HomeMy WebLinkAbout28 Development Permit 596 University Tower Remote Parking Lot'
DEVELOPMENT PERMIT
PERMIT NO . 596R
University Towers Remote Parking L~t & Employee Temporary Parking Lot
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 2 of the Lodgeco Subdivision
OWNER:
Steven Ross
University Towers
410 South Texas Avenue
College Station, Texas 77840
( 409)846-4242
DRAINAGE BASIN:
Burton Creek
TYPE OF DEVELOPMENT:
This permit is being issued for the following:
SITE ADDRESS:
NIA
1. The construction of a parking lot on Meadowland Street as shown on approved construction drawings and site
plan dated 6/28/95 and
2. The construction of landscape screening and a sidewalk (once a Tex:DOT permit has been issued) associated with
the use of the existing slabs at 300 Texas Avenue for temporary parking. This lot will be used for "employee only"
parking for the University Towers until May 1999, after which date parking on the existing slabs must cease or the
site must come into full compliance with City codes and ordinances for a parking facility. The use of the existing
curb cuts on Texas Avenue for this temporary parking does not assure the use of these same locations or number of
curb cuts for any future user. At the time the site develops for any future user, the location of the curb cut(s) on the
remainder of Lot 2 of the Lodgeco Subdivision must come into compliance with the City of College Station's
driveway and access ordinance. All construction of the screening and sidewalks as well as clean-up of construction
debris on the slabs must be complete prior to allowing any parking to occur in the area.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation
occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor
shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner
and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy
machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage
facilities .
reby grant this permit for development of an area outside the special flood hazard area. All development shall be in
rdance with the plans and specifications submitted to and approved by the City Engineer in the development permit
lication for named project and all of the codes and ordinances of the City of College Station that apply.
Date
~f2of'1K
Date
Contractor Date
CITY OF COLLEGE STATIOH *** CUSTOMER RECEIPT *** OPER: MRODGERS CT DRAWER: 1
DATE: 8/20/98 00 RECEIPT: 0019974
DESCRIPTIOH QTY AKOUHT TP TM
MISC EHGR CHARGE $300.00 3D CK
TEXAS STUDEHT HOUSIHG CORP.
TEMP PARKIHG PERMIT (EHG.)
UHIVERSITY TOWERS REMOTE PKIHG
CK. 4997
LH
TIME: 15:31:32
TOTAL PERSOHAL CHECK
AMOUHT TEHDERED
THAHK YOU
$300.00
$300.00
DEVELOPMENT PERMIT
PERMIT NO. 596
University Towers Remote Parking Lot
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 2 of the Lodgeco Subdivision
OWNER:
Steven Ross
University Towers
410 South Texas Avenue
College Station, Texas 77840
( 409)846-4242
DRAINAGE BASIN:
Burton Creek
TYPE OF DEVELOPMENT:
SITE ADDRESS:
NIA
This permit is being issued to outline conditions for the construction of a 58 space remote parking facility for the
University Towers Dormitory. This facility is being constructed without benefit of site plan, landscape plan or
drainage plan/report review prior to construction. The owner is proceeding with the construction of the parking
lot at 'HIS OWN RISK". It is understood that the final design and constructed project will meet all appropriate
City codes and ordinances. It is also understood that the design plans will be submitted to the City of College
Station Development Coordinator for review no later than NOON, Wednesday, August 12, 1998 and that all
comments from the subsequent review process will be addressed.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. The Owner and/or Contractor shall assure that all distwbed areas are sodden and establishment of vegetation
occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor
shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner
and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy
machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage
facilities .
y grant this permit for development of an area outside the special flood hazard area. All development shall be in
ce with the plans and specifications submitted to and approved by the City Engineer in the development permit
tion for the abo named project and all of the codes and ordinances of the City of College Station that apply.
Date ziisi~
Date
Contractor Date
08 /05 /98 15:55 '5'409 764 3496 DEVELOPMEN T SVCS
TR AN SMISSIO N OK
TX/RX NO.
