Loading...
HomeMy WebLinkAbout14-265CASE NO.: C ITY or C ou..EGE STATI ON Home of Texas A&M University " SITE PLAN APPLICATION GENERAL TIME: I DATE SUB~MIJTED : ........ ~~-----~ STAFF : --+"lr-l---t------~ MINIMUM SUBMITTAL REQUIREMENTS: $932 Site Pla11 Applicatio11 Fee. H /A D D D $350 tfo11-Reside11tial A1 cl litectui al Standards I Nortligete Building Review Application Fee (if applicable). tJ. /A $600 (111i11i111un 1) Deoelopnient Permit Applieatior'I I Publie lr'lfrastfuetufe Re¥iew ar'iel lr'lspeetior'I Fee . Fee is 1 % of acceptable Engi11eer's Estimate for publie infrBstrueture , $600 minimum (if fee is > $600 , tlie belenee is dt:Je prior to tlie isst:Janee of ar'ly l'lar'ls Of ele¥elel'ffieflt l'Cfffiit). N/A / [9/ Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered . vi ~ Six (6) folded copies of site plan . ~One (1) folded copy of the landscape plan. D 0Re (1) ee13y ef ti'le fellewiflg fef Nefl Resieler'ltial AFCi'liteettJFBI StBndBrds bt1ilding review or Nortligete Buildi11g Reoievv (if epplieable). t--l/A D Buildi11g eleoetions to seale fef all buileliRgs . D D A list of buildi11g n 1eteriels for all ft'JeBele ar'iel seFeefliflg . Color samples for all builelil"lgs Of list eelers to be useel frol"l"I ti'le appre·v·eel eeler palette . D Eledi011ic copy of Site Pla11 e-111ailed to csueleetdesign@esbc.gou. /~ Two (2) copies of the grading , drainage , and erosion control plans with supporting drainage report. ff Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). D Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). D Tlie etteelied Site Plar'I Non Residential Arei'liteetural Standards Building Revievv and Nortligate Building Reoievv elieeklists (es epplieBble) vvith all itel"l"ls eheekeel off or a brief explanatior'I as to oo'l'ly they Bre not ei'leelt off. t--1 /A Date of Optional Preapplication or Stormwater Management Conference NAME OF PROJECT College View High School ADDRESS 1300 George Bush Drive, College Station, TX 77845 LEGAL DESCRIPTION (Lot, Block, Subdivision) A000701 , Crawford Burnett (/CL), Tract 187 APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Ben Lamons -VLK Architects E-mail blamons@vlkarchitects.com Street Address 7915 FM 1960 West, Suite 214 City Houston State TX Zip Code _7_70_7_0 ____ _ Phone Number 281 .671 .2300 Fax Number 281 .271 .2313 ---------------~ PROPERTY OWNER'S INFORMATION : Name Jon Hall -College Station /SD E-mail jhall@csisd.org Street Address 2000 Welsh Street City College Station State TX Zip Code _7_78_4_5 ____ _ Phone Number 979. 764 .5443 Fax Number 979. 764 .5432 ---------------~ Revised 9/14 Page 1 of 11 ARCHITECT OR ENGINEER 'S I . .a MATION : Name VLK Architects E-mail blamons@vlkarchitects.com Street Add ress 7915 FM 1960 West, Suite 214 C ity Houston State TX Zip Code _7_70_7_0 ____ _ Phone Numbe r 281 .671 .2300 Fax Number 281 .671 .2313 ----------------~ --------------- 0 THE R CONTACTS (Please specify type of contact): Name E-mail Street Address City State _________ Zip Code Phone Number Fax Number Current zoning GS -General Suburban Present use of property Institutional I Public ---------------------------------~ Proposed use of property Institutional I Public ---------------------------------- Number of parkin g spaces required Not covered in U.D .O. Number of parking spaces proposed 110 Reg,8 HC=118 Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes l'X No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance . Notwithstanding any assertion made , vestin g is lim ited to that which is prov ided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior C ity platting approval(s) and you are requesting the appl ication be reviewed under previous ordinance as applicable? I Yes l'X No If yes, provide information regarding the first approved application and any related subsequent applications (provide add iti onal sheets if necessary): Project Name : C ity Project Number (if known): Date I Timeframe when submitted : Rev ised 9/14 Page 2of11 MUL Tl-FAMILY RESIDENTIAL Total Acreage Floodplain Acreage ____ _ Housing Units #of 1 Bedroom Units --- ___ #of 2 Bedroom Units #of 3 Bedroom Units --- #of 4 Bedroom Units --- FOR 2 BEDROOM UNITS ONLY # Bedrooms > 130 sq. ft . --- #Bedrooms< 130 sq . ft . --- PARKLAND DEDICATION (Fees due prior to the issuance of a Building Permit) #of Multi-Family Dwelling Units x $1636 = $ # of acres in floodplain #of acres in detention #of acres in greenways Date dedication approved by Parks & ____ Recreation Advisory Board COMMERCIAL Total Acreage _2._1_4_9 ___ _ Building Square Feet 56,006 Floodplain Acreage _o ____ _ * Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government Code may be assessed a different amount. Please contact city staff for additional information . The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true and correct. \O-t'7-14 Signature and title Date Revised 9/14 Page 3of11 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued . 2. The permit may be revoked if any false statements are made herein . 3. If revoked, all work must cease until permit is re-issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued . 5. The permit will expire if no significant work is progressing within 24 months of issuance . 6 . Other permits may be required to fulfill local , state , and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP . 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction, erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station , Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to Jt>E'ti..lS b e 14 . L ot-4 1 AA'-.JoiZ.S (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PER T APPLICATION, ARE , TO THE BEST OF MY KNOWLEDGE, TRUE , AND ACC RATE. /0.1.l-(4-- Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation , including detention ponds , proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local , State and Federal Permits prior to construction including NOi and SWPPP. Design will not preclude compliance with TPDES: i.e ., projects over 10 acres may require a sedimentation basin . 3. The i nformation and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station , Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines . All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I E ENGINEER , AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, ANQ.~~~NTS 0 THE DEVELOPMENT PERMIT APPLICATION , ARE , TO THE BEST OF MY KNmc;;eE:;··~~~ND C URATE . #it / · . ., • I~ ~*.. · .• i t ...... : ................................ ~ Date Revised 9/14 i ·~~~9.~!~~-~:~:.~~-~ ~ 1~ TI689 :"!ij ~ ~ ... <::>/!ii# '• 0~~}~G1sre.'?-_~··.-,.§'; ., '\S' .. . .. . .. ... ~'"::?' The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill /Grading Permits, and Clearing Only Permits:* certify , as demonstrated in the attached drainage study , that the lopment covered by this permit , shall not: (i) increase the Ba e Flood elevation ; (ii) create additional a as of Special Flood Hazard Area; (i ii) decrease the convey ce capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity f flow in the Base Flood event is greater than one foot per second. This area can also be approximated to either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth off m the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood wate torage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance ea where the velocity of flow in the Base Flood is equal to and less than one foot per second without acce table compensation as set forth in the City of College Station Code of Ordinances , Chapter 13 concernin encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood velocities . beyond those areas exempted by ordinance in ection 5.11 .3a of Chapter 13 Code of Ordinances . Engineer Date Initial D *If latting-status exemption to this requirement is asserted, provide written justification under separate letter lieu of certification . Required for Site Plans, Fi I Plats, Construction Plans, and Fill / Grading Permits: B. I, , certify to the following: (i) that any nonresidential or multi-fa ·1y structure on or proposed to be on this site as part of this application is designed to prevent damage to the st cture or its contents as a result of flooding from the 100-year storm . N/A Enginee r Date Additional certification for Floodway Encroachments: C. I, ~~~~~~~~~~~~~~~- ction , improvement, or fill covered by this permit shall not increase the base flood elevation . I will apply for a varian to the Zoning Board of Adjustments . Engineer Date Revised 9/14 Page 5 of 11 Required for all projects proposing structures in Special Flood Hazard Area {Elevation Certificate required). D. I, , certify that all new construction or any substantial improvement of any residential stru ure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one to above the Base Flood Elevation. Required Elevation Certificates will be provided with elevations certified during onstruction (forms at slab pre-pour) and post construction . Engineer I Surveyor Date Commercial Structures: N/A E. I, -----------------"' certify that all new construction or any substantial improvement of any commercial, industrial, or other non-resid tial structure are designed to have the lowest floor, including all utilities , ductwork and basements, elevated at leas one foot above the Base Flood Elevation Engineer I Surveyor OR I, , certify that th structure with its attendant utility, ductwork, basement and sanitary facilities is designed to be flood-proofed so th t the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and imp meable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loa and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified durin construction (forms at slab pre- pour) and post construction. Engineer I Surveyor Date Conditions or comments as part of approval : Rev ised 9/14 Page 6of11 C ITY or C oUEGE STATJO Home of Texas A&M Univmity 0 / SITE PLAN MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: --~ J heet size -24" x 36" (minimum). ·~A key map (not necessarily to scale). ~F-\MOE;}( 5MEEI [8] Title block to include : [8] Name , address , location , and legal description ~me , address , and telephone number of applicant ~me , address , and telephone number of developer/owner (if differs from applicant) ~ame , address , and telephone number of architect/engineer (if differs from applicant) [EJ)J ate of submittal IEJ!rotal site area ~orth arrow. efscale should be largest standard engineering scale possible on sheet. [8] Ownersh ip and current zoning of parcel and all abutting parcels. O Hie tot!SI 1"1t:11T1ber of ITlt:Jlti falTlily bt:1ileliA~s aAel uAits te be eeAstrueteeJ eA O:ie J3reJ3eseeJ J3rejeet site . "tJ./A O Hie eleAsity ef elwelliA~ uAits J3er sere eftl'le 13re13esea 13rejeet. NI A ~e gross square footage of all buildings and structures and the proposed use of each. If d ifferent uses are to be located in a single building , show the location and size of the uses within the building . Building separation is a minimum of 15 feet w/o additional fire protection . Ke.F. l...OCE. "i>MEEL Locations of the following on or adjacent to the subject site: Des ignate between existing and proposed D Tl'le aeAs ity ef awell i A~ uAits 13e r acre ef tl'le 13re19esea 19rejeot. ~/A [8] Phasing. Each phase must be able to stand alone to meet ordinance requirements . ~ildings (Ex isting and Proposed). [8] Setbacks according to UDO , Article 5. Geography 0 Water eouf8es. NI A. ~100 yr. floodplain and floodway (if applicable) on or adjacent to the proposed project s ite . Please note if there is none on the site with confirming FEMA/FIRM map number. [8] Existing topography (2 ' max or spot elevations) and other pertinent drainage information . (If plan has too much information , show drainage on separate sheet.) REr. Lw•L S1-u:oe,s [8] Proposed grading (1 ' max for proposed or spot elevations) and other pertinent drainage information. (If plan has too much information , show drainage on separate sheet.) REf. C.1v11... Sl-l f £""TS Rev ised 9/14 Page 7 of 11 Streets, Parking, and Sidewalh [g] Existing streets and sidewalks (R.O .W .). [g] Existing Driveways, both opposite and adjacent to the site according to UDO , Article 7 . [g] Proposed drives. Minimum drive aisle width according to UDO , Article 7 [g] Indicate proposed driveway throat length according to UDO, Article 7 [g] Proposed curb cuts . [g] For each proposed curb cut (including driveways, streets , alleys , etc.) locate existing curb cuts on the same and opposite side of the street to determine separation distances between existing and proposed curb cuts . [g] Proposed curb and pavement detail. [g] A 6" raised curb is required around all edges of all parts of all paved areas without exception . (To include island , planting areas , access ways , dumpster locations , utility pads , etc.) No exception will be made for areas designated as "reserved for future parking". Re.F. Livt L Si-tCE:I Cb.OZ. [g] Proposed medians. [g] Proposed sidewalks (both public and private). [g] Proposed pedestrian/bike circulation and facilities for non-residential buildings (UDO , Article 7). [g] Off-Street parking areas with parking spaces drawn , tabulated , and dimensioned . [g] Designate number of parking spaces required by ordinance and provided by proposal. [g] Handicap parking spaces . [g] Parking Islands drawn and dimensioned with square footage calculated according to UDO , Section 7 .2 or 7 .9 fornon- residential buildings . [g] Parking setback from R.O.W. to curb of parking lot as required. [gj Wheelstops may be required when cars overhang onto property not owned by the applicant or where there may be conflict with pedestrian or bike facilities, handicap accessible routes or above ground utilities , signs or other conflicts. [g] Security gates , showing swing path and design specs with colors. D Gt1eFar:eils . IAelt1ae aesi~A aAEl sale1'9. 't-4/A [g] Traffic Impact Analysis for non-residential development (UDO, Article 7). [g] Please note if none is required . [g] Will there be access from a TxDOT R.O .W .? [g] Yes D No If yes , then TxDOT permit must be submitted with this application. Easements and Utilities [g] Easements -clearly designate as existing or proposed and type (utility, access , etc.) RE ~. L1v1L <':>1-1an L4.o\ [g] Utilities (noting size and designate as existing or proposed) within or adjacent to the proposed site , including building transformer locations, above ground and underground service connections to buildings, and drainage inlets . D SeweF Desi~A Re19el'1: (if 01313lisaele). 't-J/A -R ef . lw11.. S.Ml&E"'\ L.'i.O\ [g] Water Design Report and/or Fire Flow Report (if applicable). ,.. el.EL.. 'S.rla-t !S\Ol [g] Drainage Report with a Technical Design Summary . [g] Meter locations , existing and proposed (must be located in public R.O .W . or public utility easement). R Ef EL.6'-· S~i:E1E:S10 \ [g] Provide a water and sanitary sewer legend to include [g] Minimum water demands [g] Maximum water demands [g] Average water demands in gallons per minute , and [g] Maximum sewer loadings in gallons per day [g] Will there be access from a TxDOT R.O.W.? [g] Yes D No If yes , then TxDOT permit must be submitted with this application . Rev ised 9/14 Page 8of11 Fire Protection ~ Show fire lanes . Fire lanes with a minimum of 20 feet in width with a minimum height clearance of 14 feet must be established if any portion of the proposed structure is more than 150 feet from the curb line or pavement edge of a public street or highway . ~ Show proposed and existing fire hydrants . Fi re hydrants must be located on the same s ide of a major street as a project , and shall be in a location approved by the City Engineer. Any structure in any zoning district other than R-1 , R-1A , or R-2 must be within 300 feet of a fire hydrant as measured along a public street , highway or designated fire lane . -RE"f. C.1v1L s HeE'"l C.t.t.of NOTE: Fire hydrants must be operable and accepted by the City , and drives must have an all weather surface before a build ing permit can be issued . ~ Will building be sprinkled? ~ Yes D No If the decis ion to sprinkle is made after the site plan has been approved , then the plan must be resubmitted . If Yes , ~ Show fire department connections . FDC 's should be within 100' of the fire hydrant. They shall be access ible from the pa rking lot w ithout being blocked by parked cars or a structure . -Ri::~. L.1v11... SHEei L<-t.ot Landscaping ~ Landscape plans as required in Article 7 of the Unified Development Ordinance . The landscaping plan can be shown on a separate sheet if too much information is on the original site plan . If requesting protected tree po ints , then those trees need to be shown appropr iately barricaded on the landscape plan . Attempt to reduce or eliminate plantings in easements . Include information on the plans such as : ~ requ ired point calculations ~ add it iona l streetscape points required . Streetscape compliance is required on all streets . IVl calcula ti ons for # of street trees required and proposed (proposed street tree po ints will accrue toward total ~ landscaping points .) ~ proposed new plant ings with points earned ~ proposed locatio ns of new plantings ~ screen ing of park ing lots , 50% of all shrubs used for screening shall be evergreen . (C.ou..Eu• 4£.-rA,•CfoJ tSD c><E"P7 1<>t4) IVl screen ing of dumpsters , concrete reta ining walls , off street loading areas , utility connection points , o r other ~ areas potentially visually offensive . ~ ex isting landscap ing to remain IVl show existing trees to be barricaded and barricade plan . Protected points will only be awarded if barricades are ~ up before the first development permit is issued . ~ Buffer as required in Article 7 of the Unified Development Ord inance . ~ Show irrigat ion system plan. (or provide note on how irrigation system requ irement w ill be met prior to issuance of C. 0 .) All plans must include irrigation systems for landscaping . Irrigation meters are separate from the regular water systems for buildings and will be sized by city according to irrigation demand submitted by applicant and must include backflow prevention protection . ~ Is there any landscap ing in TxDOT R.O .W .? D Yes ~ No If yes , then TxDOT permit must be submitted at the time of appl icat ion. Other D Common open spaces sites ~ Loading docks D Detention ponds ~ Retaining walls D Sites for sol id waste containers w ith screening . Locations of dumpsters are accessible but not visible from streets or resident ial areas. Gates are discouraged and v isual screening is required . (M inimum 12 x 12 pad required .) ~ Are there impact fees associated with th is development? D Yes ~ No NOTE: Signs are to be permitted separately . Revised 9/14 Page 9of1 1 Crrv OF C m .r .F G E STATION Home o/Texas A&M U11ivmiry· FOR OFFICE ,l!J>E ONLY C:. CASE NO.: \ '--j -...2JQ J DATE SUBMITTED: 11 ]2-E/C Lj TIME : \\ · Q Q STAFF : f\"(J --'----=-------- PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. O New Project Submittal O Incomplete Project Submittal -documents needed to complete an application . P&DS Project no .: W Existing Project Submittal. P&DS Project no .: \ L\ __,,, LLP c; ------ Project Name cs\ SD Go\ \-e~e V i (\A} rnCJ n __ s ~hDZ> \ We are transmitting the following for Planning & Development Services to review and comment (check all that apply): O Comprehensive Plan Amendment D Rezoning Application O Conditional Use Permit O Preliminary Plan 0 Final Plat 0 Development Plat O Site Plan O Special District Site Plan D Special District Building I Sign 0 Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS O Non-Residential Architectural Standards 0 Irrigation Plan D Variance Request D Development Permit 0 Development Exaction Appeal 0 FEMA CLOMNCLOMR/LOMNLOMR 0 Grading Plan D Other -Please specify below All infrastructure documents must be submitted as a complete set. The following are included in the complete set: O Comprehensive Plan Amendment D TxDOT Driveway Permit 0 TxDOT Utility Permit 0 0 Drainage Letter or Report Fire Flow Analysis Special Instructions: 10/10 O Waterline Construction Documents D D 0 D 1-·~e Print Form Sewerline Construction Documents Street Construction Documents Easement Application Other -Please specify CITY OF C OL.LE G E STATT O Home of Texas A&M Universi ty" FOR OFFICE USE ONLY CASE NO .: \ Y -ZUJS DATE SUBMITTED: I\ j 2 4/1 4 TIME : 'f-:~ STAFF : ...... A ..... i1~------ PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. D New Project Submittal D Incomplete Project Submittal -documents needed to complete an application. Case No .: [8] Existing Project Submittal. Case No .: 14-00900265 Project Name CS/SD Center for Alternative Leaming Rebuild Contact Name Veronica Morgan Phone Number 979-260-6963 We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Rezoning Application D Conditional Use Permit D Preliminary Plan D Final Plat D Development Plat D Site Plan D Special District Site Plan D Special District Building I Sign D Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS D Non-Residential Architectural Standards D Irrigation Plan D Variance Request D Development Permit D Development Exaction Appeal D FEMA CLOMA/CLOMR/LOMA/LOMR D Grading Plan D Other -Please specify below All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit D Street Construction Documents [8] Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions : 10/10 Print Form MITCHELL MM MORGAN To: City of College Station 3204 Earl Rudder Fwy S College Station , TX 77845 (979) 260-6963 Phone (979) 260 -3564 Fax info@ mitchel landmorgan .com www.mitchellandmorgan.com Letter Of Transmittal Date: 11/24/2014 Job: 1438 Attention: Danielle Singh , PE Re: CSISD Center for Alternative Leaming We are sending you : [i] Attached 0 Plans 0 Order D Under separate cover via _____ the following: 0 Drawings 0 Prints 0 Samples D Specifications 0 Letter D Other ________________ _ Item Date #of Copies Description 1 2 3 4 10/7/2014 11/18/2014 11/19/2014 11/21/2014 Transmitted as checked below: 1 1 1 TxDOT Driveway Permit Application Site Plan Paving Plan Response to Staff Comments 0 For approval 0 Approved as noted 0 Resubmit'---__ copies for approval 0 For your use 0 Approved as submitted 0 Submit copies for distribution 0 As requested 0 Returned for corrections 0 Return corrected copies rXJ For review 0 Other ____________ _ Remarks: If you have any questions or comments, please contact us at 979-260-6963. Copy to: _F_il_e _____________ S i gned : Kerry Pillow Cm OF CoIJ.EGE STATION H~ ofTeua AON f.htitlmit]. FOR OFFICE USE ONLY CASE NO.: I y -2 lP5 DATE SUBMITTED : a1C7I1 y. TIME: 4: 3S STAFF: Av: PLANNING & DEVELOPMENT SERVICES TRANSMITI AL LETTER Please check one of the options below to clearly define the purpose of your submitta l. D New Project Submittal 0 Incomplete Project Submittal -documents needed to complete an application . Case No.: }21-Existing Project Submittal. Case No.: \ 4:-2Le <S Project Name (,S \ S \:) (.,0 \ \eJ:?je V \ e\.)