ~' Wt4i ---I
' ~ I pi. I /.') :r ls~ ,'(, T .~so ___ ·-
i,i» :-I/( (,'f 621~ ~-------
1
.: _$,Jo
: 5,'6
-/0, z. c.~
-IZ 1 S
= _141 I) -
-//,, 0
= IB,~
;. -/~.9
-------~--------------
I -1-----
1
1 -
---------·----------------
!
--L
----__ ._ -t--. -
-l
I
-j
____ _...__ __ ----·-
• I ......, -----. . '
--i-~ -·-·-I
Job File: E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
Rain Dir: J:\HAESTAD\PPK6\UTIL\
==========================
JOB TITLE
==========================
Wheeler Subdivision Phase 2
Lot 1, Block 1 -2.001 acre tract
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24-97 :053 Compute Time: 12:34:04 Date: 06-29 -1998
Table of Content s
Table of Contents
************ RATIONAL METHOD CALCS ***********
C and Area
LO T1,BLK1 POST ••••••..•••..••••..•• 1 .01
Mod. Rational Grand Sllllllary
DETENTION EST1 ••••••.•••••••••••••• 1.02
Rational Peak Q's
DETENTION EST 1 • • • • • • • • • • • • • • • • • • • • • 1. 03
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24-97 :053 Compute Time: 12:34:04 Date: 06-29 -1998
Type ••.• C and Area
Name .••. LOT1,BLK1 POST
File •••• E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
Title ••. Lot 1, Block 1 Wheeler Subdivision Phase 2 -Post
Developed Conditions
RATIONAL C COEFFICIENT DATA
Page 1.01
......................................................................... .........................................................................
Lot 1, Block 1 Wheeler Subdivision Phase 2 -Post Developed Conditions
Area c x Area
Soil/Surface Description c acres acres
----------------------------------------........................... ...........................
impervious .9000 1. 741 1.567
landscaped .2500 .260 .065
WEIGHTED c & TOTAL AREA ---> .8155 2 .001 1.632 ......................................................................... ·········································································
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24-97 :053 Compute Time: 12:34:04 Date: 06-29 -1 998
Type ..•• Mod. Rational Grand SUlll11ary
Name .••. DETENTION EST1
Page 1.02
File .•.• E:\HAESTAD\PONDPACK\PPK6\YHEELER\L&B1PH2\L1B1DET .PPK
************************************************************************
************************************************************************
* *
* *
* MODIFIED RATIONAL METHOD *
* ----Grand Surrrnary For All Storm Frequencies *
* *
* *
************************************************************************
************************************************************************
Q CiA * Units Conversion; Yhere Conversion 43560 / (12 * 3600)
Area = 2.001 acres Tc = .1667 hrs ............................................................................. .............................................................................
VOLUMES
Freq. Adjusted Duration a peak Allowable I Inflow Storage
years 'C ' hrs in/hr cfs cfs I ac-ft ac -ft
------------------------------------------------------1---------------------
2
5
10
25
50
100
.816
.816
.816
.816
.816
.816
S/N: HOMOL0863131
.3500
.3833
.4000
.4000
.4167
.4167
4 .3075
5.0657
5.6172
6.4481
7 .1625
7.4775
7.09
8 .34
9 .24
10.61
11. 79
12.30
KLING ENGINEERING
3.20 I
3.8o I
4.3o I
4.9o 1
5.60
5.80
I
I
Pond Pack Ver : 6-24 -97 :053 Compute Time : 12:34:04
.205
.264
.306
.351
.406
.424
.116
• 148
.168
.194
.220
.231
Date: 06 -29 -1998
Type .•.. Rational Peak O's
Name .•.. DETENTION EST1
Page 1.D3
File ••.• E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
SUMMARY OF RATIONAL METHOD PEAK DISCHARGES
Q = CiA * Units Conversion; Where Conversion = 43560 I (12 * 3600)
Rational Storms: BRAZOS.IDQ RATIONAL
Tag Freq Fi le IDF Curve
------.. -----............................................
2 YR 2 BRAZOS. IDQ e = .8060 b = 65.0000 d = 8.0000
5 YR 5 BRAZOS. IDQ e = .7850 b = 76.0000 d = 8.5000
10 YR 10 BRAZOS.IDQ e = .7630 b = 80.0000 d = 8.5000
25 YR 25 BRAZOS. IDQ e = .7540 b = 89.0000 d = 8.5000
50 YR 50 BRAZOS. IDQ e = .7450 b = 98.0000 d = 8.5000
100 YR 100 BRAZOS . IDQ e = .7300 b = 96.0000 d = 8.0000
Tc = . 1667 hrs
Tag Freq c C adj I c Area Peak Q
(years) factor I final in/hr acres I cfs
l·····························I -------·--
2 YR 2 .816 1.000 I .816 6.3259 2.001 I 10.41
5 YR 5 .816 1.000 I .816 7.6921 2.001 I 12.66
10 YR 10 .816 1.000 I .816 8.6338 2.001 I 14.21
25 YR 25 .816 1.000 I .816 9.8607 2.001 I 16.22
50 YR 50 .816 1.000 I .816 11.1467 2.001 I 18.34
100 YR 100 .816 1.000 I .816 11.6382 2.001 I 19. 15
-----------------------------
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6·24·97 :053 Compute Time: 12:34:04 Date: 06-29-1998
APPENDIX 5
DETENTION POND ROUTING COMPUTATIONS
Job File: E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
Rain Dir: J:\HAESTAD\PPK6\UTIL\
==========================
Wheeler Subdivision Phase 2
Lot 1, Block 1 -2.001 acre tract
JOB TITLE
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06-29-1998
Table of Contents
Table of Contents
*********************** POND VOLUMES ***********************
VOL.PLAN 1 •••••. Vol: Planimeter ..••••.....•......•• 1.D1
******************** OUTLET STRUCTURES *********************
TRIAL 181 ••••••• Outlet Input Data •••••••••••••••••• 2.01
Composite Rating Curve ••••••••••••• 2.04
*********************** POND ROUTING ***********************
POND RT TRIAL Pond E-V-Q Table ··················· 3.01
POND RT TRIAL 10 YR
Pond Routing Surrmary ............... 3.03
POND RT TRIAL 1 100 YR
Pond Routing Surrmary ............... 3.04
POND RT TRIAL 1 2 YR
Pond Routing Surrmary ............... 3.05
POND RT TRIAL 1 25 YR
Pond Routing Surrmary ................ 3.06
POND RT TRIAL 1 5 YR
Pond Routing Surrnary ............... 3.07
POND RT TRIAL 1 50 YR
Pond Routing Surrnary ............... 3.08
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24 -97 :053 Compute Time: 16:25:39 Date: 06-29-1998
Type .... Vol: Planimeter Page 1.01
Name .... VOL.PLAN 1
File .... E:\HAESTAD\PONDPACK\PPK6\~HEELER\L&B1PH2\L1B1DET.PPK
Title ... Volume Plan 1 -3:1 side slopes
POND VOLUME CALCULATIONS
Planimeter scale: 1.00 ft/in
Elevation Planimeter
(ft) (sq.in)
288.90 .000
289.00 128.000
290.00 5355.300
291.00 10736.900
292.00 12578.300
Area A1+A2+sqr(A1*A2) Volume
(acres) (acres) (ac-ft)
.0000 .0000 .000
.0029 .0029 .000
.1229 .1449 .048
.2465 .5435 • 181
.2888 .8020 .267
PONO VOLUME EQUATIONS
Volune Sum
(ac-ft)
.000
.000
.048
.230
.497
* Incremental volume computed by the Conic Method for Reservoir Volumes.
Volune = (1/3) * CEL2-EL1) * CArea1 + Area2 + sq.rt.(Area1*Area2))
where: EL1, EL2 =Lower and upper elevations of the increment
Area1,Area2 =Areas computed for EL1, EL2, respectively
Volume =Incremental volume between EL1 and EL2
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Oate: 06 -29-1998
Type .... Outlet Input Data Page 2.01
Name .... TRIAL 181
File .... E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
REQUESTED POND WS ELEVATIONS:
Min. Elev.= 288.90 ft
Increment= .10 ft
Max. Elev.= 292.00 ft
**********************************************
OUTLET CONNECTIVITY
**********************************************
---> Forward Flow Only (Upstream to DnStream)
<---Reverse Flow Only (DnStream to Upstream)
<·--> Forward and Reverse Both Allowed
Structure No. Outfall El, ft E2, ft
--------------------·--------·-----
Wei r-Rectangular 2 <·--> TW 291. 750 292 .000
Culvert·Circular <---> TW 288.900 292.000
TW SETUP, OS Channel
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6 -24-97 :053 Compute Time: 16:25:39 Date: 06 -29·1998
Type ..•. Outlet Input Data
Name.... TR I AL 1B1
File •••. E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
OUTLET STRUCTURE INPUT DATA
Structure ID
Structure Type
# of Openings
Crest Elev.
Weir Length
Weir Coeff.
Weir TW effects
= 2
=Weir -Rectangular
291. 75 ft
= 15.00 ft
3.000000
(Use adjustment equation)
S/N: HOMOL0863131 KLING ENGINEERING
Page 2.02
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06-29-1998
Type •••• Outlet Input Data
Name ..•. TRIAL 181
File •.•. E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
OUTLET STRUCTURE INPUT DATA
Structure ID
Structure Type = Culvert-Circular
No. Barrels
Barrel Diameter
Upstream Invert
Dnstream Invert
Horiz. Length
Barrel Length
Barrel Slope
=
OUTLET CONTROL DATA •••
=
.8333 ft
288.90 ft
288.50 ft
50.00 ft
50.00 ft
.00800 ft/ft
.0110
Page 2.03
Mannings n
Ke
Kb
Kr
HW Convergence
=
.5000 (forward entrance loss)
.028555 (per ft of full flow)
1.0000 (reverse entrance loss)
.001 +/-ft
INLET CONTROL DATA .•.
Equation form
Inlet Control K .0098
Inlet Control M = 2.0000
Inlet Control c .03980
Inlet Control y = .6700
T1 ratio CHW/D) 1.156
T2 ratio (HW/D) = 1.303
Slope Factor = -.500
Use unsubmerged inlet control Form equ. below T1 elev.
Use submerged inlet control Form equ. above T2 elev.
In transition zone between unsubmerged and
interpolate between flows at T1 & T2 •.•
submerged inlet cont r ol,
At T1 Elev = 289.86 ft ---> Flow
At T2 Elev = 289.99 ft ---> Flow =
TW
1. 74 cfs
1. 99 cfs
Structure ID
Structure Type TW SETUP, OS Channel
FREE OUTFALL CONDITIONS SPECIFIED
CONVERGENCE TOLERANCES •••
Maxil11Llll Iterations= 30
Min. TW tolerance .01
Max. TW tolerance = .01
Min. HW tolerance .01
Max. HW tolerance = .01
Min. Q tolerance .10
ft
ft
ft
ft
cfs
Max. Q tolerance = .10 cfs
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24 -97 :053 Compute Time: 16:25:39 Date: 06-29 -1998
Type •••. Composite Rating Curve
Name •••• TRIAL 181
File ••.. E:\HAESTAD\PONDPACK\PPK6\~HEELER\L&B1PH2\L1B1DET.PPK
***** COMPOSITE OUTFLO~ SUMMARY ****
~s Elev, Total Q Notes
------------------------Converge -------------------------
Elev. Q T~ Elev Error
ft cfs ft +/-ft Contributing Structures
--------................ --------------------------
288.90 .00 Free Outfall None contributing
289.00 .03 Free Outfall
289.10 .10 Free Outfall
289.20 .21 Free Outfall
289.30 .36 Free Outfall
289.40 .54 Free Outfall
289.50 .75 Free Outfall
289.60 .98 Free Outfall
289.70 1.22 Free Outfall
289.80 1.47 Free Outfall
289.90 1.73 Free Outfall
290.00 1.99 Free Outfall
290 .10 2.20 Free Outfall
290 .20 2.36 Free Outfall
290.30 2.51 Free Outfall
290 .40 2.66 Free Outfall
290 .50 2.80 Free Outfall
290.60 2.93 Free Outfall
290.70 3 .03 Free Outfall
290.80 3.13 Free Outfall
290.90 3.23 Free Outfall
291.00 3.33 Free Outfall
291.10 3.42 Free Outfall
291.20 3.51 Free Outfall
291.30 3 .60 Free Outfall
291.40 3.69 Free Outfall
291.50 3.78 Free Outfall
291.60 3.86 Free Outfall
291.70 3.94 Free Outfall 1
291.75 3.98 Free Outfall 2 +1
291.80 4.53 Free Outfall 2 +1
291.90 6 .72 Free Outfall 2 +1
292.00 9.81 Free Outfall 2 +1
S/N: HOMOL0863131 KLING ENGINEERING
Page 2.04
Pond Pack Ver: 6-24 -97 :053 Compute Time: 16:25:39 Date: 06 -29-1998
Type .... Pond E-V-Q Table
Name .... POND RT TRIAL 1
File .... E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L181DET.PPK
LEVEL POOL ROUTING DATA
HYG Dir = E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file= L&B1PH2.HYG -det_est1 10 YR
Outflow HYG file= L&B1PH2.HYG -Outfall trial 1 10 YR
Pond Node Data = Vol plan 1
Pond Voll.Ille Data= Vol.Plan 1
Pond Outlet Data = Trial 1b1
No Infilt r ation
INITIAL CONDITIONS
Starting WS Elev
Starting Volune
Starting Outflow
Starting lnfiltr.
