HomeMy WebLinkAbout2 Development Permit 555 Holditch Office Complex-
DRAINAGE REPORT
for
TEMPORARY DETENTION
HOLDITCH OFFICE COMPLEX
PHASE II
College Station, Texas
December 1990
Prepared by : Garrett Engineering
4444 Carter Creek Pkwy. Suite 108
Bryan, Texas 77802
NOTE: Garrett Engineering is not responsible for the design of any building
or parking elevations and grades. Garrett Engineering is al.so not
responsible for the design of any stonn sewer for this project.
-
PRE-DEVELOPMENT
The Project site is a 1.189 acre tract located adjacent to Phase 1 of the Ho/ditch Office Complex on
Southwest Parkway. The site is presently covered with grass and weeds, characteristic of most
undeveloped lots. 1he natural ground slopes toward the east.
POST-DEVELOPMENT
The planned construction consists of a 14,992 s.f office building and related parking. Runoff from
the site is divided, with part flowing to Southwest Prkwy. and part flowing to the southeast into Phase
ill. Detention will be provided on Phase Ill. Discharge will be released through a 4" P. V. C. pipe with
the detention pond holding the increase in runoff due to development for a 10-year storm event.
METHOD OF ANALYSIS
1he peak runoff from the site was computed using the "Rational Method" for pre-development and
post-development conditions.
The runoff was converted to a triangular hydro graph by plotting the peak rate of runoff vs . the time-
of-concentration . The rescinding leg of the hydrograph was set at a length equal to 1. 76 times the time-
of-concentration.
The post-development hydro graph was routed through the proposed detention pond by the "Storage-
Indication" routing method.
PRE-DEVELOPMENT
Avg. Slope = 1.53%
Hydraulic Length = 180 ft.
Runoff Velocity = 0.9 fps
tc = 18010.9 = 3.33 min (use 5 min.)
Sub-area
Lot 1-B 0.30
Freq . Ian/hr)
5 9.85
JO 10.98
25 12.51
50 14.10
POST-DEVELOPMENT
Avg. slope = 1.0%
Hydraulic Length = 332 ft.
Runoff Velocity = 2 . 0 fps
.Area (ac)
1.185
QfJ;M
3.50
3.90
4.45
5.01
tc = 33212.0 = 2. 77 min. (use 5 min .)
Sub-Area {;_
Pavement 0. 87
(toward S. W. Prkwy.)
Landscaping 0 .30
(toward S. W. Prkwy.)
Bldg. 0.87
Paving 0.87
(toward the S .E .)
Landscaping 0 .30
(toward th e S .E .)
Weighted "C" = 0. 73
0.3398 0.2956
0 .1359 0 .0408
0 .3471 0 .3020
0 .1855 0 .1614
0.2415 0.0725
Freq /(in/hr.) Q
5 9.85 8.52
10 10.98 9.50
25 12.51 10.82
50 14.10 12.20
Qiltcr<as< JQ-yrstoma '"'"' = 9.50 -3.90 = 5.60 cfs.
Amount of Runoff contributing to detention
Sub-Area
Bldg.
Paving
La.ndscaping
0.87
0 .87
0 .30
Weighted "C" = 0. 69
0.3471
0.1855
0 .2415
QJQ-yr. stoma •v•fll = (0.69)(10.98)(0. 7741) = 5.86 cfs.
0.3020
0.1614
0.0725
* * * * * * * * * * * * * * *
* DETENTION DESIGN *
* HOLDITCH OFFICE COMPLEX *
* PHASE II *
* COLLEGE STATION, TEXAS *
* * * *
* * * * * * * * * * * * * * *
DISK FILES : A:hold.HYD A:holdrev.RSV
INITIAL CONDITIONS
Elevation = 284 ft
Storage = 0 cu.ft
Discharge = O cf s
GIVEN RESERVOIR DATA COMPUTATIONS
ELEV. I STORAGE IDISCHARGEI
(ft) I (cu. ft) I (cf s)
1---------1---------1---------1
I 284.0 I 0.0 I 0.00
285.0 I 5609.0 I 0.26 I
286.0 I 7891.0 I 0.26 I
2S/t
(cfs)
1---------
1 0.0
187.0
263.0
2S/t + 01
(cfs)
---------1
0.0 I
187.2 I
263.3 I
-..