._) ffi '"jV\ Seb QD \ Contact Name ____ ..:.---_________ _ Phone Number ~----------~ We are transmitting the following for Planning & Development Services to review and comment (check all that apply): 0 Comprehensive Plan Amendment 0 Rezoning Application D Conditional Use Permit 0 Preliminary Plan O Final Plat 0 Development Plat O SitePlan 0 Special District Site Plan 0 Special District Building I Sign 0 Landscape Plan INFRASTRUCTURE AND ENGINEERING DQCUMENTS 0 Non-Residential Architectural Standards 0 Irrigation Plan 0 Variance Request 0 Development Permit D Development Exaction Appeal 0 FEMA CLOMA/CLOMR/LOMNLOMR 0 Grading Plan 0 Other -Please specify below All infrastructure documents must be submitted as a complete set The following are included in the complete set: 0 Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents 0 TxDOT Utility Permit D Street Construction Documents D Drainage Letter or Report D Easement Application 0 Fire Flow Analysis D Other -Please specify Special Instructions : 10/10 MITCHELL 3204 Earl Rudder Fwy S College Station , TX 77845 (979) 260-6963 Phone (979) 260-3564 Fax info@mitchellandmorgan.com www.mitchellandmorgan .com Letter Of Transmittal MM Date: 12/17/2014 Job: 1438 MORGAN Attention: Kevin Ferrer, EIT To: City of College Station Re: CSISD Center for Alternative Learning We a re sending you: [i] Attached (g] Plans D Order D Under separate cover via _____ the following : D Drawings D Prints D Samples D Letter D Item Date # of Copies Description 1 2 3 12/17/2014 12/17/2014 12/17/2014 Transmitted as checked below: 5 3 1 Full Civil sets C5.01 sheets Demolition/erosion control sheet D Specifications ~ For approval DD Approved as noted D Resubmit. ___ copies for approval [i] For your use Approved as submitted D Submit copies for distribution D As requested D Returned for corrections D Return corrected copies D For review D Other _____________ _ Remarks: If you have any questions or comments , please contact us at 979-260-6963 . Copy to: File Signed: ---------------James Batenhorst CrTY oF C m.LEGE ST ATION Home of Texas A&M Un iversity" FOR OFFICE USE ONLY PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. ~ New Project Submittal D Incomplete Project Submittal -documents needed to complete an application. Case No.: ~~~~~~~~~ D Existing Project Submittal. Case No .: Project Name CS/SD Center for Alternative Learning Rebuild Contact Name Veronica Morgan Phone Number 979-260-6963 We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Rezon ing Application D Conditional Use Perm it D Prelim i nary Plan D Final P lat D Development Plat D Site Plan D Special District Site Plan D Special District Bu ilding I Sign D Landscape Plan D D Non-Residential Architectural Standards Irrigation Plan D Variance Request D D D D D Development Permit Development Exaction Appeal FEMA CLOMA/CLOMR/LOMA/LOMR Grading Plan Other -Please specify below INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment ~ TxDOT Driveway Permit D TxDOT Utility Permit D Drainage Letter or Report D Fire Flow Analysis Site Plan (11x17) and Paving Plan (11x17) Special Instructions: 10/1 0 D Waterline Construction Documents D Sewerline Construction Documents D Street Construction Documents D Easement Application ~ Other -Please specify Print Form MITCHELL M M 3204 Earl Rudder Fwy S College Station, TX 77845 (979) 260-6963 Phone (979) 260-3564 Fax info@mitchellandmorgan.com www.mitchellandmorgan .com Letter Of Transmittal Date: 10/14/2014 Job: 1438 MORGAN Attention: Planning & Development Services To: City of College Station Re: CSISD Center for Alternative Learning We are sending you: [i] Attached D Under separate cover via _____ the following : D Drawings D Prints D Samples D Specifications D Letter D Plans D Order D Other ________________ ~ Item Date # of Copies Description 1 2 3 10/7/2014 10/13/2014 9/30/2014 1 1 1 TxDOT Driveway Permit Application Site Plan Paving Plan Transmitted as checked below: D For approval D Approved as noted D Resubmit ____ copies for approval D For your use D Approved as submitted D Submit copies for distribution D As requested D Returned for corrections D Return corrected copies [X] For review D Other ____________ _ Remarks : If you have any questions or comments , please contact us at 979-260-6963. Copy to : Signed: -------------~ MITCHELL M M MORGAN To: City of College Station 3204 Earl Rudder Fwy S College Station, TX 77845 (979) 260-6963 Phon e (979) 260-3564 Fax info@mitchellandmorgan .com www.mitchellandmorgan .com Letter Of Transmittal Date: 1/30/2015 Job: 1438 Attention: Kevin Ferrer, EIT Re: CSISD Center for Alternative Learning l Y-ZlPS o\/30/IS 3:SO f\0 We are sending you: [i] Attached 0 Plans 0 Order 0 Under separate cover via _____ the following: 0 Drawings 0 Prints 0 Samples 0 Specifications 0 Letter 0 Other ________________ ~ Item Date # of Copies Description 1 2 3 1/30/2015 1/30/2015 1/30/2015 Transmitted as checked below: 1 1 8 Response to Staff Comments Fireflow Report Addendum Sheet C4.02 -WL-1 Reroute 0 For approval B Approved as noted 0 Resubmit ____ copies for approval [i] For your use Approved as submitted 0 Submit copies for distribution 0 As requested 0 Returned for corrections 0 Return corrected copies 0 For review 0 Other ____________ _ Remarks: Kevin, Please see attached for the plans regarding the rerouting of the 8" waterline on the CAL project. If you have any questions or comments, please contact us at 979-260-6963. Copy to: File Signed: --------------Kerry Pillow CITY OF C m.LE GE STAT ION Hom e o/Texas A&M University" FOR OFFICE USE ONLY CASE NO., tt/-~ DATE SUBMITTED : IL/J<{ TIME : ~! 15 STAFF : b.5t PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. 0 New Project Submittal D Incomplete Project Submittal -documents needed to complete an application . Case No .: Existing Project Submittal. Case No .: 14-00900265 Project Name CS/SO Center for Alternative Learning Rebuild Contact Name Veronica Morgan Phone Number 979-260-6963 We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Non -Res idential Arch itectural Standards D Rezoning Application D Irrigation Plan D Conditional Use Permit D Variance Request D Preliminary Plan D Development Permit D Final Plat D Development Exaction Appeal D Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR D Site Plan D Grading Plan D Special District Site Plan D Other -Please specify below D Special District Building I Sign D Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are incl uded in the complete set: D Comprehensive Plan Amendment [8J Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instruct ions: 10/10 Print Form MITCHELL 3204 Earl Rudder Fwy S Co ll ege Statio n . TX 77845 (979) 260-6963 Ph one (979) 260-356 4 Fax info@m itchellandmorgan .com www.m itchellandmorgan .co m Letter Of Transmittal M M Date: 1/27/2015 Job: 1438 MORGAN Attention: Erika Bridges, EIT To: City of College Station Re: CSISD Center for Alternative Learning We are sending you: [i] Attached D Under separate cover via _____ the following: D Drawings D Prints D Samples D Specifications D Letter D Plans D Order D Other _________________ _ Item Date # of Copies Description 1 2 3 1/27/2015 1/27/2015 1/27/2015 Transmitted as checked below: 2 2 2 Sheet C4.01 -Site Utility Sheet C4.02 -WL-1 Reroute COCS Electrical Plan D For approval DD Approved as noted D Resubm it~ __ copies for approval [XJ For your use Approved as submitted D Submit cop i es for distribution D As requested D Returned for corrections D Return corrected copies D For review D Other _____________ _ Remarks: Erika , Please see attached for the plans regarding the rerouting of the 8" waterline on the CAL project. If you have any questions or comments , please contact us at 979-260-6963. Copy to: Fi le Signed: Kerry Pillow --------------~ Crrv OF CoUEGE STATION H""" efTet111 Ad-M lJMJmit}• FOR OFFICE USE ONLY CASE NO.: \y ~2 lfS DATE SUBMITTED : 12-ll ~ I y TIME : II : 00 STAFF: -1A~,~:::._ _____ _ PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal . 0 New Project Submittal D Incomplete Project Submittal -documents needed to complete an application . Case No.: r::{ Existing Project Submittal. Case No.: \ y -2 LOS Project Name C $ l SD Co\ ~ -ecoe \Ji f ,\J.J tb C()D SI X\ o o ( Contact Name -Phone Number ~----------~ We are transmitting the following for Planning & Development Services to review and comment (check all that apply): O Comprehensive Plan Amendment 0 Rezoning Application 0 Conditional Use Permit O Preliminary Plan O Final Plat 0 Development Plat O SitePlan O Special District Site Plan D Special District Building I Sign 0 Landscape Plan INFBASTRUCTVRE AND ENGINEERING DQCUMENIS O Non-Residential Architectural Standards 0 lnigation Plan 0 Variance Request O Development Permit D Development Exaction Appeal 0 FEMA CLOMA/CLOMR/LOMNLOMR 0 Grading Plan 0 Other -Please specify below All infrastructure documents must be submitted as a complete set The following are induded in the complete set: 0 Comprehensive Plan Amendment 0 Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit 0 Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis 0 Other -Please specify Special Instructions: 10/10 CITY OF Cou .EGE STATION Home of Texas A &M University • FOR OFFICE USE ONLY CAS ENO .: \4-ZIPS DATE SUBMITTED : tJ6 · \Q . \fi TIME : \ \ -. 1-5 STAF F: ___,P\J~------- PLANNING & DEVELOPMENT SERVICES TRANS MITT AL LETTER Please check one of the options below to clearly define the purpose of your submittal. D New Proj ect Subm ittal D Incomplete Project Submittal -documents needed to complete an application . Case No .: Qg Existing Project Submittal. Case No.: \L\,... Zl.P S rtcon :ihDo \ Contact Name ---"-_,.,. ____________ _ Phone Number ,,..---------------- We are transm itt ing the following for Planning & Development Services to review and comment (check all that apply): D D D D D D g Comprehensive Plan Amendment Rezon ing Application Condit ional Use Perm it Prelim in ary Plan Final Plat Development Plat Site Plan >< ~ Special District Si te Plan D Special District Bui lding I Sign D Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS D D D D D D D D Non-Res idential Arch itectural Standards Irrigation Plan Variance Request Development Permit Development Exaction Appeal FEMA CLOMA/CLOMR/LOMA/LOMR Grading Plan Other -Please specify below All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehens"ive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Perm it D Sewerline Construction Documents D TxDOT Utility Perm it D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analys is D Other -Please specify Special Instructions : 10/10 Print Fo rm VLK IARCHITECTS TRANSMITTAL Project: College Station ISD -Center for Alternative Learning To : Jessica Bullock City of College Station 1101 Texas Avenue Co ll ege Station, TX 77842 FOR YOUR: D APPROVAL D SIGNATURE THE FOLLOWING: ::J REVIEW I COMME T _C_o~p_i _es ___ D_a_te ___ D_escriptio_n _____ _ 4 219/15 Copies of A1 .01, as requested --+----- I -~---------- COMMENTS : COPIES TO : File Architect's Project No.: Date: 1405.00 March 10, 2015 :J INFORMATION I FILES 0 DISTRIBUTION TO PARTIES By : ~0sa leming Project Coordinator Member American Institute of Architects· 7915 F.M. 1960 West Suite 214 · Houston Texas 77070 Ph 281.671.2300 . Fax 281.671.2313. www.vlkarchitecls.com C ITY OF C OLLEGE STATION Home o/Texas A&M Univerrity• FOR OFFICE USE ONLY CASE NO .: 1Y. • 2!,t~ DATE SUBMITIED: o?)f &i r I s: TIME : Mo: 0 0 STAFF : ~ -----~~~~~~~ PLANNING & DEVELOPMENT SERVICES TRANS MITT AL LETTER Please check one of the options below to clearly define the purpose of your submittal. O New Project Submittal D Incomplete Project Submittal -documents needed to complete an application . Case No.: Existing Project Submittal. Case No .: 14-00900265 Project Name CS/SD Center for Alternative Leaming Rebuild (College View High School) Contact Name Veronica Morgan Phone Number 979-260-6963 We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Non-Residential Architectural Standards D Rezoning Application D Irrigation Plan D Conditional Use Permit D Variance Request D Preliminary Plan D Development Permit D Final Plat D Development Exaction Appeal D Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR D Site Plan D Grading Plan D Special District Site Plan [8J Other -Please specify below D Special District Building I Sign Civil Construction Plans to be included in the D Landscape Plan Building Plans Approved Plans INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions: 10/10 Print Form MITCHELL 3204 Earl Rudder Fwy S College Station, TX 77845 (979) 260-6963 Phone (979) 260-3564 Fax info@mitchellandmorgan.com www.mitchellandmorgan.com Letter Of Transmittal M M Date: 3/9/2015 Job: 1438 MORGAN Attention: Ben McCarty To: City of College Station Re: CSISD College View High School We are sending you: [i] Attached D Under separate cover via the following: D Drawings ~ Plans D Prints D Samples D Specifications D Letter D Order D Other Item Date # of Copies Description 1 2 3/9/2015 3/9/2015 3 2 Civil Construction Planset Copies of the Folded Site Plan (Sheet C2.01, C2.02, C2.03) Transmitted as checked below: [&I For approval DD Approved as noted D Resubmit~ ___ copies for approval [ii For your use Approved as submitted DD Submit copies for distribution D As requested D Returned for corrections Retum ____ corrected copies D For review D Other ____________ _ Remarks: Ben, We have attached copies of all the approved plans we have received on this project, please include these sheets in the building plansets. Thanks. If you have any questions or comments, please contact us at 979-260-6963. Copy to: _F_ile _____________ Signed: Kerry Pillow .. VLK j ARCHITECTS TRANSMITTAL Project: C~ll~on<?lCPet!JGA /i?nii~b ing • Architect 's ~ J Pmject No To Theo R°"~tioo lodepeodeot School D~ e s.;s l cA- ~~i,o e ~::tioo , TX 77840 :l3 {.) l l be }:::.. I D•te FOR YOUR: 1405 .00 February 27 , 2014 D APPROVAL D SIGNATURE :J REVIEW I COMMENT 0 INFORMATION I FILES :J DISTRIBUTION TO PARTIES THE FOLLOWING : Copies Date Description 9 12/18/14 full size sheet L 1.01 COMMEN TS: College Station Independent School Dist.. 2000 Welsh College Station, TX 77840 Website: www.csisd.org E-mail : trouse@csisd.org COPIES TO : THEoRousE Coordinator of Construction Fil e Phone : 979-694-5634 Cell : 979-255-5357 .J :J ::J :J .J By : Ben Lamons Project Coordinator Member American I nstitute of Arch i tects · 79 15 F.M. 1960 West Suite 214 . H ouston Texas 77070 Ph 281.671.2300 ·Fax 281 671.2313 · www.v l karchitects.com CITY OF COLL.E GE S TATIO: __________ ..., ....... ----Home of Texas A&M University • MEMORANDUM DATE : December 11 , 2014 TO: Ben Lamons , via ; blamons@vlkarchitects .com FROM : Jessica Bullock , Staff Planner SUBJECT: CSISD COLLEGE VIEW HIGH SCHOOL (SP) Staff reviewed the above-mentioned site plan as requested . The following page is a list of staff review comments detailing items that need to be addressed . C ity of College Station Transmittal Letter Two (2) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans and detail sheets attached Engineering Cost Estimate Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein . If there are comments that you are not addressing with the revised site plan , please attach a letter explaining the details . If you have any questions or need additional information , please call me at 979 .764 .3757 . Attachments : Staff review comments PC : John Hall , College Station Independent School District, via ; jhall@cs isd .org P&DS Project No. 14-00900265 Planning & Development Services P.O. BOX 9960 • l 101 TEXAS AVENUE · COLLEGE S1ATJON ·TEXAS · 77842 TEL. 979.764.3570 ·FAX. 979.7<14.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 2 Project: CSISD College View High School (SP) -14-00900265 PLANNING 1. The service drive on the SW side will need the length of the hammerhead will need to be 120' during phase II , for sufficient fire access . 2 . Please prov ide an explanation/survey to show the property line . What is shown does not match what I can see . Understanding that what I see does not accurately depict what will be on record , and explanation will be fine . Please also verify that the property line does not go i nto TxDot ROW along George Bush Dr, where it runs along the island . 3 . When location of bike rack is determined , please include on sheet A 1.01. 4 . Please show driveway apron as identified in the site design standards . 5. For the Fire lane stripping detail on sheet A1 .01 , the lettering should be 4 ". The red strip should rema in 8". 6 . Response to TxDot comments are still be reviewed and will follow . 7. Please note that any changes made to the plans , that have not been requested by the City of College Station , must be expla ined in your next transmittal letter. Reviewed by : Jessica Bullock Date : December 10 , 2014 LANDSCAPING/STREETSCAPING/BUFFER 1. Please verify streetscaping calculation . I show property frontage not including driveways as 424 ' along T imber, 194' along Holik , and 600 ' along George Bush Dr . This would mean 13 canopy trees along Timber, 6 along Holik and 24 along George Bush Dr . The only place where additional trees would need to be added for streetscaping is along George Bush Dr. These would need to be placed within same proximity the existing trees are to George Bush Dr. The calculation for 300 additional points along the ROW can also be revised to take out driveway spacing. Based on my calculations total points required is 13 ,968 . 2 . Planting not in the property lines cannot be counted towards po ints . This includes the crepe myrtles along George Bush Drive and some trees along Timber. For existing trees , they can rema i n shown on the plan , but they would not count towards point requirements . For the new proposed plantings , please move them so the trunk is within the property li ne . 3. I am still unable to verify the count for crepe myrtles. Please e ither use a different symbol or label which trees are crepe myrtles . 4 . W it h the next submittal , please include a request to have the trees next to the front of the bu ild ing count toward streetscaping along George Bush Drive . The request should expla in why these exemptions are necessary for the site . Rev iewed by : Jessica Bullock Date : December 10 , 2014 ENGINEERING COMMENTS NO. 2 1. Response comment has been noted . Prior the submittal for approved plans , please make su re t hat there 's a note next to the existing manhole on Ho li k St. stating that the private sewer line terminates at this manhole and that the public sewer is beg inning here since the Util ity sheet was not submitted during the last submittal. 2. Prov ide a note stating where the public storm sewer begins on the plans . 3. Please check the drainage area down on Halik Street , and acquire a dedicate drainage easement for the proposed storm sewer line to the creek . 4 . Please provide an Engineering Cost estimate . Reviewed by : Kevin Ferrer Date : December 10 , 2014 ~. C ITY OF C OLLEGE S TATION _______________ ,.,,_ ~ Home o/Texas A&M University • pC -----------'= MEMORANDUM DATE : November 6 , 2014 TO : Ben Lamons , via; blamons@vlkarchitects.com FROM : Jessica Bullock, Staff Planner SUBJECT: CSISD COLLEGE VIEW HIGH SCHOOL (SP) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed . Please address the comments and submit the following information for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments Two (2) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you , please submit additional copies if you want more than one approved set); Drainage Report Two (2) 24 "x36 " revised site plans; One (1) 24 "x36 " revised landscaping plan ; Please note that this application will expire in 90 days from the date of this memo , if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein . If there are comments that you are not addressing with the revised site plan , please attach a letter explaining the details . If you have any questions or need additional information , please contact Jessica Bullock at 979. 764 .3570 . Attachments : Staff Review Comments pc: John Hall , College Station Independent School District, via ; jhall@csisd .org P&DS Project No. 14-00900265 Pla11niug & Development Services P.O. BOX 9960 • l I 0 I TEXAS AVENUE • COLLEGE STAT IO N ·TEXAS • 77842 TEL. 979.764 .3570 ·FAX. 979.764.3496 est><. gov I de vs ervices STAFF REVIEW COMMENTS NO. 1 Project: CSISD College View High School (SP) 14-00900265 PLANNING 1. Please include site detail sheets with next submittal and add the curb detail to sheet A 1.01 . 2 . Please clarify phase lines. On sheet A 1.0 , it is not clear what is in phase II versus phase Ill. 3. Please show property line and easements . 4. Please revise the street labels to also show right-of-way widths on George Bush Drive , Timber Street, and Halik Street. 5. Please revise the curb radii on the proposed driveway to Halik . They should be between 25 and 30 feet. 6 . Are bike racks provided on site? 7. Please clarify the temporary fire lane by the Barbara Bush Center. 8. Please revise fire lane stripping to extend 100 feet from the driveway along George Bush Drive . Also revise stripping details so the red stripe is 8". 9 . Please verify that signs are not in the right-of-way . 10. Provide a general note on the site plan that all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot , measured from a point five feet above grade . Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance . 11 . Provide a general note on the site plan that states the following : Exterior building and site lighting will meet the standards of Section 7 .11 of the Unified Development Ordinance . The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. 12 . Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter. Rev iewed by: Jessica Bullock Date: 10/6/14 LANDSCAPING/STREETSCAPING/BUFFER 1. Please differentiate between existing and proposed trees. 2. Quantities provided in the table do not match what is shown on the site . Please only include plantings within the borders of the site . 3. Please separate streetscaping points . 1 canopy tree is required ever 25 feet along George Bush Drive and every 32 feet along Timber and Halik. 2 non-canopy trees can be substituted for 1 canopy. These trees should be located within 50 feet of the property line . 4. Please show property line and easements on landscape plan. 5. Please show the barricade around the trees on the plan . 6 . To receive landscaping points for existing trees , all existing trees must be in good form and condition and reasonably free of damage by insects and/or disease . 7 . Please add a general note that barricades will be in place prior to any activity on the property including but not limited to grading . 8. Parking screening is required along 100% of George Bush Drive . Screening can be done with plantings , berms , structural elements or a combination and a minimum of 3 feet above parking lot elevation . Reviewed by: Jessica Bullock Date : 10/6/14 MISCELLANEOUS 1. Irrigation system must be protected by a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device , or a Double-Check Back Flow Device , and installed as per City Ord inance 2394. 