Starting Total Qout=
288.90 ft
.000 ac-ft
.00 cfs
.00 cfs
.00 cfs
Time Increment = .0200 hrs
Elevation
ft
Outflow
cfs
Storage
ac-ft
Area
acres
Inf i l t.
cfs
Q Total
cfs
Page 3.01
2S/t + 0
cfs
------------------------------------------------------------------------------
288.90 .00 .000 .0000 .00 .00 .00
289.00 .03 .000 .0029 .00 .03 . 15
289. 10 .10 .001 .0070 .00 .10 .80
289.20 .21 .002 .0129 .00 .21 2. 10
289.30 .36 .003 .0205 .00 .36 4.25
289.40 .54 .006 .0299 .00 .54 7.45
289.50 . 75 .009 .0410 .00 .75 11.93
289.60 .98 .014 .0539 .00 .98 17.88
289.70 1.22 .020 .0685 .00 1.22 25.51
289.80 1.47 .028 .0849 .00 1.47 35.02
289.90 1.73 .037 .1030 .00 1. 73 46.63
290.00 1.99 .048 .1229 .00 1.99 60.55
290. 10 2.20 .061 . 1334 .00 2.20 76.26
290.20 2.36 .075 .1442 .00 2.36 93.21
290.30 2.51 .090 .1555 .00 2.51 111.49
290.40 2.66 .106 .1673 .00 2.66 131.17
290.50 2.80 .124 .1794 .00 2.80 152.27
290.60 2.93 .142 .1920 .00 2.93 174.87
290.70 3.03 .162 .2050 .00 3.03 198.98
290.80 3.13 .183 .2184 .00 3. 13 224.68
290.90 3.23 .206 .2322 .oo 3.23 252.04
291.00 3.33 .230 .2465 .00 3 .33 281.10
291. 10 3.42 .254 .2506 .00 3.42 311. 26
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06 -29-1998
Type .... Pond E·V·Q Table
Name .... POND RT TRIAL 1
File .... E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET .PPK
LEVEL POOL ROUTING DATA
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file= L&B1PH2.HYG -det_est1 10 YR
Outflow HYG file= L&B1PH2.HYG -Outfall trial 1 10 YR
Pond Node Data = Vol plan 1
Pond Volune Data= Vol.Plan 1
Pond Outlet Data = Trial 1b1
No Infiltration
INITIAL CONDITIONS
Starting WS Elev
Starting Volune
Starting Outflow
Starting Infiltr . =
288.90 ft
.000 ac-ft
.00 cfs
.00 cfs
Starting Total Qout= .00 cfs
Time Increment .0200 hrs
Elevation
ft
Outflow
cfs
Storage
ac·ft
Area
acres
Infi l t.
cfs
Q Total
cfs
Page 3.02
2S/t + 0
cfs
------------------------------------------------------------------------------
291.20 3.51 .280 .2547 .00 3.51 341.91
291.30 3.60 .305 .2588 .00 3.60 373.07
291.40 3.69 .331 .2630 .00 3.69 404. 73
291 .50 3.78 .358 .2672 .00 3.78 436.89
291.60 3.86 .385 .2714 .00 3.86 469.57
291. 70 3.94 .412 .2757 .00 3.94 502.75
291. 75 3.98 .426 .2779 .00 3.98 519.54
291.80 4.53 .440 .2800 .00 4.53 536.96
291.90 6.72 .468 .2844 .00 6.72 573.30
292.00 9.81 .497 .2888 .00 9.81 611.06
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24 -97 :053 Compute Time: 16:25:39 Date: 06-29-1998
Type .•.• Pond Routing Surrrnary
Name .••. POND RT TRIAL 1 Tag: 10 YR
File •••. E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L181DET.PPK
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file
Outflow HYG file
L&B1PH2.HYG · det_est1 10 YR
L&B1PH2.HYG · Outfall trial 10 YR
Pond Node Data Vol plan 1
Pond VolLme Data =
Pond Outlet Data
No Infiltration
INITIAL CONDITIONS
Vol.Plan 1
Trial 1b1
----------------------------------
Starting WS Elev 288.90 ft
Starting Vol1..me .000 ac·ft
Starting Outflow .00 cfs
Starting Infil tr. .00 cfs
Starting Total Qout= .00 cfs
Time Increment .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
= 9.24 cfs
3.22 cfs
290.89 ft
.204 ac-ft
at
at
. 1668 hrs
.5068 hrs
=====================================================
MASS BALANCE (ac-ft)
+ Initial Vol = .000
+ HYG Vol IN .305
-Infiltration= .000
-HYG Vol OUT = .305
-Retained Vol .000
Unrouted Vol -.000 ac-ft (.003% of Inflow Volume)
WARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 3.03
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06-29-1998
Type .••. Pond Routing Slnl!lary
Name •••• POND RT TRIAL 1 Tag: 100 YR
File •••. E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
LEVEL POOL ROUTING SUMMARY
HYG Dir = E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file= L&B1PH2.HYG -det_est1
Outflow HYG file L&B1PH2.HYG -Outfall trial
Pond Node Data = Vol plan 1
Pond VollJTle Data =Vol.Plan 1
Pond Outlet Data = Trial 1b1
No Infiltration
INITIAL CONDITIONS
Starting WS Elev 288.90
Starting Vo lune .000
Starting Outflow .00
Starting Infi l tr. = .00
Starting Total Qout= .00
Time Increment = .0200
ft
ac-ft
cfs
cfs
cfs
hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
100 YR
100 YR
=====================================================
Peak Inf low
Peak Outflow
Peak Elevation
Peak Storage =
MASS BALANCE (ac-ft)
12.30 cfs
3.59 cfs
291.29 ft
.304 ac-ft
+ Initial Vol .000
+ HYG Vol IN .423
-Infiltration= .000
-HYG Vol OUT .423
-Retained Vol .000
at
at
• 1668 hrs
.5268 hrs
Unrouted Vol -.000 ac-ft (.002% of Inflow Volume)
WARNING: Inflow hydrograph truncated on left side.
S/N: HOMO L0 863131 KLING ENGINEERING
Page 3.04
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06 -29-1998
Type .••. Pond Routing Sumnary
Name •... POND RT TRIAL 1 Tag: 2 YR
File .••. E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file L&B1PH2.HYG -det_est1 2 YR
Outflow HYG file L&B1PH2.HYG -Outfall trial 2 YR
Pond Node Data Vol plan 1
Pond Volune Data Vol.Plan 1
Pond Outlet Data = Trial 1b1
No Infiltration
INITIAL CONDITIONS
----------------------------------
Starting WS Elev 288.90 ft
Starting Vo lune .000 ac-ft
Starting Outflow .00 cfs
Starting Infiltr. .00 cfs
Starting Total Qout= .00 cfs
Time Increment .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
= 7.09 cfs
2.83 cfs
290.52 ft
.128 ac-ft
at
at
. 1668 hrs
.4468 hrs
=====================================================
MASS BALANCE (ac-ft)
+ Initial Vol = .000
+ HYG Vol IN = .205
-Infiltration .000
-HYG Vol OUT .205
-Retained Vol .000
----·-----
Unrouted Vol = -.000 ac-ft (.005% of Inflow Volume)
WARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 3.05
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06-29-1998
Type •••• Pond Routing Sl.ITITiary
Name •.•. POND RT TRIAL 1 Tag: 25 YR
File ••.• E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file L&B1PH2.HYG -det_est1 25 YR
Outflow HYG file L&B1PH2.HYG -Outfall trial 25 YR
Pond Node Data = Vol plan 1
Pond Vol1.111e Data =Vol.Plan 1
Pond Outlet Data = Trial 1b1
No Infiltration
INITIAL CONDITIONS
Starting WS Elev = 288.90 ft
Starting Vol1.111e .ODO ac-ft
Starting Outflow = .00 cfs
Starting lnfiltr. .00 cf s
Starting Total Qout= .00 cfs
Time Increment .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inf low
Peak Outflow
Peak Elevation
Peak Storage =
= 10.61 cfs
3.38 cfs
291.05 ft
.243 ac-ft
at
at
.1668 hrs
.5068 hrs
=====================================================
MASS BALANCE (ac-ft)
+ Initial Vol .000
+ HYG Vol IN .350
-Infiltration= .000
-HYG Vol OUT .350
-Retained Vol .000
Unrouted Vol = -.000 ac-ft (.003% of Inflow Volume)
WARNING: Inflow hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 3.06
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06-29-1998
Type ..•. Pond Routing Surrrnary
Name .... POND RT TRIAL 1 Tag: 5 YR
File ..•. E:\HAESTAD\PONDPACK\PPK6\YHEELER\L&B1PH2\L1B1DET .PPK
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\YHEELER\L&B1PH2\
Inflow HYG file
Outflow HYG file
= L&B1PH2.HYG -det_est1 5 YR
l&B1PH2.HYG -Outfall trial 5 YR
Pond Node Data = Vol plan 1
Pond Volune Data =Vol .Plan 1
Pond Outlet Data = Trial 1b1
No Inf i ltration
INITIAL CONDITIONS
Starting YS Elev 288.90 ft
Starting Volune .000 ac -ft
Starting Outflow = .OD cfs
Starting Infiltr. = .DO cfs
Starting Total Qout= .00 cfs
Time Increment = .0200 hrs
INFLOY/OUTFLOY HYDROGRAPH SUMMARY
=====================================================
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
8.34 cfs
3.08 cfs
= 290.75 ft
.172ac-ft
at
at
. 1668 hrs
.4868 hrs
=====================================================
MASS BALANCE (ac -ft)
+ Initial Vol .000
+ HYG Vol IN .264
-Infiltrat i on= .000
· HYG Vol OUT = .264
-Retained Vo l .000
Unrouted Vol = -.000 ac -ft (.003% of Inflow Volume)
YARNING: Inflow hydrograph truncated on Left side.
S/N: HOMDL0863131 KLING ENGINEERING
Page 3.07
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06 -29-1998
Type ...• Pond Routing Sunmary
Name .•.. POND RT TRIAL 1 Tag: 50 YR
File •••. E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L181DET.PPK
+
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file
Outflow HYG file
= L&B1PH2.HYG -det_est1 50 YR
L&B1PH2.HYG -Outfall trial 50 YR
Pond Node Data = Vol plan 1
Pond Vollllle Data =Vol.Plan 1
Pond Outlet Data = Trial 1b1
No Infiltration
INITIAL CONDITIONS
Starting WS Elev = 288.90 ft
Starting Vollllle .000 ac -ft
Starting Outflow .00 cfs
Starting Infiltr. .00 cfs
Starting Total a out= .00 cfs
Time Increment = .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
=
=
11. 79 cfs
3.54 cfs
= 291.23 ft
.288 ac-ft
at
at
• 1668 hrs
.5268 hrs
=====================================================
MASS BALANCE (ac-ft)
Initial Vol .000
+ HYG Vol IN .406
-Infiltration = .000
-HYG Vol OUT .406
-Retained Vol .000
--··------
Unrouted Vol = -.000 ac -f t (.002% of Inf low Volume)
WARNING: Inflow hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 3.08
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06-29-1998
Table of Contents
Table of Contents
*********************** PONO ROUTING ***********************
POND RT TRIAL 2 10 YR
Pond Routing Sunmary ··············· 1.01
POND RT TRIAL 2 100 YR
Pond Routing s L1T111a ry .••••..•••••.•. 1.02
POND RT TRIAL 2 2 YR
Pond Routing Surrmary ••.•••••••••.•• 1 .03
POND RT TRIAL 2 25 YR
Pond Routing Sunmary ··············· 1 .04
POND RT TRIAL 2 5 YR
Pond Routing Sunmary ••••••••••••••• 1.05
POND RT TRIAL 2 50 YR
Pond Routing Surrmary ··············· 1.06
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6 -24 -97 :053 Compute Time: 10 :09 :48 Date: 06-26 -1998
Type ...• Pond Routing Sunmary
Name •... POND RT TRIAL 2 Tag: 10 YR
File •••• E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.ppk
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file= L&B1PH2.HYG -det_est1 10 YR
Outflow HYG file L&B1PH2.HYG -Outfall trial 10 YR
Pond Node Data
Pond Volune Data
Pond Outlet Data
No lnfi l tration
INITIAL CONDITIONS
Starting WS Elev
Starting VolL111e
Starting Outflow
Starting lnfiltr.
Vol plan 1
Vol.Plan 1
Trial 1b clogged
= 288.90 ft
.000 ac-ft
.00 cfs
.00 cfs
Starting Total Qout= .00 cfs
Time Increment = .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
=
=
9.24 cfs
.00 cfs
= 291.30 ft
.305 ac-ft
at
at
. 1668 hrs
.0268 hrs
=====================================================
MASS BALANCE (ac -ft)
+ Initial Vol
+ HYG Vol IN
-lnfi l trat i on
-HYG Vol OUT
-Retained Vol
Unrouted Vol
.000
.305
.000
.000
.305
-.000 ac-ft (.001% of Inflow Volume)
WARNING: Inflow hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 1 .01
Pond Pack Ver: 6-24-97 :053 Compute Time: 10:09:48 Date: 06 -26-1998
Type .... Pond Routing Surmary
Name .... POND RT TRIAL 2 Tag: 100 YR
File .... E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.ppk
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file L&B1PH2.HYG -det_est1 100 YR
Outflow HYG file L&B1PH2.HYG -Outfall trial 100 YR
Pond Node Data = Vol plan
Pond Volune Data= Vol.Plan
Pond Outlet Data = Trial 1b clogged
No Infiltration
INITIAL CONDITIONS
Starting WS Elev 288.90 ft
Starting Volune .000 ac-ft
Starting Outflow .00 cfs
Starting Infiltr. .00 cfs
Starting Total Qout= .00 cfs
Time Increment .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
= 12.30 cfs
.00 cfs
= 291. 74 ft
.423 ac-ft
at
at
. 1668 hrs
.0268 hrs
=====================================================
MASS BALANCE (ac-ft)
+ Initial Vol .000
+ HYG Vol IN .423
-Infiltration= .000
-HYG Vol OUT .000
-Retained Vol = .423
Unrouted Vol = -.000 ac-ft (.001% of Inflow Volume)
WARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 1.02
Pond Pack Ver: 6-24-97 :053 Compute Time: 10:09:48 Date: 06-26-1998
Type .... Pond Routing Sunmary
Name .... POND RT TRIAL 2 Tag: 2 YR
File ..•. E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.ppk
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file
Outflow HYG file
L&B1PH2.HYG -det_est1 2 YR
= L&B1PH2.HYG -Outfall trial 2 YR
Pond Node Data = Vol plan
Pond Voli..rne Data Vol.Plan
Pond Outlet Data = Trial 1b clogged
No Inf ilt ration
INITIAL CONDITIONS
Starting WS Elev = 288.90 ft
Starting Voll.Ille .000 ac-ft
Starting Outflow .00 cfs
Starting Infiltr. .00 cfs
Starting Total Qout= .00 cfs
Time Increment .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
= 7.09 cfs
.00 cfs
290.90 ft
.205 ac -ft
at
at
.1668hrs
.0268 hrs
=====================================================
MASS BALANCE (ac-ft)
+ Initial Vol .000
+ HYG Vo l IN = .205
-Infiltration= .000
-HYG Vol OUT .000
-Retained Vol = .205
Unrouted Vol = -.000 ac-ft (.008% of Inflow Volume)
WARNING: Inflow hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 1.03
Pond Pack Ver: 6-24-97 :053 Compute Time: 10:09:48 Date: 06-26-1998
Type .••• Pond Routing SU1T111ary
Name .••. POND RT TRIAL 2 Tag: 25 YR
File •••. E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.ppk
LEVEL POOL ROUTING SUMMARY
HYG Dir = E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file= L&B1PH2.HYG · det _est1 25 YR
Outflow HYG file= L&B1PH2.HYG · Outfall trial 25 YR
Pond Node Data Vol plan 1
Pond Voll.Jlle Data= Vol.Plan 1
Pond Outlet Data = Trial 1b clogged
No Infiltration
INITIAL CONDITIONS
Starting WS Elev 288.90 ft
Starting Voll.Jlle = .000 ac·ft
Starting Outflow .00 cfs
Starting Jnfiltr. .00 cfs
Starting Total oout= .00 cfs
Time Increment .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
10.61 cfs
.00 cfs
= 291.47 ft
.350 ac·ft
at
at
.1668 hrs
.0268 hrs
=====================================================
MASS BALANCE (ac·ft)
+ Initial Vol .000
+ HYG Vol IN = .350
· Infiltration= .000
· HYG Vol OUT .000
· Retained Vol = .350
Unrouted Vol = -.000 ac·ft (.013% of Inflow Volume)
WARNING: Inflow hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 1.04
Pond Pack Ver: 6·24-97 :053 Compute Time: 10:09:48 Date: 06-26-1998
Type .... Pond Routing Si..umary
Name .... POND RT TRIAL 2 Tag: 5 YR
File .... E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.ppk
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file L&B1PH2.HYG -det_est1 5 YR
Outflow HYG file L&B1PH2.HYG -Outfall trial 5 YR
Pond Node Data = Vol plan 1
Pond Volune Data= Vol.Plan 1
Pond Outlet Data = Trial 1b clogged
No Infiltration
INITIAL CONDITIONS
Starting WS Elev 288.90 ft
Starting Volune = .000 ac-ft
Starting Out fl ow = .00 cfs
Starting Infiltr. .00 cfs
Starting Total Qout= .00 cfs
Time Increment .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
8.34 cfs
.oo cfs
= 291. 14 ft
.264 ac-ft
at
at
. 1668 hrs
.0268 hrs
=====================================================
MASS BALANCE (ac -ft)
+ Initial Vol .000
+ HYG Vol IN .264
-Infiltration= .000
-HYG Vol OUT .000
-Retained Vol .264
Unrouted Vol -.000 ac-ft (.01'7°1. of Inflow Volume)
WARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 1.05
Pond Pack Ver: 6-24-97 :053 Compute Time: 10:09:48 Date: 06-26-1998
Type .... Pond Routing Sunmary
Name .... POND RT TRIAL 2 Tag: 50 YR
File .... E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.ppk
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file= L&B1PH2.HYG · det_est1 50 YR
Outflow HYG file= L&B1PH2.HYG · Outfall trial 50 YR
Pond Node Data
Pond Volt.me Data =
Pond Outlet Data
No Infiltration
INITIAL CONDITIONS
Starting WS Elev
Starting Volt.me
Starting Outflow
Starting Jnfiltr.