CO NECTIO N TEL
CO NN ECTIO N ID
ST ART TI ME
USAGE TI ME
PAGES
RES ULT
*************************** *** ACTI VIT Y REPORT ***
***************************
4876
9p8468569
UN I VERSIT Y TO WER
08 /05 15 :54
00 '44
2
OK
~00 1
COLLEGE STATION
August 5, 1998
Mr. Steven Ross
University Tower
P. 0 . Box 9960
410 South Texas Avenu e
College Station, Texas 77840
Dear Mr. Ross ,
1101 Texas Avenu e
Tel : 409 764 3500
Per our discussion yesterday you asked the following questions :
Question:
College Station , TX 77842
Can your employees park on the existing "flat " slabs located on the remainder of Lot 2 of the
Lodgeco Subdivision until May 1999?
Answer :
Yes , .because it has been used as a parking area in the past. However, we would require that in
doing so you :
1. Screen the parking from Texas Avenue using vegetation or other means as outlined in the
City of College Station Zoning Ordinance Section 11.3 . Please submit a plan for review
and approval by City Staff prior to planting .
2 . Construct the sidewalk along Texas Avenue as required per the platting of the property to
the City of College Station standards. Please submit plans for review and approval by
City Staff prior to construction .
3. Cease the use of the area as an overflow parking area after May 1999 or bring the facility
up to full City standards .
Qu e stion :
Can you proceed with the construction of the 5 8 space parking lot off Meadowland without benefit
of permit or plan review ?
Answer :
Yes , but by doing so you will be proceeding at your own risk. It is with the understanding that you
will submit the completed site plan, landscape plan and drainage report by Noon on Wednesday,
August 12, 1998 . It is also with the understanding that you will meet all City codes/ordinances
with the ultimate design and constructed product. As we discussed in the meeting this may mean
that your ultimate cost may be greater in the long run . You may have to detain off-site on the
remainder of the property near Texas Avenue or you may have to remove and repour portions of
the parking lot to meet all ordinances. We do require that you complete a Development Permit
Home of Texas A&M University
Application, pay the $100 fee associated with that permit, provide erosion control on site in tenns
of silt fencing or hay bales to prevent silt migration off-site and sign a conditional permit we will
issue stating all construction is proceeding "at the owner's risk".
Question:
Can you make any modifications to the parking lot (if necessary) during the Christmas holidays?
Answer:
Yes, we will allow you to defer the demolition/repaving of the parking lot until December
1998/January 1999 while the students are away on break if this becomes necessary .
Question:
Is there anyway to expedite the review process?
Answer:
Perhaps . Once your Engineer can confirm the date he will be finished and submit all necessary
documents, we could ask if there are any employees willing to work "after hours " to complete the
review. A fee for this review would be required to be paid by the owner. This fee is typically 2
times the employees hourly rate on weekday evenings . Please call Shirley Volk to coordinate this
review at 764-3570 .
I hope this has answered all of your questions . If you need clarification or have additional
questions, please call . I can be reached at 764 -3570 . Please have someone come by immediately
to fill out the application, pay the fee and sign the "conditional" permit.
.....
cc: Paul Kaspar, Graduate Engineer
Jane Kee , City Planner
Jim Callaway, Director of Development Services
Shirley Volk, Development Coordinator
Natalie Ruiz, Assistant Development Coordinator
Jon Mies , Fire Marshal
CITY OF COLLEGE STATION *** CUSTO"ER RECEIPT *** OPER: "RODGERS CT DRAWER: 1
DATE: 8/05/98 00 R,ECEIPT: 0018890
DESCRIPTION QTY A"OUNT TP T"
FILING FEE/DS/BI $100.00 B7 CA
DEVELOP"ENT PERKIT
LODGECO CASH
DEVELOPKENT PERKIT
DEBORAH GRACE
THIE: 17:00:50
TOTAL CASH
A"OUNT TENDERED
THANK YOU
$100.00
$100.00
***** N 0 S A L E ***** OPER: KRODGERS CT DRAWER: 1
DATE: 8/05/98 00 RECEIPT: 0000000
TI"E: 17:01:04
..