2 . All BackFlow devices must be installed and tested upon installation as per City Ord inance 2394 . ENGINEERING COMMENTS NO. 1 1. Please provide a drainage study. 2 . I was curious why there 's a 6 feet drop for the flow lines for the grate inlet 1-9 at station 4+70 .10. 3. Please provide the fire flow demand & building type , and show the locat ion of the fire hydrants on the site plan (sheet A 1.01 ). 4 . Please show the existing fire hydrants on Holik St. and Timber St. on the plans . 5. Provide an access easement for the sidewalk along George Bush Drive that is going through the parking lot. 6 . GIS is showing a sewer line connecting to the building that is to be demolished and replaced w ith parking & fire lane on Timber St. Please specify on the plans if it's being abandoned or removed . 7. Please clearly label wh ich manholes the private sewer line is starting and ending . Rev iewed by : Kevin Ferrer Date : 10/31 /14 TRANSPORTATION 1. Please revise and resubmit the driveway permit to comply with TxDOT comments . Reviewed by : Danielle Singh , P.E. Transportation Planning Coord. Date : 10/28/14 TxDOT 1. Proposed med ian does not meet the TxDOT access management guidelines for a right-in I right-out only access point , the median needs to be more substantial so there is no question regarding the intended function of this access point , also required is a restriping eliminating the left turn lane assuring south bound traffic no option to left i nto property from George Bush Dr. Before access can be approved these revisions must be implemented into the property's proposed plan and commercial access request. We look forward to rev iewing the rev ised proposal for access on the land use I access change . Reviewed by : Vincent Espinoza Date : 10/27/14 FIRE 1. Fire Lanes are covered but it is my understanding that the East end of the school is over 30 ' in height which will require an Aerial Access Easement. This AAE will need to start with i n 15 ' to 30 ' of the structure . 2. The Gate , near the Sou t h West corner of the building , will need a Knox Padlock 3 . The FDC may need to be remote due to elevation changes . Reviewed by : Steve Smith Date : 10/29/14 SANITATION 1. The dumpster pads need to be turned 10-15 degrees clockwise in order to have a better approach . Rev iewed by: Wally Urrutia Date: 10/27/14 MEMORANDUM DATE : October 23 , 2014 TO : Ben Lamons , via ; blamons@vlkarchitects.com FROM : Jessica Bullock, Staff Planner SUBJECT: CSISD COLLEGE VIEW HIGH SCHOOL (SP) Thank you for the submittal of your Site Plan application . Kevin Ferrer, Graduate Civil Eng ineer, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Thursday , November 6 , 2014 . If you have questions in the meantime , please feel free to contact us . / PC : John Hall , College Station Independent School District, via ; jhall@csisd.org P&DS Project No . 14-00900265 Pla11ni11g & Development Services P.O . BOX 9960 • 1101 TEXAS AVENUE · COLLEGE STATION· TEXAS · 77842 TEL. 979 764 . .3570 ·FAX. 979.764.3496 cst><.gov/devservices / \ . _._.,____ - DATE : TO : FROM : SUBJECT: C ITY OF C OLLE GE STATION Home ofTo:as A&M Uni versity " MEMORANDUM November 6 , 2014 Ben Lamons , via ; blamons@vlkarchitects .com Jessica Bullock, Staff Planner -Hev-iro Bew~ r Sdafhl-k t-ol CSISD COLLEGE VIEW HIGH SCHOOL (SP) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed . Please address the comments and submit the following information for further staff review : City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments Two (2) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you , please submit addit ional copies if you want more than one approved set); Drainage Report Two (2) 24 "x36 " revised site plans ; One (1) 24 "x36 " revised landscaping plan ; Please note that this application will expire in 90 days from the date of this memo , if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein . If there are comments that you are not addressing with the revised site plan , please attach a letter explaining the details . If you have any questions or need additional information , please contact Jessica Bullock at 979.764.3570 . Attachments : Staff Review Comments pc : John Hall , College Station Independent School District, via ; jhall@csisd .org P&DS Project No . 14-00900265 Pla11ni11g Cr D evel opment Services P.O. BOX 9960 • 110 I TEXAS AVENUE • COLLEGE STATION • TEXA':l • 77842 TEL. 979.764.3570 ·FAX. 979.764.3496 cstx. gov I devse rvices STAFF REVIEW COMMENTS NO. 1 Project: CSISD College View High School (SP) 14-00900265 PLANNING 1. Please include site detail sheets with next submittal and add the curb detail to sheet A 1.01 . 2. Please clar ify phase lines . On sheetA1 .0 , it is not clear what is in phase II versus phase Ill. 3. Please show property line and easements . 4. Please rev ise the street labels to also show right-of-way widths on George Bush Drive , Timber Street , and Halik Street. 5. Please revise the curb radii on the proposed driveway to Halik . They should be between 25 and 30 feet. 6 . Are bike racks provided on si t e? 7 . Please clarify the temporary fire lane by the Barbara Bush Center. 8 . Please revise fire lane stripping to extend 100 feet from the driveway along George Bush l-Drive . Also revise stripping deta ils so the red stripe is 8". \! · Please verify that signs are not in the right-of-way . . . Provide a general note on the site plan that all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public t JJ~ ~ right-of-way or residential district within 150 ' of the subject lot , measured from a point five ~ feet above grade . Such screening shall be coordinated with the building architecture and i scale to maintain a unified appearance . .h/ Provide a general note on the site plan that states the following: Exterior building and site tf<J . lighting will meet the standards of Section 7.11 of the Unified Development Ordinance . The r./ ~ light source shall not project below an opaque housing and no fixture shall directly project tf. r light horizo ntally . Fixtures wi ll be mounted in such a manner that the projected cone of light ;W does not cross any property line. 12 . Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter. Reviewed by : Jessica Bullock Date : 10/6/14 LANDSCAPING/STREETSCAPING/BUFFER 1. Please differentiate between existing and proposed trees. 2 . Quantities provided in the table do not match what is shown on the site. Please only include plantings within the borders of the site . Please separate streetscaping points . 1 canopy tree is required ever 25 feet along George Bush Drive and every 32 feet along Timber and Halik . 2 non-canopy trees can be substituted for 1 canopy. These trees should be located within 50 feet of the property line . 4 . Please show property line and easements on landscape plan . 5. Please show the barricade around the trees on the plan . 6 . To receive landscaping points for existing trees , all existing trees must be in good form and condition and reasonably free of damage by insects and/or disease . 7 . Please add a general note that barricades will be in place prior to any activity on the property including but not limited to grading . .,,,, ~ Parking sc reening is required along 100% of George Bush Drive . Screening can be done with plantings , berms , structural elements or a combination and a minimum of 3 feet above parking lot elevation . Reviewed by : Jessica Bullock Date : 10/6/14 ! ) MISCELLANEOUS 1. Irrigation system must be protected by a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device , or a Double-Check Back Flow Device , and installed as per City Ord inance 2394 . 2 . All BackFlow devices must be installed and tested upon installation as per City O rdinance 2394 . ENGINEERING COMMENTS NO . 1 1. Please provide a drainage study. 2. I was curious why there 's a 6 feet drop for the flow lines for the grate inlet 1-9 at station 4+70 .10. 3 . Please provide the fire flow demand & building type , and show the location of the fire hydrants on the site plan (sheet A 1.01 ). 4 . Please show the existing fire hydrants on Holik St. and Timber St. on the plans. 5. Prov ide an access easement for the sidewalk along George Bush Drive that is going thro ugh the parking lot. 6. G IS is showing a sewer line connecting to the building that is to be demolished and replaced w ith parking & fire lane on Timber St. Please specify on the plans if it's being abandoned o r removed . 7 . Please clearly label which manholes the private sewer line is starting and ending . Rev iewed by : Kevin Ferrer Date : 10/31/14 TRANSPORTATION 1. Please revise and resubmit the driveway permit to comply with TxDOT comments . Rev iewed by : Danielle Singh , P.E. Transportation Planning Coord. Date : 10/28/14 TxDOT 1. Proposed median does not meet the TxDOT access management guidelines for a right-in I right -out only access po int , the median needs to be more substantial so there is no quest ion regarding the intended function of this access point , also required is a restr iping eliminating the left turn lane assuring south bound traffic no option to left into property from George Bush Dr. Before access can be approved these revisions must be implemented into the property 's proposed plan and commercial access request. We look forward to rev iewing the revised proposal for access on the land use I access change . Rev iewed by : Vincent Espinoza Date : 10/27/14 FIRE 1. Fire Lanes are covered but it is my understanding that the East end of the school is over 30 ' in height which will require an Aerial Access Easement. This AAE will need to start with in 15 ' to 30 ' of the structure. 2. The Gate , near the South West corner of the building , will need a Knox Padlock 3 . The FDC may need to be remote due to elevation changes. Rev iewed by: Steve Sm ith Date : 10/29/14 I • SANITATION 1. The dumpster pads need to be turned 10-15 degrees clockwise in order to have a better approach . Reviewed by : Wally Urrutia Date : 10/27 /14 J . Google earth feet-...--------------------200 rreters·-----------------------------so Go ogle earth feet• 1 -----------------------------------------------------700 rreters~1 ---------------------------------------------------200 Go gle earth feet~ ................................................................................... 500 rreters~ ................................................... -100 Go ogle earth feet...--------------------------700 rreters...------------------------200 Go o g le earth feet•, ----------------------------------------------------------1000 rreters 300 Kevin Ferrer City of College Station 1101 Texas Ave S . College Station , TX 77842 MITCHELL MM MORGAN Re: CSISD COLLEGE VIEW IDGH SCHOOL Dear Kevin , January 30, 2015 Please see below for our response to the City of College Station Staff Comments that affected Mitchell & Morgan 's civil sheets on this project: STAFF REVIEW COMMENTS NO. 3 Project: CSISD College View High School 14-00900265 ENGINEERING COMMENTS NO. 3 Revised Water line I . Provide the vertical curves for the water line on the profile and ensure it meets the minimum radius of curvature. RESPONSE: Vertical curves have been added to P.L locations in line. 2. Provided an addendum for the water analysis report ensuring that it still meet the pressure and velocity requirements. RESPONSE: Addendum letter is attached to these comments. 3. Include Inset "A" detail from the approved plan to this sheet. RESPONSE: Inset "A" added to this sheet. 1 3204 EARL RUDDER FWY. S. • CO LLEGE STATION, TX 77845 • T 979 .260 .6963 • F 979 .260.3564 CIVIL ENG INEERING • HYDRAULI CS • HYDROLOGY • UTI LI TIE S • STR EET S • SITE PLAN S • SUBDIVISIONS 1nfo@m1tchellandmorgan com • www m1tchellandmorgan com 4 . Remove the extra scale shown on the plans. RESPONSE: Scale removed. 5. The vertical clearance label around station 13+00 appears to not match the scaled clearance . RESPONSE: The 4.52' clearance is correct 6. Provide an additional 2 feet PUE to the 10 foot PUE on eastern side of the water line. So that there 's a 5 .5 feet clearance with the water line center line with the PUE boundary . RESPONSE: The section of 8" WL from Sta 10+15 to 11+10.92 has not changed alignment from the previously approved WL plan. This 10' PUE and WL location was chosen to protect existing trees. 7 . FYI TCE Q chapter 290 page 61-62 , clause B (ii) and (iii). l believe TCEQ has some recommendations regarding sewer lateral crossing above the water line? I have some concern s regarding the sewer line possible leaking into the potable line since this sewer line is privatel y maintained and might be damaged during the water line construction. Maybe adding a note to center a pipe segment of the waterline with the center line of the sewer line would suffice? RESPONSE: Added note to the WL plan & profile to center one joint of pipe at the center of the sanitary line. have any que stions or comments, please feel free to call our office at 979-260-6963 . Veronica J .B. Mo g Managing Partner cc: F ile M 2 DEVELOPMENT PERMIT PERMIT NO. 14-265 CITYOFCOLLEGEST,\TION PU,,niJtt & lln.JlJpinn11 c;...,u" FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: A000701 Crawford Burnett (ICL) Tract 187 DATE OF ISSUE: 12/18/2014 OWNER: Jon Hall -College Station ISO 2000 Welsh Street College Station, TX 77845 TYPE OF DEVELOPMENT: CONDITIONS: SITE ADDRESS: 1300 George Bush Dr, College Station, TX 77845 DRAINAGE BASIN: Wolf Pen Creek VALID FOR 24 MONTHS CONTRACTOR: Full Development Permit 1. No work beyond limits covered in permit is authorized . 2. The permit may be revoked if any false statements are made herein . If revoked , all work must cease until permit is re- issued . 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4 . Other permits may have been required to fulfill local, state and federal requirements . Construction will be in compliance with all necessary State and Federal Permits . 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6 . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site , it is the Contractor 's responsibility to implement measures that will meet City , State, and Federal requirements . 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance , prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to, paint, oil , solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply . Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10 . Special Conditions : TXDOT permit has not been approved, prcoeed at own risk . Landscape plans have not been approved, and needs to be address prior full building permit. I, _______________ , the Contractor, hereby agree to comply with all conditions here in. Contractor Signature Date Phone number E~mail I hereby grant this permit for development. Contact )edy Jo)'!t~ 111-l/S~l/ , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections . ~ ~ ---'l~l--~'~---~~0~1¥~~~~~~ Cif;Eng~resentative Date December 12, 2014 Jessica Bullock, Staff Planner City of College Station 1101 Texas Ave S College Station, Texas 77840 RE: College View High School College Station ISD VLK IARCHITECTS 1300 George Bush Dr. College Stat i on, Texas 77840 Jessica Bullock, The following are responses to comments generated from the City of College Station 's Site Plan Review, received on December 10, 2014. Responses are in Italics. PLANNING 1. The service drive on SW side will need the length of the hammerhead will need to be 120' during phase II , for sufficient fire access . The length of the hammerhead during phase II will be 120'. Please see attached revised sheet A1 .01 for clarification between phase II and phase Ill servi ce drive . 2. Please provide an explanation/survey to show the property line . What is shown does not match what I can see. Understanding that what I see does not accurately depict what will be on record, an explanation will be fine . Please also verify that the property line does not go into TxDot ROW along George Bush Dr where it runs along the island . Please see attached survey to help clarify the property line . 3. When the location of the bike rack is determined, please include on sheet Al.01. The bike rack has been located on the SW corner of the building. Please see attached revised sheet A1 .01 . 4 . Please show driveway apron as identified in the site design standards. Please see sheet C6 .02 for the driveway apron as identified in the site des ign standards. Member American Institute of Architects . 7915 F.M. 1960 West Suite 214. Houston Texas 77070 Ph 281.671.2300. Fax 281.671.2313. vlkarchitects .com 5. For the Fi r e lane stripping deta i l on sheet Al.01, the lettering should be 4". The red strip should remain 8 11 • The striping details have been revised to 4 " lettering and 8 " stripe will remain . Please see attached revised sheet Al.01 . 6. Response to TxDOT comments are still being reviewed and will follow. We respectfully request that the site development permit be released with the understanding that construction of the driveways will not commence until TxDot approval has been obtained. 7. Make sure the FDC is within 100 feet of a fire hydrant. The proposed FDC location is located within 100 feet of the proposed hydrant location. The proposed hydrant is located just across the service drive from the proposed FDC. Please see two located on the attached revised sheet Al.01 . 8 . Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter. Please note the greenhouse location has moved at the owner's request. We have shown that location with additional sidewalk to the new location of the greenhouse . LANDSCAPING/STREETSCAPING/BUFFER 1. Please verify streetscaping calculation . I show property frontage not including driveways as 424' along Timber, 194' along Halik and 600 ' along George Bush Dr . This would mean 13 canopy trees along Timber, 6 along Halik and 24 along George Bush Dr . The only place where additional trees would need to be added for streetscaping is along George Bush Dr . These would need to be placed within the same proximity to the existing trees to George Bush Dr . The calculation for 300 additional points along the ROW can also be revised to take out driveway spacing . Based on my calculations, total points required is 13 ,968. The streetscaping calculations have been revised to the numbers listed in your comment however, we still need to resolve the landscaping plan. We respectfully request that the site development permit be released with the understanding that VLK Architects and the City of College Station are still working on the landscaping requirements due to the complexity of the development on the existing site. Member American Institute of Architects. 7915 F.M . 1960 West Suite 214. Houston Texas 77070 Ph 281 .671.2300 ·Fax 281.671 .2313. vlkarchitects .com 2. Planting not in the property lines cannot be counted towards point. This includes the crepe myrtles along George Bush Drive and some trees along Timber . For existing trees, they can remain shown on the plan, but they would not count towards point requirements . For the new proposed plantings, please move them so the trunk is within the property line . These calculations have been revised to not i nclude planting not in the property lines however, we still need to resolve the landscaping plan. We respectfully request that the site development permit be released with the understanding that VLK Architects and the Ci ty of College Station are sti ll working on the landscaping requirements due to the complexity of the development on the existing site .. 3. I am still unable to ver ify the count for crepe myrtles. Please either use a different symbol or label which trees are crepe myrtles . The symbol for crepe myrtles will distinguish them apart from other trees upon submission of the Landscaping plan. 4 . With the next submittal, please include a request to have the trees next to the front of the bu i lding count toward streetscaping along George Bush Drive . The request should explain why these exemptions are necessary for the site . Please see attached letter requesting to have the trees next to the building along George Bush count toward streetscaping . ENGINEERING COMMENTS NO . 2 1. Response comment has been noted . Prior to submittal for approved plans , please make sure that there's a note next to the existing manhole on Halik St. stat i ng that the private sewer line terminates at this manhole and that the public sewer is beginning here si nce the Utility sheet was not submitted during the last submittal. Please see public and private sanitary sewer designation shown on sheet C4.01 . 2. Provide a note stating where the public storm sewer begins on the plans . Please see storm sewer designation shown on sheet CS .01 . 3. Please check the drainage area down on Halik Street, and acquire a dedicated drainage easement for the proposed storm sewer line to the creek . Please see the attached graphic showing the drainage area wh i ch flows to this new 10 foot i nlet on Halik. This flowrates for the 10 & 100 year storm events are 0.3 cfs and 0.4 cfs, respectively. Please see attached blanket easement form for Lot 1, Block 1, CS/SD -Willow Branch & Oakwood School sites We would prefer to dedicate a blanket easement now because we are not confident this storm sewer line will not shift duri ng construction . 4 . Please provide an Engineering Cost estimate . Please see the cost estimate attached. Member American Institute of Architects. 7915 F.M. 1960 West Suite 214 ·Houston Texas 77070 Ph 281 .671 .2300. Fax 281.671 .2313 . vlkarchitects .com If further information is required to address the above listed comments please do not hesitate to contact the office. Thank you, ~:J. -----Ben Lamons Enc: Streetscape Request Letter, Engineer's Estimate, Easement Application, Holik Street Sketch, Replat, Survey, C2.01, C2 .02, C2 .03, C3 .01 , C4.01, C6 .02 & Al.01 Member American Institute of Architects. 7915 F.M. 1960 West Suite 214. Houston Texas 77070 Ph 281.671 .2300. Fax 281 .671 .2313. vlkarchitects .com December 11, 2014 Ms. Jessica Bullock Planning & Development Services City of College Station, Texas P. 0 . Box 9960 College Stat ion, Texas 77842 Dear Ms . Bullock, V L K JAl\CHITEC TS VLK Architects, on behalf of College Station ISD asks that the following two requirements be waived from enforcement on the above referenced project. 1. Parking Lot Screening On previous CSISD projects it has been agreed to by the City to not require the District to provide the required parking lot screening due to safety and secur ity of the campuses due to the fact that th is screening provides places for individuals to hide who may be a threat to the campus and its occupants. Further, the City of Co llege Station Police Department has agreed that this requirement is a determent to the safety and security of schools. 