Vol plan 1
Vol .Plan 1
Trial 1b clogged
288.90 ft
.000 ac·ft
.00 cfs
= .00 cfs
Starting Total Qout= .00 cfs
Time Increment .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inf low
Peak Outflow
Peak Elevation
Peak Storage =
11. 79 cfs
.oo cfs
= 291.68 ft
.406 ac·ft
at
at
. 1668 hrs
.0268 hrs
=====================================================
MASS BALANCE (ac ·f t)
+ Initial Vol = .000
+ HYG Vo l IN .406
· Infiltration= .000
· HYG Vol OUT .000
· Retained Vol .406
Unrouted Vol ·.000 ac·ft (.010% of Inflow Volume)
WARNING: Inflow hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 1.06
Pond Pack Ver: 6·24 ·97 :053 Compute Time: 10:09:48 Date: 06 ·26-1998
Appendix A A-1
index of Starting Page NlJ'Tlbers for ID Names
1.06
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24-97 :053 Compute Time: 10:09:48 Date: 06-26-1998
Drainage Report
FOR
BA YMONT INN AND SUITES
LOT ONE, BLOCK ONE,
WHEELER SUBDIVISION PHASE TWO
VICINITY MAP
NTS
OCTOBER , 1998
Prepared By:
McClure Engineering, Inc.
1722 Broadmoor Drive, Suite 210
Bryan, Texas 77802
( 409) 776-6700
Drainage Report
FOR
BA YMONT INN AND SUITES
LOT ONE, BLOCK ONE,
WHEELER SUBDIVISION PHASE TWO
VICINITY MAP
NTS
OCTOBER, 1998
Prepared By:
McClure Engineering, Inc.
1722 Broadmoor Drive, Suite 210
Bryan, Texas 77802
( 409) 776 -6700
CERTIFICATION
I , Joel J. Mitchell, Registered Professional Engineer No. 80649 , State of Texas, certify
that this report for the drainage design for the BA YMONT INN AND SUITES Project, Lot
One, Block One of the Wheeler Subdivision, Phase Two , was prepared by me in accordance
with the provisions of the City of College Station Drainage Policy and Design Standards for
~~''"''""· the owners thereof ~--:..r. O.f TE;~\\,
T ~~r;··· ···-.-z.s> ''• if*·· * · ... ,. ~* • • *fA •.. : .............. ~··2 Z JOEL J. MITCHELL 2 Z,···~··············· .. l '\·.~ 80649 ~<>l$1 .,OA.•fG1s~~.·~<cfl '·~~:······~,~~ '~~'lONA\.. ~" -,~,~411P
DRAINAGE REPORT
BA YMONT INN AND SUITES
'tchell, P.E. No. 80649
TABLE OF CONTENTS
BAYMONT INN AND SUITES
INTRODUCTION 1
GENERAL LOCATION AND DESCRIPTION 1
PRIMARY & SECONDARY DRAINAGE BASIN DESCRIPTION 2
DRAINAGE DESIGN CRITERIA 2
STORM DRAIN FACILITY DESIGN 2
DETENTION FACILITY DESIGN 3
CONCLUSION 4
TABLE OF EXHIBITS
EXCERPT FROM FLOOD INSURANCE RATE MAP "A"
EXISTING CONDITION DRAINAGE AREA MAP "B-1"
PROPOSED CONDITION DRAINAGE AREA MAP "B-2"
RATIONAL FORMULA DRAINAGE AREA CALCULATIONS "C-1"
INLET COMPUTATIONS "C-2"
PIPE SIZE CALCULATIONS "C-3"
FLUME CALCULATIONS "C-4"
PROPOSED DETENTION POND ROUTING "D-1"
HYDROGRAPHS "D-2"
STAGE-STORAGE/STAGE DISCHARGE TABLE "D-3"
DRAINAGE REPORT ll
BA YMONT INN AND SUITES
DRAINAGE REPORT
BA YMONT INN AND SUITES
INTRODUCTION:
The purpose ofthis report is to study potential drainage effects from the proposed Baymont
Inn and Suites. Results from the analysis of existing conditions and proposed improvements are
provided to show that the final design accomplishes the objectives of the City of College Station
Drainage Policy and Design Standards (DPDS) by controlling runoff from this site.
GENERAL LOCATION AND DESCRIPTION:
The two-acre site is located in the Wheeler Subdivision which is located at the southwestern
comer of the intersection ofUniversity Drive and Lincoln Drive. The property is platted as Lot One,
Block One, Wheeler Subdivision Phase Two. Bordering the site is Quality Suites on the west, an
undeveloped tract on the east, and an unnamed tributary of Burton Creek to the south. The site is
wooded with a gentle, rolling terrain with an average slope of 4.5% to 5.0% to the southeast. No
extension of public roadways or storm drains is anticipated for this project.
This property is not located in a 100-Year Flood Hazard Area according to the Flood
Insurance Rate Maps for Brazos County, Texas and Incorporated Areas, Map No. 48041C142 C
effective July 2, 1992 as prepared by the Federal Emergency Management Agency (See Exhibit "A").
The tnbutary that this site drains into is designated as Zone A. In conjunction with this plat
a detailed floodplain analysis was performed for the tributary by Kling Engineering and Surveying
(Kling.) The analysis includes realignment of the tributary and construction of a channel to contain
the 100-year event within a platted drainage easement. The detailed study shows that with the
DRAINAGE REPORT 1
BA YMONT INN AND SUITES
realignment, the property is not located in a 100-Y ear Flood Hazard Area For additional information
refer to "Floodplain Analysis for East Tnbutary to Burton Creek Just Above Confluence with Carters
Creek" dated June 1998 prepared by Kling.
PRIMARY & SECONDARY DRAINAGE BASIN DESCRIPTION:
The primary drainage basin for the site is Burton Creek, which is a tributary of Carters Creek.
Storm water from this site presently drains into a tributary of Burton Creek to the south of the site.
DRAINAGE DESIGN CRITERIA:
The proposed drainage system is designed in accordance with the City of College Station
DPDS. The design storm is a 10-year event and flow calculations are based on the Rational Method.
Pipe sizes were determined from Manning's Equation using an "n" of 0.014. Required storage
volume for the detention pond was developed using a triangular hydrograph (base= 3* Tc).
The pre-development area used for the study is the present day condition as depicted in
Exhibit "B-1." Exhibit "B-2" shows the proposed development and the location of the proposed
detention facility on the site.
STORM DRAIN FACILITY DESIGN:
Storm water from the proposed development will be captured in the curbs and gutters of the
hotel parking lot. The curbs will convey the storm to the two curb inlets and into the storm drainage
system The storm drain system will convey the water by reinforced concrete pipe to the detention
facility . Exhibit "C-1" provides the calculations for the drainage areas shown in Exhibit "B-2."
A 4' concrete flume will be constructed along the western property line. This flume is
DRAINAGE REPORT 2
BA YMONT INN AND SUITES
-
necessary to capture Storm water runoff from the Quality Suites s ite . Storm water from the Quality
Suites site is diverted onto the Baymont site. The flume will corr ect this problem by conveying the
Storm water to the existing tributary instead of across the Baymo nt site. The design o f the flume
is documented in Exhibit "C-4 ". Note that the Q5/3 is conveyed o n a low flow channel and the Q25
is conveyed with more than 0.5' of freeboard per the ordinance r equirements. The flows used for
e Quality Suites Drainage Report. sizing this flume are the linear summation of the flows shown in th
DETENTION FACILITY DESIGN:
te detention facility and drainage The proposed detention facility will be located in a priva
easement located south of the site. The outlet structure will be a 12" RC.P. that will discharge into
the realigned channel Exhibits "D-1" and "D-2" show the routing s and hydrographs for the various
design storms.
The following summary tables show the pre-development and post-development flows at the
study point.
II) . >.
' ' ·Study Point 1 (P_orid Outfa
Design Event Pre-Development Post-Develop ment Water Surface Elev.
11 cfs 8 cfs 287 .6
13 cfs 8 cfs 287.8
14 cfs 9 cfs 288.1
16 cfs 9 cfs 288.3
18 cfs 10 cfs 288 .5
Top of Berm = 290.00
As required, post-development runoff rates from all design storms (5 , 25 , 50 and 100-year)
DRAINAGE REPORT 3
BA YMONT INN AND SUITES
are less than or equal to corresponding pre-development runoff rates.
The analysis provided does not account for the tailwater condition of the channel. The pond
is adequately oversized such that while the channel is flowing full, the pond will store the runoff from
the site until such time that the elevation in the pond is higher than the elevation in the channel,
driving the water back into the channel.
CONCLUSION:
For all of the design events , the post-development runoff does not exceed the pre-
development runoff. The 100-year event is contained in the detention pond and released into the
realigned channel. The drainage design for this site meets the requirements as stated in the City of
College Station Drainage Policy and Design Standards.
DRAINAGE REPORT 4
BA YMONT INN AND SUITES
ZONEX
o-• JOINS PANEL 0144
City of College
480083
EXHIBIT A
Flood Insurance Rate M
8
ap Excerpt
razos County T • exas
and Incorporated Areas
Map Numbers: 48041C0142C
Effective Date: July. 2, 1992
EXHIBIT C-1 Rational Formula Drainage Area Calculations Baymont Inn and Suites r <1'. l 3: 3: W 0 I 0 0 > > a::: ...J ...J > > <1'. <1'. ~ ...J u. u. 0 0 w w 0 ~ I-0 0 ...J ...J c.9 a::: ...J 1-z <1'.z z u. u. >-<1'. <1'. w ~ w u <1'.:::c: <1'. a::::::c: a::: !::: 0 Z ...J > :!!: ...J ....l1-....l WI-W U 1--<1'. w <1'. e w <1'. a::: c.9 a::: ...J 1-c.9 1-...J •o . ~ <1'. 1-ow C/l > 1-wz W...J 1-z 1-...J ...J EI LI a::: o za::: w <1'. o >w ><t =>w =>ct w 111 ' o 1-::::><1'. a::: a.. 1-0...J Ou. c.9...J c.9u. > U : J ? ) ll) !:::! ll) N 0 0 !!? 0 ll) 0 0 0 ..... 0 0 ..... 0 NO. AC. 0.4 0.55 0.95 ft. ft. ft. ft. ft/s min min In/Hr cfs In/Hr cfs In/Hr cfs In/Hr cfs In/Hr cfs In/Hr cfs 1 I 1.041 0.29! 0.001 0.7510.831105.0I 5.01285.0I 6.01 2.31 2.81 5.01 8.221 6.81 9.91 8.21 11.0I 9.11 12.5110.41 14.1111.71 15.8113.1 2 I 0.941 0.131 0.001 0.8110.821 78.0I 5.0l 385.0I 11.ol 2.91 2.61 5.01 8.221 6.81 9.91 8.11 11.0I 9.01 12.5110.31 14.1111.61 15.8113.0 3 I 0.281 0.14i 0.001 0.1410.191110.0I 5.0l 100.0I 5.01 2.21 1.61 5.01 8.221 1.61 9.91 1.91 11.01 2.11 12.51 2.41 14.11 2.71 15.81 3.0 Ex I 2.871 2.87i 0.001 0.0011.151390.0I 18.0I 1.01 1.01 1.51 4.31 5.01 8.221 9.41 9.9111.31 11.0112.61 12.5114.41 14.1116.21 15.8118.1 ,_Pro_e_L2.4~ 0.91j 0.0~56j1.85j 1050j 5.0j 500.0j 4.8J 1.9j 5.4j 5.4j 8.01j14.8j 9.6j17.7j 10.7j19.Bj 12.2j22.5j 13.Bj25.4j 15.4j28.5j ,____....._ --l---+------l --+--+-~-I 1---1----+-' ---I 10/14/98 9815dra.xls Exhibit C-1
m~ x -" -" :!. ~ ~ 2: ..., -i. ...... ll> c..> () x co N Ci) CD tv ~ "° 0 0 0 "° 0 tv 00 -iv ~ tv "° 0 ~ "' "' a. t'"' ~ '"ti 0 s· -e: i:P. tv w w w 00 -..J VI 0 -~ "° -0 0 "° -tv 00 -iv ~ -~ -~ "' "' a. t'"' ~ '"ti 0 :r -5' [ tv w w w \o 0 VI 0 n ~ n ~ ~ = c ., O" ~ 1:1 = ;" .... ::!! n C) ~ ~ .... ~ l'D ~ I 1:1 = ;" .... "' ..c I = DRAINAGE AREA NO. Overflow Drainage Area Drainage area Q Q Carry Over Total Q at Inlet Street Width Required Street Slope(%) Inlet No. Total Q at Inlet ~ t_!l!j 00 (i ~ ~ ~ 0 z CAP. Per L.F. L. Reqd. L. Provided Q Carry Over Ponded Depth CAP. Per S.F. Area Required Area Provided m-i» z '< r m 3 -Im g 0 >< r+ 0 ::I: -3: -5 'ti ~ D) c -I ::s -I 0 Q. )> I -I N en -5. 0 r+ z m en
e < 0 i.. E-4 u 0 z ~ -~ ~ 00
E-4 ~ ~ = ~ Oil
~ ·;; 0 0 ~ {,) ~
E-4 E-4 E-4 Q
# # Ac. min yr
1 2 0.8 5.0 10
2 Pond 1.7 5.3 10
*Includes 25% Flow Increase for pipe sizes <2T' dia.