Figure XU
Development Permit
City of College Station, Texas
Site Legal Description : L-n± ;l. Lo~rco s~d.lv t~I~
Site Owner: keof\A.r.Q
Architect/
Engineer: C~ f. S {;_,/,~ fb
Contrac tor: ~uAU ~+Lei< Gnk~
Date Application Filed: £3 '0 S"'' C/f
Application Fee
Signed Certifications
Address: 4to S ~ca.;, Av<.
Telephone : Cf v:}; !1~b -Y..J 'l'G
Address : ~ -;3 S.(~~ tWe, S1c,·v~
Tel e phone No : '84fo -8 ~lo f' "6eA/-1-r-l ·J~uz.
Address : H"""y d I werl-
Telephone No : 822-//:,DY
Drainage and erosion control plan, with supporting Drainage Report two (2) copies each .
Site and Construction Plans, with supporting Drainage Report two ) copies each .
Othe r : P _,.~0-~ ·
ACKNOWLEDGMENTS :
, d esig n eng in e ~her eby acknowledge or affir m that:
The information a nd conclusion s contained in the above plans and suppo rting docume nts comply
with the current requirements of th e City of Co llege St atio n, Texas City Code, Chapte r 13 and its
associated Drainage Policy and Desi g n Standards .
As a condition of approval of this permit application, I agree to construct the improve ments
proposed in th is application according to the se documents and the requirements of Chapter 13 of
th e Co ege Sta io City Cod e .
Contractor
Drainage Development Pennit
Issuance Checklist
~F $100 .00 Fee Paid
i:{ ~ Application Complete/Signed
.k~~~~~-Q.rfr~~i ,~n Cone1fr7~n (submitted & approved)
lfSne > 5 Acres Is N .0 .1. Submitted ~~ \ot-~
~b-~-tl/~-~
D ainage Rep ~etter (submitted & approved)
-~~~t·~r · ~ $300 Fee Paid -For Subdivision Inspection (if applicable)
''The above checklist must be complete prior to issuing a full drain,age
permit o·n a project. To issue a partial permit for clearing and grading
only , all items minus the drainage report mu s t be complete _ Please initial
in each hox i r you check off any of these items _"
GENERAL NOTES :
1. ALL LINEAR DIMENSIONS ARE IN FEET.
2. BEARING SOURCE IS PLAT RECORDED IN 1996/331.
3. ALL CURB RADII SHOWN ARI;: 4.0' MEASURED
AT BACK OF CURB .
'4-. PARKING LOT SURFACE SHALL BE ASPHALt WITH
THE FOLLOWING CROSS-SECTION:
~ CRUSHED LIMESTONE
1.5" HMAC
5. STD .CONCRETE CURB AND GUTTER SHALL BE INSTALL.ED
AT PARKING PERIMETER ANO ISi.ANOS.
NOW OR FORMERLY /
APPLEBEE'S OF TEXAS, INC. ~~
2000/188 ~'\.-
93 v
.<-)
6. B.M . IS TOP OF l'IRE HYDRANT IN FRONT OF f'OURPU:XES
AT 135 MEAOOWLAND ST. -ELEV. 331.59'.
7. SOLID CONTOURS !IRE EXISTING. DASHED CONTOURS
ARE PROPOSED . ~%
8 . ONE 2 '-WIDE CURB UT SHALL BE INSTALLED AT
PARKING SPACES TO -.58 •
9 . A 20'-WIDE RIPRAP STRIP SHALL BE PLACED
OONWNSfREAM FROM ALL CURB CUTS.
VACANT
LOT 1
LODGECO SUBDIVISION
1996/3~1
PL.ATIEO
SCALE :
1" = 40'
1 480
N
s
VACANT
RaWl<lER Of
LOT 2
LOOOECO SUBOMSION
1996/331
PlATTED
/~
~
4
·'" "' 0"
-" b<: NOW OR FORMERLY '° EQUITY INNS L.P.