2. Streetscap ing Requ irements Due to Texas Department of Transportation Right of Way Easements along George Bush Drive and that approximately the first 55 feet of the site is paved ; the project cannot comply with the Streetscaping requirements. We ask that the existing line of mature trees located approximate ly 60 feet from the property line and parallel to George Bush Drive be considered as meet ing the street scaping requirements along George Bush Drive . Thank you for your consideration of the se requests. If you have any q uestions, please do not hesitate to call. Me m be r Ame r ica n Ins t itut e of A r ch it ec t s · 20 44 5 St ate H ig hw ay 24 9 Su i te 350 . H ou st o n Texas 77070 Ph 28 1 .67 1 .23 00 . Fax 281 .67 1 .23 1 3 . vl ka r c hit ec ts .co m December 12, 2014 Jessica Bullock, Staff Planner City of College Station 1101 Texas Ave S College Station, Texas 77840 RE : College View High School College Station ISD VLK !\R(l-llTE(TS 1300 George Bush Dr. College Station, Texas 77840 Jessica Bullock, The following are responses to comments generated from the City of College Station's Site Plan Review, received on December 10, 2014. Responses are in Italics. PLANNING l. The service drive on SW side will need the length of the hammerhead will need to be 120' during phase II, for sufficient fire access . The length of the hammerhead during phase II will be 120'. Please see attached revised sheet Al.01 for clarification between phase II and phase Ill service drive . 2. Please provide an explanation/survey to show the property line . What is shown does not match what I can see . Understanding that what I see does not accurately depict what will be on record , an explanation will be fine . Please also verify that the property line does not go into TxDot ROW along George Bush Dr where it runs along the island. Please see attached survey to help clarify the property line . 3. When the location of the bike rack is determined, please include on sheet Al.01. The bike rack has been located on the SW corner of the building. Please see attached revised sheet Al.01. 4. Please show driveway apron as identified in the site design standards. Please see sheet C6.02for the driveway apron as identified in the site design standards. Member American Institute of Architects· 7915 F.M . 1960 West Suite 214. Houston Texas 77070 Ph 281 .671 .2300 ·Fax 281 .671 .2313. vlkarchitects .com 5 . For the Fire lane stripping detail on sheet Al.01, the lettering should be 4". The red strip should remain 8". The striping details have been revised to 4 " lettering and 8 11 stripe will remain. Please see attached revised sheet Al.01 . 6. Response to TxDOT comments are still being reviewed and will follow . We respectfully request that the site development permit be released with the understanding that construction of the driveways will not commence until TxDot approval has been obtained. 7. Make sure the FDC is within 100 feet of a fire hydrant. The proposed FDC location is located within 100 feet of the proposed hydrant location. The proposed hydrant is located just across the service drive from the proposed FDC. Please see two located on the attached revised sheet Al .01 . 8 . Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter. Please note the greenhouse location has moved at the owner's request. We have shown that location with additional sidewalk to the new location of the greenhouse . LANDSCAPING/STREETSCAPING/BUFFER 1. Please verify streetscaping calculation . I show property frontage not including driveways as 424' along Timber, 194' along Holik and 600 ' along George Bush Dr. This would mean 13 canopy trees along Timber, 6 along Holik and 24 along George Bush Dr . The only place where additional trees would need to be added for streetscaping is along George Bush Dr . These would need to be placed within the same proximity to the existing trees to George Bush Dr. The calculation for 300 additional points along the ROW can also be revised to take out driveway spacing . Based on my calculations, total points required is 13,968. The streetscaping calculations have been revised to the numbers listed in your comment however, we still need to resolve the landscaping plan. We respectfully request that the site development permit be released with the understanding that VLK Architects and the City of College Station are still working on the landscaping requirements due to the complexity of the development on the existing site . Member American Inst i tute of Architects. 7915 F.M. 1960 West Suite 214 ·Houston Texas 77070 Ph 281.671 .2300 ·Fax 281.671.2313 · vlkarchitects .com 2. Planting not in the property lines cannot be counted towards point. This includes the crepe myrtles along George Bush Drive and some trees along Ti mber. For existing trees, they can remain shown on the plan , but they would not count towards point requirements . For the new proposed plantings, please move them so the trunk is within the property li ne . These calculations have been revised to not include planting not in the property li nes however, we still need to resolve the landscaping plan. We respectfully request that the site development permit be released w i th the understanding that VLK Architects and the City of College Station are still working on the landscaping requirements due to the complexity of the development on the ex isting site .. 3. I am still unable to verify the count for crepe myrtles . Please either use a d ifferent symbol or label which trees are crepe myrtles . The symbol for crepe myrtles will distinguish them apart from other trees upon submission of the Landscaping plan . 4 . With the next submittal, please include a request to have the trees next to the front of the building count toward streetscap i ng along George Bush Drive . The request should explain why t hese exemptions are necessary for the site . Please see attached letter requesting to have the trees next to the building along George Bush count toward streetscapi ng. ENGINEERING COMMENTS NO . 2 1. Response comment has been noted . Prior to submittal for approved plans , please make sure that there's a note next to the existing manhole on Halik St . stating that the private sewer line terminates at this manhole and that the public sewer is beginning here si nce the Utility sheet was not submitted during the last submittal. Please see public and private sanitary sewer designation shown on sheet C4 .01 . 2. Provide a note stating where the public storm sewer begins on the plans . Please see storm sewer designation shown on sheet CS .01 . 3. Please check the drainage area down on Halik Street, and acquire a dedicated drainage easement for the proposed storm sewer line to the creek. Please see the attached graphic showing the drainage area which flows to this new 10 foot inlet on Halik. This flowrates for the 10 & 100 year storm events are 0.3 cfs and 0.4 cfs, respectively . Please see attached blanket easement form for Lot 1, Block 1, CS/SD-Willow Branch & Oakwood School si tes We would prefer to dedicate a blanket easement now because we are not confident this storm sewer line will not shift during construction . 4 . Please provide an Engineering Cost estimate . Please see the cost estimate attached. Member American Institute of Architects· 7915 F.M . 1960 West Suite 214. Houston Texas 77070 Ph 281.671 .2300 ·Fax 281.671 .2313 · vlkarchitects .com If further information is required to address the above listed comments please do not hes itate to contact the offic e. Thank you , fS:J. -----Ben Lamons Enc: Streetscape Request Letter, Engineer's Estimate, Easement Applicat ion , Halik Street Sketch , Replat, Survey, C2 .01, C2 .02 , C2 .03 , C3 .01 , C4 .01 , C6.02 & A l.01 Member American Institute of Architects. 7915 F.M . 1960 West Suite 214. Houston Texas 77070 Ph 281 .671 .2300 ·Fax 281 .671 .2313. vlkarchitects .com December 11, 2014 Ms . Jessica Bullock Planning & Development Services City of College Station, Texas P. 0 . Box 9960 College Stat ion , Texas 77842 Dear Ms. Bullock, V L K IARC HI TECTS VLK Architects, on behalf of Co ll ege Station ISD asks that the following two requirements be waived from enforcement on the above referenced project. 1. Parking Lot Screening On previous CSISD projects it has been agreed to by the City to not require the District to provide the required parking lot screening due to safety and security of the campuses due to the fact that this screening provides places for individuals to hide who may be a threat to the campus and its occupants . Further, the City of College Station Police Department has agreed that this requirement is a determent to the safety and security of schools. 2. Streetscaping Requirements Due to Texas Department of Transportation Right of Way Easements along George Bush Drive and that approximately the first 55 feet of the site is paved ; the project cannot comply with the Streetscaping requirements . We ask that the existing li ne of mature trees located approximately 60 feet from the property line and parallel to George Bush Drive be considered as meeting the street scap i ng requirements along George Bush Drive . Thank you for your consideration of these requests . If you have any questions, please do not hesitate to call. Memb e r A mer ican Institute of Architects· 20445 Stille H ighway 2 49 Suite 35 0. H ousto n Texas 77070 Ph 28 1.67 1 .2300 ·Fax 281.67 1 .23 1 3 . vl kar chitects.c om ENGINEER'S ESTIMATE CENTER FOR ALTERNATIVE LEARNING llCM NO . QUANTITY UNIT Public Waterline 1 372.5 LF 2 2 EA 3 1 EA 4 1 EA 5 1 EA 6 1 EA 7 1 EA 8 1 EA 9 2 EA 10 1 EA 11 1 EA 12 1 EA 13 1 EA 14 300 .4 LF 15 7 EA 16 382 .5 LF 11CM NO . QUANTITY UNIT Public Strom Drain 17 1 EA 18 125.5 LF 19 1 EA 20 1 EA 21 70.8 LF 22 125.5 LF 23 262 .5 SF DESCRIPTION UNIT PRICE 8" PVC Waterline CAWWA C900 Cl 200) $ 45 .00 8" M .J . Gate Valve & Box $ 1,250 .00 16"x8" M.J . Tee $ 1,200.00 8"x6" M.J. Tee $ 550.00 8"x4 " M.J. Tee $ 550.00 8"x6" M.J. Reduce r $ 550.00 8"x45 Degree M.J . Bend $ 550.00 8"x22 .5 Degree M.J . Bend $ 550 .00 8"x11 .25 Degree M.J. Bend $ 550.00 6" M.J. Gate Valve & Box w/ Locking lid $ 1,100.00 Meter Vault and 3" Water Meter Conection Fittings and Valves $ 12,500.00 Connection to existing system $ 2,000.00 Std . Fire Hydrant Assembly $ 3,500 .00 Structural Backfill $ 8.00 Thrust Blocks for Fittings $ 45 .00 1 rencn notect1on $ 5.00 Public Waterline Total : DESCRIPTION UNIT PRICE 1 O' Standard Recess ed Curb Inlet $ 3,500 .00 30" RCP $ 80 .00 Standard Junction Box 36" RCP $ 2 ,000 .00 30" Concrete Headwall with Energy Dissipater Blocks $ 2 ,500 .00 Structural Backfil l $ 8.00 Trench Protection $ 5.00 Street Repai r $ 10.00 Public Storm Drain Total :! Total Public Improvements ~°))'''' .::--,,.,_~ '*'" "'•·· k--t.n't• ,:: c;_, •• •' .... v · 'I ;'. .... .. .. -tc ,,, "•.. ···~ i1 : ............. ·~ '"'.......................... AN~ \':SS ........ 7isa9 /fE J I 11 ~VERONICA J&.M~~ ...... ~ zj ( \4 l .>!\ Q /{ij~ '•.? • ~~G/STE.:-.~:._~r#.J' 'f:IAA jJii:;._.,//IA3: .,, s1(:;;;,f..~ ~t$ l~VV\~' i-rr: '"'\: :<to ... TOTAL COST $ 16,762.50 $ 2,500 .00 $ 1,200.00 $ 550 .00 $ 550 .00 $ 550 .00 $ 550 .00 $ 550 .00 $ 1,100.00 $ 1, 100.00 $ 12,500.00 $ 2,000.00 $ 3,500.00 $ 2,403 .20 $ 315 .00 $ 1,912 .50 $ 48 ,043 .20 TOTAL COST $ 3,500.00 $ 10,040.00 $ 2,000.00 $ 2,500.00 $ 566.40 $ 627.50 $ 2,625.00 $ 19,233.90 $ 67,277.10 EASEMENT APPLICATION To be filled in and submitted with construction plans and specifications for preliminary review (Not to be used where City is purchasing property) THIS SECTION TO BE COMPLETED BY CITY STAFF PROCESSED BY : ____________ _ DEPT. _____ _ EXT. __ _ REQUESTED BY : ____________ _ DEPT. _____ _ EXT. __ _ ACCOUNTNO.-==---:--:--=--:-----:--:----:--:--(For ordering title work , appraisals , etc .) PROJECT NAME : _________ _ PROJECT NO . _________ _ TYPE OF EASEMENT: __ Public Utilities (PUE) L Temporary Blanket PUE (prior to building permit) __ __ Electric Only Water Only SPECIAL INSTRUCTIONS :--------------------------- REVIEW AND APPROVAL REQUIRED/GIVEN BY THE FOLLOWING DEPARTMENTS: Approval Required By : (please initial) ___ Electric ___ Water/WW ___ Asst. City Engineer ___ Public Works Approval Given By : (ple ase initial) ___ Electric Water/WW -===. Asst. City Engineer Public Works METES & BOUNDS DESCRIPTION CHECKED FOR CLOSURE BY:-------------- (City Staff-Name/Dept.) THIS SECTION TO BE COMPLETED BY APPLICANT PROPERTY OWNER(S): Coul3be ~OU \ ':>D (Names must be exactly as they appear on the deed) ADDRESS : i't>l 'l W eA4 PHONE NUMBER: <011) /G:;4---54-co C.t> e.. ~~ TX 11~ e furnish copies of all lien documents): IF OWNER IS A CORPORATION, PARTNERSHIP, OR JOINT VENTURE (also see #5 below): 1. Sta te of Incorporation I Registration 2. Partners' Names (if appl icable) 3. Person Authorized to Sign (Name and Title) 11h.S LS LEGAL DEPARTMENT MUST BE PROVIDED WITH THE FOLLOWING: ) f Oli' W ... ~ l U G-(Please check items that are attached) \.. /. r 1. A copy of a recent (within 90 days) deed or title insurance policy showing the names of the granters I owners ; and ~ t.JA 2. For unplatted property, s signed, sealed and dated metes and bounds description and a diagram of the property showing the location of the easement; or ~ 3. For platted property, a copy of the plat showing the lot, block, subd ivisi on , and recording Information . 11 1 • ) ~ 4. For blanket easements, a signed, sealed and dated metes and bounds description and a diagram of the property.(W.Q;UiJ\Opl:tf UJ'A 5 . Corporate or partnership owners must furnish a copy of a corporate resolution or other proof of authority to sign on behalf of the corporation , partnersh ip, or joint venture . IX 6 . Name , address and phone number of person who is to receive the easement and be responsible for getting it executed : I Sol\ Wtll 1 ~\i wats~ lo ~~ 11340 CcnctJ111-14q1 Any land acqws1lion resuhmg from Capilal Improvement Pro1ecls requires a meeting with the Legal Departmert . - ---- = -... ... --- ' ' .... --- ' ' ---- 0.037 acres '10-yr==0 .3 cfs 100-yr==0 .4 cfs / / / t\. ,.,--/ '\IA, ), ' -- -- ,. - - ---- / / / / / / / / / / / / / / December 12, 2014 Jessica Bullock, Staff Planner City of College Station 1101 Texas Ave S College Station , Texas 77840 RE : College View High School College Station ISO VLK IARC lilTECTS 1300 George Bush Dr. College Station, Texas 77840 Jessica Bullock, The following are responses to comments generated from the City of College Station 's Site Plan Review, received on December 10, 2014 . Responses are in Italics. PLANNING ~ as ~ \,rie j ~rv1ce drive on SW side will need the length of the hammerhead will need to be 120' during phase 11 , for sufficient fire access . The length of the hammerhead during phase II will be 120'. Please see attached revised sheet Al .01 for clarification between phase II and phase Ill service drive . Please provide an explanation/survey to show the property line . What is shown doe s not match what I can see . Understanding that what I see does not accurately depict what will be on record , an explanation will be fine. Please also verify that the property l i ne does not go into TxDot ROW along George Bush Dr where it runs along the island . Please see attached survey to help clarify the property line . ?~hen the location of the bike rack is determined, please include on sheet Al.01. ~ The bike rack has been located on the SW corner of the building. Please see attached revised ~~ <Q<';;:Y' / sheet Al .01. 41 Please show driveway apron as identified in the site design standards. Please see sheet C6. 02 for the driveway apron as identified in the site design standards. Member American Institute of Architects. 7915 F.M . 1960 West Suite 214 . Houston Texas 77070 Ph 281 .671 .2300 ·Fax 281.671.2313 · vlkarchitects .com ~the Fire lane stripping detail on sheet Al.01, the lettering should be 4". The red stri p should remain 8". The striping details have been revised to 4 " lettering and 8 " stripe will remain . Please see attached revised sheet Al.01 . ---&. Response to TxDOT comments are still being reviewed and will follow . We respectfully request that the site development permit be released with the understanding that construction of the driveways will not commence until TxDot approval / has been obtained. J/ Make sure the FDC is within 100 feet of a fire hydrant. The proposed FDC location is located w i thin 100 feet of the proposed hydrant location . The proposed hydrant is located just across the service drive from the proposed FDC. Please see two located on the attached revised sheet Al .01 . 8. Please note that any changes made to the plans that have not been requested by the City of College Stat ion must be explained in your next transmi t tal letter. Please note the greenhouse location has moved at the owner's request. We have shown that location with additional sidewalk to the new location of the greenhouse . LANDSCAPING/STREETSCAPING/BUFFER 1. Please verify streetscaping calculation . I show property frontage not including driveways as 424 ' along Timbe r, 194' along Halik and 600 ' along George Bush Dr . This would mean 13 canopy trees along Timber, 6 along Halik and 24 along George Bush Dr. The only place where additional trees would need to be added for streetscaping is along George Bush Dr . These would need to be placed with i n the same proximity to the existing trees to George Bush Dr . The calculat ion for 300 additional points along the ROW can also be revised to take out driveway spacing . Based on my calculations , total points required is 13 ,968 . The streetscaping calculations have been revised to the numbers listed in your comment however, we still need to resolve the landscaping plan. We respectfully request that the site development permit be released with the understanding that VLK Architects and the City of College Station are still working on the landscaping requirements due to the complexity of the development on the existing site . Member American Institute of Architects . 791 S F.M. 1960 West Suite 214. Houston Texas 77070 Ph 281.671 .2300. Fax 281 .671.2313. vlkarchitects .com 2. Planting not in the property lines cannot be counted towards point. This includes the crepe myrtles along George Bush Drive and some trees along Timber . For existing trees, they can remain shown on the plan, but they would not count towards point requirements . For the new proposed plantings, please move them so the trunk is within the property line . These calculations have been revised to not include planting not in the property lines however, we still need to resolve the landscaping plan. We respectfully request that the site development permit be released with the understanding that VLK Architects and the City of College Station are still working on the landscaping requirements due to the complexity of the development on the existing site .. 3. I am still unable to verify the count for crepe myrtles. Please either use a different symbol or label which trees are crepe myrtles. The symbol for crepe myrtles will distinguish them apart from other trees upon subm ission of the Landscaping plan . 4. With the next submittal, please include a request to have the trees next to the front of the building count toward streetscaping along George Bush Drive . The request should explain why these exemptions are necessary for the site . Please see attached letter requesting to have the trees next to the building along George Bush count toward streetscaping . ENGINEERING COMMENTS NO . 2 l. Response comment has been noted . Prior to submittal for approved plans , please make sure that there 's a note next to the existing manhole on Halik St . stating that the private sewer line terminates at this manhole and that the public sewer is beginning here since the Utility sheet was not submitted during the last submittal. Please see public and private sanitary sewer designation shown on sheet C4 .01 . 2. Provide a note stating where the public storm sewer begins on the plans . Please see storm sewer designation shown on sheet CS .01 . 3. Please check the drainage area down on Halik Street, and acquire a dedicated drainage easement for the proposed storm sewer line to the creek . Please see the attached graphic showing the drainage area which flows to this new 10 foot inlet on Halik. This flowrates for the 10 & 100 year storm events are 0.3 cfs and 0.4 cfs, respectively . Please see attached blanket easement form for Lot 1, Block 1, CS/SD -Willow Branch & Oakwood School sites We would prefer to dedicate a blanket easement now because we are not confident this storm sewer line will not shift duri ng construction . 4. Please provide an Engineering Cost estimate . Please see the cost estimate attached. Member American Institute of Architects. 7915 F.M . 1960 West Suite 214 . Houston Texas 77070 Ph 281.671 .2300. Fax 281.671.2313 · vlkarchitects .com If further information is required to address the above listed comments please do not hesitate to contact the office . Thank you, fS:J. Ben Lamons Enc: Streetscape Request Letter, Engineer's Estimate, Easement Application , Holik Street Sketch , Re plat, Survey, C2 .01, C2 .02 , C2 .03 , C3.01, C4 .01 , C6 .02 & Al.01 Member Amer i can Institute of Architects. 7915 F.M. 1960 West Suite 214 . Houston Texas 77070 Ph 281.671.2300. Fax 281.671 .2313 . vlkarchitects .com December 11, 2014 Ms . Jessica Bullock Planning & Development Services City of College Station, Texas P. 0 . Box 9960 College Station, Texas 77842 Dear Ms . Bullock, VLK IA~C HITECTS VLK Architects, on behalf of College Station ISD asks that the following two requirements be waived from enforcement on the above referenced project. 1. Parking Lot Screening On previous CSISD projects it has been agreed to by the City to not require the District to provide the required parking lot screening due to safety and security of the campuses due to the fact that this screening provides places for individuals to hide who may be a threat to the campus and its occupants . Further, the City of College Station Police Department has agreed that this requirement is a determent to the safety and security of schools . 