Loading...
HomeMy WebLinkAbout14 Development Permit 567 St Francis Episcopal Parking Lot ExpDEVELOPMENT PERMIT PERMIT NO. 567 St. Francis Episcopal Church Parking Lot Expansion FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Tract "A", Crawford Burnett League OWNER: St. Francis Episcopal Church 1101 Rock Prairie Rd. College Station, Tx. 77840 (409) 696-1491 DRAINAGE BASIN: Bee Creek Trib "A " TYPE OF DEVELOPMENT: SITE ADDRESS: 1101 Rock Prairie Rd This permit is valid for the construction of a parking lot expansion in accordance with the approved plans. Erosion control must be provided to keep all silt and debris from entering Rock Prairie Road. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . I hereby grant this permit for development of an area outside the special flood haz.ard area. All d velopment shall be in accordance with the plans and specifications submitted to and approved by the Ci Engineer in the development permit application for the above named project and all of the codes and r · nances of e Ci of College Station that apply. Date 1 /t,'1/1~ Date Figure Xll Development Permit City of College Station, Texas Site Legal Description: \'\JGX·~I\ C"'::w~J...1b~'<~Le=,"°~ L~ ~-A-,~ Site Owner: ~ rt~\A.c.U. ~~~ ~Jn Address : llOl ~~y.j< ,~s..T~ '1'1Mi~ Telephone: 401 Cc"i 4:> W"\ \ Address : /l,bJ ~+~S{f~.:ll~. ~.~.T'1-172''\'0 Telephone No : c\E>'l (d:\?~i.1i 1 Arch itect/ Eng ineer: Wex J. ~. l\.\.l... . Address : ~~'M..e. . Telephone No :~_..:;:~;_;;,;_:;_~=--------- Date Application Filed: -~--'{'-[j?--'/'-4'-~-----Approved : ------------ Appl ication is hereby made for the following development specific waterway alterations : ~ Application Fee l!Y Signed Certifications 0 Drainage and erosion control plan, with supporting Drainage Report two (2) copies each . 0 Site and Construction Plans, with supporting Drainage Report two (2) copies each . 0 Other: ------------------------------ ACKNOWLEDGMENTS : I, J~.u,. 4:; ·~o\_,,,~ des ign engineer/owner, hereby acknowledge or affirm that : The information and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards . As a condition of approval of this permit application, I agree to construct the improvements proposed in this application according to these documents and the requirements of Chapter 13 of t~~~~~t~;~?· ~ ¥- ~+.~-~~~~ ~ ----~ Property Owner(s) · Contractor Figure XII Continued CERTCFCCATIONS : (for proposed alterations w ithin designated flood hazard areas .) A. I, certify that any nonresidential structure Qn or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the l 00 year storm. Engineer Date B. l , cert ify that the finished floor elevation o f the lowest floor , including any basement , of any residenti al structure, proposed as part of this application is at or above the base flood elevation establis he d in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended . En gi neer Date C . I, certi fy that the alterations or development covered by this permit shall not dimin ish the flood-carry ing capacity of the waterway adjoining or crossing this pe rm itted site and that such alterations o r development are consistent with requirements of the City of College Station City Code, Chapter l3 concerning encroachments of flood ways and of floodway fringes . Engineer Date I, do certify that the proposed alterations do not raise the level ,___) of the I 00 year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. Engineer Date Conditions or comments as part of approval : ------------------- In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, .measures shall be taken to insure that debris from cons~ction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . I hereby grant this permit for development. AH development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project . AH of the applicable codes and ordinances of the City of College Station shall apply . CITY OF COLLEGE STATION *** CUSTOl'IER RECEIPT *** OPER: l'IRODGERS CT DRAWER: 1 DATE: 9/08/98 00 RECEIPT: 0021339 DESCRIPTION QTY Al'IOUHT TP Tl'I l'IISC EHGR CHARGE 1 $100.00 •3D CK HOLSTER & ASSOCIATES i · DEVELOPl'IEHT PERl'IIT ST. FRANCIS EPISCOPAL CK. 3257 LH TEHDER DETAIL CK $100.00 DATE: 9/08/98 Til'IE: 14:51:10 TOTAL PERSONAL CHECK $100.00 Al'IOUHT TEHDERED $100.00 THANK YOU HESTER ENGINEERING COMPANY CIVIL ENGINEERING SERVICES March 30, 1998 7607 EASTMARK DR IVE, SU ITE 253 -8 COLLEGE STATION , TEXAS 77840 <409>693-11 oo fx: C409>693-107 s email : hec2ooo@aol.com Ms. Veronica Morgan, P.E . College Station Development Services P.O . Box 9960 College Station, TX 77842 Re: St. Francis Episcopal Church 1101 Rock Prairie Road College Station, Texas Drainage Letter Dear Veronica, 11L-E ~-~ ffi~~ ~~~ ~~Leµ (tJa::DS A~·) The administrators of the St . Francis Episcopal Church have gathered sufficient funding to pay for the construction of another phase in the ultimate development of their church complex and propose to have constructed additional parking faci l ities for their congregation from the existing 50 to 72 spaces. With the construction of the parking spaces approximately 10513 s.f . (0 .24 acres) of surface area will be made impervious which results in a storm drainage runoff increase of 1.7 cubic feet per second for the 100 year storm. Due to this small increase in runoff and the negligible impact to the drainage system down to the primary channel detention is not required nor planned for this phase of development. If you have any questions please call. ----"":__._;:.c_-""lr:.-----"....,.,.,~:.......JL~J....-4.~ • ~~~·°If:) * Q100=cia=0.6*11.5in/hr*0.24acres=l.7cfs st. Fra nci s Ep iscopal Ch urch comple x -Drain age Lette r