DISK FILES: A:hold.HYD A:holdrev.RSV
GIVEN INFLOW HYDROGRAPH ROUTING COMP UTATIONS
DATE
1000
1000
1000
1000
,1000
11000
11000
11000
11000
11000
11000
11000
11000
11000
11000
HOUR
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
INFLOW I
(cf s) I
--------1
0.01
1.21
2.31
3.51
4.71
5.91
5 .11
4.5
3.8
3.2
2.5
1.9
1.2
0.5
0.01
Il +I2
(cfs)
0.0
1. 2
3.5
5.8
8.1 I
10.5
10.9
9.6
8.4
7.1
5.7
4.3
3.1
1. 7
0.5
2S/t -0
(cfs)
0.0
1. 2
4.6
10.4
18.5
29.0
39.8
49.2
57.4
64.2
69.7
73.9
76.7
78.2
78.5
PEAK OUTF LOW=.1. (cfs)
2S/t + 0
(cfs)
0 .0
1. 2
4.7
10.5
18.6
29.0
39.9 I
49.3
57.5
64.4
69.9
74.1
76.9
78.4
78.7
PEAK ELEVA T ION = 284.42(FT)
STORAGE AT PEA K = 2359 (cu.ft)
OUTFLO W! ELE V .
(cfs) I (ft)
--------1---------
0.0 I
o.o
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
28 4 .0 0
284.01
284.02
284.06
284.10
284.16
284.21
284.26
284.31
284.34
284.37
284.40
284.41
284.42
284.42
284.4 288.9 293.4 297.9 302.4
WATER
ELEV. (ft)
0.1 1.3 2.4 3.6 4.8 6.0
I 1----------1-----------1-----------1-----------1-----------I
I
0 -x PEAK ELEV. = 284.42 ft.
I
STORAGE = 2359 (cu.ft)
Q MAX =.1. cfs
1 -xi/ *
I
2 -x *
3 -x *
4 -x *
5 -x
6 x
7 x
8 x
9 -I x
10 -I x
11 x *
\ I
HOUR
*
* x
*
*
*
*
Inf low Hydrograph Data
Reservoir Outflow Hydrograph
ROUTED FILES: hold.HYD; holdrev.RSV
FLOW
(cfs)
·-------5'
-----·-~
1-.·
I .
I
PO'&-t -Development l-Jy dro9raph
Con+ributtn3 w De t entio n
Q peak = C?, BG, ct5'
T;me.
------1
!
0
I
z
'3
4-
~
(,
7
s
0
to
II
IZ ,.,
14
Q
0
1.17
~.-ot
::i. s
+.&9
17. e&
~o~
4.~
~JJ9
3:z o
'l...00
/.<0 0 .
J, 1.0
o,0Z
0
DRAINAGE REPORT
for
TEMPORARY DETENTION
HOLDITCH OFFICE COMPLEX
PHASE II
College Station, Texas
December 1990
Prepared by: Garrett Engineering
4444 Carter Creek Pkwy . Suite 108
Bryan, Texas 77802
NOTE: Garrett Engineering is not responsible for the design of any building
or parking elevations and grades. Garrett Engineering is also not
responsible for the design of any stonn sewer for this project.
PRE-DEVELOPMENT
The Project site is a 1.189 acre tract located adjacent to Phase l of th e Ho/ditch Office Complex on
Southwest Parkway . The site is presently covered with grass and weeds, characteristic of most
undeveloped lots. The natural ground slopes toward the east.
POST-DEVELOPMENT
The planned construction consists of a 14,992 s.f office building and related parking. Runoff from
the site is divided, with part flowing to Southwest Prkwy. and part flowing to the southeast into Phase
Ill. Detention will be provided on Phase Ill. Discharge will be released through a 4" P. V. C. pipe with
the detention pond holding the increase in runoff due to development for a 10-year storm event.
METHOD OF ANALYSIS
The peak runoff from the site was computed using the "Rational Method" for pre-development and
post-development conditions.
The runoff was converted to a triangular hydrograph by plotting the p eak rate of runoff vs. the time-
of-concentration. The rescinding leg of the hydro graph was set at a length equal to 1. 76 tim es the time-
of-concentration .
The post-development hydro graph was routed through the proposed d etention pond by the "Storage-
lndication" routing method.