2. Streetscaping Requirements Due to Texas Department of Transportation Right of Way Easements along George Bush Drive and that approximately the first SS feet of the site is paved; the project cannot comply with the Streetscaping requirements. We ask that the existing line of mature trees located approximately 60 feet from the property line and parallel to George Bush Drive be considered as meeting the street scap ing requirements along George Bush Drive . Thank you for your consideration of these requests. If you have any questions, please do not hesitate to call. Memb e r Ame r ica n Institute of Architects · 20445 State H ig h way 2 49 Sui te 350 . H ousto n Texas 77070 Ph 28 1 .67 1 .2300 ·Fax 28 1 .67 1 .231 3 . vl k a r c hit ects.c om ENGINEER'S ESTIMATE CENTER FOR ALTERNATIVE LEARNING llCM NO. QUANTITY UNIT Public Waterline 1 372 .5 LF 2 2 EA 3 1 EA 4 1 EA 5 1 EA 6 1 EA 7 1 EA 8 1 EA 9 2 EA 10 1 EA 11 1 EA 12 1 EA 13 1 EA 14 30 0.4 LF 15 7 EA 16 382 .5 LF lli:;m NO. QUANTITY UNIT Public Strom Drain 17 1 EA 18 125.5 LF 19 1 EA 20 1 EA 21 70.8 LF 22 125.5 LF 23 262 .5 SF DESCRIPTION 8" PVC Waterline (AWWA C900 CL 200} 8" M .J. Gate Valve & Box 16"x8" M.J. Tee 8"x6" M.J. Tee 8"x4 " M.J. Tee 8"x6" M.J. Reducer 8"x45 Degree M .J . Bend 8"x22 .5 Degree M.J. Bend 8"x 11 .25 Degree M.J . Bend 6" M.J. Gate Va lve & Box w/ Locking Lid Meter Vault and 3" Water Meter Conection Fitlinas and Valves Connection to existina svstem Std . Fire Hvdrant Assembly Structural Backfill Thrust Blocks for Fittinas Trench Protection Public Waterline Total: DESCRIPTION 1 O' Standard Reces sed Curb Inlet 30" RCP Standard Junction Box 36" RCP 30" Concrete Headwall with Enerav Dissipator Blocks Structural Backfill Trench Protection Street Repair Public Storm Drain Total :! Total Public Improvements ~}1'''' .:;..,_~ '*'" ""·· :.f-i.n't • ::' ~ ··" ·· .. ..., .. , ;' .. ·· ·· ... ,, ... * ... ... * ~ i! : ................... "' :;··············""'' MORGAN~ \'iC"""716es /f§ J I 11 UNIT PRICE $ 45.00 $ 1,250 .00 $ 1,200.00 $ 550 .00 $ 550 .00 $ 550 .00 $ 550 .00 $ 550 .00 $ 550 .00 $ 1,100.00 $ 12 500 .00 $ 2,000.00 $ 3 500 .00 $ 8 .00 $ 45 .00 $ 5.00 UNIT PRICE $ 3,500 .00 $ 80 .00 $ 2,000 .00 $ 2 500 .00 $ 8 .00 $ 5.00 $ 10.00 ~ VERONICA .~:~: ................ ~ zJ ( \4 '/.>!." Q:'YJ~ ''•~" ~~G1sre.:-,~:._~(:#'.,£ r: IA a JJJ_ V-'(/lti:3 .• , °S/ONA~ f(:.~ I ~VV\ 11' I Tl- '"'\: :'lo.~ TOTAL COST $ 16,762.50 $ 2,500.00 $ 1,200 .00 $ 550 .00 $ 550 .00 $ 550.00 $ 550.00 $ 550.00 $ 1,1 00 .00 $ 1,100.00 $ 12,500.00 $ 2,000 .00 $ 3 ,500.00 $ 2,4 03 .20 $ 315.00 $ 1,912.50 $ 48 ,043.20 TOTAL COST $ 3,500.00 $ 10,040.00 $ 2 000 .00 $ 2,500 .00 $ 566.40 $ 627 .50 $ 2,625.00 $ 19,233.90 $ 67,277.10 EASEMENT APPLICATION To be filled in and submitted with construction plans and specifications for preliminary review (Not to be used where City is purchasing property) THIS SECTION TO BE COMPLETED BY CITY STAFF DEPT. EXT. PROCESSED BY: ____________ _ ----------- REQUESTED BY: ____________ _ DEPT .. ______ _ EXT. __ _ ACCOUNTNO .~~--,-~~--,----,--,---,--,--­ (For ordering title work , appraisals, etc .) PROJECT NAME: ________ _ PROJECT NO . _________ ~ TYPE OF EASEMENT: __ Public Utilities (PUE) L Temporary Blanket PUE (prior to building permit) __ __ Electric Only Water Only SPECIAL INSTRUCTIONS :--------------------------- REVIEW AND APPROVAL REQUIRED/GIVEN BY THE FOLLOWING DEPARTMENTS: Approval Required By: (please initial) ___ Electric ___ Water/WW ___ Asst. City Engineer Public Works --- Approval Given By: (please initial) ___ Electric Water/WW ___ Asst. City Engineer ___ Public Works METES & BOUNDS DESCRIPTION CHECKED FOR CLOSURE BY: -------,(=C.,.,.ity--.S""'t....,aff,,..._--.N"""a-m-e"""/D""'"e-pt'"'.)---- THIS SECTION TO BE COMPLETED BY APPLICANT PROPERTY OWNER(S): Ccv @e ~OU \ ':>D (Names must be exactly as they appear on the deed) ADDRESS : t4t>l "l W eA~ PHONE NUMBER: ~11) t~ --54co ~ Q..~~ TX 11~ ALL LENDERS (Plea e furnish copies of all lien documents): IF OWNER IS A CORPORATION , PARTNERSHIP, OR JOINT VENTURE (also see #5 below): 1. State of Incorporation I Registration 2 . Partners' Names (if applicable) 3. Person Authorized to Sign (Name and Title} ~5 'S LEGAL DEPARTMENT MUST BE PROVIDED WITH THE FOLLOWING: 1' 0~ yM l U G-(Please check items that are attached) /. t 1. A copy of a recent (within 90 days) deed or title insurance policy showing the names of the grantors I owners ; and '-......__.., t-.JA 2 . For unplatted property, s signed, sealed and dated metes and bounds description and a diagram of the property showing the location of the easement; or JjC 3. For platted property , a copy of the plat showing the lot, block , subdivision , and recording Information . 11 1 .~ ) j'j( 4. For blanket easements, a signed, sealed and dated metes and bounds description and a diagram of the property .(~ ~f~ ~ 5. Corporate or partnership owners must furnish a copy of a corporate resolution or other proof of authority to sign on behalf of the corporation , partnership, or joint venture . 6. Name , address and phone number of person who is to receive the easement and be responsible for getting it executed : Any land acqws1/ion resuflmg from Capital Improvement Pro1ecls requires a meetmg with the Legal Departmerk.. / / / '/ / / / '<,./ / / / / / ' / / / /, -- - - ----- -' ' ' ' ... - - - --~ : : _-_- _---3-c\ 6-- ... ' 0 - - -- --- - --- - ---a-- - - - -- 0.037 acres 10-yr=0 .3 cfs 100-yr=0.4 cfs ------ - - -- -- -- ;-- November 24, 2014 Jessica Bullock, Staff Planner City of College Station 1101 Texas Ave S College Station, Texas 77840 RE: College View High School College Station ISD VLK IAR HITECTS 1300 George Bush Dr. College Station , Texas 77840 Jessica Bullock, The following are responses to comments generated from the City of College Station's Site Plan Review, received on November 6, 2014. Responses are in Italics. PLANNING 1. Please include site detail sheets with next submittal and add the curb detail to sheet Al.01. Site detail sheets have been included with this submittal Please see attached sheets Al.01, Al.02, Al .03, Al.OS and Al.06. The curb detail is drawing 4/Al .02. 2. Please clarify phase lines. On sheet Al.01, it is not clear what is in phase II versus phase Ill. ~ eerV1 ~ {w Fire lane will be included in Phase II with building. Please see attached revised sheets Al.010 Ar-ve o"'"' ·--:>O' (.)II' u)'l\ 0 eed d &Al .01 . SCe ~~ Please show property line and easements . ~e. ~ The property line has been included on the site plan . Please see attached revised sheet ~ ~ / Al.01. There is a blanket easement in place during construction and a plat will be filed upon ~~ eJI ~ completion of construction. ( V . /) V P lease revise the street labels to also show right-of-way widths on George Bush Drive , Timber Street, and Halik Street. The street labels for George Bush Drive, Timber Street, and Halik Street have been revised to show right-of-way widths. Please see attached revised sheet Al.01. Member American Institute of Architects · 7915 FM . 1960 West Suite 214 . Houston Texas 77070 Ph 281 671.2300 ·Fax 281 671.2313. vlkarch1tects.com ./.Please revise the curb radii on the proposed driveway to Holik. They should be between 25 and 30feet. The curb on the proposed driveway to Holik has been revised to 20' radii. In house, we have la id templates over to confirm the fire truck has access. Please see attached revised sheet A l.01 . · n ~ e e.cJ 6. Are bi ke racks provided on site? ll"1 a:tk\ a; . '-7 / The bike rack detail has been provided, location pending per owner.~ :::.....0 ~ i<l . V P lease clarify the temporary fire lane by the Barbara Bush Center. The temporary fire lane by the Barbara Bush Center was requested by Eric Dotson during the Preapplication Conference as a temporary access during construction. 8. Please revise fire lane stripping to extend 100 feet from the driveway along George Bush Drive . Also revise stripping deta i ls so the red strip is 8". The fire lane stripping currently extends 100' from the driveway along George Bush Drive in the SW direction. The striping details have been revised to 8 ". Please see attached revised sheet Al.01 . {¥""Please verify that signs are not in the right -of-way . . / Proposed monument sign is not in the right-of-way. W" Provide a general note on the site plan that all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or res idential district w ithin 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a un ified appearance . Roof and ground-mounted mechanical equipment is not required to be screened from view per meeting with Jessica Bullock on 11/21/2014. u/Provide a general note o n the site plan that states the follow i ng : Exterior building and site lighting will meet the standards of Section 7.11 of the Unified Development Ord i nance . The light sou rce shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the proj ected cone of light does not cross and property line. Exterior building and site lighting is not required to meet the standards of Section 7.11 of the UDO per meeting with Jessica Bullock on 11/21/2014. "2 . Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter. All changes made have been requested by the City of College Station. Any further changes not requested by the City of College Station will be brought to your attention. Member American Institute of Architects· 7915 F.M 1960 West Suite 214 ·Houston Texas 77070 Ph 281.671 .2300. Fax 281.671 .2313. vlkarch1tects .com ' • /6 LANDSCAPING/STREETSCAPING/BUFFER 1. Please differentiate between existing and proposed trees. Please refer to the Landscaping Point Calculation for graphic legend. Please see attached revised sheet Ll.01. 2. Quantities provided in the table do not match what is shown on the site. Please only i nclude plantings within the borders of the site . <::-3. The quantities have been revised to match what is shown on the site. Please see attached revised sheet Ll.01. Please separate streetscaping points . 1 canopy tree is required every 25 feet along George Bush Drive and every 32 feet along Timber and Halik. 2 non -canopy trees can be substituted for 1 canopy. These trees should be located within 50 feet of the property line . The streetscaping points have been broken out to show the different requirements along the two groups of streets. Please see attached revised sheet Ll .01. 4. Please show property line and easements on landscape plan. The property line has been included on the landscape plan. Please see attached revised sheet Ll.01. There is a blanket easement in place during construction and a plat will be filed upon / completion of construction. t¥ Please show the barricade around the trees on the plan . Barricades have been shown around the trees on the landscape plan. Please see attached revised sheet Ll.01 . ~To receive landscaping points for existing trees, all existing trees must be in good form and condition and reasonably free of damage by insects and/or disease . An Arborist has visited the site and confirmed the health of the existing trees used for / landscaping points. rY. Please add a general note that barricades will be in place prior to any activity on the property i ncluding but not limited to grading. A general note indicating that barricades will be in place prior to any activity on the property has been included in the drawings. Please see attached revised sheet Ll.01 8. Parking screening is required along 100% of George Bush Drive . Screening can be done with plantings, berms, structural elements or a combination and a minimum of 3 feet above parking lot elevation . Screening is not possible as the landscape buffer between the existing parking and George Bush Drive is within the right-of-way. In addition, screening is a safety and security concern of College Station ISO and College Station Police Department. We respectfully request to be exempt from this requirement. Member American Institute of Architects. 7915 F.M 1960 West Suite 214 ·Houston Texas 77070 Ph 281 671 2300 ·Fax 281.671 .2313 · vlkarch1tects .corn MISCELLANEOUS 1. Irrigation system must be protected by a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Flow Device, and installed as per City Ordinance 2394. An irrigation system shall be designed to meet the requirements of City Ordinance 2394 and installed by a certified installer. 2. All Back Flow devices must be installed and tested upon installation as per City Ordinance 2394. An irrigation system shall be installed and tested by a certified installer to meet the requirements of City Ordinance 2394. ENGINEERING COMMENTS NO. 1 1. Please provide a drainage study. Please find the drainage report attached to this letter. 2. I was curious why there's a 6 feet drop for the flow lines for the grate inlet 1-9 at station 4+70.10. The drop was necessary to not have excessive velocities in the storm drain. The existing and proposed grades are s teep in this area and the drop allows the velocities in the pipe to not exceed 15 fps . 3. Please provide the fire flow demand & building type, and show the location of the fire hydrants on the site plan (sheet Al.01). The fire flow demand and building type have been provided. The location of the proposed fire hydrants has been shown. Please see attached revised sheet Al.01. 4. Please show the existing fire hydrants on Halik St. and Timber St . on the plans. The existing fire hydrants have been shown . Please see attached revised sheet Al.01 . 5. Provide an access easement for the sidewalk along George Bush Drive that is going through the parki ng lot. There is a blanket easement in place during construction and a plat will be f iled upon completion of construction. 6. GIS is showing a sewer line connecting to the building that is to be demolished and replaced with parking & fire lane on Timber St. Please specify on the plans if it's being abandoned or removed . The abandonment or removal of this sewer line will be at the discretion of the contractor as to which method best suits the contractor's scope of work. 7. Please clearly label which manholes the private sewer line is starting and ending. All sanitary sewer lines on this project are private. The private sewer line terminates at the existing manhole on Holik Street. Member AmertCan Institute of Architects. 7915 F.M . 1960 West Su i te 214 . Houston Texas 77070 Ph 281.671.2300. Fax 281.671 .2313 · vlkarch1tects.com TRANSPORTATION 1. Please revise and resubmit the driveway permit to comply with TxDOT comments. The driveway permit has been revised and resubmitted. TxDOT 1. Proposed median does not meet the TxDOT access management guidelines for a right-in I right- out only access point, the median needs to be more substantial so there is no question regarding the intended function of this access point , also required is a restriping eliminating the left turn lane assuring south bound traffic no option to left into the property from George Bush Dr. Before access can be approved these revisions must be implemented into the property's proposed plan and commercial access request. We look forward to reviewing the revised proposal for access on the land use I access change . FIRE The driveway permit has been revised and resubmitted as per your request. Please see the enclosed resubmittal. 1. Fire Lanes are covered but it is my understanding that the East end of the school is over 30' in height which will require an Aerial Access Easement. This AAE will need to start within 15 ' to 30' ofthe structure. Per a conversation with Steve Smith at the Fire Marshall's office, the Fire Marshall is OK with access to the roof of the structure on the western side through the gated yard area. The yard area has been partially striped as "Fire Lane " and a knox padlock will be provided on the gate. Please see attached revised sheet Al.03. 2. The Gate , near the South West corner of the building will need a Knox Padlock. The gates near the SW corner of the building will have a Knox Padlock. Please see attached sheet Al.06. The FDC nay need to be remote due to elevation changes . From the grading plan, the fire lane adjacent to the FDC is approximately 327.15. The sidewalk elevation below the FDC is at 327.98. Wi th these spot elevations the grade change f OC... at the FDC location does not seem to be an issue. ( SANITA~ ~ i.:;/'he dumpster pads need to be turned 10-15 degrees clockwise in order to have a better ~~ approach. J /1<J'\.I , l..v' The dumpster pads have been rotated 10 degrees clockwise as requested. Please see f<O«' attached revised sheet Al.01. n<e.. ~(CU'\-. Member American Institute of Architects· 7915 FM . 1960 West Suite 214. Houston Texas 77070 Ph 281.671.2300 ·Fax 281 671 .2313 · vlkarch1tects.com If further information is required to address the above listed comments please do not hesitate to contact the office. Thank you , '8,p. ---Ben amons Enc: C2 .0l, C2 .02, C2.03, C3 .01, CS .01, Ll .01, Al.010, Al.01, Al.02, Al.03, Al.OS and Al.06 Member American Institute of Architects. 7915 F.M 1960 West Suite 214 ·Houston Texas 77070 Ph 281 671.2300. Fax 281 671.2313 · vlkarch1tects.com 3. Please check the drainage area down on Holik Street, and acquire a dedicated drainage easement for the proposed storm sewer line to the creek. Addressed in previous submittal. 4. Please provide an Engineering Cost estimate . Addressed in previous submittal. If further information is required to address the above listed comments please do not hesitate to contact the office . Thank you, ~:J. -----Ben Lamons Enc: Streetscape Request Letter, Ll.01 Member American Institute of Architects • 7915 F.M. 1960 West Suite 214 • Houston Texas .77070 Ph 281.671.2300 ·Fax 281.671.2313 • vfkarchitects.com , December 11, 2014 Ms. Jessica Bullock Planning & Development Services City of College Station, Texas P. 0. Box 9960 College Station, Texas 77842 Dear Ms. Bullock, V L K !1\RCHITECTS VLK Architects, on behalf of College Station ISD asks that the following two requirements be waived from enforcement on the above referenced project. 1. Parking Lot Screening On previous CSISD projects it has been agreed to by the City to not require the District to provide the required parking lot screening due to safety and security of the campuses due to the fact that this screening provides places for individuals to hide who may be a threat to the campus and its occupants . Further, the City of College Station Police Department has agreed that this requirement is a determent to the safety and security of schools . 2. Streetscap i ng Requirements Due to Texas Department of Transportation Right of Way Easements along George Bush Drive and that approximately the first 55 feet of the site is paved; the project cannot comply with the Streetscaping requirements. We ask that the existing line of mature t rees located approximately 60 feet from t he property line and parallel to George Bush Drive be considered as meeting the street scaping requirements along George Bush Drive. Thank you for your consideration of these requests. If you have any questions, please do not hesitate to call. Member Ame r ican I nst itu te of Architec t s . 20445 St ate Highway 249 Suite 350 . H ouston Texas 77070 ....... ~.-. Ph 28 1 .671.2300 . Fax 281.671 .2313 . vl k architects .co m January 7, 2015 Jessica Bullock, Staff Planner City of College Station 1101 Texas Ave S College Station, Texas 77840 RE: College View High School College Station ISO VLK IARCHITECTS 1300 George Bush Dr. College Station, Texas 77840 Jessica Bullock, The following are responses to Landscaping/Streetscaping/Buffer comments generated from the City of College Station's Site Plan Review, received on December 10, 2014. Responses are in Italics. PLANNING y The service drive on SW side will need the length of the hammerhead will need to be 120' during phase II, for sufficient fire access . / Addressed in previous submittal. l/2 . Please provide an explanation/survey to show the property line . What is shown does not match what I can see . Understanding that what I see does not accurately depict what will be on record, an explanation will be fine. Please also verify that the property line does not go into TxDot ROW along George Bush Dr where it runs along the island. Addressed in previous submittal. When the location of the bike rack is determined, please include on sheet Al.01. Addressed in previous submittal. Please show driveway apron as identified in the site design standards. Addressed in previous submittal. ~For the Fire lane stripping detail on sheet Al.01, the lettering should be 4". The red strip should remain 8". / Addressed in previous submittal. Response to TxDOT comments are still being reviewed and will follow. Addressed in previous submittal. Member Amerlcan Institute of Architects· 7915 F.M . 1960 West Suite 214 . Ho u ston Texas 77070 Ph 281.671.2300 ·Fax 281.671.2313 . vlkarchitects.com ~Make sure the FDC is within 100 feet of a fire hydrant. Addressed in previous submittal. s /r1ease note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter. Noted. LAN DSCAPING/STREETSCAPI NG/BUF FER V Please verify streetscaping calculation . I show property frontage not including driveways as 424' along Timber, 194' along Holik and 600' along George Bush Dr. This would mean 13 canopy trees along Timber, 6 along Holik and 24 along George Bush Dr . The only place where additional trees would need to be added for streetscaping is along George Bush Dr. These would need to be placed w ith i n the same proximity to the existing trees to George Bush Dr . The calculation for 300 additional points along the ROW can also be revised to take out driveway spacing . Based on my calculations, total points required is 13,968. Please find the revised Landscape Plan attached. The streetscaping calculations have been revised to the numbers listed in your comment above. Please see the revised Landscape Plan attached on sheet Ll .01 . 2. Planting not in the property l ines cannot be counted towards point. This includes the crepe myrtles along George Bush Drive and some trees along Timber. For existing trees, they can remain shown on the plan, but they would not count towards point requirements. For the new proposed plantings, please move them so the trunk is within the property line . These calculations have been revised to not include planting not in the property lines. Please see the revised Landscape Plan attached on sheet Ll.01. I am still unable to verify the count for crepe myrtles. Please either use a different symbol or label which trees are crepe myrtles. The symbol for crepe myrtles distinguishes them apart from o t her trees. Please see the revised Landscape Plan attached on sheet Ll .01. Y With the next submittal, please include a request to have the trees next to the front of the building count toward stree t scaping along George Bush Drive . The request should explain why these exemptions are necessary for the site. Please see attached letter requesting to have the trees next to the building along George Bush count toward streetscaping. ENGINEERING COMMENTS NO . 2 1. Response comment has been noted . Prior to submittal for approved plans, please make sure that the re's a note next to the existing manhole on Halik St . stating that the private sewer line termina t es at this manhole and that the public sewer is beginning here since the Utility sheet was not submitted during the last submittal. Addr essed in previous submittal. 2. Provide a note stating where the public storm sewer begins on the plans . Addr essed in previous submittal. Member American Institute of Architects· 7915 F.M . 