EXHIBIT C-3
PIPE SIZE CALCULATIONS
Baymont Inn and Suites
= .~ = « "' ~ Oil «
Q ·;;; ~ ~
~ Q. Q.
"'O Q "' .... 0 ~ ~ ~ Q. 00 -"'O i.. "' ~ ~ ~ = = -~ 0 ..... "' « ~ .... "'O ~ .:. ~ 0 ~ -= {,)
= 0 "'O 0 0 0 "i: -< fi: fi: ~ ~ z ~
cfs cfs # cfs O/o
9.1 11.4 1 11.4 3.58
17.8 22.2 1 22.2 5.17
**See Plan & Profile for pipe slope used (Pipe slope >or= Friction slope)-
~ ~ ~ ~ z
S:3 ~ ~
00 ~
II fps '
15 9.3 187
18 12 .6 17
~ e "'O E::: = ~ ~ ~
> @ s = i.. {,) ~ E-4 E-4
min min '
0.34 5.34
0.02 5.36
10/13/98
9815dra .xls
Exhibit C-3
E-4
~
~
~
'
Input Data Output Data
w= (ft) 3.33 depth (ft)= 0.3
Rt. Slope(: 1) O Area (ft2) 0.9
Lt . Slope(: 1) o WP= 3.9
N= 0.014 R= 0.2
Q(cfs)= 4.8 Q= 4.8
Slope(%)= 1.600% depth (ft)= 0.28
error(%) 0.050 % V(fps)= 5.2
Fn= 1.72932509
Baymont Inn and Suites
Exhibit C-4
Flume Calculations
Input Data
w= (ft)
Rt. Slope (:1)
Lt. Slope (: 1)
N=
Q(cfs)=
Slope(%)=
error(%)
3.33
0.00
0.00
0.014
18.1
0.016
0.050 %
Output Data
depth (ft)= o. 7
Area (ft2) 2.2
WP= 4.7
R= 0.5
Q= 18 .1
depth (ft)= 0.66
V(fps)= 8.2
Fn= 1.771674
D.A. # D.A.# :ii: .J::. ·c 0. w "' .. z Cl iii 0 .. 0. ::!:: "C 0 >. .. 0 ::t: Q. () Qp 17.7 Tc 5.4 inc 1.0 Time cfs cfs 0.0 0.0 0.0 1.0 3.3 3.3 2.0 6.5 6.5 3.0 9.8 9.8 4.0 13.1 13.1 5.0 16.3 16.3 6.0 16.8 16.8 7.0 15.2 15.2 8.0 13.5 13.5 9.0 11.9 11.9 10.0 10.3 10.3 11.0 8.6 8.6 12.0 7.0 7.0 13.0 5.4 5.4 14.0 3.7 3.7 15.0 2.1 2.1 16.0 0.5 0.5 17.0 0.0 0.0 18.0 0.0 0.0 19.0 0.0 0.0 20.0 0.0 0.0 21.0 0.0 0.0 22.0 0.0 0.0 23.0 0.0 0.0 24.0 0.0 0.0 25.0 0.0 0.0 26.0 0.0 0.0 27.0 0.0 0.0 28.0 0.0 0.0 29.0 0.0 0.0 30.0 0.0 0.0 31.0 0.0 0.0 32.0 0.0 0.0 33.0 0.0 0.0 34.0 0.0 0.0 35.0 0.0 0.0 36.0 0.0 0.0 37.0 0.0 0.0 PEAK FLOWS 17 17 0.00 indicates inital condition EXHIBIT "D-1" PROPOSED DETENTION POND ROUTING Baymont Inn and Suites Pond RoutinQ EVENT= 5 D.A.# c: a t. c: c: 32 .2 .... 2 + .... .... "C ~ c: 32 + + + c: C: GI (/) (/) c: 0-c: N N a Q. w .., 1.9 5.0 cfs cfs cfs cfs ft cfs 3.27 0.00 0.00 0.00 285.1 0.0 9.80 0.30 3.27 1.48 285.4 0.4 16.34 1.71 10.10 4.20 286.0 0.7 22.87 9.06 18.05 4.49 286.2 1.1 29.41 21.93 31.94 5.00 286.4 1.5 33.15 39.90 51.34 5.72 286.8 1.9 31.99 60.63 73.05 6.21 287.1 1.7 28.72 79.75 92.62 6.44 287.3 1.5 25.46 95.23 108.47 6.62 287.4 1.3 22.19 107.17 120.69 6.76 287.5 1.1 18.92 115.64 129.36 6.86 287.6 0.9 15.65 120.72 134.56 6.92 287.6 0.7 12.39 122.48 136.37 6.94 287.6 0.6 9.12 121.02 134.87 6.93 287.6 0.4 5.85 116.40 130.14 6.87 287.6 0.2 2.58 108.69 122.25 6.78 287.5 0.0 0.48 97.98 111.28 6.65 287.4 0.0 0.00 85.44 98.45 6.50 287.3 0.0 0.00 72.74 85.44 6.35 287.2 0.0 0.00 60.33 72.74 6.21 287.1 0.0 0.00 48.23 60.33 6.05 287.0 0.0 0.00 37.01 48.23 5.61 286.8 0.0 0.00 26.63 37.01 5.19 286.5 0.0 0.00 17.02 26.63 4.81 286.3 0.0 " 0.00 8.11 17.02 4.45 286.2 0.0 0.00 0.74 8.11 3.68 285.9 0.0 0.00 0.07 0.74 0.34 285.2 0.0 0.00 0.01 0.07 0.03 285.1 0.0 0.00 0.00 O.D1 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 7 287.6 2 c w (/) ..J 0 ct Q. I-0 0 a: I-Q. cfs 0.00 1.86 4.94 5.61 6.50 7.59 7.89 7.93 7.93 7.88 7.80 7.67 7.50 7.30 7.06 6.78 6.65 6.50 6.35 6.21 6.05 5.61 5.19 4.81 4.45 3.68 0.34 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 D.A. # >< w 11.3 5.0 cfs 0.0 2.3 4.5 6.8 9.0 11.3 10.2 9.0 7.9 6.8 5.7 4.5 3.4 2.3 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11 9815dra.xls Exhibit D-1 (!) ..J z ct i:: I-!!? g 1i'.i cfs 0.00 2.26 4.52 6.79 9.05 11.31 10.18 9.05 7.92 6.79 5.65 4.52 3.39 2.26 1.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11
D.A.# D.A. # 'It .&: c c.. w .,, ... z Cl iii 0 ... c.. :: "C 0 >-... 0 :c Q.. (.) Qp 19.8 Tc 5.4 inc 1.0 Time cfs cfs 0.0 0.0 0.0 1.0 3.6 3.6 2.0 7.3 7.3 3.0 10.9 10.9 4.0 14.6 14.6 5.0 18.2 18.2 6.0 18.8 18.8 7.0 16.9 16.9 8.0 15.1 15.1 9.0 13.3 13.3 10.0 11.5 11.5 11.0 9.6 9.6 12.0 7.8 7.8 13.0 6.0 6.0 14.0 4.2 4.2 15.0 2.4 2.4 16.0 0.5 0.5 17.0 0.0 0.0 18.0 0.0 0.0 19.0 0.0 0.0 20.0 0.0 0.0 21.0 0.0 0.0 22.0 0.0 0.0 23.0 0.0 0.0 24.0 0.0 0.0 25.0 0.0 0.0 26.0 0.0 0.0 27.0 0.0 0.0 28.0 0.0 0.0 29.0 0.0 0.0 30.0 0.0 0.0 31.0 0.0 0.0 32.0 0.0 0.0 33.0 0.0 0.0 34.0 0.0 0.0 35.0 0.0 0.0 36.0 0.0 0.0 37.0 0.0 0.0 PEAK FLOWS 19 19 0. 00 indicates inital condition EXHIBIT "D-1" PROPOSED DETENTION POND ROUTING Baymont Inn and Suites Pond Routina EVENT= 10 D.A.# c a t. c c: 32 .2 ..... a + .:. ..... ..... "C 1;j c: + + ~ c + c: > I/) "' c 0 ..!! c: N N a Q.. w .., 2.1 5.0 cfs cfs cfs cfs ft cfs 3.64 0.00 0.00 0.00 285.1 0.0 10.93 0.33 3.64 1.66 285.5 0.4 18.22 2.79 11.27 4.24 286.0 0.8 25.51 11.81 21.01 4.60 286.2 1.2 32.80 26.92 37.32 5.20 286.5 1.7 36.98 47.66 59.72 6.03 287.0 2.1 35.68 71.95 84.64 6.34 287.2 1.9 32.04 94.42 107.63 6.61 287.4 1.7 28.40 112.80 126.46 6.83 287.5 1.5 24.75 127.20 141.20 7.00 287.7 1.2 21.11 137.70 151.95 7.12 287.7 1.0 17.46 144.40 158.81 7.20 287.8 0.8 13.82 147.39 161.87 7.24 287.8 0.6 10.17 146.75 161.21 7.23 287.8 0.4 6.53 142.56 156.92 7.18 287.8 0.2 2.88 134.90 149.08 7.09 287.7 0.0 0.53 123.87 137.79 6.96 287.6 0.0 0.00 110.79 124.40 6.80 287.5 0.0 0.00 97.50 110.79 6.65 287.4 0.0 0.00 84.52 97.50 6.49 287.3 0.0 0.00 71.83 84.52 6.34 287.2 0.0 0.00 59.44 71.83 6.19 287.1 0.0 0.00 47.40 59.44 6.02 287.0 0.0 0.00 36.25 47.40 5.57 286.7 0.0 0.00 25.93 36.25 5.16 286.5 0.0 0.00 16.37 25.93 4.78 286.3 0.0 0.00 7.51 16.37 4.43 286.1 0.0 0.00 0.69 7.51 3.41 285.8 0.0 0.00 0.06 0.69 0.31 285.2 0.0 0.00 0.01 0.06 0.03 285.1 0.0 0.00 0.00 0.01 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 0.00 0.00 0.00 0.00 285.1 0.0 7 287.8 2 c w I/) ..J 0 ct Q.. ..... 0 0 D:: ..... Q.. cfs 0.00 2.07 5.07 5.85 6.87 8.11 8.22 8.27 8.28 8.25 8.16 8.04 7.86 7.65 7.39 7.09 6.96 6.80 6.65 6.49 6.34 6.19 6.02 5.57 5.16 4.78 4.43 3.41 0.31 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 D.A.# )( w 12.6 5.0 cfs 0.0 2.5 5.0 7.6 10.1 12.6 11.3 10.1 8.8 7.6 6.3 5.0 3.8 2.5 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 13 9815dra.xls Exhibit D-1 0 ..J z ct I= ..... !!? 0 )( ..... w cfs 0.00 2.52 5.04 7.56 10.09 12.61 11.35 10.09 8.82 7.56 6.30 5.04 3.78 2.52 1.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13
D.A. # D.A. # 'II: .c. ·c Q. w "' Ci z iii 0 ... Q. :?: "C 0 0 >. ... ::c a. 0 Qp 22.5 Tc 5.4 inc 1.0 Time cfs cfs 0.0 0.0 0.0 1.0 4.2 4.2 2.0 8.3 8.3 3.0 12.5 12.5 4.0 16.6 16.6 5.0 20.8 20.8 6.0 21.4 21.4 7.0 19.3 19.3 8.0 17.2 17.2 9.0 15.1 15.1 10.0 13.1 13.1 11.0 11.0 11.0 12.0 8.9 8.9 13.0 6.8 6.8 14.0 4.8 4.8 15.0 2.7 2.7 16.0 0.6 0.6 17.0 0.0 0.0 18.0 0.0 0.0 19.0 0.0 0.0 20.0 0.0 0.0 21.0 0.0 0.0 22.0 0.0 0.0 23.0 0.0 0.0 24.0 0.0 0.0 25.0 0.0 0.0 26.0 0.0 0.0 27.0 0.0 0.0 28.0 0.0 0.0 29.0 0.0 0.0 30.0 0.0 0.0 31.0 0.0 0.0 32.0 0.0 0.0 33.0 0.0 0.0 34.0 0.0 0.0 35.0 0.0 0.0 36.0 0.0 0.0 37.0 0.0 0.0 PEAK FLOWS 21 21 0. 00 indicates inital condition EXHIBIT "D-1" PROPOSED DETENTION POND ROUTING Baymont Inn and Suites Pond Routing EVENT= 25 D.A. # c: a t. c: c: .... g :!;! 0 ;; + .... .... "C "' c: :!;! + + c: > + c: c: 0 .!! (/) (/) c: N N a a. w .., 2.4 5.0 cfs cfs cfs cfs ft cfs 4.15 0.00 0.00 0.00 285.1 0.0 12.46 0.38 4.15 1.89 285.5 0.5 20.76 4.24 12.84 4.30 286.1 0.9 29.06 15.51 25.00 4.75 286.3 1.4 37.37 33.63 44.57 5.47 286.7 1.9 42.12 58.63 70.99 6.18 287.1 2.4 40.65 87.69 100.75 6.53 287.3 2.1 36.50 114.64 128.34 6.85 287.5 1.9 32.35 136.91 151.14 7.11 287.7 1.7 28.20 154.61 169.26 7.32 287.9 1.4 24.04 167.85 182.81 7.48 288.0 1.2 19.89 176.80 191.89 7.54 288.0 0.9 15.74 181.55 196.70 7.57 288.1 0.7 11.59 182.14 197.29 7.58 288.1 0.5 7.44 178.62 193.73 7.55 288.0 0.2 3.28 171.04 186.05 7.51 288.0 0.0 0.60 159.55 174.32 7.38 287.9 0.0 0.00 145.72 160.16 7.22 287.8 0.0 0.00 131.62 145.72 7.05 287.7 0.0 0.00 117.85 131.62 6.89 287.6 0.0 0.00 104.39 117.85 6.73 287.5 0.0 0.00 91.25 104.39 6.57 287.4 0.0 0.00 78.41 91.25 6.42 287.2 0.0 0.00 65.86 78.41 6.27 287.1 0.0 p 0.00 53.61 65.86 6.13 287.0 0.0 0.00 42.01 53.61 5.80 286.9 0.0 0.00 31.25 42.01 5.38 286.6 0.0 0.00 21.30 31.25 4.98 286.4 0.0 0.00 12.08 21.30 4.61 286.2 0.0 0.00 3.54 12.08 4.27 286.1 0.0 0.00 0.32 3.54 1.61 285.5 0.0 0.00 0.03 0.32 0.15 285.1 0.0 0.00 0.03 0.03 0.00 285.1 0.0 0.00 0.03 0.03 0.00 285.1 0.0 0.00 0.03 0.03 0.00 285.1 0.0 0.00 0.03 0.03 0.00 285.1 0.0 0.00 0.03 0.03 0.00 285.1 0.0 0.00 0.03 0.03 0.00 285.1 0.0 8 288.1 2 c w (/) ..J 0 ct a. I-0 0 a:: I-a. cfs 0.00 2.36 5.25 6.17 7.37 8.56 8.66 8.75 8.77 8.75 8.67 8.49 8.28 8.05 7.79 7.51 7.38 7.22 7.05 6.89 6.73 6.57 6.42 6.27 6.13 5.80 5.38 4.98 4.61 4.27 1.61 0.15 0.00 0.00 0.00 0.00 0.00 0.00 9 D.A. # )( w 14.4 5.0 cfs 0.0 2.9 5.7 8.6 11.5 14.4 12.9 11.5 10.0 8.6 7.2 5.7 4.3 2.9 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14 9815dra.xts Exhibit D-1 C) ..J z ct I= I-!12 0 >< I-w cfs 0.00 2.87 5.74 8.61 11.49 14.36 12.92 11.49 10.05 8.61 7.18 5.74 4.31 2.87 1.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14