PRE-DEVELOPMENT
Avg. Slope = 1.53%
Hydraulic Length = 180 ft.
Runoff Velocity = 0.9 fps
tc = 18010.9 = 3.33 min (use 5 min.)
Sub-area
Lot 1-B 0.30
Freq. !(in/hr)
5 9 .85
10 10.98
25 12.51
50 14.10
POST-DEVELOPMENT
Avg. slope = 1.0%
Hydraulic Length = 332 ft.
RunojJVelocity = 2.0.fps
Area (ac)
1.185
QJef1J.
3.50
3.90
4.45
5.01
tc = 33212.0 = 2. 77 min. (use 5 min.)
Sub-Area ~
Pavement 0. 87
(toward S . W. Prkwy .)
Landscaping 0.30
(toward S . W. Prkwy.)
Bldg. 0.87
Paving 0.87
(toward the S.E.)
Landscaping 0.30
(toward the S .E .)
Weighted "C" = 0. 73
0.3398 0.2956
0.1359 0.0408
0.3471 0.3020
0.1855 0.1614
0.2415 0.0725
Freq !(in/hr.) Q
5 9.85 8.52
10 10.98 9.50
25 12.51 10.82
50 14.10 12.20
Qincreare Jf>.yrstonn even/ = 9 .50 -3 .90 = 5 .60 cfs.
Amount of Runoff contributing to detention
Sub-Area
Bldg.
Paving
La.ndscaping
0.87
0 .87
0.30
Weighted "C" = 0.69
0 .3471
0 .1855
0.2415
Qlf>.yr. stonn even1 = (0.69)(10.98)(0. 7741} = 5 .86 cjs.
0.3020
0 .1614
0.0725
* * * * * * * * * * * * * * *
* DETENTION DESIGN *
* HOLDITCH OFFICE COMPLEX *
* PHASE II *
* COLLEGE STATION, TEXAS * * *
* *
* * * * * * * * * * * * * * *
DISK FILES : A:hold.HYD A:holdrev.RSV
INITIAL CONDITIONS
Elevation = 284 ft
Storage = O cu.ft
Discharge = 0 cf s
GIVEN RESERVOIR DATA
ELEV. I STORAGE IDISCHARGEI
I (ft) I (cu. ft) I (cf s) I
1---------1---------1---------1
I 284.0 I 0.0 I 0.00 I
285.0 I 5609.0 I 0.26 I
286.0 I 7891.0 I 0.26 I
COMPUTATIONS
2S/t 12S/t + 0
(cfs) (cfs)
1---------1---------
1 0.0 I 0.0
187.0 I 187.2
263.0 I 263.3
SK FILES: A:hold.HYD A:holdrev.RSV
GIVEN INFLOW HYDROGRAPH RO UTIN G COMPUTATIONS
-------------------------------------------------------------------------
DATE HOUR I INFLOW I Il+I2 2S/t -0 I 2S/t + 01 OUTFLOW I ELEV. I
I (cfs) (cfs) (cfs) (cfs) I (cfs) I (ft) I
·--------1----------------1 ------------------1--------1--------1---------
1000 0 0.01 0.0 0.0 0.0 0.0 I 284.00 I
1000 1 1.21 1. 2 1. 2 I 1. 2 0.0 284.01
11000 2 2.31 3.5 4.6 4.7 0.0 284.02
1000 3 3.51 5.8 10.4 10.5 0.0 284.06
1000 4 4.71 8.1 18.5 18.6 0.0 284.10
11000 5 5.91 10.5 29.0 29.0 0.0 284.16
1000 6 5.11 10.9 39.8 39.9 0.1 284.21
1000 7 4.51 9.6 49.2 49.3 0.1 284.26
1000 8 3.8 8.4 57.4 57.5 0.1 284.31
11000 9 3.2 7.1 64.2 64.4 0.1 284.34
1000 10 2.5 5.7 69.7 69.9 0.1 284.37
1000 11 1.9 4.3 73.9 74.1 0.1 284.40
11000 12 1.2 3.1 76.7 76.9 0.1 284.41
1000 13 0.5 1.7 78.2 78.4 0.1 284.42
1000 14 0.0 0.5 78.5 78.7 0.1 284.42
-------------------------------------------------------------------------
PEAK OUTFLOW=.1. (cfs)
PEAK ELEVATION = 284.42(FT )
STORAGE AT PEAK = 2359 (cu.ft)
284.4 288.9 293.4
0.1 1.3 2.4
297.9 302.4
3.6 4.8
WATER
ELEV. (ft)
6.0
I l----------1-----------1-----------1-----------1-----------I
FLOW
(cfs)
I
0 -x PEAK ELEV. = 284.42 ft.