1960 West Suite 2 14 ·Houston Texas 77070 Ph 281.671.2300. Fax 281.671.2313 . vlkarchitects.com ENGINE ER'S ESTIMATE August 11 , 2016 CEN TE R FOR ALTERNATIV E LEARNING llt:M NO . QUANTITY UN IT DESCRIPTION UNI T PRIC E Public Wat erline 1 688 .7 LF 8" PVC W aterl ine (AWW A C90 0 C L 200) $ 45.00 2 2 EA 8" M.J . Gate Va lve & Box $ 1,250.00 3 1 EA 16"x8" Tapp inq Slee ve & Va lve $ 4,000.00 4 1 EA 8"x6" M.J. Tee $ 550.00 5 1 EA 8"x4" M.J. Tee $ 55 0.00 6 1 EA 8"x6 " M.J . Reduce r $ 550 .00 7 7 EA 8"x45 Deqree M.J. Bend $ 55 0.00 8 2 EA 8"x22.5 Deqree M.J . Bend $ 550.00 9 1 EA 6" M.J . Gate Val ve & Box w/ Locki nq lid $ 1,100.00 10 1 EA Meter Vault an d 3" W ater Meter Co nec tion Fittinq s and Valves $ 12,500 .00 11 1 EA Co nn ec tio n to existinq svs tem $ 2,000.00 12 1 EA Std. Fire Hvdran t A ssemb ly $ 3,500.00 13 6 12 LF Stru ctural Backfill $ 8.00 14 11 EA Thru st Bl oc ks for Fittin qs $ 45.00 15 688 .7 LF T renc h Protectio n $ 5.00 Pub l ic Wa t erlin e Total : 11l::M NO . QUANTITY UNI T DESCRIPTION UNIT PRICE Public Storm Drain 16 1 EA 1 O' St and ard Reces sed Curb In let $ 3,500.00 17 125 .5 LF 30" RCP $ 80.00 18 1 EA 30" Concrete Hea dwall with En erg y Dissipator Bl ocks $ 2,500.00 19 70.8 LF Structural Backfil l $ 8.00 20 125.5 LF Trenc h Protec tio n $ 5.00 21 262.5 SF Stree t Repa ir $ 10.00 Public Storm Drain Total :I QUAN TITY UNIT DESCRIPTION UNIT PRICE 1 6 EA Handica Ram s $ 2 13 71 .0 S F Sid ewal k $ Public Si dew alk Total :I Total Public Improvements _ ............ ,,,,,,,, __ ... ~ OF T~~ \\\ -=---,,,_~ ................ -4.s-,,, ,:: ':i .... * · ... ~ ,, ~*... ... * 'l ti!* : ............. ~ ~ ..... ~ ................... ORGAN~ ~ VERO~~<?.~.~:~:.~ ....... :'cr"~ TOTA L COS T $ 30,99 1.50 $ 2,500.00 $ 4,000.00 $ 55 0.00 $ 55 0.00 $ 550.00 $ 3,850.00 $ 1,100 .00 $ 1,100 .00 $ 12,500.00 $ 2,000 .00 $ 3 ,500 .00 $ 4 ,8 96.00 $ 495.00 $ 3,44 3.50 $ 72 ,026 .00 TOTAL COST $ 3,500.00 $ 10,04 0.00 $ 2,500.00 $ 566.40 $ 62 7.50 $ 2,625.00 $ 17,23 3.90 TOTAL COST 5,4 00.00 6,855 .00 $ 12,255 .00 $ 101 ,514.90 ~ ..... ~.... 77689 .: !JJ , ~ ~... <:) ... !:!J ~ Jt ll1,0~· .. ~?G1 s 1 . ~"~°&~ nt\IJ\1' f-W\-3 .,, ~.s. ......... ~.: ,,, S'/QN ~ --'"'"1 E NGINEER'S ESTIMATE CENTER FOR ALTERNATIVE LE A RNING llCM NO. QUANTITY UNIT Public Waterline 1 372.5 LF 2 2 EA 3 1 EA 4 1 EA 5 1 EA 6 1 EA 7 1 EA 8 1 EA 9 2 EA 10 1 EA 11 1 EA 12 1 EA 13 1 EA 14 300.4 LF 15 7 EA 16 382.5 LF llCM NO. QUANTITY UNIT Public Strom Drain 17 1 EA 18 125.5 LF 19 1 EA 20 1 EA 21 70.8 LF 22 125.5 LF 23 262.5 SF DESCRIPTION UNIT PRICE 8" PVC Waterline (AWWA C900 CL 200) $ 45.00 8" M.J . Gate Valve & Box $ 1 250.00 16"x8" M .J . Tee $ 1,200.00 8"x6" M .J. Tee $ 550.00 B"x4" M .J. Tee $ 550.00 B"x6" M .J . Reducer $ 550.00 B"x45 Degree M .J . Bend $ 550.00 8"x22.5 Degree M .J. Bend $ 550.00 8"x11 .25 Degree M.J . Bend $ 550.00 6" M .J . Gate Valve & Box w/ Lockino Lid $ 1 100.00 Meter Vault and 3" Water Meter Conection Fittinos and Valves $ 12,500.00 Connection to existina svstem $ 2,000.00 Std. Fire Hydrant Assemblv $ 3 ,500.00 Structural Backfill $ 8 .00 Thrust Blocks for Fittings $ 45.00 1 rench Protection $ 5.00 Public Waterline Total : DESCRI PTION UNIT PRICE 1 O' Standard Recessed Curb Inlet $ 3 ,500.00 30" RCP $ 80 .00 Standard Junction Box 36" RCP $ 2,000.00 30" Concrete Headwall with Enerov Dissipator Blocks $ 2 500.00 Structural Backfill $ 8 .00 Trench Protection $ 5 .00 Street Repair $ 10.00 Public Storm Drain Total:I Total Public Improvements ~~\~,, .:"A.,_~ '*'" ""·· k-1.n 't• ::' c_, ··" .... ...,. ,, ;' * .·· ... -tr '1. .,.... ....~ ~ : ................... ,,, ;..................... MORGAN ~ \'i~ .......... 77ee9 /fE J I 1 1 r-r ~VERONICA~:~: ................ ~ ~ ( lA _ "~... <:> /YJ~ ''••a · ~~G1sre.~"::._~&~; r:i A t JJ.J,~(/lti:3 '' S10N°A\. f(;.":_/ I it.AV' qt\ -,r: '"~ :-...""" TOTAL COST $ 16 762.50 $ 2 500.00 $ 1,200.00 $ 550.00 $ 550.00 $ 550.00 $ 550.00 $ 550.00 $ 1, 100.00 $ 1,1 00.00 $ 12,500.00 $ 2,000.00 $ 3 ,500.00 $ 2,4 03.20 $ 315.00 $ 1,912.50 $ 48,043.20 TOTAL COST $ 3 ,500.00 $ 10,040.00 $ 2 000.00 $ 2 ,500.00 $ 566.40 $ 627.50 $ 2 ,625.00 $ 19,233.90 $ 67,277.10 MISCELLANEOUS 1. Irrigation system must be protected by a Pressure -Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Flow Device, and installed as per City Ordinance 2394. An irrigation system shall be designed to meet the requirements of City Ordinance 2394 and installed by a certified installer. 2. All Back Flow devices must be installed and tested upon installation as per City Ordinance 2394. An irrigation system shall be installed and tested by a certified installer to meet the requirements of City Ordinance 2394. ENGINEERING COMMENTS NO. 1 _>:' Please provide a drainage study. Please find the drainage report attached to this letter. )/. I was curious why there's a 6 feet drop for the flow lines for the grate inlet 1-9 at station 4+70.10. The drop was necessary to not have excessive velocities in the storm drain. The existing and proposed grades are steep in this area and the drop allows the velocities in the pipe to not exceed 15 fps . /.Please provi de the fire flow demand & building type, and show the location of the fire hydrants on the site plan (sheet Al.01). / & The fire flow demand and building type have been provided. The location of the proposed fire hydrants has been shown. Please see attached revised sheet Al.01. Please show the existing fire hydrants on Holik St. and Timber St. on the plans. The existing fire hydrants have been shown. Please see attached revised sheet Al.01 . Provide an access easement for the sidewalk along George Bush Drive that is going through the parking lot. There is a blanket easement in place during construction and a plat will be filed upon completion of construction. GIS is showing a sewer line connecting to the building that is to be demolished and replaced with parking & fire lane on Timber St. Please specify on the plans if it's being abandoned or removed. The abandonment or removal of this sewer line will be at the discretion of the contractor as to which method best suits the contractor's scope of work. Please clearly label which manholes the private sewer line is starting and ending. All sanitary sewer lines on this project are private. The private sewer line terminates at the existing manhole on Halik Street. Member American Institute of Architec t s. 7915 F.M . 1960 West Suite 214 ·Houston Texas 77070 Ph 281.671.2300. Fax 281.671 .2313. vlkarch i tects .com 464 DRAINAGE TABLES -ROUND GRATES (CONTINUED) Grate Manhole Col< Basin Sq. In , Option Grote Dia . Grote Thk. Openi ng Perimeter 1266M 31 9/16 1 1/8 18:1 99 1266 1811M 31 11/16 1 5/16 240 100 1230, 1232, 1234, 1820, 1825, V-1600-4, V-17 00-4 . V-7032 V-3601J.4 31 7/8 1 3/8 350 100 1230, 1232, 1234, 1820, 1825, V-1600-4 , V-1700-4 , V-7032 8025MVH 31 15/16 1 3/8 209 100 ADA 8027 1480M1 31 15/16 1 1/2 262 101 ADA , DNW 1320, 1322, 1480, 2810, V-1419, V-1420, V-1432 132 0M 32 1 1/2 360 101 Cross bar 1320, 1322, 1480, 2810, V-1419, V-1420, V-1432 1322M 32 i 1/2 240 101 1320 1480M 3:1 1 1/2 275 101 Non·Troffic 1320, 1322 , 1480, 2810 , V-1419, V-1420. V-1432 8028MVH 32 1/4 1 3/8 209 101 ADA 8027 28 80M 32 3/4 2 2419 103 2880Z TF V-7069 33 3/4 1 3/8 236 106 ADA V-7069·1 V-3610-6 33 7/8 1 1/2 350 106 V-1610-6 1330 M 35 375 110 1330 1585M 36 1 1/2 400 113 1585, 1586 8029MVH 37 1/4 1 1/2 308 117 ADA V-360(}-$ 38 480 119 V-160 (}-5, V-1700-5 1580M 38 1/2 1 1/2 468 121 Heavy du ty & Extra Heavy duty 1581 , 1821, 2815 1580M 2 38 1/2 1 1/2 304 1?1 ADA 1581 , 1821 , 2815 V-36 10-7 39 5/8 1 1/2 516 125 V-1610-7 1843M 1 44 1/8 639 139 1843, 1845 V-36 10-8 45 5/8 1 1/2 810 143 V-1611}-8 V-3600-6 50 1/4 760 158 V-160CJ.<>, V-170CJ.<> DRAINAGE TABLES -CATCH BASIN GRATES EJIW is co ntinu ally adding new construction castings and drainage grates to our product offering. Please con sult with your EJ IW represe ntative or emai l us at ejiwsa les@ejiw.co m to request a sales drawing not shown in this ca talog . Grate Sq . In. 3-Sided 4-Sided Grate De scription Frame Option Option Opening Perimeter Per imeter 5000M3 10 58 81 Restricted Flow, DNW 5000, 5020 , 5080 V-5 70 8 33 28 38 V-5708 8201 M 50 41 55 ADA 8201, 8301 51 00M2 50 66 3/8 88 1/2 Restricted Flow (variable) 5100 , 5125 V-5713 55 40 54 V-5613 , V-5713 V-5712 66 ~ .'46' 36 48 V-5712 7797M 70 41 54 7797 V-5714 76 44 58 V-5714 V-5716 90 48 64 V-5716 7720M 100 48 68 7720 770 0M2' 100 59 83 Vane, DNW 7700 770 0M3' 100 59 83 Bi-directiona l Vane, DNW 7700 V-5720-80 105 59 79 ADA V-5620 , V-5720 580 0M 1 112 51 73 5150 Note: All dimensions o re in inches . ----·-~-------------· - East Jordon Iron Works, Inc. 800 .626.4653 www.ejiw.con1 ENGINEER'S ESTIMATE CENTER FOR ALTERNATIVE LEARNING '"'"' NO . QUANTITY UNIT DESCRIPTION UNIT PRICE TOTAL COST Public Waterline 1 688 .7 LF 8" PVC Waterline {AVVWA C900 CL 200) $ 45 .00 $ 30 991 .50 2 2 EA 8" M.J . Gate Valve & Box $ 1,250.00 $ 2 500.00 3 1 EA 16"x8" Tapping Sleeve & Valve $ 4 000 .00 $ 4,000.00 4 1 EA B"x6" M .J. Tee $ 550.00 $ 550.00 5 1 EA 8"x4" M.J. Tee $ 550 .00 $ 550.00 6 1 EA 8"x6" M .J . Reducer $ 550.00 $ 550.00 7 7 EA 8"x45 Decree M.J . Bend $ 550.00 $ 3 850.00 8 2 EA 8"x22.5 Degree M .J. Bend $ 550.00 $ 1 100.00 9 1 EA 6" M.J . Gate Valve & Box w/ Locking Lid $ 1100.00 $ 1100.00 10 1 EA Meter Vault and 3" Water Meter Conectlon Fittlnos and Valves $ 12 500 .00 $ 12 500.00 11 1 EA Connection to existing system $ 2 000 .00 $ 2 000.00 12 1 EA Std . Fire Hydrant Assembly $ 3 500.00 $ 3 500.00 1"3 612 LF Structural Backfi ll $ 8.00 $ 4 896.00 14 11 EA Thrust Blocks for Flttinas $ 45 .00 $ 495.00 15 688 .7 LF I rencn Protection $ 5.00 $ 3,443.50 Public Waterllne Total: $ 72,026.00 llCIYI NO. QUANTITY UNIT DESCRIPTION UNIT PRICE TOTAL COST Public Storm Crain 16 1 EA 1 O' Standard Recessed Curb Inlet $ 3,500.00 $ 3,500.00 17 125.5 LF 30"RCP $ 80 .00 $ 10,040.00 18 1 EA 30" Concrete Headwall with Energy Disslpalor Blocks $ 2,500 .00 $ 2,500.00 19 70.8 LF Structural Backfill $ 8.0-0 $ 566.40 20 125.5 LF Trench Protection $ 5 .0U $ 627 .50 21 282 .5 SF Street Reoair $ 10.00 $ 2,625.00 Public Storm Drain Total:! $ i 7,233.90 Total Public Improvements $ 89,259.90 DEVELOPMENT PERMIT PERMIT NO. 14-265 CITY OF COLL EGE STATION Pl"•mi~ cf Dr-wf{lpm,.111 _t;,.,.,.U.,, FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: A000701 Crawford Burnett (ICL) Tract 187 DATE OF ISSUE: 12/18/2014 OWNER: Jon Hall -College Station ISO 2000 Welsh Street College Station , TX 77845 SITE ADDRESS: 1300 George Bush Dr, College Station, TX 77845 DRAINAGE BASIN: Wolf Pen Creek VALID FOR 24 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized . 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued . 3. The permit will expire if no significant work is progressing within 24 months of issuance . 4. Other permits may have been required to fulfill local, state and federal requirements . Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements . 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy . 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as, but not limited to, paint, oil , solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station , as well as State and Federal Regulations that apply . Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Special Conditions : TXDOT permit has not been approved, prcoeed at own risk . Landscape plans have not been approved , and needs to be address prior full building permit. l ,~6~--{LJ_c__ __ S_A_Y-!_f:_S" _______ , the Contractor, hereby agree to comply with all conditions herein . Contractor Signature Z-IO-Sb 3 -2.~a 9 Phone number E~mail I hereby grant this permit for development. Contact Jedy Jow~S 111-l/S~l/ , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections . Ci{t;,g~resentative ll -/~ -:l.Ollf Date t I City of College Station Development Services P.O. Box 9960 College Station, Texas 77842 Attn: Ke v in Ferrer MITCHELL M M MORGAN RE: Fire Flow Status, Center for Alternative Learning Project Dear Kevin , 30 January 2015 The following fire flow information is being provided for the Center for Alternative Learning (CAL) buildin g construction on George Bush Drive in College Station. A 396 LF 8"waterline was designed to meet the need s of CAL. The waterline was later rerouted due to a conflict with a portable building that will be needed as a temporary facility during construction. A new waterline placement was designed but required an increase in pipe length. The length of the rerouted waterline is 703 LF. As s hown in the previous water model dated October 2014 for this project, the 396 LF meets the requirements set in the BCS design standards for pressures and velocities . The worst case scenario model ed for CAL was fire flow of 1250 GPM placed at nodes C.A.L.-3 & 4 during peak day demand. This scenario was modified by increas in g the length of the 8" WL to 703 LF. Attached are the re s ults Uunction & node s) from this model. As you can see the press ure s lightly decrease, and there was no change in velocities of the pipe . The proposed waterline reroute will meet the BCS des ign requirements of 12 ft/sec ve lociti es maximum and 20 psi pressure minimum . Cc : file et me kno w if you have any questiog.,ico-''~o:'\'''''' --~E. F r~ \\ ?-<..~ ............ ~.., •• , ;' ~ .... * ··· .. IS' ,, OU , ,, it / "· i< II [*: .... ,,, ,, ..... : .......................... : ..... ~ ~ VERONICA J.B. MORGAN ~ l ..... , ........................... : ..... ~ \ ~\ 77689 /$; 11 0". ~ <),•'kl~ ftt~"·~<}ISTE'i':~··&~ .:' ''\~s1Q"NAL. €.~--5 -n~lf-\44-3 320 4 EARL RUDDER FWY . S. • COL LEGE STATIO N, TX 778 4 5 • T 979 .260 .6963 • F 97 9.260.3564 CIVIL ENGINEERIN G • HYDR AULI CS • HYD ROLOGY • UTILITIE S • ST REET S • SITE PLAN S • SUBDIV ISIONS info@m1tchellandmorgan com • wwwm1tchellandmorgan com EXHIBIT A M ike URBAN N ode I d entifi er s D es cription: Steady State Analys i s-Ex i sting peak d ay demand on the system with CSISD - Center for Alternative Leaming demand with wate rli ne increased to 703 L.F ., and 1250 gpm fire flow added to nodes C .A .L.-3 and C.A.L.-4 Node Results Name Demand Pressure (gpm) (psi) 508 12.891 7 1.87743 567 4 .182 76 .00895 572 0 75 .79523 573 5 .156 75.81062 591 0 74 .1 2515 601 7 .505 76 .13941 604 5.271 76 .28098 611 0 7 3 .26386 614 0 .974 70 .62386 615 0 70 .98313 643 0 67 .4 3 726 647 5 .042 59 .8242 651 0 68 .82667 657 7 .162 64 .71566 659 10.313 56 .49503 665 3 .953 68.04424 673 2.349 66 .88825 674 5.844 60 .68788 677 3 .266 59 .99247 684 4 .87 60 .87565 702 23.661 64 .48981 C.A.L.-1 0 59 .1366 C.A.L.-2 143 53 .96941 C.A.L.-3 1250 53 .3316 C.A.L.-4 1250 61.44328 J-023 0 63 .2758 J-024 0 59 .33034 J-025 0 60 .54472 CSISD-C e n te r for Alt e rn ative Le a rn ing Ex h ibit A • • I I EXHIBITB MikeURB ~N Link Identifiers Description: Steady State Analysis-Existin g peak day demand on the system with CSISD- Center for A lternative Leaming demand with waterl in e inc reased to 70 3 L.F ., and 1250 gp m fire flow add e d to nodes C .A.L.-3 and C.A.L.-4 - Link Results Name Diameter (in) Velocity Headloss/1000 Roughness Friction (ft/s) (ft) (millift) Factor 108 8 2 .603449 6.856911 90 0 .043433 110 8 2 .521168 6 .461048 90 0 .043641 121 6 1.223366 1.044889 140 0.022481 135 6 2.65177 9 .924785 90 0 .045447 16 8 3.301372 8.758062 100 0 .034499 2080 8 1 .985207 4 .149461 90 0 .045204 2087 6 0 .989822 0.809724 130 0 .0266 12 23 -A 6 3.160399 6.060151 140 0 .019537 23-B 6 3 .160399 6 .060241 140 0.019537 2459 0 .75 0 .600946 5 .914154 100 0.065915 2460 6 1 .14131 2 .082678 90 0 .05 1484 2461 6 1.105845 1.964489 90 0.051727 2588-A 16 2 .354735 1.488214 120 0.023046 2588-B 16 2.354735 1.487894 120 0.023042 26 6 0 .97877 0 .689802 140 0 .023186 2631 6 1.409723 1.358778 140 0 .022016 27 6 0 .989822 1.599858 90 0.05258 28 8 2.084615 2 .804093 140 0 .020778 3350 1 6 2 .172949 1 .282537 120 0 .023 3 23 3351-A 1 6 2 .79112 1 2 .038996 120 0 .022474 3351-B 16 0 .568318 0.070815 150 0 .018826 3351-C 16 1.4263 0.588081 120 0 .024822 3351-D 16 1 .4263 0 .588087 120 0 .024822 3830 6 2 .084615 6 .355893 90 0.047095 3831 6 1.067598 1.514213 100 0.042778 3835 6 0 .989822 1.600068 90 0 .052587 456 6 2 .003346 2 .605064 140 0 .020901 64 6 0.97877 0 .691369 140 0.023238 849 6 1.315686 2 .229791 100 0 .041478 850 6 1 .260426 2 .503127 90 0 .050734 854 8 2 .148601 3 .953179 100 0 .036764 865 8 2 .541982 6 .558892 90 0 .043579 CSISD -Ce nte r for Altern a t iv e Learning Ex hibi t B \ • I ' EXHIBITB MikeURBAN Link Identifiers Link Results Diameter (in) Velocity Headloss/1000 Roughness Friction Name (ft/s) (ft) (millift) Factor 866 8 2 .574892 5 .526754 100 0 .035789 867 6 1.14655 1.723796 100 0 .042224 98 8 2 .622795 5 .718907 100 0 .035693 C.A.L.-FH 8 7 .978474 21.18485 150 0 .014288 C.A.L.-WL 8 8.891212 25 .8908 150 0 .014061 CSISD -Center fo r Alternative Learning Ex hibit B ' . EXHIBITC MikeURBAN Layout Description: Steady State Analysis-Existing peak day demand on the system with CSISD- Center for Alternative Leaming demand with waterline increased to 703 L.F., and 1250 gpm fire flow added to nodes C.A.L.-3 and C.A.L.-4 C.A.L.o{ C.A.L.l CSISD-Center for Alternative Learning Exhibit C COLLEGE STATION INDEPENDENT SCHOOL DISTRICT CENTER FOR ALTERNATIVE LEARNING REBUILD DRAINAGE ANALYSIS November 2014 Prepared for: COLLEGE STATION INDEPENDENT SCHOOL DISTRICT 1812 WELSH AVENUE COLLEGE STATION , TX 77840 Submitted to OLLEGE TA I N rl. e heart of th~ Rmarch Valley By MITCHELL MORGAN ENGINEERS & CONSTRUCTORS 3204 EARL RUDDER FREEWAY SOUTH COLLEGE STATION, TX 77845 OFFICE (979) 260-6963 FAX (979) 260-3564 CERTIFICATION This report for the drainage design for the Center for Alternative Learning Rebui ld was prepared under my supervision in accordance with provisions of the Bryan/College Station Unified Drainage Design Guidelines for the owners of the property . All licenses and permits required by any and all state and federal regulatory agencies for the proposed drainage improvements have been issued . _ ...... ,,,,,,, .:-~~OF /€ \\' ZA.,_'i-, ........... ~-'l ltl .:' CO;) _... *. ·· .. IS' I ;'•/ ...... ,l 1.~.i ....................... :: ... ~.\ ~ VERONICA J.B. MORGAN i'. Veronica JB rg .E. ~ .. ~\ ......... 77689"''')$'l Registered Profess al Engineer ~1,1b·· .. -?~ «,Q/'JiJ J St t f T N 77689 I ~ "· "°G/STE~ ·" ~ -a e o exas o . 11 ~s." ............. ~0: ''\\°SIONA\..€ __ : \\,,'\,, ...... ~ Firm #F-1443 (t ...-U-14 INTRODUCTION Center for Alternative Learning Rebuild Drainage Analysis The purpose of this drainage report is to present an analysis of the necessary drainage infrastructure for the Center for Alternative Learning (CAL) rebuild, (formally known as Timber Academy and the City of College Station Conference Center) located on the block adjacent to George Bush Drive , Holik Street and Timber Street. GENERAL LOCATION & DESCRIPTION Located on the eastern corner of the intersection at George Bush Drive and Bizzel/Timber, the Center for Alternative Learning (CAL) rebuild property consists of an approximately 15 acre tract bounded by Timber Street on the west , George Bush Drive on the north , Oakwood School on the south and Holik Street on the east as seen in Exhibit 1. Prior to demolition , the site contained the COCS Conference Center, a portion of the Barbara Bush Parent Center, and Timber Academy . The project will be redeveloped into a two-story learning center, adjacent to the remainder of the Barbara Bush Parent Center and Oakwood Intermediate School. No portion of the property lies within the regulatory 100-year floodplain per the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) panel 48041C0305E , with an effective date of May 16 , 2012 (Exhibit 1A). The overall storm drain layout for the site can be seen on Exhibit 2 . DRAINAGE DESIGN CRITERIA All drainage design is in accordance with the Bryan/College Station USDG . As such: • Design rainstorm events consist of the 2-, 5-, 10-, 25-, 50-and 100-year, 24 hour duration hypothetical frequency storm events in order to analyze the effectiveness of the storm water facilities as well as capture conservative peak flow values. • Initial flow calculations are based on the Rational Method (used to determine if detention is necessary .) • Detention and hydrograph data were computed using HEC-HMS . • The target peak runoff rate for the post-development condition is that of the pre- development peak flow rates at the study confluence. PRIMARY DRAINAGE BASIN DESCRIPTION The CAL Rebuild project is located within the Wolf Pen Creek Watershed . Currently , there are no offsite drainage areas that flow through the site. All onsite drainage currently flows to two outfall points (Study Points "OUT1" and "OUT2"). OUT1 discharges to George Bush Drive , while OUT2 discharges to Wolf Pen Creek . STORMWATER RUNOFF ANALYSIS ON-SITE STORM SEWER SYSTEM Pre-Development Drainage Basin The pre-development areas for the CAL rebuild project consist of 1 O drainage subbasins as seen in Exhibit 3 . This exhibit illustrates the total area contained within each of these drainage subbasins. It is important to note that the existing site has a high percent of impervious cover. Subbasins E-DA 1, 2 , 3, and 8 all drain to the existing gutterlines of Timber and George Bush Center for Alternative Leaming, CS/SD Drainage Report Drive and ultimately flow to Study Point OUT1 which is a 15 foot curb inlet on George Bush Drive discharging directly into Wolf Pen Creek . All other drainage basins with the exception of E-DA-9 and E-DA-4 flow to an onsite storm sewer system or overland flow to Holik Street and to Study Point OUT3 in Wolf Pen Creek. Drainage area E-DA-4 flows to an existing 5 foot inlet in the parking lot near Holik Street and to OUT2 in Wolf Pen Creek . And E-DA-9 flows south down Timber Street and does not contribute to Wolf Pen Creek . These subbasins were used to compute storm water discharge for the pre-development conditions . The discharge flows for the 2 , 5, 10, 25 , 50, and 100 year storm events were computed using the Rational method and are seen in Exhibit 5. Post-Development Drainage Basin The post-development drainage areas for the CAL rebuild project consists of 20 subbasins as seen in Exhibit 4 . The discharge flows for the 2, 5, 10 , 25 , 50 , and 100 year storm events were computed for each of these subbasins using the Rational method and are seen in Exhibit 5. Drainage areas P-DA-1 , 2, 3, 3A and 4 all drain to George Bush Drive and then to OUT1 . Drainage area P-DA-16 drains to 1-13 and then to OUT2 while drainage area P-DA-5 drains to the underground detention pond and ultimately to OUT3. All remaining drainage basins drain to the underground drainage system being constructed with the CAL project between the CAL and Oakwood schools and then undetained to OUT3 . There is an existing underground drainage system between the Oakwood and old Conference Center building but when looking at the 10-100 year flows to that system, calculations show it is severely undersized. With such a small area between the buildings and this area being a major corridor for underground and overland relief of stormwater this project upsized this storm line to carry through the 100 year storm event. As stated earlier this project currently has a great deal of impervious cover on the site . As such much of the flow will be leaving the site undetained . Both OUT1 and OUT2 will not have any detention provided for flow exiting the site in those directions . All flows in those directions have been significantly reduced due to the regrading of the site and shifting of storm flows in other directions. Table 1 below shows the flows for all storm events both pre-and post-development to these 2 outfall locations . 