D.A. # D.A.# 'II: .c. c a. w IG z ... Cl iii 0 ... a. :: ,, 0 0 >-~ J: 0 Qp 25.4 Tc 5.4 Inc 1.0 Time cfs cfs 0.0 0.0 0.0 1.0 4.7 4.7 2.0 9.4 9.4 3.0 14.0 14.0 4.0 18.7 18.7 5.0 23.4 23.4 6.0 24.1 24.1 7.0 21.7 21.7 8.0 19.4 19.4 9.0 17.1 17.1 10.0 14.7 14.7 11.0 12.4 12.4 12.0 10.0 10.0 13.0 7.7 7.7 14.0 5.4 5.4 15.0 3.0 3.0 16.0 0.7 0.7 17.0 0.0 0.0 18.0 0.0 0.0 19.0 0.0 0.0 20.0 0.0 0.0 21.0 0.0 0.0 22.0 0.0 0.0 23.0 0.0 0.0 24.0 0.0 0.0 25.0 0.0 0.0 26.0 0.0 0.0 27.0 0.0 0.0 28.0 0.0 0.0 29.0 0.0 0.0 30.0 0.0 0.0 31.0 0.0 0.0 32.0 0.0 0.0 33.0 0.0 0.0 34.0 0.0 0.0 35.0 0.0 0.0 36.0 0.0 0.0 37.0 0.0 0.0 PEAK FLOWS 24 24 0.00 indicates inital condition EXHIBIT "D-1" PROPOSED DETENTION POND ROUTING Baymont Inn and Suites Pond Routina EVENT= 50 D.A. # c: a t. c: c: 32 .2 ... ~ + ... ... ,, ~ c: + + c: + C: GI (/) (/) c: 0-.5 N N a a. w .., 2.7 5.0 cfs cfs cfs cfs ft cfs 4.68 0.00 0.00 0.00 285.1 0.0 14.04 0.43 4.68 2.13 285.6 0.5 23.41 5.76 14.47 4.36 286.1 1.1 32.77 19.36 29.16 4.90 286.4 1.6 42.13 40.63 52.13 5.75 286.8 2.1 47.50 70.12 82.76 6.32 287.2 2.7 45.84 104.17 117.62 6.73 287.5 2.4 41.15 135.80 150.00 7.10 287.7 2.1 36.47 162.13 176.96 7.41 287.9 1.9 31.79 183.44 198.60 7.58 288.1 1.6 27.11 199.86 215.23 7.68 288.2 1.3 22.43 211.47 226.98 7.75 288.2 1.1 17.75 218.32 233.90 7.79 288.2 0.8 13.07 220.46 236.07 7.80 288.3 0.5 8.39 217.94 233.52 7.79 288.2 0.3 3.70 210.83 226.33 7.75 288.2 0.0 0.68 199.18 214.54 7.68 288.1 0.0 0.00 184.68 199.86 7.59 288.1 0.0 0.00 169.68 184.68 7.50 288.0 0.0 0.00 155.02 169.68 7.33 287.9 0.0 0.00 140.70 155.02 7.16 287.8 0.0 0.00 126.72 140.70 6.99 287 .. 6 0.0 0.00 113.06 126.72 6.83 287.5 0.0 0.00 99.71 113.06 6.67 287.4 0.0 0.00 86.68 99.71 6.52 287.3 0.0 0.00 73.94 86.68 6.37 287.2 0.0 0.00 61.50 73.94 6.22 287.1 0.0 0.00 49.35 61.50 6.07 287.0 0.0 0.00 38.06 49.35 5.65 286.8 0.0 0.00 27.60 38.06 5.23 286.6 0.0 0.00 17.91 27.60 4.84 286.4 0.0 0.00 8.94 17.91 4.49 286.2 0.0 0.00 0.82 8.94 4.06 286.0 0.0 0.00 0.08 0.82 0.37 285.2 0.0 0.00 0.08 0.08 0.00 285.1 0.0 0.00 0.08 0.08 0.00 285.1 0.0 0.00 0.08 0.08 0.00 285.1 0.0 0.00 0.08 0.08 0.00 285.1 0.0 8 288.3 3 c w (/) -I 0 cs: a. I-0 0 0:: I-a. cfs 0.00 2.66 5.43 6.50 7.89 8.99 9.13 9.24 9.28 9.19 9.02 8.82 8.59 8.34 8.06 7.75 7.68 7.59 7.50 7.33 7.16 6.99 6.83 6.67 6.52 6.37 6.22 6.07 5.65 5.23 4.84 4.49 4.06 0.37 0.00 0.00 0.00 0.00 9 0.A.# >< w 16.2 5.0 cfs 0.0 3.2 6.5 9.7 12.9 16.2 14.6 12.9 11.3 9.7 8.1 6.5 4.9 3.2 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 16 981 Sdra.xts . Exhibit 0-1 (!) -I z cs: I= I-!!? 0 >< I-w cfs 0.00 3.24 6.47 9.71 12.95 16.18 14.57 12.95 11.33 9.71 8.09 6.47 4.86 3.24 1.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16
D.A.# D.A.# 'It .s:: c Q.. w Ill ... z g> iii ... Q.. ~ "C 0 >-... 0 :r: a. (.) Qp 28.5 Tc 5.4 Inc 1.0 Time cfs cfs 0.0 0.0 0.0 1.0 5.2 5.2 2.0 10.5 10.5 3.0 15.7 15.7 4.0 21.0 21.0 5.0 26.2 26.2 6.0 27.0 27.0 7.0 24.4 24.4 8.0 21.7 21.7 9.0 19.1 19.1 10.0 16.5 16.5 11.0 13.9 13.9 12.0 11.2 11.2 13.0 8.6 8.6 14.0 6.0 6.0 15.0 3.4 3.4 16.0 0.8 0.8 17.0 0.0 0.0 18.0 0.0 0.0 19.0 0.0 0.0 20.0 0.0 0.0 21.0 0.0 0.0 22.0 0.0 0.0 23.0 0.0 0.0 24.0 0.0 0.0 25.0 0.0 0.0 26.0 0.0 0.0 27.0 0.0 0.0 28.0 0.0 0.0 29.0 0.0 0.0 30.0 0.0 0.0 31.0 0.0 0.0 32.0 0.0 0.0 33.0 0.0 0.0 34.0 0.0 0.0 35.0 0.0 0.0 36.0 0.0 0.0 37.0 0.0 0.0 PEAK FLOWS 27 27 0.00 indicates inital conaition EXHIBIT "D-1" PROPOSED DETENTION POND ROUTING Baymont Inn and Suites Pond Routing EVENT= 100 D.A.# c: a t. c: c: 32 .!2 ... q + ... ... "C "1ii c: 32 + + c: + c: > Cl) Cl) c: 0 .!! c: N N a a. w ... 3.0 5.0 cfs cfs cfs cfs ft cfs 5.24 0.00 0.00 0.00 285.1 0.0 15.73 0.48 5.24 2.38 285.6 0.6 26.21 7.36 16.21 4.42 286.1 1.2 36.70 23.45 33.58 5.06 286.5 1.8 47.18 48.05 60.14 6.05 287.0 2.4 53.19 82.30 95.23 6.47 287.3 3.0 51.33 121.63 135.49 6.93 287.6 2.7 46.09 158.22 172.96 7.37 287.9 2.4 40.84 189.07 204.31 7.62 288.1 2.1 35.60 214.38 229.92 7.77 288.2 1.8 30.36 234.21 249.98 7.89 288.3 1.5 25.12 248.62 264.57 7.97 288.4 1.2 19.87 257.69 273.74 8.03 288.4 0.9 14.63 261.46 277.56 8.05 288.5 0.6 9.39 260.01 276.09 8.04 288.5 0.3 4.15 253.40 269.40 8.00 288.4 0.0 0.76 241.68 257.54 7.93 288.4 0.0 0.00 226.76 242.44 7.84 288.3 0.0 0.00 211.26 226.76 7.75 288.2 0.0 0.00 195.94 211.26 7.66 288.1 0.0 0.00 180.81 195.94 7.57 288.1 0.0 0.00 165.89 180.81 7.46 288.0 0.0 0.00 151.32 165.89 7.28 287.8 0.0 0.00 137.09 151.32 7.12 287.7 0.0 p 0.00 123.19 137.09 6.95 287.6 0.0 0.00 109.61 123.19 6.79 287.5 0.0 0.00 96.34 109.61 6.63 287.4 0.0 0.00 83.39 96.34 6.48 287.3 0.0 0.00 70.73 83.39 6.33 287.2 0.0 0.00 58.37 70.73 6.18 287.1 0.0 0.00 46.41 58.37 5.98 287.0 0.0 0.00 35.33 46.41 5.54 286.7 0.0 0.00 25.07 35.33 5.13 286.5 0.0 0.00 15.57 25.07 4.75 286.3 0.0 0.00 6.77 15.57 4.40 286.1 0.0 0.00 0.62 6.77 3.08 285.8 0.0 0.00 0.06 0.62 0.28 285.2 0.0 0.00 0.06 0.06 0.00 285.1 0.0 8 288.5 3 c w Cl) ...I 0 ct a. I-0 8~ cfs 0.00 2.98 5.62 6.86 8.44 9.46 9.62 9.76 9.71 9.56 9.38 9.17 8.92 8.65 8.34 8.00 7.93 7.84 7.75 7.66 7.57 7.46 7.28 7.12 6.95 6.79 6.63 6.48 6.33 6.18 5.98 5.54 5.13 4.75 4.40 3.08 0.28 0.00 10 D.A.# )( w 18.1 5.0 cfs 0.0 3.6 7.2 10.9 14.5 18.1 16.3 14.5 12.7 10.9 9.1 7.2 5.4 3.6 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 18 9815dra.x1s Exhibit 0-1 C> ...I z ct i= I-!:!? 0 )( I-w cfs 0.00 3.62 7.25 10.87 14.49 18.12 16.30 14.49 12.68 10.87 9.06 7.25 5.43 3.62 1.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18
Baymont Inn and Suites
5 Year Event Hydrograph
16.00
12 .00
6 .00
2.00
0 .00 ""'"""------+------+----.;;:::,,,,:'+--~-----+------+-_,,,, ___ +------+-------4
0.00 5.00 10.00 15.00 20.00
Time(min.)
25 .00 30.00 35 .00 40.00
--Prop
--Qn+1
--3
--TOTAL PROPOSED
- - -TOTAL EXISTING
10/22/98
Exhibit D-2
Baymont Inn and Suites
10 Year Event Hydrograph
20 .00 --.-----------------------------------------.
18 .00
16.00
14 .00
,.
I \ 12 .00 \
\
~ ~ 10 .00
\
\ a
8 .00
6 .00
4 .00
\
\
o .oo_.,._-----+---------...;:::::.,:+-~----+-----+---~~+-----+--------1
0.00 5 .00 10.00 15 .00 20.00
Time(min.)
25.00 30.00 35.00 40 .00
--Prop
--Qn+1
--3
--TOTAL PROPOSED
- - -TOTAL EXISTING
10/22/98
Exhibit D-2
Baymont Inn and Suites
25 Year Event Hydrograph
25 .00 -.---------------------------------------..
20 .00
15 .00
10.00
5 .00
o .oo"""----+-----+---___:::::::.;:*--~---+-----+-----~.__---+--------4
0 .00 5.00 10.00 15 .00 20 .00
Time(min .)
25 .00 30.00 35.00 40 .00
--Prop
--Qn+1
--3
--TOTAL PROPOSED
- - -TOTAL EXISTING
10/22/98
Exhibit D-2
Baymont Inn and Suites
50 Year Event Hydrograph
30 .00 -.-------------------------------------~
25 .00 .
20 .00
~ ~ 15 .00
r,
I \
I \ a I \
I "
10.00
5.00 -
\
'\
\
'\
o .oo"""------+-----+----;;::::,,.:'+--~---------+-----+-----l..__-+--------4
0.00 5 .00 10 .00 15 .00 20 .00
Time (min .)
25.00 30 .00 35 .00 40 .00
--Prop
--Qn+1
--3
--TOTAL PROPOSED
---TOT AL EXISTING
10/22/98
Exh ibit 0-2
~
Baymont Inn and Suites
100 Year Event Hydrograph
30.00 -.-----------------------------------------.
25 .00
20.00
,~,
I \
~ 15 .00
I \
I
I a
10 .00
5 .00
I
I
I
I
I
o.oo ..,:;...----------+----=--i+-.....::...----1------+-----+------+_.....------l
0.00 5 .00 10.00 15.00 20.00
Time (min.)