2050/111
LEOCNP
IR -IRON ROD
IP = IRON PIPE
CM • CONCRETE MARKER
MOC -MARK ON CONCRETE
S/F = SET OR FOUND
FP = fENCE POST
FC "" ftNCE CORNER
ROW = RIGHT OF WAY
BB = BACK TO El.ACK Of CURB
BL "' BUILDING LINE
PUE = PUBLIC UTIUlY EASMT.
EE "" ELECTRICAL e;.\SfMENT
DE "' ORAi w.GE EASEMENT
AE ,. ACCESS EASEMENT
PAE = PARKING/,4,CCESS EASMT ,
EN = ELECTRIC t.IETER
ET =-aECTRIC TRANSFORMER
E/P /L .. ELECTRJCAL/POLE/UOffT
MH = MANHOLE
CO "" Cl£AN OUT
VIM = WATER METER
W/V ,. WATER/VALVE
sS "' SANITARY SEWER
FH = FIRE HYDRANT
GM .. GAS METIER
T/8 .. TELEPHONE PEDESTAL
C/TV "" CABLE TV
>C .. AIR CONDmONER
OH =~ANG
( M ) • MEASURED
( R ) -RECORDED
GENERAL NOTES :
1. ALL LINEAR Dll.1ENSIONS ARE IN FEET .
Z. BEARING SOURCE IS PLAT RECORDED IN 1999/331.
3. ALL CURB RADII SHOWN ARE 4.0' MEASURED
AT BACK OF CURB . +. PARKING LOT SURFACE SHALL BE ASPHALT WITH
THE FOLLOWING CROSS-SECTION :
6" CRUSHED LIMESTONE
1.5" HMAC
5. STD.CONCRETE CURB AND GUTTER SHALL BE INSTALLED
AT PARKING PERIMETER AND ISl.J\NOS.
NOW OR FORMERLY
APPLEBEE'S OF TEXAS, INC.
2000/1aa
6. B.M. IS TOP OF FIRE HYDRANT IN f'RONT OF FOURPLEXES
AT 136 MEAOO'M.AND ST. -ELEV. 331.59'.
7. SOLID CONTOURS ARE EXISTING, DASHED CQNTOIJRS
ARE PROPOSED . w,g z
8 . ONE 2 '-WIOE CURB cur SHALL BE INSTALLED AT
PARKING SPACES TO ,..,_ 5'81
9 . A 20'-WIOE RIPRAP STRIP SHALL BE PLACED
OONWNstREAM FROM ALL CURB CUTS .
VACANT
LOT 1
LODGECO SUBDIVlSION
1996/331
PLAITED
SCALE :
1" 40'
1 : 480
N
s
322
VAo.NT
REMAJt«lE:R Of
~
'"<)
"'
LOT 2
l.ODGECO SUBOMSION
1996/331
PlATIEO
</:? ~ ~ NOW OR FORMERLY
EQUITY INNS L.P.
2050/111
LEGEND
IR -IRON ROD
IP = IRON PIPE
CM • CONCRETE MARKER
MOC -MARK ON CONCRETE
S/F "" SET OR FOUND
FP = FENCE POST
FC = FENCE CORNER
ROW = RIGHT OF WAY
BB "' BACK TO BACK OF CURB
BL '"' 8Ull.DING LINE
PUE • PUBLIC UTILITY EASMT.
EE = ELECTRICAL E"ASEt.1ENT
DE .. ORAi NAGE EASf).I ENT
AE = ACCESS EASEMENT
PAE ,. PARKING/ACCESS EASMT .
EM = ELECTRIC METER
ET "' ELECTRIC TRANSFORMER
E/P /L "' ELECTRICAl../POLE/UCHT
MH .. w.NHOLE
CO ,. Cl.E:AN OUT
WM "' WATER METER
W/V = WATER,NALVE
SS "' SANrTARY SEWER
FH = FIRE HYDRANT
GM = QAS 1.1ETER
T /8 • TELEPHONE PEDESTAL
C/TV = CABLE TV
JC -= AIR CONDITIONER
OH -= OVERHANG
( M ) • MEASURED
( R ) -RECORDED