2-YRQ 10-YR Q 25-YR Q 50-YR Q 100-YR Q OUTFALLS PRE POST PRE POST PRE POST PRE POST PRE POST OUT1 8.4 7.2 11.4 9.71 13 11.1 14.7 12.6 16.5 14.1 OUT2 3.6 1.2 5.0 1.6 5.7 1.8 6.4 2.1 7.2 2.3 Table 1 -Pre-and Post-Development Flows As seen in Table 1, the runoff contributing to outfalls OUT1 and OUT2 for the post-developed condition is less than the runoff contributing to these outfall locations in the pre-developed scenario. The runoff from the remaining drainage areas does increase runoff amounts which required the need for underground detention . This is mainly due to the amount of impervious area that was added in drainage areas E-DA-3 and E-DA-6. The sizing of the underground detention is discussed later in this report . Center for Alternative Leaming, CS/SD Drainage Report 2 Storm Sewer System The storm sewer system designed for CAL consists of one major run of storm sewer pipe . The pipe sizes were determined using Exhibit 6 . This spreadsheet illustrates the pipe calculations used to size the storm drain system on the project. The calculations use the Manning 's Formula , and utilizes the flow at each pipe segment to optimize the slope and size of each pipe segment. The pipe calculations can be seen for both the 10-year and 100-year storm events in both Exhibits 6 and 7. As seen on these exhibits, the pipes range in size from 8 to 30 inches to facilitate collection of the storm water for the 100-year event. Thi s design well exceeds the City • of College Station standards . This was intentional to assure there would be no concerns with the building finished floor elevations vs . flooding depths over storm inlets g iven the proximity of the storm sewer to the buildings. This storm sewer will be privately owned and maintained by CSISD . The CAL rebuild project includes 9 grate inlets and one new curb inlet on Holik Street. In addition, one existing curb inlet (1-13) in the parking lot near Holik Street was checked for capacity to assure its size is sufficient to handle the flows directed to it. All inlets were sized using both the 10-year and 100-year storm events . Exhibits 8 and 9 show each grate inlet as well as the flow directed to it under each storm event. All depths calculated over these storm inlets was less than an 8 inch ponded depth during the 10-year and 100-year storm events . It should be noted , there is no flow to in let 1-3 . That is because inlet 1-3 which has a top of grate elevation 1 foot higher th an inlet 1-2 will only receive flow if 1-2 becomes clogged and reaches a depth of 12 inches . This extra grate was added , to an already required junction box , because of the proximity of the doorways into the school building and the emergency services area . In addition to sizing the storm sewer piping and inlets, hydraulic grade lines (HGL) were calculated to illustrate the water level in these pipe systems during the 10-and 100-year events . As seen in Exhibits 10 and 11 , the HGL elevations are below the proposed ground elevations which can be seen on Exhibit 2. These HGL 's were computed using the soffit elevation of 298.50 at the 30 -inch pipe at Wolf Pen Creek for the 10-year storm event and 303ft which is the 100-year floodplain elevation at the discharge location in the creek , which can be seen on Exhibit 1A. In addition , the flows used per pipe were the unadjusted flows shown on Exhibits 6 and 7 for the 10-year and 100-year events . Underground Detention System The underground detention system consists of five 48 -i nch HOPE pipes , approximately 40 feet in length each , embedded in cement stabilized backfill. The increased runoff from the development drains to the underground detention system and is controlled by an outlet orifice consisting of a 1/4"' steel plate with a 6"x5 " rectangular orifice opening in the plate . The plate is to be bolted into place over a 12 " outlet pipe. In addition , a grate inlet is located at the downstream end of the detention pipe system to provide for an emergency release of stormwater, if the outlet orifice becomes clogged. This emergency outflow grate is set just downstream of the detention pond header pipe and is set at elevation 317 .97ft with a flowline of 310 .97ft . From this detention pond header, the 12-inch PVC and then 30-inch RCP storm sewer carries the outflow to Wolf Pen Creek and the study point OUT3 . At Wolf Pen Creek all three outfalls will converge (OUT1, OUT2 and OUT3) Center for Alternative Leaming, CS/SO Drainage Report 3 The USACE HEC-HMS flood hydrograph program was used to create hydrographs for each storm event for all existing and proposed drainage areas . Also modeled in HEC-HMS was the underground detention system or pond. These hydrographs were routed through HEC-HMS , with the results shown in Appendix A . As seen in Table 2 below , the total post-detention peak runoff at the discharge location in Wolf Pen Creek where all three outfalls converge approximates existing flows are less than the existing peak runoff, showing that the underground detention has effectively detained the runoff to below pre-existing rates . Table 2: HEC-HMS Model Results Pre vs. Post Discharge @ Wolf Pen Creek (OUTl + OUT2 + OUT3) Pond Existing Proposed Difference 5-YR 28 .9 28.6 -0.3 10-YR 32.4 32 -0 .4 25-YR 37 .9 37.4 -0 .5 50-YR 42 .3 41 .7 -0 .6 100-YR 46 .5 45 .8 -0 .7 * Flows in units of cfs . CONCLUSION & RECOMMENDATIONS The Center for Alternative Learning (CAL) project discharges to 3 study points , OUT1 , OUT2 and OUT3 . As seen in Table 1, the proposed stormwater discharge from OUT1 and OUT2 study points are less than predevelopment flowrates . The project has designed an underground detention facility to accommodate the increases seen at study point OUT3 . As seen in Table 2 , the underground detention has effectively reduced the discharge from OUT3 to below predevelopment rates. The CAL site will not cause an increase in runoff to any of the outfall locations and the internal storm sewer system has been designed in accordance with the Bryan/College Station USDG . Center for Alternative Leaming, CS/SD Drainage Report 4 ATTACHMENTS EXHIBIT 1: EXHIBIT 1A: EXHIBIT 2: EXHIBIT 3 : EXHIBIT 4: EXHIBIT 5 : EXHIBIT 6: EXHIBIT 7 : EXHIBIT 8 : EXHIBIT 9: EXHIBIT 10: EXHIBIT 11: APPENDIX A: Site & Storm Sewer Layout General Location Map -FEMA Firmette Storm Drain Layout Sheet 1 of 2 Existing Drainage Area Map Proposed Drainage Area Map Rational Formula Calculations Pipe Capacity Calculations -10-year Design Storm Pipe Capacity Calculations -100-year Design Storm Inlet Capacity Calculations -10-year Design Storm Inlet Capacity Calculations -100-year Design Storm Hydraulic Grade Line Calculations -10-year Design Storm Hydraulic Grade Line Calculations -100-year Design Storm HEC-HMS Results Center for Alternative Leaming, CS/SD Drainage Report 5 MAP SCALE 1" = 1000' PANEL 0305F J FIRM FLOOD INSURANCE RATE MAP BRAZOS CO UNTY, TEXA S AN D INC ORPORATE D AREAS PANEL 305 OF 475 (SE E MAP INDEX FOR FIRM PANEL LA YOUl) ~ COM MUNITY BRAZOS COUNTY 461195 0305 BRYAN , CITY OF 480062 0305 COLLEGE STATION , CITY OF 480083 0305 Notice to U11 r: The Map Numbu shown be low ahould be used when piec ing map orders ; the Community Number shown above sho uld be used on lnaurance applications tor the subject commun ity. MAP NUMBER 48041C0305F MAP REVISED APRIL 2, 2014 Federal E me r gency Ma nagement Agency This is an official copy of a portion of t he above refere nced flood map. It ~1--H----".----.<-->.,~-->,~--.'----->,--,,£-=-'l was extracted using F-MITOn-Line. This map does not reftect changes or amendments which may have been made subsequent t o the date on the title block. For the latest product information about Nati onal F lood Insurance Program flood maps check the FEMA Flood Map Store at www.msc.fema.gov !Exhibit 1A < w a:: < l'.5 Q Q w z w I- C> a:: < 0.. z < < < ..J 0 w 0 z ..J I/) ..J :E ..J :;;: < I/) w w < I-< > > I-a:: ~ a:: w < 0 Q C> Q 0.. I- NO. AC . 0.40 0 .7 0.95 EDA-1 0.08 0.00 0 .00 0.08 0.07 EDA-2 0 17 o nn n nn 017 0.16 ED A-3 1.58 0.94 0 .00 0 .64 0.98 EDA-4 0.74 0.22 0 .00 0 .51 0 .58 EDA-5 0.52 0.07 0.00 0 .45 0.46 EOA-6 1.08 0 .97 (l .00 0.10 0 .49 EDA-7 1.27 1.01 0.00 0.26 0.65 EDA-8 0 .11 0 .00 0.00 0 .11 0 .11 EDA-9 0 .14 0 .00 0.00 0.14 0.13 EDA-10 1.87 0 .00 0 .00 1.87 1.78 PDA-1 0 .08 0 .00 0.00 0.08 0 .07 f'UA-2 0 .17 0.00 0 .00 0 17 0 .16 PDA-3 1.0 1 0.46 0.00 0.55 0 .71 PDA-4 0 .27 0 .13 0 .00 0 .14 0.19 P DA-5 0 .64 0.00 0 .00 0.64 0 .60 PDA-6 1.17 1.04 0 .00 0 .13 0.54 P DA-6a 0.32 0.00 0.00 0 .32 0.31 PDA-6 0 0 .06 0 .00 0 .00 0 .06 0 .06 PD A-6c 0 .63 0 .63 0 .00 0 .00 0 .25 PDA-7 0 .03 0 .00 0.00 0 .03 0.03 P DA-8 0.11 0.0 1 0.00 0 .09 0.09 P11A-9 006 n n? 0.00 n nA 004 PD A-10 0 .06 0 .02 0.00 0 .04 0 .04 PDA-11 0.09 0 .05 0.00 0.03 0.05 P DA-12 0 .08 0.04 0.00 0.04 0 .06 PDA~13 0 .09 0 .04 0.00 0.04 0.06 PD A-14 0.58 0.32 0.00 0.26 0.38 PDA-15A 0.16 o:oo 0.00 016 0 .15 P DA-16 0.25 0.09 0.00 0.16 0.19 PDA-150 0 .15 0 .00 0 .00 0 .15 0 .15 P DA-15C 0.15 0 .00 0.00 0.15 0 .14 PDA-1 50 0 ,48 0 .00 n nn n AA "-"'"" EX HIBIT 5 Rational Formula Drainag e Area Calculatio ns CSISD-Cente r for Alternative Learning :!: :!: 0 0 :!: :!: ..J ..J ... ... 0 0 Q Q ..J ..J z z ... ... ~ :3 i= :3 a:: J: a:: " w I-w u I-" a:: Cl a:: ..J I= Cl I= ..J 0 J I- ~z ~ ..J ::J z ::J ..J ..J w w .. I/) N o~ o~ (!) ~ (!) ~ > () ::J !::! 0 ft . ft . ft . ft ft/s min min In/Hr cfs 100.0 1.0 1.0 1.0 0.7 2.4 10.0 6 .33 0.5 ?nr Q ?n 10 1 0 07 47 10.0 " ...... 1,0 300.0 11 .0 180.0 2 .0 1.6 5.1 10.0 6 .33 6 .2 100.0 1.0 1.0 1.0 0.7 2 .4 10.0 6 .33 3.6 100.0 1.0 1.0 1.0 0.7 2.4 10.0 6.33 2 .9 "<nn .o "" 15n n 12 0 1.4 ".4 10 Q 633 3 1 100 .0 1.0 1.0 1.0 0 .7 2.4 10 .0 6 .33 4 .1 100.0 1.0 1.0 1.0 0.7 2.4 10 .0 6 .33 0 .7 100 .0 1.0 1.0 1.0 0 .7 2.4 10 .0 6.33 0 .8 100.0 1.0 1.0 1.0 0 .7 2 .4 10.0 6 .33 11 .2 100.0 1.0 1.0 1.0 0 .7 2.4 10 .0 6.33 0.5 ?nr .0 ?n 1 0 1 0 07 47 10.0 6,33 1.0 300.0 11 .0 180 .0 2.0 1.6 5.1 10.0 6 .33 4 .5 90.0 8 .0 160.0 2 .0 2.2 1.9 10.0 6 .33 1.2 1.0 1.0 180.0 3.0 2.6 1.2 10.0 6 .33 3.8 1.0 1.0 210.0 40 2 .7 1 3 10 Q 6 .33 3.4 1.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 1.9 1.0 1.0 1.0 1 .0 10 .4 0 .0 10 .0 6 .33 0.4 1.0 1.0 1.0 1.0 10 .4 0.0 10.0 6.33 1.6 1.0 1.0 1.0 1.0 10.4 0 .0 10.0 6 .33 0 .2 1.0 1.0 1.0 1.0 10 .4 0 .0 10.0 6 .33 0.6 10 1.0 10 1 0 104 nn 10,0 6,33 0 .3 1.0 1.0 1.0 1.0 10.4 0.0 10 .0 6 .33 0.3 1.0 1.0 1.0 1 .0 10.4 0 .0 10.0 6 .33 0 .3 1.0 1.0 1.0 1.0 10.4 0 .0 10 .0 6 .33 0.4 1.0 1.0 1.0 1.0 10.4 0.0 10.0 6 .33 0.4 15 1.0 12.0 175.0 3.0 2 .3 2 .4 10 .0 6 .33 2.4 1.0 1.0 ·85.2 0.9 ?n 0 ,7 10,0 ·6.33 0,9 1.0 1.0 129.0 7 .2 4 .7 0 .5 10 .0 6 .33 1.2 1.0 1.0 114.9 1.1 2.0 1.0 10.0 6.33 0 .9 1.0 1.0 116.9 1.2 2 .0 1.0 10.0 6.33 0 .9 1.0 1.Q 182.Q 1.8 2 ,0 1.5 10 0 6 .33 2 .9 Exhib it 5 0 0 ID 0 0 0 0 0 "' N 0 "' 0 0 ~ !::! 0 !!! 0 ~ In/Hr cfs In/Hr cfs In/Hr cfs In/Hr cfs 8 .6 0.6 9 .9 0.7 11.1 0.8 12.5 0.9 8.6 1.4 9.9 1.6 1 1.1 1.8 12.5 2 .0 8 .6 8 .5 9.9 9.7 11 .1 10.9 12.5 12.3 8 .6 5 .0 9.9 5.7 1 1.1 6 .4 12.5 7 .2 8 .6 3.9 9 .9 4 .5 11.1 5.1 12.5 5.7 86 .4? QQ 48 11 .1 5.4 12.5 6 .1 8 .6 5.6 9.9 6.4 11 .1 7 .3 12.5 8 .2 8 .6 0 .9 9.9 1.0 11 .1 1.2 12.5 1.3 8 .6 1.2 9.9 1.3 11 .1 1.5 12 .5 1.7 8 .6 15.3 9.9 17.5 11 1 1Q A 1? "-22 .3. 8 .6 0 .6 9.9 0.7 11 .1 0.8 12 .5 0 .9 A I: 14 9 9 1.6 11 .1 1.8 12 .5 2.0 8 .6 6 .11 9 .9 7 .0 1 1.1 7 .9 12 .5 8 .9 8 .6 1.6 9 .9 1.8 11 .1 2 .1 12.5 2.3 8 .6 5.2 9 .9 6.0 11.1 6 .7 12.5 7.6 A I: "'"" 99 53 11 1 "n 12.5 67 8 .6 2 .6 9.9 3.0 11 .1 3.4 12.5 3.8 8.6 0.5 9 .9 0.6 11.1 0.7 12.5 0.7 8 .6 2.2 9.9 2 .5 11 .1 2.8 12 .5 3.2 8 .6 0.2 9.9 0.3 11 .1 0.3 12.5 03 8 .6 0.8 9 .9 0.9 11 .1 1.0 12.5 1.1 8 .6 0.4 9.9 0,4 1 1.1 0 .5 12 .5 0 .6 8 .6 0.4 9.9 0.4 11 .1 0.5 12.5 0.6 8.6 0 .5 9.9 0.5 11 .1 0 .6 12.5 0.7 8 .6 0.5 9 .9 0 .6 11 .1 0.6 12.5 0.7 8.6 0 .5 9.9 0.6 1 1.1 0 .7 12.5 0.7 8 .6 3.2 9 .9 3.7 11.1 4 .2 12.5 4.7 8.6 1 3 99 1:5 11 .1 1 .7 ·12 .5 1.9 8 .6 1.6 9 .9 1.8 11.1 2 .1 12.5 2.3 8 .6 1.3 9.9 1.4 11.1 1.6 12.5 1.8 8 .6 1.2 9 .9 1.4 11 .1 1.5 12 .5 1.7 8 .6 3.9 9 .9 4 .5 1 1.1 5.1 12 .5 5.7 EXHIBIT6 Pipe Capacity Calculations CSISD-Center for Alternative Learning 10-year Design Storm I ~ I I;' -c: fi: I . ·~ ~ I [? s ~ ·;; ~ I ~ t: .. • -( I-~ "'·-1 Q ~ o fooo Q 'C i::i ~ 0.1 -~ •. e ..,,. ·~' u -~ g,, I VJ g,, ~··'+--I = ·-'C ..... -00 t; "O ·-t ' = Q ' ' ' c fo-= fo-.,J .:: = = ~ Q.,, o. I Q -, • .• ·• , ·-fo--~ ~ ._, rl.) '-"-·-00 ';.. .. CJ ~ ~ ~ fo-.~-g~ .2, ~~It:~.,.\ ..JI~~~ @ z o o ... ~ =£ "O Q .s ·c: .e-"· ... ~I = ~ -... -fo-fo-f>-o i::i ;;i IJ,. < z IJ,. IJ,. Q.,, •), ' > ' u .,J fo-fo-# # Ac. min yr cfs cfs # cfs % % ·.lllc fps I cfs ft. min min PDA-5 ~ Pond o.60 10.0 10 5.2 6.5 1 6.5 1.01 !2.150 ,:16 7.7 j 9.5 30 0.06 10.06 PDA-6b 1-2 0.06 10.0 10 0.5 0.6 1 0.6 0.28 11.000 :' .. '•-.' 3.5 I 1.2 90 0.43 10.43 PDA-7 1-3 0.12 10.2 10 1.0 1.3 1 1.3 0.34 11.000 1q. 4.0 2.2 10 0.04 10.19 PDA-8 PDA-7 0.09 10.0 10 0.8 1.0 1 1.0 0.20 11.000 .··. 1. 0 4.0 I 2.2 37 0.15 10.15 PDA-9 1-5 0.04 10.0 10 0.4 0.5 1 0.5 0.16 11.000 ,fJ, 3.5 1.2 11 0.05 10.05 PDA-10 1-6 0.04 10.0 10 0.4 0.5 1 0.5 0.15 11.000 · 8 3.5 1.2 22 0.11 10.11 PDA-12 1-8 0.06 10.0 10 0.5 0.6 1 0.6 0.25 1.000 i·g 3.5 1.2 42 0.20 10.20 PDA-13 1-9 0.06 10.0 10 0.5 0.6 1 0.6 0.27 1.000 . ·a· 3.5 1.2 30 0. 14 10.14 1-1 1-2 0.31 10.0 10 2.7 3.3 1 3.3 0.26 1.000 1$. 5.3 6.5 37 0.12 10.12 1-2 1-3 0.90 10.4 10 7.7 9.6 1 9.6 0.83 1.740 18 7.9 13.9 55 0.12 10.55 1-3 JB-4 1.02 10.5 10 8.6 10.8 1 10.8 0.23 1.000. 24 7.2 22.7 70 0.16 10.71 JB-4 1-5 1.43 10.7 10 12.0 15.0 1 15.0 0.43 1.000 . 24· 7.2 22.7 43 0.10 10.81 1-5 1-6 1.47 10.8 10 12.3 15.4 1 15.4 0.46 1.000 24· 7.2 22.7 56 0.13 10.94 1-6 JB-7 1.51 10.9 10 12.6 15.7 1 15.7 0.48 1.000 . .24 7.2 22.7 38 0.09 11.03 JB-7 1-8 1.51 11.0 10 12.6 15.7 1 15.7 0.48 1.000 24 7.2 22.7 32 0.07 11.10 1-8 1-9 1.62 11.1 10 13.4 16.8 1 16.8 0.55 1.150 '24 7.7 24.3 109 0.23 11.33 1-9 1-10 1.68 11.3 10 13.8 17.2 1 17.2 0.58 1.220 AM 8.0 25.0 87 0.18 11.52 1-10 1-11 1.68 11.5 10 13.7 13.7 1 13.7 0.11 1.000 ; .. ~ 8.4 41.1 73 0.15 11.66 1-11 Out3 2.06 11.7 10 16.7 16.7 1 16.7 0.16 2.000 .''30 11.8 58.2 134 0.19 11.85 Exhibit 6 EXHIBIT7 Pipe Capacity Calculations CSISD-Center for Alternative Learning 100-year Design Storm I ""' j , ... ., j' .. . . ··(.t Q I '"··'· I ~ ~ ~r: i. i ·-= 1.c· ·, I fl} bl> I : ;'·'." -.~," : ~ ·-4,,> ~ I . i . < E ~ ,,,.e-§-1 j' IG> 0 E--u Q"O Q G>""' -·G> IS :z: ~ -G> Q, 00 ' Q. ~·· ··;· = ' ·-"O ...J ...J 00 t; ~ il'.: t = Q ''-"' C fo-I fo-= E--:z: < = .:. <;; .... ""' Q : t;j ·: .>:;. ·c:; ~ ~ ~ ~ ... E--.!!.'! "O ,.. = Q ,.. :;: . G> ,.1·.'· ; = :z: • > r;;;,', ...J Cl) = .. .... . .. -' " -Q, = ~ :z: 0 0 rJ G> = ..!: "O Q ..!: ·;:: .e-" . . . f;i;1 = ~ ' a.. rJ -E--E--E--Q ::;i""' < :z:""' ""' Q.. ::, > u ...J E--E--# # Ac. min yr cfs cfs # ds % I % :ji,t_'J; fps cfs ft. I min min -I I ·~ "'' PDA-5 Pond 0.60 10.0 100 7.6 9.5 1 9.5 2.13 2.150 : ~~~ 7.7 9.5 30 0.06 10.06 PDA-6b 1-2 0.06 10.0 100 0.7 0.9 1 0.9 0.58 1.000 18, 3.5 1.2 90 0.43 10.43 PDA-7 1-3 0.12 10.2 100 1.5 1.9 1 1.9 0.71 11.000 "'IO 4.0 2.2 10 0.04 10.19 PDA-8 PDA-7 0.09 10.0 100 1.1 1.4 1 1.4 0.43 1.000 ., • .,. 4.0 2.2 37 0.15 10.15 PDA-9 1-5 0.04 10.0 100 0.6 0.7 1 0.7 0.33 1.000 :~·. 3.5 1.2 11 I 0.05 10.05 PDA-10 1-6 0.04 10.0 100 0.6 0.7 1 0.7 0.32 1.000 ·~ 3.5 1.2 221 0.11 10.11 PDA-12 1-8 0.06 10.0 100 0.7 0.9 1 0.9 0.52 1.000 '.f8 3.5 1.2 42 0.20 10.20 PDA-13 1-9 0.06 10.0 100 0.7 0.9 1 0.9 0.58 1.000~;8 3.5 1.2 30 0.14 10.14 1-1 1-2 0.31 10.0 100 3.8 4.8 1 4.8 0.55 1.000: 15, 5.3 6.5 37 0.12 10.12 1-2 1-3 0.90 10.4 100 11.1 13.9 1 13.9 1.74 1.740. •· 7.9 13.9 55 0.12 10.55 1-3 JB-4 1.02 10.5 100 12.5 I 15.7 1 15.7 0.48 1.000 ~; 7.2 22.7 70 I 0.16 10.71 JB-4 1-5 1.43 10.7 100 17.4 21.7 1 21.7 0.92 1.000 :-;24. 7.2 22.7 43 0.10 10.81 1-5 1-6 1.47 10.8 100 17.9 ! 22.3 1 22.3 0.97 1.000 24 7.2 22.7 56 0.13 10.94 1-6 JB-7 1.51 10.9 100 18.3 I 22.9 1 22.9 1.02 1.000 24. 7.2 22.7 381 0.09 11.03 JB-7 1-8 1.51 11.0 100 18.2 I 22.8 1 22.8 1.01 1.000 24 7.2 22.7 32 0.07 11.10 1-8 1-9 1.62 11.1 100 19.5 I 24.4 1 24.4 1.16 1.150 .• ~ 1.1 24_3 109 0.23 11.33 1-9 1-10 1.68 11.3 100 20.0 ·1 25.1 1 25.1 1.2211.220 ·24 8.0 25.0 87 0.18 11.52 1-10 1-11 1.68 11.5 100 19.9 19.9 1 19.9 0.23 1.000 :30 8.4 41.1 73 0.15 11.66 1-11 Out3 2.06 11.7 100 24.2 24.2 1 24.2 0.35 2.000 30 11.8 58.2 134 0.19 11.85 Exhibit 7 EXHIBITB CS ISO -C enter for Alterna ti ve Learning INLET CAPACITY 10-YEAR STORM SUM PUr<AI C 1-1 Q= 2 .65 cfs clog= 25% Q clogged= 3.31 cfs Inlet Selected= V-5724-1 EJIW Open Area Selected= 1.86 ft 2 T/G= 327 .15 ft h =I 0.141ft WSE= 327 .29 ft 1-3 Q= 0.00 cfs clog= 25% Q clogged= 0.00 cfs Inlet Selected= V-5712-ADA EJIW Open Area Selected= 0 .30 ft 2 T/G= 327 .01 ft h =I o.001ft WSE= 327 .01 ft 1-6 Q= 0 .13 cfs clog= 25% Q clogged= 0 .16 cfs Inlet Selected= V-5712 EJIW Open Area Selected= 0 .46 ft 2 T/G= 324 .72 ft h =I o.011ft WSE= 324 .73 ft 1-9 Q= 0 .52 cfs clog= 25 % Q clogged= 0 .65 cfs Inlet Selected= V-5712 EJIW Open Area Selected= 0 .46 ft 2 T/G= 324 .56 ft h =I 0.09jft WSE-324 .65 ft 1-12 Q= 0 .12 cfs clog= 25% Q clogged= 0 .15 cfs Inlet Selected= V-5712 EJIW Open Area Selected= 0 .46 ft 2 T/G= 318 .02 ft h =I o.oo jft WSE-318 .02 ft Note * Recessed inlets curt> opening = Height of curt> +depression y = 6"+4"=equal 10" 1-2 Q= clog= Q clogged= Inlet Se lected= Open Area Selected= T/G= h-1 WSE= 1-5 Q= clog= Q clogged= Inlet Selected= Open Area Se lected= T/G= h-1 WSE= 1-8 Q= clog= Q clogged= Inlet Selected= Open Area Selected= T/G= h-1 WSE- 1-1 0 Q= clog= Q dogged= Inlet Se lected= Open Area Selected= T/G= h =I WSE= SUMP CURB: Q = 3.0*L Y'1.5 L= Q/(3 .0Y1 .5) SUMP GRATE: Q = 4.82*A*h'0.5 A = Q/(4 .82Y0.5) I 1u Yea r :>tonn 1 4.64 cfs 25% 5.80 cfs V-5726 EJIW 2 .23 tt2 326 .00 ft 0.29 1ft 326 .29 ft 0 .30 cfs 25% 0 .37 cfs V-5712 EJIW 0.46 ft 2 326.56 ft O.D3 1ft 326.59 ft 0 .32 cfs 25% 0 .40 cfs V-57 12 EJIW 0 .46 ft 2 324 .96 ft 0.031 ft 324 .99 ft 0 .13 cfs 25% 0 .17 cfs V-5712 EJIW 0.46 ft2 315.32 ft o.011ft 315 .33 ft I sUMPi.URB (recessed 1 110 Year stonn1 1-11 Q = 3 .25 cfs clog= 10 % Q clogged= 3 .57 cfs y= 0.83 ft L=I 1.57jft 1-13 (Chec kl Ex hibit 8 Q= 1.61 cfs clog= 10% Q dogged= 1.77 cfs y= 0 .83 ft L=I o.1a1ft SUMP CURB: Q = 3.0*L Y'1 .5 L= Q/(3 .0Y1 .5) EXHIBIT9 CSISD-Center for Alternative Learning INLET CAPACITY 100-YEAR STORM Sl.JM,.GRAre 1-1 Q= 3 .84 cfs clog= 25% Q clogged= 4.80 cfs Inlet Selected= V-5724-1 EJIW Open Area Selected= 1.86 fl2 TIG= 327.15 fl h =I 0.29jtt WSE= 327.44 fl 1-3 Q= 0.00 cfs clog= 25% Q clogged= 0 .00 cfs Inlet Selected= V-5712-ADA EJIW Open Area Selected= 0 .30 fl2 T/G= 327 .01 fl h =I o.oo jtt WSE= 327 .01 fl I~ Q= 0.19 cfs clog= 25% Q clogged= 0 .24 cfs Inlet Selected= V-5712 EJIW Open Area Selected= 0.46 fl2 TIG= 324.72 fl h =I o.011 f1 WSE= 324 .73 fl 1-9 Q= 0.76 cfs clog= 25% Q clogged= 0 .95 cfs Inlet Selected= V-5 712 EJI W Open Area Selected= 0.46 fl2 T/G= 324 .56 fl h-1 o.1&lfl WSE= 32 4.74 fl 1-12 Q= 0 .24 cfs clog= 25% Q clogged= 0 .29 cfs Inlet Selected= V-5712 EJ IW Open Area Selected= 0 .46 fl2 TIG= 318.02 fl h -I o.021f1 WSE= 318.04 fl Note* Recessed inlets curb opening = Height of curb +depression y = 6"+4"=equal 1 o· SU M CURB 1-11 Q= clog= Q clogged= y= (NCessed ) 4.71 cfs 10% 5 .18 cfs 0 .83 fl L-l.__ __ 2_.2_.alfl 1-2 -Q= clog= Q clogged= Inlet Selected= Open Area Se lected= T/G= h-1 WSE- 1-5 ~ Q= clog= Q clogged= Inlet Selected= Open Area Selected= TIG= h =I WSE- 1-9 ~ Q= clog= Q clogged= Inlet Selected= Open Area Selected= TI G= h-1 WSE- 1-10 - Q= clog= Q clogged= Inlet Selected= Open Area Selected= T/G= h-1 WSE- - SUMP CURB. Q = 3.0*L )t•1 .5 L= Q/(3 .0)t•1.5) SUMP GRATE: Q = 4.82*A*h•0 .5 A= Q/(4 .82)t•0.5) 1-13 (Checkl Q= clog= Q clogged= y= I 1100 Year stonnl 6 .73 cfs 25 % 8.41 cfs V-5726 EJIW 2 .23 fl2 326 .00 fl 0.6 11fl 326 .61 fl 0 .43 cfs 25 % 0 .54 cfs V-5712 EJIW 0 .46 fl2 326 .56 fl 0.06 1fl 326 .62 fl 0 .46 cfs 25 % 0 .58 cfs V-5712 EJIW 0 .46 fl2 324.96 fl 0.071fl 325 .03 fl 0 .19 cfs 25 % 0 .24 cfs V-5712 EJIW 0.46 112 315.32 fl o.011f1 315 .33 fl I (100 Yea r tonn) 2 .33 cfs 10% 2.56 cfs 0 .83 fl L=._I ___ 1_.1 _.3'11 SUMP CURB: Q = 3.0*L y1 .5 L= Q/(3 .0)t•1 .5) Exhi bit 9 APPENDIX A CAL EXISTING CONDITIONS HEC-HMS DIAGRAM studyf't A ppe ndi x A CAL PROPOSED CONDITIONS HEC-HMS DIAGRAM Appendix A CAL 5-YR EXISTING DISCHARGE SUMMARY Project: Cal Simulation Run: ES Start of Run: 16Sep 1986, 00: 00 End of Run: 17Sep1986, 00:00 Compute Time: 18Sep2014, 20: 16: 20 Basin Model: ExistingSystem Show Elements: All Element ~ Hydro logic Drainage Area Element (MI2) RearOfBldg 0.004481 FrontOfBldg 0.004170 StudyPt 0.008651 Meteorologic Model: 5 YR STORM Control Specifications: HYDROLOGY Volume Units: @ IN Q AC-FT Sorting: I Hydrologic v I Peak Discharge Time of Peak Volume (CFS) (IN) 14.5 16Sep1986, 12:07 4.74 14.4 16Sep1986, 12:07 5.31 28.9 16Sep1986, 12:07 5.01 A ppe ndi x A CAL 5 YEAR EXISTING OUTFLOW HYDROGRAPH Junction 'StudyPt' Results ror Run 'E5' 30 I I I I I I I I I I 25 20 l -~ -+ I ------+----,____ - I ~ I I I ~ 15 I 10 I----t -11 I--... --- 1 -l I I r\--- I -,_.,-~jJ ~~ -0 00 :00 03 :00 06 :00 09 :00 12:00 16Sep1986 15:00 18:00 21 :00 00 :01 I I Legend (Compute Time : 18Sep2014, 20: 16:20) --Run:E5 ElemertSTLOYPT Resul:O\.C11ow ---Rt-n:E5 Elemert:REAROfBLI)G Resul:Oti11ow ----- -Run:E5 ElemertFRONTOfBLOO Resul: Otiflow Appendix A CAL 5-YR PROPOSED DISCHARGE SUMMARY Project: Cal Simulation Run: PS Start of Run: 16Sep 1986, 00: 00 End of Run: 17Sepl 986, 00:00 Compute Time: 18Sep2014, 20: 16: 48 Basin Model: Proposed System Meteorologic Model: 5 YR STORM Control Specifications: HYDROLOGY Show Elements: All Elements3 Volume Units: @ IN Q AC-FT Sorting: I Hydrologic v I Hydrologic Drainage Area Peak Discharge Time of Peak Volume Element (MI2) (CFS) (IN) RearOfBldg 0.005107 16.7 16Sepl 986, 12:07 4.84 Front Of Bldg 0.003094 10.7 16Sepl 986, 12:07 5.29 ProposedBldg 0.000670 2.5 16Sepl 986, 12:07 6.19 Pondl 0.000670 1.5 16Sepl 986, 12: 16 6.19 Study Pt 0.008871 28.6 16Sepl 986, 12:07 5.10 Appendi x A CAL 5 YEAR PROPOSED OUTFLOW HYDROGRAPH Junctio n 'Stu dyPt ' Re sults f or Run 'P5 ' 25 20 ~ 15 10 + --RinPS Elemert:STl.()YPT Resi.«:Wflow ------Riil:PS Elemert:FRONTOfBLOO Resul:Wflow t 09 :00 12:00 16Sep1 986 15:00 + - + - 18:00 21 :00 ---RinPS Element:REAROfBLOO Resi.«:Wflow ---· RinPS Element:POtCI Resul:Wflow Appendi x A 00 :01 I i::-u. 0 ~ Ol Cl !! 