25.00 30.00 35.00 40 .00
--Prop
--Qn+1
--3
--TOTAL PROPOSED
- --TOT AL EXISTING
10/22/98
Exhibit D-2
1.200
1.000
"';" 0.800
c;:
!
GI
Ol
!! .s
Ill 0.600
0.400
0.200
Baymont Inn and Suites
Stage-Storage Curve
o .ooo+-~~~~+41~~~--+=======--~~4-~~~~4-~~~~4-~~~~4-~~~~4-~~~~4-~~~~-+-~~~~
284 285 286 287 288 289
Elevatlon (msl)
290 291 292 293 294
Exhibit D-3
Baymont Inn and Suites
Stage-Discharge Curve
0 .000+-~~~~+.~~~~+-~~~~+-~~~~+-~~~~+-~~~~t--~~~~t--~~~--if--~~~--t~~~~-1
284.0 285 .0 286.0 287.0 288.0 289.0
Elevatlon (msl)
290 .0 291 .0 292 .0 293 .0 294 .0
Exhibit D-3
PRELIMINARY DRAINAGE REPORT
FOR
LOT 1, BLOCK 1, WHEELER SUBDIVISION
PHASE 2
Richard Carter Survey, A-8
College Station, Brazos County, Texas
June 29, 1998
PREPARED FOR:
Bert Wheelers Inc.
1 0665 Richmond
Houston , Texas 77042
PREPARED BY:
Kling Engineering & Surveying
4013 Texas Ave ., Suite 212
Bryan, Texas 77802
( 409) 846-6212
Preliminary Drainage Report
for
Lot 1, Block 1, Wheeler Subdivision -Phase 2
Richard Carter Survey, A-8
College Station, Brazos County, Texas
June 29, 1998
GENERAL LOCATION & DESCRIPTION:
Lot 1, Block 1 of the Wheeler Subdivision -Phase 2 consists of a two acre tract of land
lying adjacent to the southern right of way line for University Drive (F.M . 60) approximately 337'
west of the Lincoln Avenue I F .M . 60 intersection . Currently, the lot is vacant. Existing land
cover consists of field grasses and brush with a few trees . The site drains in a southeasterly
direction to the nearby East Tributary to Burton Creek (see Appendix 1 "General Location Map "
and 2 "Final Plat" for map). The site is currently within the 100 year floodplain according to the
FEMA Flood Insurance Rate Map (FIRM) for Brazos County, Texas and Incorporated Areas ,
Community Number 480083, Panel Number 0142 C, Map Number 48041 C0142 C, effective date
July 2, 1992 (see Appendix 3 "Flood Insurance Rate Map"). It has a floodplain designation of,
"Zone A-Special Flood Hazard Areas Inundated By 100-Year Flood -No base flood elevations
determined". Current development plans involve a Letter of Map Revision for the East Tributary
to Burton Creek that will eliminate floodplain from Lot 1, Block 1 by the channelization of a
portion of the creek. Proposed improvements include a hotel/motel establishment of the same
character as currently developing projects within the University Drive Corridor.
Previous studies for the area include :
1) Kling Engineering & Surveying, Floodplain Analysis for East Tributary to Burton Creek
Just Above Confluence with Carters Creek, June , 1998 . The purpose of this study was to
establish the elevation of the 100 year floodplain water surface and define a floodway for the
East Tributary to Burton Creek. Included in this study was the analysis of proposed channel
improvement and its effect on the floodplain .
DRAINAGE BASINS & SUB-BASINS:
The primary drainage basin for the area is the Burton Creek drainage basin . The
Tributary drainage basin can be considered a sub -basin within the lower region of the Burton
Creek drainage basin . The Tributary drainage basin is broken into 7 sub-basins according to
flow patterns (refer to abovementioned Floodplain Analysis for further detail). Lot 1, Block 1 is
accounted for in the Floodplain Analysis in drainage area DA-II of Sub-basin 7 . The two acre
site will be considered as a single drainage area with respect to stormwater runoff calculations
for this report.
DRAINAGE DESIGN CRITERIA:
The City of College Station requires attenuation of excess stormwater runoff through the
100 year return event. The Rational Method was used to determine the stormwater runoff for
existing and post-developed conditions. Detention requirements were calculated us ing the
difference in peak runoff discharges for existing and post-developed conditions , from the 2, 5 ,
10, 25 , 50, and 100 year return storm events, incorporated into the Modified Rational Method .
Detention pond routing was done using the Level Pool Routing Procedure combined with the
appropriate hydraulic equations to model the outlet device . Excess runoff due to development
will be attenuated off-site in a 0 .39 acre private detention and drainage easement adjacent to the
south lot line of the property (see Appendix 2 "Final Plat"). This report will document the
management of stormwater runoff as a result of proposed development. Due to the lack of a final
site development plan, conservative assumptions with respect to runoff will be made . Upon
complet ion of a final site plan , an addendum to this drainage report will be submitted
documenting that final conditions are within design parameters as set forth in this report .
DRAINAGE ANALYSIS & DESIGN:
The area was analyzed under existing and post-developed cond itions to determine total
peak runoff rate for the proposed improvements and total allowable peak runoff from the site
(exist ing conditions). Based on a time of concentration of 10 minutes , intensities for the varying
storm events were obtained using the Intensity-Duration-Frequency equation and coefficients
corresponding to Brazos County as defined by the U.S. Weather Bureau (NWS) Technical Paper
No . 40 . Site area used is 2 .001 acres with 'C' factors for existing and post-developed conditions
of 0 .25 and 0 .81 respectively . In absence of a final development site plan , post developed 'C '
was determined by assuming the entire two acre tract to be impervious with the exception of the
required 24' landscape reserve adjacent to the F .M. 60 right of way . This assumption is
conservative as it does not account for set-back or landscaped areas within the lot. The
following table summarizes the peak runoff rates derived from the Rational Method for pre and
post developed conditions .
Table 1
Storm Return (yr) 2 5 10 25 50 100
Pre Q (cfs) 3 .2 3 .8 4.3 4 .9 5.6 5 .8
Post Q (cfs) 10 .2 12.5 14 .0 16.0 18 .0 18.9
Requ ired Atten . Q (cfs) 7 .0 8 .7 9.7 11.1 12 .4 13.1
*See Appendix 4 "Hydrolog1c Calculations" for computation
As stated above, under proposed conditions , detention will be accomplished within an off-
site detention easement accommodating runoff through the 100 year event. The detention pond
will be adjacent to the improved channel for the Tributary with top of berm elevations at a
minimum of 1' above the 100 year water surface elevation in the channel. The outlet works for
the detention area will consist of a 1 O" PVC pipe at a 0.8% slope. The pipe outlet flowline will
be at 288.9. Overflow will be accommodated using a 15' long, grassed emergency spillway at
elevation 291. 75 . Outfall for the 1 O" PVC pipe will be immediately adjacent to the improved
channel. Minimum outfall flowline elevation will be set at 288 .5 , approximately 0.5' above the
100 year floodway water surface elevation in the channel at outfall location .
A post development, inflow hydrograph for the pond was generated using the Modified Rational
Method to determine a storm duration that would require the greatest amount of storage volume
(see Appendix 4 "Hydrologic Calculations" for summary print out). The Level Pool Routing
procedure with the appropriate hydraulic equations for modeling the outlet works was used to
route the design storm inflow hydrograph through the pond . Two scenarios were created to
model the various storm events . Scenario 1 models the pond with the outlet works functioning
properly as des igned . Due to the small size of the outlet pipe , 1 O", the second scenario models
the pond with the outlet pipe completely clogged . The following table summarizes the peak
elevations and discharges of the pond routing for each scenario.
Table 2
Scenario 1 Scenario 2
Storm Return Peak Inflow Allowable
Outflow Peak Outflow Peak Elev . Peak Outflow Peak Elev.
(yr) (cfs) (cfs) (cfs) (cfs)
2 7.1 3.2 2 .8 290 .5 0 .0 290.90
5 8.3 3.8 3.1 290.8 0.0 291 .10
10 9.2 4 .3 3.2 290 .9 0 .0 291 .30
25 10.6 4 .9 3.4 291.0 0 .0 291 .50
50 11 .8 5.6 3 .5 291.2 0 .0 291.70
100 12.3 5.8 3.6 291.3 0 .0 291 .70
*See Appendix 5 "Detention Pond Routing" for computation .
As shown above, peak outflow for Scenario 1 averages 3.3 cfs for the six design storm events .
All excess runoff as a result of development is attenuated under optimal design conditions . The
pond provides sufficient volume such that during completely clogged conditions , Scenario 2 ,
water surface elevations do not reach the emergency spillway for the six design storm events .
CONCLUSIONS:
Post developed runoff rates were determined using an assumed worst case scenario for
amount of impervious cover on the site . Design storm hydrographs were routed through a
proposed detention pond which attenuated above the required amounts for all storm events. Due
to the relatively small size of the outlet works, the design storm hydrographs were routed through
the pond assuming fully clogged conditions . Under this scenario, it is shown that the water
surface elevation in the pond does not exceed the elevation of the emergency spillway for any
design storm event. However, storm events and physical conditions that may occur during a
storm are variable and pond overtopping is possible due to the unbounded combinations of
particular attributes that may affect pond performance . The emergency spillway provides for the
controlled release of pond overflow. No adverse impact on downstream structures or property
owners is expected from proposed improvements .
APPENDICES
1) General Location Map -U.S.G.S . Quad
2) Final Plat -Wheeler Subdivision Phase 2
Lot 1, Block 1
3) Flood Insurance Rate Map - F.E.M .A.
4) Hydrologic Computations
5) Detention Pond Routing Computations
k:\projects\wheeler8\ph21t I \It I blk I . wpd
APPENDIX 1
GENERAL LOCATION MAP -U.S.G.S. QUAD .
APPENDIX 4
HYDROLOGIC COMPUTATIONS
I
~ _A"'___ _I 2 '°' -:
r·--"'1 !Uil:\ --' -. "'i '
-----Q ~ 0 . _-__ __ --·. ·-----
Q.<):) -
"· ¥ c.. --· ----. ---. o. ~7 1t-o. 91) -0, 78
01 l~~o.zs -o,o~
A ~~~-~i>· :-8 7 % 1rnp ¢tre..V1r)I.)~
I ~ 'o ~llf-,-.J c~ r~
I . lJ, -B I ·-=Tt:iiil i-
}./()?a : 4~6Ulf'/PT7o~ ~At:ir!:D ON 21 JAN.D~pc-~11€'
AL.J:Jfl.X.. ()N1r/l#t.s.11tf 1~ .7H~ ON'-'f AICMJ • ,,,,,., f>~tZ.i.,Ju:us
~ wr7f.ltr.J N~ Z.. ~~ ~
(.. z. :: ~.33
-c G) ~ C..'-.. A
Qt. •
Q5 ~ ':'s = 7, ~?
l..10 . : _f, b.3
c., 2.5 ::-9, ~'
---·-a IQ _;:__ ----- -
1 6h.~ >
is.,. :: //, 14
i1i»:: l/1 ~
Z eGv1 o .it::. 4ne:M,Je-nw ~
Aem. = ~~~· -Q~
At. ~ 10,z-'3. z -7 c..~
.}r~ ~. /Z,S-__ !>• S .~ ~.7
A10 :_/'-/, o -4,J -,,7
Ai.$ : It-,()_. 4 9 ;;;-//,I
J4"1 r 18 • 0 -5, b ";;-Z1 4
A ,~ --t'd.c;-!7,~ :L.:3::..!.,..:...'-~
.Qso ~
6211)) 7 --
------------·-· .
/0, z. c.f:S
-12 1 S = 14r v
-/t-, 0
= IB,t!'J
;:. ';g,9
Job File: E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
Rain Dir: J:\HAESTAD\PPK6\UTIL\
==========================
JOB TITLE
==========================
Wheeler Subdivision Phase 2
Lot 1, Block 1 -2.001 acre tract
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24-97 :053 Compute Time: 12:34 :04 Date: 06-29-1998
Table of Contents
Table of Contents
************ RATIONAL METHOD CALCS ***********
C and Area
LOT1,BLK1 POST •••••••.••.•.•.•••••• 1.01
Mod. Rational Grand Sl.lmlary
DETENTION EST1 ••••••••••••••••••••• 1.02
Rational Peak Q's
DETENTION EST 1 • • • • • • • • • • • • • • • • • • • • • 1. 03
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6·24·97 :053 Compute Time: 12:34:04 Date: 06 ·29·1998
Type .... C and Area
Name .••• LOT1,BLK1 POST
File .••• E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
Title ••. Lot 1, BlocK 1 Wheeler Subdivision Phase 2 -Post
Developed Conditions
RATIONAL C COEFFICIENT DATA
Page 1.01
········································································· ·········································································
Lot 1, BlocK 1 Wheeler Subdivision Phase 2 -Post Developed Conditions
Area c x Area
Soil/Surface Description c acres acres
--------------------------------------·-------------------·-
impervious .9000 1. 741 1.567
landscaped .2500 .260 .065
WEIGHTED c & TOTAL AREA ---> .8155 2.001 1.632
········································································· ·········································································
S/N: HOMOL0863131 KLING ENGINEERING
Pond PacK Ver: 6-24-97 :053 Compute Time: 12:34:04 Date: 06-29-1998
Type •••• Mod. Rational Grand Surrmary
Name •••• DETENTION EST1
Page 1 .02
File •••• E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET .PPK
************************************************************************
************************************************************************
* *
* *
* MODIFIED RATIONAL METHOD *
* ----Grand Sl.fllllary For All Storm Frequenc i es *
* *
* *
************************************************************************
************************************************************************
Q = CiA * Units Conversion; Where Conversion 43560 I (12 * 3600)
Area = 2.001 acres Tc = • 1667 hr s ............................................................................ ············································································
Freq. Adju s ted Durat i on
years 'C' hrs in/hr
Qpeak Allowable!
cfs cfs I
VOLUMES
Inf low
ac-ft
Storage
ac ·ft
------------------------------------------------------1---------------------
2
5
10
25
50
100
.816
.816
.816
.816
.816
.816
S/N: HOMOL0863131
.3500
.3833
.4000
.40DO
.4167
.4167
4.3075
5.0657
5 .6172
6.4481
7. 1625
7.4775
7.09
8.34
9.24
10.61
11. 79
12.30
KLING ENGINEERING
3.20 I
3.8o I
4.3o I
4.9o I
5 .6o I
5 .8o I
Pond Pack Ver: 6 -24-97 :053 Compute Time : 12:34:04
.205
.264
.306
.351
.406
.424
.116
.148
.168
.194
.220
.231
Date: 06 -29 -1998
Type .... Rational Peak O's Page 1.03
Name .... DETENTION EST1
File .... E:\HAESTAD\PONDPACK\PPK6\YHEELER\L&B1PH2\L1B1DET.PPK
SUMMARY OF RATIONAL METHOD PEAK DISCHARGES
Q = CiA * Unit s Conversion; Yhere Conversion = 43S60 / C12 * 3600)
Rational Storms: BRAZOS.IDQ RATIONAL
Tag Freq File IDF Curve
--·-·-------......................................