STORAGE = 2359 (cu.ft)
Q MAX =.1. cfs
1 -xi/ *
I
2 -x *
3 -x *
4 -x *
5 -Ix
6 x
7 x
8 x
9 x
10 x
11 x *
\ I
HOUR
*
* x
*
*
*
*
Inf low Hydrograph Data
Reservoir Outflow Hydrograph
ROUTED FILES : h o ld.HYD ; holdrev.RSV
" .
5'
1-.·
P~-t--Development Wydro9raph
Contribuhn9 w Deten tion
Q peak = 9, BG, cts-
Tim&
0
J ·---------z
?
4-
5
&
7
I ---1 i
0
--l-----+--IO
11
ll ,.,
I 14 -: -------I
: I I I ---i--+----i-------i--
I I l -----.--r
-----------1---1 ---
I I
Q
0
1.17
~.oz
~.s
4;'79
9. ec.,
~OIS'
4.9
~.SC?
3.i o
'l..t:;O
/.0 0 ·
/,10
0.02
0
4 7 0 0 /0 II IZ '~ 14 11;7 j(, 17 '~ 19 'LL!
January 2, 1991
Holster & Associates
7607 Eastmark Drive, Ste. 200
College Station, TX 77840
Re: Holditch Office Bldg. Phase II
Dear Constantine:
f ILE COPY
I am in receipt of the drainage report prepared in part by Garrett Engineering.
It appears the engineer has not designed the grades, storm sewer pipe, nor is his
stamp on the plan showing details.
Our ordinance requires these items be designed by a registered professional
engineer. Therefore, we are unable to release a development permit for this
project.
Enclosed please find an application for a development permit. Please fill out the
application and resubmit the report with the engineer's seal if you would like for
staff to continue the review process.
Sincerely,
Deborah Leslie Keating, P.E.
Project Engineer
cc: David Pullen, City Engineer
Veronica Morgan, Assistant to the City Engineer
DK/ejm
' .
/
DRAINAGE REPORT
for
TEMPORARY DETENTION
HOLDITCH OFFICE COMPLEX
PHASE II
College Station, Texas
December 1990
Prepared by: Garrett Engineering
4444 Carler Creek Pkwy. Suite 108
Bryan, Texas 77802
DRAINAGE REPORT
for
TEMPORARY DETENTION
HOLDITCH OFFICE COMPLEX
PHASE II
College Station, Texas
December 1990
Prepared by: Garrett Engineering
4444 Carter Creek Pkwy. Suite 108
Bryan, Texas 77802
(
"----· .
Figure XII-1
Applicat i on Form
Development Perm i t
For Areas Outside Flood Hazard Areas
City of College Station, Texas
( re : 0 rd i n a n c e No . )
Site Legal Description: Lot 1 , Block 7 Southwest Crossing PH III
Site Address: 902 Southwest Parkway
Located in: Wolf Pen r;r eek -1 ,189 AC Wat e rshed
Owner:
Architect/
Engineer:
SA Holditch& Associates
~---~--~------
Address: 900 Southwest Parkway E
Telephone No.: -+-7 ~64:i:.......l~lu2~2~----
Address: 7607 Ea~tmark , Suite 200
Holster & Associates , Inc Telephone No.: 693 31 79
~--------
Contractor: .James Holster Address: 7607 Eastmark, Suite 200
Tel e phone No. : __;..69._J.._-...... J=l ...... 79.__ ___ _
Date Application Filed: 1/7/91 -----------Approved:
Application is hereby made for the following development: Holditch Office
Complex , Phase II
Attached as part of this application:
Application Fee
Drainage Plan with supporting documentation: two copies of each
Other:
ACKNOWLEDGEMENTS:
I, ""$.A. y\dJ~ tc..l.. 1 l ..... c... , as owner, hereby acknowledge or affirm that:
The above Drainage Plan and supporting documents complies with the
requ i rements of Ordinance No.
'~ l ,l '"fi t
Da te '
98