2 YR 2 BRAZOS.IDQ e = .8060 b = 6S.OOOO d = 8.0000
S YR s BRAZOS. IDQ e = .78SO b = 76.0000 d = 8.SOOO
10 YR 10 BRAZOS.IDQ e = .7630 b = 80.0000 d = 8.SOOO
2S YR 2S BRAZOS . IDQ e = .7S40 b = 89.0000 d = 8.SOOO
SO YR so BRAZOS . IDQ e = .74SO b = 98.0000 d = 8.SOOO
100 YR 100 BRAZOS. IDQ e = .7300 b = 96.0000 d = 8.0000
Tc = . 1667 hrs
-----------------------------
Tag Freq c C adj c Area I Peak Q
(years) factor I final in/hr acres I cfs
1-----------------------------1 ....................
2 YR 2 .816 1 .000 I .816 6.32S9 2.001 I 10.41
S YR s .816 1.000 I .816 7.6921 2.001 I 12.66
10 YR 10 .816 1.000 I .816 8.6338 2.001 I 14.21
25 YR 2S .816 1.000 I .816 9.8607 2.001 I 16.22
50 YR so .816 1.000 I .816 11. 1467 2.001 I 18.34
100 YR 100 .816 1.000 I .816 11.6382 2.001 I 19. 1S
-----------------------------
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24-97 :OS3 Compute Time: 12:34:04 Date : 06 -29 -1998
APPENDIX 5
DETENTION POND ROUTING COMPUTATIONS
Job File: E:\HAESTAD\PONDPACK\PPK6\YHEELER\L&B1PH2\L1B1DET.PPK
Rain Dir: J:\HAESTAD\PPK6\UTIL\
==========================
JOB TITLE
==========================
Yheeler Subdivision Phase 2
Lot 1, Block 1 -2.001 acre tract
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6·24-97 :053 Compute Time: 16:25:39 Date: 06·29 -1998
Table of Contents
Table of Contents
*********************** POND VOLUMES ***********************
VO L.PLAN 1 ...•.. Vol: Planimeter ••••.•••..........•. 1 .01
******************** OUTLET STRUCTURES *********************
TRIAL 181 ••••••• Outlet Input Data •••••••••••••••••• 2.01
Composite Rating Curve ••••••••••••• 2.04
*********************** POND ROUTING ***********************
POND RT TRIAL Pond E·V·Q Table ................... 3.01
POND RT TRIAL 10 YR
Pond Routing SU1T1T1ary ............... 3.03
POND RT TRIAL 1 100 YR
Pond Routing SUlllnary ............... 3.04
POND RT TRIAL 1 2 YR
Pond Routing SU111T1ary ............... 3.05
POND RT TRIAL 1 25 YR
Pond Routing SU1T1T1ary ............... 3.06
POND RT TRIAL 1 5 YR
Pond Routing SU1T1T1ary ............... 3.07
POND RT TRIAL 1 50 YR
Pond Routing SU1T1T1ary ............... 3.08
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24 -97 :053 Compute Time: 16:25:39 Date: 06-29 -1998
Type .... Vol: Planimeter
Name ..•. VOL.PLAN 1
File ..•. E:\HAESTAD\PONDPACK\PPK6\~HEELER\L&B1PH2\L1B1DET.PPK
Title •.. Vol1..me Plan 1 · 3:1 side slopes
POND VOLUME CALCULATIONS
Planimeter scale: 1.00 ft/in
Elevation Planimeter
(ft) (sq.in)
288.90 .000
289.00 128.000
290.00 5355.300
291.00 10736.900
292.00 12578.300
Area A1+A2+sqrCA1*A2) Vol1..me
(acres) (acres) (ac-ft)
.0000 .0000 .000
.0029 .0029 .000
• 1229 .1449 .048
.2465 .5435 . 181
.2888 .8020 .267
POND VOLUME EQUATIONS
Page 1.01
Vol1..me S1..m
(ac -ft)
.000
.000
.048
.230
.497
* Incremental volune computed by the Conic Method for Reservoir Volunes.
Vol1..me = (1/3) * CEL2-EL1) * (Area1 + Area2 + sq.rt.(Area1*Area2))
where: EL1, EL2 =Lower and upper elevations of the increment
Area1,Area2 =Areas computed for EL1, EL2, respectively
Vol1..me =Incremental volune between EL1 and EL2
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06-29-1998
Type .... Outlet Input Data Page 2.01
Name .... TRIAL 181
File •... E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
REQUESTED POND WS ELEVATIONS:
Min. Elev.= 288.90 ft
Increment= .10 ft
Max. Elev.= 292.00 ft
**********************************************
OUTLET CONNECTIVITY
**********************************************
---> Forward Flow Only (Upstream to DnStream)
<---Reverse Flow Only (DnStream to Upstream)
<---> Forward and Reverse Both Allowed
Structure No. Outfall E1, ft E2, ft
-----------------------------------
Weir-Rectangular 2 <---> TW 291. 750 292.000
Culvert-Circular <---> TW 288.900 292.000
TW SETUP, OS Channel
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06-29-1998
Type .... Outlet Input Data
Name .... TRIAL 181
File .... E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
OUTLET STRUCTURE INPUT DATA
Structure ID
Structure Type
# of Openings
Crest Elev.
Weir Length
Weir Coeff.
Weir TW effects
= 2
=Weir-Rectangular
= 291. 75 ft
= 15.00 ft
= 3.000000
(Use adjustment equation)
S/N: HOMOL0863131 KLING ENGINEERING
Page 2.02
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06-29-1998
Type .... Outlet Input Data
Name .... TRIAL 1B1
File .••. E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
OUTLET STRUCTURE INPUT DATA
Structure ID
Structure Type Culvert-Circular
No. Barrels =
Barrel Diameter
Upstream Invert =
Dnstream Invert
Horiz. Length
Barrel Length
Barrel Slope
OUTLET CONTROL DATA ...
Mannings n
.8333 ft
288.90 ft
288.50 ft
50.00 ft
50.00 ft
.00800 ft/ft
.0110
Page 2.03
Ke
Kb
Kr
HW Convergence
.5000 (forward entrance loss)
.028555 (per ft of full flow)
1.0000 (reverse entrance loss)
.001 +/-ft
INLET CONTROL DATA ...
Equation form
Inlet Control K .0098
Inlet Control M 2.0000
Inlet Control c .03980
Inlet Control y = .6700
T1 ratio (HW/D) = 1.156
T2 ratio (HW/D) = 1.303
Slope Factor -.500
Use unsubmerged inlet control Form equ . below T1 elev.
Use submerged inlet control Form equ. above T2 elev.
In transition zone between unsubmerged and submerged inlet control,
interpolate between flows at T1 & T2 ...
At T1 Elev 289.86 ft ---> Flow 1.74 cfs
At T2 Elev= 289.99 ft ---> Flow= 1.99 cfs
Structure ID
Structure Type
TW
TW SETUP, OS Channel
FREE OUTFALL CONDITIONS SPECIFIED
CONVERGENCE TOLERANCES ...
Maxi mun Iterations= 30
Min. TW tolerance .01 ft
Max. TW tolerance = .01 ft
Min. HW tolerance = .01 ft
Max. HW tolerance = .01 ft
Min. Q tolerance = .10 cfs
Max. Q tolerance = .10 cfs
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6 -24-97 :053 Compute Time: 16:25:39 Date : 06-29-1998
Type .•.. Composite Rating Curve
Name .... TRIAL 1B1
File .... E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
***** COMPOSITE OUTFLOW SUMMARY ****
WS Elev, Total Q Notes
--------Converge -------------------------
Elev. Q TW Elev Error
ft cfs ft +/-ft Contributing Structures
288.90
289.00
289.10
289.20
289.30
289.40
289.50
289.60
289.70
289.80
289.90
290.00
290. 10
290.20
290.30
290.40
290.50
290.60
290.70
290.80
290.90
291.00
291. 10
291.20
291.30
291.40
291.50
291.60
291.70
291. 75
291.80
291.90
292.00
.00 Free Outfall
.03 Free Outfall
.10 Free Outfall
.21 Free Outfall
.36 Free Outfall
.54 Free Outfall
• 75
.98
1.22
1.47
1.73
1.99
2.20
2.36
2.51
2.66
2.80
2.93
3.03
3.13
3.23
3.33
3.42
3.51
3.60
3.69
3.78
3.86
3.94
3.98
4.53
6.72
9.81
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
None contributing
1
2 +1
2 +1
2 +1
2 +1
S/N: HOMOL0863131 KLING ENGINEERING
Page 2.04
Pond Pack Ver: 6 -24 -97 :053 Compute Time: 16:25:39 Date: 06 -29 -1998
Type .... Pond E-V-Q Table
Name •.•• POND RT TRIAL 1
File .... E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
LEVEL POOL ROUTING DATA
HYG Dir = E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file= L&B1PH2.HYG -det_est1 10 YR
Outflow HYG file= L&B1PH2.HYG -Outfall trial 1 10 YR
Pond Node Data = Vol plan 1
Pond Volune Data= Vol.Plan 1
Pond Outlet Data = Trial 1b1
No Infiltration
INITIAL CONDITIONS
Starting WS Elev 288.90 ft
Starting Volune = .000 ac·ft
Starting Outflow = .00 cfs
Starting lnfiltr. = .00 cfs
Starting Total Qout= .00 cfs
Time Increment = .0200 hrs
Elevation Outflow Storage Area
ft cfs ac-ft acres
lnfi l t.
cfs
Q Total
cfs
Page 3.01
2S/t + 0
cfs
------------------------------------------------------------------------------
288.90 .00 .000 .0000 .00 .00 .00
289.00 .03 .000 .0029 .00 .03 .15
289. 10 .10 .001 .0070 .00 .10 .80
289.20 .21 .002 .0129 .00 .21 2.10
289.30 .36 .003 .0205 .00 .36 4.25
289.40 .54 .006 .0299 .00 .54 7.45
289.50 .75 .009 .0410 .00 .75 11.93
289.60 .98 .014 .0539 .00 .98 17.88
289.70 1.22 .020 .0685 .00 1.22 25.51
289.80 1.47 .028 .0849 .00 1.47 35.02
289.90 1.73 .037 .1030 .00 1. 73 46.63
290.00 1.99 .048 .1229 .00 1.99 60.55
290. 10 2.20 .061 .1334 .00 2.20 76.26
290.20 2.36 .075 .1442 .00 2.36 93.21
290.30 2.51 .090 .1555 .00 2.51 111.49
290.40 2.66 .106 .1673 .00 2.66 131.17
290.50 2.80 .124 .1794 .00 2.80 152.27
290.60 2.93 .142 .1920 .00 2.93 174.87
290.70 3.03 • 162 .2050 .00 3.03 198.98
290.80 3.13 .183 .2184 .00 3. 13 224.68
290.90 3.23 .206 .2322 .00 3.23 252.04
291.00 3.33 .230 .2465 .00 3.33 281. 10
291.10 3.42 .254 .2506 .oo 3.42 311.26
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06-29-1998
Type .... Pond E-V-Q Table
Name .... PO ND RT TRIAL 1
File .... E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET .PPK
LEVEL POOL ROUTING DATA
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file= L&B1PH2.HYG -det est1 10 YR
Outflow HYG file= L&B1PH2.HYG -Outfall trial 1 10 YR
Pond Node Data = Vol plan 1
Pond Vollllle Data = Vol.Plan 1
Pond Ou t let Data = Tr i al 1b1
No Infilt r ation
INITIAL CONDITIONS
Start i ng WS Elev
Start i ng Vo l lllle
Start i ng Outflow
St arting Infiltr.
Start i ng Total Qout =
Ti me Inc r ement
El evation
ft
Outflow
cfs
288.90 ft
.000 a c-ft
.00 cf s
.00 cfs
.00 cfs
.0200 hr s
Storage
ac-ft
Area
acres
Infil t.
cfs
Q Total
cfs
Page 3.02
25/t + 0
cfs
------------------------------------------------------------------------------
291.20 3.51 .280 .2547 .00 3.51 341.91
291 .30 3.60 .305 .2588 .00 3.60 373.07
291 .40 3.69 .331 .2630 .00 3.69 404.73
291.50 3.78 .358 .2672 .00 3.78 436.89
291 .60 3 .86 .385 .2714 .00 3.86 469.57
291 .70 3.94 .412 .2757 .00 3.94 502 . 75
291.75 3 .98 .426 .2779 .00 3.98 519.54
291.80 4.53 .440 .2800 .00 4.53 536.96
291.90 6.72 .468 .2844 .00 6.72 573.30
292.00 9.81 .497 .2888 .00 9.81 611.06
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6-24 -97 :053 Compute Time: 16:25 :39 Date : 06 -29 -1998
Type .••• Pond Routing Sl.Ulllary
Name •••• POND RT TRIAL 1 Tag: 10 YR
File •••• E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
+
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file L&B1PH2.HYG -det_est1 10 YR
Outflow HYG file= L&B1PH2.HYG -Outfall trial 10 YR
Pond Node Data = Vol plan 1
Pond Volune Data= Vol.Plan 1
Pond Outlet Data = Trial 1b1
No Infiltration
INITIAL CONDITIONS
Starting WS Elev 288.90 ft
Starting Vol1..me .000 ac -ft
Starting Outflow .00 cfs
Starting lnfiltr. .00 cfs
Starting Total Qout= .00 cfs
T i me Increment .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inf low
Peak Outflow
Peak Elevation
Peak Storage =
9.24 cfs
3.22 cfs
= 290.89 ft
.204 ac-ft
at
at
.1668 hrs
.5068 hrs
=====================================================
MASS BALANCE (ac-ft)
Initial Vol = .000
+ HYG Vol IN = .305
-Infiltration .000
-HYG Vol OUT .305
-Retained Vol = .000
-------·--
Unrouted Vol -.000 ac-ft (.003% of Inflow Vo l ume)
WARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 3 .03
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06 -29-1998
Type •••• Pond Routing SlJTTllary
Name •••• POND RT TRIAL 1 Tag: 100 YR
File .••• E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
+
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file L&B1PH2.HYG -det_est1 100 YR
Outflow HYG file= L&B1PH2.HYG -Outfall trial 100 YR
Pond Node Data = Vol plan 1
Pond Vollllle Data Vol.Plan 1
Pond Outlet Data = Trial 1b1
No Infiltration
INITIAL CONDITIONS
----------------------------------
Starting WS Elev 288.90 ft
Starting Volume .000 ac-ft
Starting Outflow .00 cfs
Starting lnfiltr. .00 cfs
Starting Total Qout= .00 cfs
Time Increment .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inf low
Peak Outflow
Peak Elevation
Peak Storage =
=
12.30 cfs
3.59 cfs
291. 29 ft
.304 ac-ft
at
at
• 1668 hrs
.5268 hrs
=====================================================
MASS BALANCE (ac ·ft)
Initial Vol = .000
+ HYG Vol IN = .423
-Infiltration .000
-HYG Vol OUT = .423
-Retained Vol = .000
------·--·
Unrouted Vol -.000 ac-ft C. 002% of Inflow Volume)
WARNING: Inflow hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 3.04
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06 -29-1998
Type ..•• Pond Routing Surrmary
Name .••. POND RT TRIAL 1 Tag: 2 YR
File •... E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file L&B1PH2.HYG · det_est1 2 YR
Outflow HYG file L&B1PH2.HYG ·Outfall trial 2 YR
Pond Node Data Vol plan 1
Pond Vol1..111e Data Vol.Plan 1
Pond Outlet Data Trial 1b1
No Infiltration
INITIAL CONDITIONS
----------------------------------
Starting WS Elev = 288.90 ft
Starting Volume .ODO ac·ft
Starting Outflow .00 cfs
Starting Inf i l tr. .00 cfs
Starting Total Qout= .00 cfs
Time Increment .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
= 7.09 cfs
2.83 cfs
290.52 ft
.128 ac·ft
at
at
.1668 hrs
.4468 hrs
=====================================================
MASS BALANCE (ac·ft)
+ Initial Vol .000
+ HYG Vol IN .205
· Infiltration .000
· HYG Vol OUT .205
· Retained Vol = .000
Unrouted Vol = ·.000 ac·ft (.005% of Inflow Volume)
WARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 3.05
Pond Pack Ver: 6·24·97 :053 Compute Time: 16:25:39 Date: 06-29-1998
Type •••. Pond Routing Surrrnary
Name .••. POND RT TRIAL 1 Tag: 25 YR
File •••. E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file= L&B1PH2.HYG -det_est1 25 YR
Outflow HYG file= L&B1PH2.HYG -Outfall trial 25 YR
Pond Node Data Vol plan 1
Pond VollJTle Data= Vol.Plan 1
Pond Outlet Data Trial 1b1
No Infiltration
INITIAL CONDITIONS
Starting WS Elev 288.90 ft
Starting VollJTle .000 ac-ft
Starting Outflow = .00 cfs
Starting lnfiltr. .00 cfs
Starting Total Qout= .00 cfs
Time Increment .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inf low
Peak Outflow
Peak Elevation
Peak Storage =
= 10.61 cfs
3.38 cfs
291.05 ft
.243 ac-ft
at
at
. 1668 hrs
.5068 hrs
=====================================================
MASS BALANCE (ac-ft)
+ Initial Vol .000
+ HYG Vol IN .350
-Infiltration= .000
-HYG Vol OUT .350
-Retained Vol .000
Unrouted Vol -.000 ac-ft (.003% of Inflow Volume)
WARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 3.06
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06-29-1998
Type •..• Pond Routing Sunmary
Name •••. POND RT TRIAL 1 Tag: 5 YR
File ..•• E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
LEVEL POOL ROUTING SUMMARY
HYG Dir = E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file
Outflow HYG file
L&B1PH2.HYG -det_est1 5 YR
L&B1PH2.HYG -Outfall trial 5 YR
Pond Node Data
Pond Vol1.111e Data
Pond Outlet Data
No lnfil tration
Vol plan 1
Vol.Plan 1
= Trial 1b1
INITIAL CONDITIONS
Starting WS Elev 288 .90
Starting Volume .000
Starting Outflow .00
Starting lnfiltr. .00
Starting Total Qout= .00
Time Increment = .0200
ft
ac-ft
cfs
cfs
cfs
hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
=
8.34 cfs
3.08 cfs
290.75 ft
.172ac-ft
at
at
• 1668 hrs
.4868 hrs
=====================================================
MASS BALANCE (ac-ft)
+ Init i al Vol = .000
+ HYG Vol IN = .264
-Infiltration
-HYG Vol OUT
-Retained Vol
Unrouted Vol
.000
.264
.000
-.000 ac-ft (.003% of Inflow Volume)
WARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 3.07
Pond Pack Ver: 6-24-97 :053 Compute Time: 16:25:39 Date: 06-29-1998
Type ..•• Pond Rout ing Surrmary
Name .••• POND RT TRIAL 1 Tag: SD YR
File ..•• E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.PPK
+
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file= L&B1PH2.HYG -det_est1 SD YR
Outflow HYG file= L&B1PH2-HYG -Outfall trial SO YR
Pond Node Data = Vol plan 1
Pond VollJlle Data= Vol.Plan 1
Pond Outlet Data = Trial 1b1
No Infiltration
INITIAL CONDITIONS
Starting WS Elev 288.90 ft
Starting Volune = .000 ac-ft
Starting Outflow _oo cfs
Starting Infiltr. .00 cfs
Starting Total Qout= .00 cfs
Time Increment .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
11.79 cfs
3.54 cfs
291.23 ft
.288 ac-ft
at
at
.1668hrs
.S268 hrs
=====================================================
MASS BALANCE (ac-ft)
lni tial Vol = .000
+ HYG Vol IN .406
-Infiltration = .000
-HYG Vol OUT .406
-Retained Vol = .000
...... -............. --
Unrouted Vol = -.000 ac-ft (.002% of Inflow Volume)
WARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 3.08
Pond Pack Ver: 6-24-97 :OS3 Compute Time: 16:2S:39 Date: 06-29-1998
Table of Contents
Table of Contents
*********************** POND ROUTING ***********************
POND RT TRIAL 2 10 YR
Pond Routing Surrmary ••••••••••••••• 1.01
POND RT TRIAL 2 100 YR
Pond Routing SU1111ary ............... 1.02
POND RT TRIAL 2 2 YR
Pond Routing SU1111ary ............... 1.03
POND RT TRIAL 2 25 YR
Pond Routing Surrmary ............... 1.04
POND RT TRIAL 2 5 YR
Pond Routing S lJllllla ry •.••.•.•••••.•• 1.05
POND RT TRIAL 2 50 YR
Pond Routing Surrmary ............... 1.06
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6·24·97 :053 Compute Time: 10:09:48 Date: 06 ·26·1998
Type •.•. Pond Routing Surrmary
Name •••. POND RT TRIAL 2 Tag: 10 YR
File •.•. E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.ppk
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file= L&B1PH2.HYG -det_est1 10 YR
Outflow HYG file L&B1PH2.HYG -Outfall trial 10 YR
Pond Node Data Vol plan 1
Pond Voll.me Data= Vol.Plan 1
Pond Outlet Data Trial 1b clogged
No Infiltration
INITIAL CONDITIONS
----------------------------------
Starting WS Elev 288.90 ft
Starting Voll.me .000 ac-ft
Starting Outflow .00 cfs
Starting lnfiltr. .00 cfs
Starting Total Qout= .00 cfs
Time Increment .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inf low
Peak Outflow
Peak Elevation
Peak Storage =
=
=
9.24 cfs
.00 cfs
291.30 ft
.305 ac-ft
at
at
• 1668 hrs
.0268 hrs
=====================================================
MASS BALANCE (ac-ft)
+ Initial Vol .000
+ HYG Vol IN .305
-Infiltration= .000
-HYG Vol OUT .000
-Retained Vol .305
Unrouted Vol -.000 ac-ft (.001% of Inflow Volume)
WARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 1 .01
Pond Pack Ver: 6-24-97 :053 Compute Time: 10:09:48 Date: 06 -26-1998
Type .... Pond Routing SU1TTI1ary
Name .... POND RT TRIAL 2 Tag: 100 YR
File ..•. E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.ppk
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file L&B1PH2.HYG -det_est1 100 YR
Outflow HYG file L&B1PH2.HYG -Outfall trial 100 YR
Pond Node Data = Vol plan 1
Pond Volune Data =Vol.Plan 1
Pond Outlet Data = Trial 1b clogged
No Infiltration
INITIAL CONDITIONS
Starting WS Elev = 288.90 ft
Starting Volune .000 ac-ft
Starting Outflow .00 cfs
Starting Infiltr. = .00 cf s
Starting Total a out= .00 cfs
Time Increment .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
12.30 cfs
.00 cfs
291. 74 ft
.423 ac-ft
at
at
.1668 hrs
.0268 hrs
=====================================================
MASS BALANCE (ac-ft)
+ Initial Vol .000
+ HYG Vol JN .423
-Infiltration= .000
-HYG Vol OUT .000
-Retained Vol = .423
Unrouted Vol -.000 ac -ft (.001% of Inflow Volume)
WARNING: Inflow hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Pag e 1.02
Pond Pack Ver: 6-24-97 :053 Compute Time: 10:09:48 Date: 06-26-1998
Type .... Pond Routing Surmary
Name .... POND RT TRIAL 2 Tag: 2 YR
File .... E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L181DET.ppk
LEVEL POOL ROUTING SUMMARY
HYG Dir = E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file L&B1PH2.HYG -det_est1 2 YR
Outflow HYG file= L&B1PH2.HYG -Outfall trial 2 YR
Pond Node Data = Vol plan 1
Pond Volune Data= Vol.Plan 1
Pond Outlet Data = Trial 1b clogged
No Infiltration
INITIAL CONDITIONS
Starting WS Elev 288.90 ft
Starting Voll.Ille = .000 ac-ft
Starting Outflow .00 cfs
Starting Inf i l tr. = .00 cfs
Starting Total Qout= .00 cfs
Time Increment = .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
=
7.09 cfs
.00 cfs
= 290.90 ft
.205 ac-ft
at
at
.1668 hrs
.0268 hrs
=====================================================
MASS BALANCE (ac-ft)
+ Initial Vol .000
+ HYG Vol IN .205
-Infiltration= .000
-HYG Vol OUT .000
-Retained Vol .205
Unrouted Vol = -.000 ac -ft (.008% of Inflow Volume)
WARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 1.03
Pond Pack Ver: 6-24-97 :053 Compute Time: 10:09:48 Date: 06-26-1998
T,ype .... Pond Routing SlJTIT\ary
Name .... POND RT TRIAL 2 Tag: 25 YR
File .••. E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.ppk
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file
Outflow HYG file
L&B1PH2.HYG -det_est1 25 YR
= L&B1PH2.HYG -Outfall trial 25 YR
Pond Node Data
Pond Volune Data
Pond Outlet Data
No Infiltration
= Vol plan 1
Vol .Plan 1
= Trial 1b clogged
INITIAL CONDITIONS
Starting WS Elev 288.90 ft
Starting Volune = .000 ac-ft
Starting Outflow .00 cfs
Starting Infiltr. = .00 cfs
Starting Total Qout= .00 cfs
Time Increment = .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inf low
Peak Outflow
Peak Elevation
Peak Storage =
10.61 cfs
.00 cfs
291.47 ft
.350 ac-ft
at
at
.1668hrs
.0268 hrs
=====================================================
MASS BALANCE (ac -ft)
+ Initial Vol = .000
+ HYG Vol IN .350
-Infiltration= .000
-HYG Vol OUT = .000
-Retained Vol = .350
Unrouted Vol = -.000 ac-ft (.013% of Inflow Vo l ume)
WARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 1.04
Pond Pack Ver: 6-24-97 :053 Compute Time: 10:09:48 Date: 06-26-1998
Type •.•. Pond Routing Surrmary
Name •.•• POND RT TRIAL 2 Tag: 5 YR
File .••. E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\L1B1DET.ppk
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\WHEELER\L&B1PH2\
Inflow HYG file= L&B1PH2.HYG -det_est1 5 YR
Outflow HYG file= L&B1PH2.HYG -Outfall trial 5 YR
Pond Node Data = Vol plan 1
Pond Vol1..rne Data =Vol.Plan 1
Pond Outlet Data = Trial 1b clogged
No Infiltration
INITIAL CONDITIONS
Starting WS Elev 288.9D ft
Starting Volume = .000 ac-ft
Starting Outflow = .00 cfs
Starting lnfiltr. .00 cfs
Starting Total Qout= .oo cfs
Time Increment = .0200 hrs
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
Peak Inf low
Peak Outflow
Peak Elevation
Peak Storage =
= 8.34 cfs
.00 cfs
291. 14 ft
.264 ac -ft
at
at
• 1668 hrs
.D268 hrs
=====================================================
MASS BALANCE (ac -ft)
+ Initial Vol = .000
+ HYG Vol IN
-Infiltration
-HYG Vol OUT
-Retained Vol
Unrouted Vol
.264
.OOD
.000
.264
-.000 ac-ft (.01'7°1. of Inflow Volume)
WARNING: Inflow hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 1.05
Pond Pack Ver: 6-24-97 :053 Compute Time: 10:09:48 Date: 06-26-1998
Type •.•• Pond Routing Sunmary
Name •.•• POND RT TRIAL 2 Tag: SO YR
File •••• E:\HAESTAD\PONDPACK\PPK6\IJHEELER\L&B1PH2\L1B1DET.ppk
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\HAESTAD\PONDPACK\PPK6\IJHEELER\L&B1PH2\
Inflow HYG file= L&B1PH2.HYG -det_est1 SO YR
Outflow HYG file L&B1PH2.HYG -Outfall trial SO YR
Pond Node Data = Vol plan 1
Pond VolLme Data= Vol.Plan 1
Pond Outlet Data = Trial 1b clogged
No Infiltration
INITIAL CONDITIONS
Starting \JS Elev 288.90 ft
Starting VolLme .000 ac-ft
Starting Outflow = .00 cfs
Starting Infiltr. .00 cfs
Starting Total Qout= .00 cfs
Time Increment = .0200 hrs
INFLOIJ/OUTFLOIJ HYDROGRAPH SUMMARY
=====================================================
Peak Inf low
Peak Outflow
Peak Elevation
Peak Storage =
=
=
11.79 cfs
• 00 cfs
291.68 ft
.406 ac-ft
at
at
. 1668 hrs
.0268 hrs
=====================================================
MASS BALANCE (ac-ft)
+ Initial Vol .000
+ HYG Vol IN = .406
-Infiltration .000
-HYG Vol OUT .000
-Retained Vol = .406
----------
Unrouted Vol -.000 ac-ft (.010% of Inflow Volume)
IJARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 1.06
Pond Pack Ver: 6-24-97 :OS3 Compute Time: 10:09:48 Date: 06-26-1998
Appendix A A-1
Index of Starting Page Nll!lbers for ID Name s
1.06
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 6 -24 -97 :053 Compute Ti me : 10:09:48 Date: 06 -26 -1998