0 1i5 ~ ~ ~ ;:;:: 0.030 0.025 0.020 0.015 O.Q10 0.005 2.5 2.0 1.5 1.0 0.5 0.0 00:00 I I __,. I I I 03 :00 06 :00 Legend (Compute Time : 185ep20 14, 20: 16:48) - -- - - -R1.11:P5 ElemertPON01 Resut:storage --R1.11:P5 ElemertPON01 Result:Outflow CAL DETENTION POND SUMMARY FOR 5-YR STORM Reservoir 'Pond 1' Results for Run "P5' I ~ n i II II I " II II I ~ ----~------- I r I 09 :00 11 1 l r I l l I I \ \ \ I 12 :00 16Sep1986 + - I I I 15:00 18 :00 21 :OO Rl.nPS BemertPOND1 Resut:Pool Elevellon - --R1.11:P5 BemertPOND1 Result :COl!Dned Flow Appendix A 313.00 312 .70 312 .40 g 312 .10 > Q) ITi 311 .80 311 .50 311 .20 - 00 :00 I CAL 10-YR EXISTING DISCHARGE SUMMARY Project: Cal Simulation Run: E 1 O Start of Run: 16Sep 1986 J 00: 00 End of Run: 17Sep1986J 00:00 Compute Time: 18Sep2014 J 20: 17: 22 Basin Model: Existing System Meteorologic Model: 10 YR STORM Control Specifications: HYDROLOGY Show Elements: All Elements v I Volume Units: @ IN 0 AC-FT Sorting: I Hydrologic ~J I Hydro logic Drainage Area Peak Discharge T ime of Peak Volume Element (MI2) (CFS) (IN) Rear Of Bldg 0.004481 16.3 16Sep 1986) 12:07 5.81 FrontOfBldg 0.004170 16.0 16Sep 1986) 12:07 6.40 StudyPt 0.008651 32.4 16Sep 1986) 12:07 6.09 App e ndi x A CAL 10 YEAR EXISTING OUTFLOW HYDROGRAPH Junction 'StudyPt' Results for Run 'E 1 O' 30 l + 25 20 ~ 15 10 + 09 :00 --R\nE10 Elemert:STUOYPT Res<.t:O\.lflow ------R<.n:E10 Elemert:FRONTOfBUXl ResUl:O\.lftow 12:00 16Sep1986 15:00 t 18:00 t + l 21 :OO - - -R\nE10 Elemerl:flEAROFBlOO Res<.t:O\.lflow Appendix A 00 :01 I CAL 10-YR PROPOSED DISCHARGE SUMMARY Project: Cal Simulation Run: P 10 Start of Run: 16Sep 1986, 00: 00 End of Run: 17Sep1986, 00:00 Compute Time: 18Sep2014, 20: 17: 4 7 Basin Model: ProposedSystem Meteorologic Model: 10 YR STORM Control Specifications: HYDROLOGY Show Elements: j All Elements ,3 Volume Units: @ IN Q AC-FT Sorting: I Hydrologic v I Hydro logic Drainage Area Peak Discharge Time of Peak Volume Element (MI2) (CFS) (IN) RearOfBldg 0.005107 18.8 16Sepl 986, 12:07 5.92 FrontOfBldg 0.003094 11.9 16Sepl 986, 12:07 6.38 ProposedBldg 0.000670 2.8 16Sepl 986, 12:07 7.32 Pondl 0.000670 1.6 16Sepl 986, 12: 17 7.32 StudyPt 0.008871 32.0 16Sepl 986, 12:07 6.18 Append ix A CAL 10 YEAR PROPOSED OUTFLOW HYDROGRAPH Junction 'StudyPt' Results for Run 'P 1 O' 35 30 25 20 ./!? ~ ~ 15 + 10 + t --Rl.n:P10 ElemertSTUOYPT ResUl:Oli1low • • • • • • Run:P10 Elemert :FRONTOFBLOO ResUl:O\Aflow t- i + 09 :00 12:00 16Sep1986 15:00 + + I I 18:00 I r ~ l 1 I r 21 :OO ---R""P10 Elemert REAROFBLDG ResUl:Ot.tflow -• -· Run:P10 Elemert: PON01 ResUl:O\Aflow Appendix A 00 :01 I CAL DETENTION POND SUMMARY FOR 10-YR STORM Reservoir "Pond 1" Results for Run 'P 1 O" 0.030-1-----+------1r------+-------+1+-------1r------+-----+-----4-313 .05 ---·-+-------+-~312.71 f 0.025 ~ 0.020 '-312.37 € Q) ~ g' 0.015 ---_____ _,__ ___ ....._ __ ...._ ___ -~ ----~ 312 .03 w ~ 0.010 .... 311.69 3 .o~---------Jfi ___ l ______ _ ~ ~ 2.0 ~ 1.5 ~ ~ 0 u: 1.0 0.5 0.0 00 :00 03 :00 06 :00 I Legend (Compute Time : !8Sep2014, 20 :17 :47) -- - - --Rll1:P10 Elemert:PQN)1 Resuft :storage --Rll1:P10 Elemenl:PQN)1 Resuft :Ot.tflow 09 :00 II I\ ll 12 :00 16Sep1986 + 15 :00 + +- 18:00 21 :00 Run:P10 Element :POllD1 Resuft:Pool Elevation ---Run:P10 Elemenl :POllD1 Resuft :Cotril:Wled Flow Appendix A 00 :00 I CAL 25-YR EXISTING DISCHARGE SUMMARY Project: Cal Simulation Run: E25 Start of Run: 16Sep 1986, 00: 00 End of Run: 17Sepl 986, 00:00 Compute Time: 18Sep2014, 20: 18: 14 Basin Model: ExistingSystem Meteorologic Model: 25 YR STORM Control Specifications: HYDROLOGY Show Elements: All Elements _::j Volume Units: ® IN Q AC-FT Sorting: I Hydrologic ~I Hydrologic Drainage Area Peak Discharg e Time of Peak Volume Element (MI2) (CFS) (IN) RearOfBldg 0.004481 19.2 16Sepl 986, 12:07 6.85 FrontOf Bldg 0.004170 18.7 16Sepl 986, 12:07 7.45 StudyPt 0.008651 37.9 16Sepl 986, 12:07 7.14 Appe ndi x A ' CAL 25 YEAR EXISTING OUTFLOW HYDROGRAPH Junction 'StudyPt' Results ror Run 'E25" 40 35 + + + 30 t l 25 + ~ 20 ~ u: 15 ~ ,, 1, .. 10 \ -1 l r' J1 \ I I -+ I \ I _j.~~~-1.~~~'"""'SE:~-~-~-=-~-~--==r~r-l/__jl __ ,_'_-~-=-~-;=-==-~-~-=~==;::==-=-~=-=-=i=-=-~==~ 0 00 :00 03 :00 06 :00 09 :00 I L"llend (Compute Tine : 16Sep2011, 20 :18 :11) --Rt.ll:E2S Element:STUOYPT Rest.«:Oliflow ----• • Rt.ll:E2S Element:FRONTOfBLOO Rost.«:Oliflow 12 :00 16Sep1986 15 :00 18 :00 21 :OO - - -Rt.ll:E2S Element:RfAROFBLOO Rest.«:Oliflow Appendix A 00 :01 I CAL 25-YR PROPOSED DISCHARGE SUMMARY Project: Cal Simulation Run: P25 Start of Run: 16Sep 1 986, 00: 00 End of Run: 17Sep1986, 00:00 Compute Time: 18Sep2014, 20: 18: 43 Basin Model: ProposedSystem Meteorologic Model: 25 YR STORM Control Specifications: HYDROLOGY ---, Show Elements: All Element ~ Volume Units: @ IN Q AC-FT Sorting: I Hydrologic v I Hydrologic Drainage Area Peak Discharge Time of Peak Volume Element (MI2) (CFS) (IN) RearOfBldg 0.005107 22.1 16Sep1986, 12:07 6.95 FrontOfBldg 0.003094 13.8 16Sep1986, 12:07 7.43 ProposedBldg 0.000670 3.2 16Sep1986, 12:07 8.39 Pondl 0.000670 1.8 16Sep1986, 12: 18 8.39 Study Pt 0.008871 37.4 16Sep1986, 12:07 7.23 Appen di x A CAL 25 YEAR PROPOSED OUTFLOW HYDROGRAPH Junction 'St udyPt" Results ror Run 'P25' 40 35 30 + 25 ~ 20 + ~ ;;: 15 r 10 t --R\xl:P25 Element:STOOYPT Resul:O\.tflow • • •••• R\xl:P25 Element:fRON TOfBLOO Resul:O\.tflow I t I ~ + 09 :00 12:00 16Sep1986 15:00 + t 18:00 l + + + 21 :00 - - -Run:P25 Elemenl:RfAROfBL OO Resul:O\.tflow -• -· Run:P25 Element:POK>1 Resul:O\.tflow Append ix A 00 :01 I CAL DETENTION POND SUMMARY FOR 25-YR STORM 0 .045 0.040 0.035 E o .o3o u ~ 0.025 -t Q) ~ 0.020 0 (ii 0.015 0.010 0.005 0.000 3 .5 3.0 2.5 2.0 ~ ~ 1 .5 Li: 1 .0 0 .5 00 :00 03:00 06:00 I Legend (Compute Time : 185ep2014, 20 :18:43) - -----Run:P2S ElemertPQllD1 Resul:storage --Run:P2S ElemertPOllD1 Resul:Outflow Reservoir 'Pond 1" Results for Run 'P25' 09:00 12:00 16Sep1906 +- +- 15 :00 10 :00 21:00 Run:P2S Elemert :POllC>1 ResutPool Elevlllion ---Run:P2S Elemert :POllC>1 ResutCombined Flow Appendix A 314 .00 313 .67 313 .33 313 .00 312 .67 g 312 .33 ~ m 312 .00 311 .67 311 .33 311 .00 00:00 I CAL 50-YR EXISTING DISCHARGE SUMMARY Project: Cal Simulation Run: E50 Start of Run: 16Sep 1986) 00 : 00 End of Run: 17Sep1986) 00:00 Compute Time: 18Sep2014) 20: 19: 13 Basin Model: ExistingSystem Meteorologic Model: 50 YR STORM Control Specifications: HYDROLOGY Show Elements: I All Elements ~ Volume Units: @ I N Q AC-FT Sorting: I Hydrologic lv]I Hydrologic Dr a in age Area Peak Discharge Time of Peak Volume Element (MI2) (CFS) (IN) RearOfBldg 0.004481 21.6 16Sep1986) 12:07 8 .20 FrontOfBldg 0.004170 20 .7 16Sep1986) 12:07 8.82 Study Pt 0.008651 42.3 16Sep1986) 12:07 8.50 Append ix A 45 40 35 30 25 E ~ 20 ;;:: 15 10 CAL 50 YEAR EXISTING OUTFLOW HYDROGRAPH t "t +- +- .. +- Junction •studyPt' Results ror Run 'E50 ' + + + + + t t I t 1 L o .l...-~-....---=--,......-=====:::;:::=.:.::::::_J__:::::::::::==::::=~:=:=::==~===:===J 00 :00 03:00 06 :00 09 :00 I Le~end (C~e Time : 18Sep201i, 20:19:13) --Rtn:ESO Elemenl:STUDYPT ReslA:OIJflow ------Rtn:ESO Elemenl:FRONTOFBLOO Res<Ao.tf1ow 12 :00 16Sep1986 15:00 18 :00 21 :00 - --Rtn:ESO ElemertREAROFBLOO Res<Ao.tflow Appendix A 00 :01 I CAL 50-YR PROPOSED DISCHARGE SUMMARY Project: Cal Simulation Run: P50 Start of Run: 16Sep 1 986, 00: 00 End of Run: 17Sep1986, 00:00 Compute Time: 18Sep2014, 20: 19:40 Basin Model: ProposedSystem Meteorologic Model: 50 YR STORM Control Specifications: HYDROLOGY Show Elements: Al~lements ~I Volume Units: @ IN Q AC-FT Sorting: I Hydro logic v I Hydrologic Drainage Area Peak Discharge Time of Peak Volume Element (MI2) (CFS) (IN) RearOfBldg 0.005107 24.7 16Sep1986, 12:07 8.31 Front Of Bldg 0.003094 15.4 16Sep1986, 12:07 8.80 ProposedBldg 0.000670 3.5 16Sep1986, 12:07 9.79 Pondl 0.000670 1.9 16Sep1986, 12: 18 9.79 StudyPt 0.008871 41.7 16Sep1986, 12:07 8.59 A p pendi x A CAL 50 YEAR PROPOSED OUTFLOW HYDROGRAPH Jun cti on 'Stu dyPt" Res ult s ror Run 'P50 ' 45 40 35 30 25 l!1 ~ ~ 20 <;:: 15 ... 10 09 :00 --R\Jn:PSO Element:STLOYPT Res<.t:Ooiflow ------R\Jn:PSO Element:FRON TOfBLOO ReslAl:OtJflow 12:00 1 6Sep1 986 15:00 ... ... 1 8:00 t -1- ~ l ~ 21 :00 ---R\Jn:PSO Elemert:RfAROFBLOO Res<.t:OtJflow ---· Ro.n:P50 Elemerl:POND1 Res<.t:OtJ flow Appe nd ix A 00:01 I 0.04 E u 0.03 :;. Q) Cl ~ 0.02 0 (jj + CAL DETENTION POND SUMMARY FOR 50-YR STORM Reservoir 'Pond 1" Results for Run 'P50" + + + + ... 313 .80 313 .10 g iii 312.40 iij 0.01 -i-----r-----<1-------t-----.r-"\"---l------+-----+-----·t-311 .70 o .oo~---~----~---~---~--------~---~----~311 .00 4 .0~---~-----------------------------~ 3.5 --+-+--+ --- 3.0 --+- 2.5 + ~ 2.0 ~ Li: 1.5 1.0 + + 0.5 + o.o~==~==:=;:=====:=;;:::::::___.----==:;::::=====:;::===r===~ 00 :00 03 :00 06 :00 09 :00 I Legend (Compute T1111e: 18Sep2014, 20 :19 :40 ) ---- --Rl.fl:PSO Element:POllD1 ReslA :Slorage --Rl.fl: PSO Element: POllD1 ReslA : Otiftow 12 :00 16Sep1986 15:00 18 :00 21 :00 Run :PSO Element:POND1 ReslA:Pool Elevation ---Run:PSO Element:POND1 ReslA:Combined Flow Appendix A 00 :00 I l CAL 100-YR EXISTING DISCHARGE SUMMARY Project: Cal Simulation Run: E 100 Start of Run: 16Sep 1 986, 00: 00 End of Run: 17Sep1986, 00:00 Compute Time: 18Sep2014, 20: 20: 11 Basin Model: ExistingSystem Meteorologic Model: 100 YR STORM Control Specifications: HYDROLOGY Show Elements : All Elements v I Volume Units: @ IN Q AC-FT Sorting: I Hydrologic fvJI Hydrologic Drainage Area Peak Discharge Time of Peak Volume Element (MI2) (CFS) (IN) RearOfBldg 0.004481 23.8 1 6Sep1986, 12:07 9.37 FrontOfBldg 0.004170 22 .7 1 6Sep1986, 12:07 10.00 StudyPt 0.008651 46.5 1 6Sep1986, 12:07 9.68 Append ix A 50 45 40 35 30 ~ 25 ~ ;;: 20 1 5 10 CAL 100 YEAR EXISTING OUTFLOW HYDROGRAPH Jun ction 'Stu dyPt' Re sults for Run 'E 100 ' + + + + ' + ~ I I 11 ii ---+----+ + I +- +-+ - +- I + l -+----1- . } \ ~ t -1------+-~-~"f, =-~-;;:-~-:::'---:;,;, __ -::!/ I .. \._r------;------·- 00 :00 03:00 06:00 09 :00 12:00 15 :00 18 :00 21 :OO I 16Sep1 98 6 Legend (Compute rune: 18Sep2014, 20:20: 11) --Ro.n:E100 Element:STUOYPT Resul:Oo.tflow ---Ro.n:E100 Element:RE AROFBLOO Resul:Oo.t flow ------Ro.n:E1 00 Elemenl:fRONT OFBLOO Resul :O..C flow Ap p e ndi x A 00 :01 I CAL 100-YR PROPOSED DISCHARGE SUMMARY Project: Cal Simulation Run: P 100 Start of Run: 16Sep 1986 > 00: 00 End of Run: 17Sep1986> 00:00 Compute Time: 18Sep2014 > 20: 20: 44 Basin Model: ProposedSystem Meteorologic Model: 100 YR STORM Control Specifications: HYDROLOGY Show Elements: All Elements ~ Volume Units: @ IN Q AC-FT Sorting: I Hydrologic v I Hydro logic Drainage Area Peak Discharge Time of Peak Volume Element (MI2) (CFS) (IN) RearOfBldg 0.005107 27.2 16Sep1986> 12:07 9.48 FrontOfBldg 0.003094 16.9 16Sep1986> 12:07 9.98 Proposed Bldg 0.000670 3.8 16Sep1986> 12:07 10.99 Pondl 0.000670 2.0 16Sep1986> 12: 19 10.99 StudyPt 0.008871 45.8 16Sep1986> 12:07 9.77 A ppe ndi x A CAL 100 YEAR PROPOSED OUTFLOW HYDROGRAPH Junction 'StudyPt" Results tor Run 'P 1 00 ' 50 45 T 40 35 .. 30 ~ 25 ~ u: 20 ~ 15 I-+ I 10 ~ I t 1 11 1 I It 11 I.I ~1 r:r ~ :1 l••I Ii\!.; l' ·1 1/ \1 /, ·I + .. I t _'_J: "\ /: \\ 0 .J., -----=~ ..... ==n;<i~:o~;;_ :::-~=~1.::::::-.~::L°~ ,' ....::~?.=:::~:::::~=~,.,:~.~r--".U:F...-.-r. I 00 :00 09 :00 12:00 15:00 18:00 21 :oo 03 :00 06:00 I 16Sep1986 Legend (Compute Tme: 18Sep2011, 20:20 :11) --RlXl:P100 Elemert:S TUOYPT Resl.t:Oliflow ---Rui:P100 Elemert:REAROfBLOO Resul:O\t11ow • ·---• Rui:P100 Elemert:fRONTOfBLOO Resl.t:Oliflow -• -· Rui:P100 Elemert:f'Ollll1 Resl.t:Oliflow Append ix A I 00 :01 I CAL DETENTION POND SUMMARY FOR 100-YR STORM 0.06 0.05 I=' 0.04 ...._ u ~ 0.03 Q) Cl !! B 0.02 -CJ) 0.01 0.00 4.0 3.5 3.0 2.5 I ~ 2.0 t ~ ~ 1.5 -... Li: 1 .0 ... 0.5 -+ 0.0 00 :00 03 :00 06 :00 I Legend (Compute Tme : IBSep20 14, 20 :20:44) ------RlJ'l :P100 Element:POl\01 Result: storage --RlJ'l :P100 Element :POl\01 Result:Outflow Reservoir 'Pond 1" Results for Run "P 1 DD" 09 :00 12 :00 16Sep1986 15:00 l 18:00 21 :00 RlJ'l:P100 Element :POND1 Result:Pool Elevllllion - --RlJ'l:P100 Element :POND1 Restk.Cornbned Flow Appendix A 315.00 314 .33 313.67 g -313.00 ~ w 312 .33 311 .67 311 .00 00 :00 I DEVELOPMENT PERMIT PERMIT NO . 14-265 Crrv OF C OLL EGE ST ATI ON P!,;11111i11$ t} lln'tllipmrnt ."Wn iM FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: A000701 Crawford Burnett (ICL) Tract 187 DATE OF ISSUE: 12/18/2014 OWNER: Jon Hall -College Station ISO 2000 Welsh Street College Station, TX 77845 SITE ADDRESS: 1300 George Bush Dr, College Station , TX 77845 DRAINAGE BASIN: Wolf Pen Creek VALID FOR 24 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized . 2. The permit may be revoked if any false statements are made herein . If revoked , all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4 . Other permits may have been required to fulfill local, state and federal requirements . Construction will be in compliance with all necessary State and Federal Permits. 5 . Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project. 6 . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site , it is the Contractor 's responsibility to implement measures that will meet City, State, and Federal requirements . 7 . All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy . 8 . All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as, but not limited to , paint , oil , solvents , asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply . Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed . 10. Special Conditions : TXDOT permit has not been approved, prcoeed at own risk . Landscape plans have not been approved , and needs to be address prior full building permit. l ,_,,.E~rz..=1....;c..=-..... &---"'-'-"'1::'~7 ,..../ £_ .... S" _____ , the Contractor, hereby agree to comply with all conditions herein . Contractor Signature Date~ /' -z, 10 -Sb3 -Zto °t Phone number E-mail I hereby grant this permit for development. Contact Jed7 Jo )'tt ~ 111-l/S'jl/ , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections . ll -/~ -).OJlf Ci Date Danielle Singh , P.E. City of College Station 1101 Texas Avenue College Station , TX 77842 MITCHELL M M MORGAN Re: CSISD COLLEGE VIEW HIGH SCHOOL (CAL) -TxDOT PERMIT Dear Danielle , November 21 , 2014 Please see below for our response to the TxDOT comments for the CSISD College View High School (CAL) TxDOT permit: TxDOT 1. Proposed median does not meet the TxDOT access management guidelines for a right-in I right-out only access point, the median needs to be more substantial so there is no question regarding the intended function of this access point , also required is a restriping eliminating the left turn lane assuring south bound traffic no option to left into property from George Bush Or . Before access can be approved these revisions must be implemented into the property 's proposed plan and commercial acces s request. We look forward to reviewing the revised proposal for access on the land us e I access change . Response: The median has been modified to be more substantial to direct users in a manner that discourages left in/left out movements. Becaus~ of the limited throat depth available, we had to remove two existing parking spaces to modify the driveway median as shown. It was also our understanding in a previous meeting with TxDOT that they had agreed to restripe George Bush Drive as to not allow the left in movement. If o have any questions or comments , please feel free to call our office at 979-260 -6963 . Veronica J . . or Manag ing Partner Cc : File ----J ) PE , CFM 3204 EARL RUDDER FWY. S. • COLLEGE STATION, TX 77845 • T 979 .260 .6963 • F 979 .260.3564 CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES STREETS • SITE PLANS • SUBDIVISIONS info@m1tchellandmorgan com • www.m1tchellandmorgan com Permit to Construct Access Driveway Facilities on Highway Right of Way PERMIT NUMBER: GPS* ROADWAY REQUESTOR LATITUDE, LONGITUDE HWY NAME FM 30°36 '45.49"N , 96°19 '48.90 FOR TxDOT'S USE CONTROL NAME College Station Independent School District SECTION MAILING ADDRESS 2000 Welsh CITY , STATE , ZIP College Station , Texas 77840 PHONE NUMBER Theo Rouse 979-694-5634 •GLOBAL POSITIONING SYSTEM COORDINATES AT INTERSECTION OF DRIVEWAY CENTERLINE llVITH ABUTIING ROADWAY Form 1058 (Rev . 05 /13 ) Page 1of 2 2347 The Texas Department of Transportation, hereinafter called the State , hereby authorizes College Station Independent School District , hereinafter called the Permittee , to 0 construct I ~ reconstruct a School (residential , convenience store , retail mall , farm , etc.) access driveway on the highway right of way abutting highway number FM2347 in Brazos County County , located approximately 340-feet southwest of the intersection of George Bush Drive (FM2347) and Halik Street USE ADDITIONAL SH EETS AS NEEDED Subject to the Access Driveway Policy described on page 2 and the following : 1. The undersigned hereby agrees to comply with the terms and conditions set forth in this permit for construction and maintenance of an access driveway on the state highway right of way . 2 . Design of facilities shall be as follows and/or as shown on sketch on page 2 and is subject to conditions stated below : We are requesting to modify the existing driveway located approximately 340-feet southwest of the intersection of George Bush Drive (FM2347) and Halik Street by adding a median that will limit the drivers to right-in right-out maneuvers only. Please see the attached site plan for the driveway layout and the construction plan sheet with the construction details. All construction of materials shall be subject to inspection and approva l by the State . 3. Maintenance of facilit ies constructed hereunder shall be the responsibility of the Permittee , and the State reserves the right to require any changes, maintenance or repairs as may be necessary to provide protection of life or property on or adjacent to the highway . Changes in design will be made only with approval of the State . 4. The Permittee shall hold harmless the State and its duly appointed agents and employees against any action for personal injury or property damage sustained by reason of the exercise of this permit. 5. Except for regulatory and guide signs at county roads and city streets , the Permittee shall not erect any sign on or extending over any portion of the highway right of way , and vehicle service fixtures such as fuel pumps , vendor stands , or tanks and shall be located at least 12 feet from the right of way line to ensure that any vehicle services from these fixtures will be off the highway right of way . 6. The State reserves the right to require a new access driveway permit in the event of a material change in land use or change in driveway traffic volume or vehicle types . 7. This permit will become null and void if the above-referenced driveway facilities are not constructed within six (6) months from the issuance date of this permit. 8. The Permittee will contact the State 's representative---------------------------- telephone , ( ) , at least twenty-four (24) hours prior to beginning the work authorized by this permit. 9 . The requesting Permittee will be provided instructions on the appeal process if this permit request is denied by the State . Date of Issuance The undersigned hereby agrees to comply with the terms and conditions set fort access driveway on the highway right of way . State Authorized Representative Date : / t) /Y / t.j Signed : 1 -----;n=-:::-:-::.t-:i:f-:-'.:::--::-c"'=-::r--t:cw~n~e~r~s~r~e=pr~e~s~e=nt~a7-ti~ve~):---~ 'Fonn 10 58 (Rev . 05 /1 3) Page 2 of 2 Access Driveway Policy Title 43 Texas Administrative Code (Transportation), Chapter 11 (Design), Subchapter C (Access Connections To State Highways) and the "Access Management Manual" establish policy for the granting of access and the design , materials , and construction of driveways connecting to state highways . All driveway facilities must follow this policy . TxDOT Driveway Permit Request Contact For a local contact for your TxDOT Driveway Permit Request visit: http ://www .txdot.gov/inside-txdot/district .html. You can click on the section of the map closest to your location to find the local TxDOT office . You can also click on the drop down box below the map to find the district for your county. Sketch of Installation (Use additional sheets as needed} .. COLLEGE STATION INDEPENDENT SCHOOL DISTR ICT CENTER FOR ALTERNATIVE LEARNING WATER LINE ANALYSIS October 2014 PR EPARE D FOR : COLLEGE STATION INDEPENDENT SCHOOL DISTRICT 1812 WELSH AVENUE COLLEGE STATION, TX 77840 Submitted to LLEGE TA I N 1l f heart of tht Rmarch Vall~ By MITCHELL MORGAN ENGINEERS & CONSTRUCTORS 3204 EARL RUDDER FREEWAY SOUTH COLLEGE STATION, TX 77845 OFFICE (979) 260-6963 FAX (979) 260-3564 CERTIFICATION This report for the water design for The CSISD-Center or Alternative Learning in College Station , Texas, was prepared under my supervision in accordance with provisions of the Bryan/College Station Unified D~~r,uidelines for the owners of the property . ............ '"'' ---~€.OF r~ l\ : "\~ ············ :.t ..... , -<":) •• ··*.· ... --.IS\, : ...• •• ••• -tr ,l ~..... .....~ ~······························· .. ·····~ ~ VERONICA J.B. MORGAN I 1.·······································it ~ l \ 77689 .if£ J ~l1~· ... '9~G ,,«,<:)_ .• ·~.f ,ey(C, 'ff I ;r.,. ... /STE .... ·,..~­,, '\S's ············· ~v: ,,,,!ONAL ~ .... --=- ''''''''"'-Jb.,.-._ Veronica J .B. Morgan , P.E ., C.F .M. t1Zt(-rr/#~ Registered Professional Engineer State of Texas No. 77689 CSISD-Center for Alternative Learning Page 1 INTRODUCTION WATERLINE ANALYSIS CSISD-CENTER FOR ALTERNATIVE LEARNING OCTOBER 2014 The College Station Independent School District Center for Alternative Learning (CAL) will be located in College Station , Te xas, at the address 1300 George Bush Drive, College Station, Texas 77840 . Prior to demolition, the site contained the City of College Station Conference Center, a portion of the Barbara Bush Parent Center, the Venture and Leap Buildings and Timber Academy . The project will be redeveloped into a two-story 56 ,006 square foot building for an alternative learning center, adjacent to the Barbara Bush Parent Center and Oakwood Intermediate School. The proposed development will be located on the A000701, Crawford Burnett (ICL), Tract 187 . The tract is bounded by George Bush Drive to the northwest, Timber Street to the southwest, Hal ik Street to the northeast, and Oakwood Intermediate School to the southeast. The utility plan is provided in Exhibit 1. FIRE FLOW DESIGN CRITERIA An updated City of College Station system MikeURBAN model was used to model hydraulic events on the existing distribution system . Select Node and Link labels located near the proposed project can be seen on Exhibits 2 & 3 respective ly. In order to determine if this model is repetitive, two calibrat ion runs were performed : • Run 1 -Peak Day Conditions without CAL Development (Exhibit 4A&B) • Run 2 -Peak Day Conditions without CAL Development and 1300 GPM Fire Flow at Node J-025 (Exhibit SA&B) The results from these runs were compared to the fire flow pressure test performed by the City of College Station Utilities Department (Exhibit 6). College Station Utilities performed the fire flow test during the 9 a.m . hour. In order to closely replicate actual system conditions during the field tests, RUNS 1 & 2 were modeled using the system average day demands . Utiliz ing results obta ined from RUN 1, static pressure at Node J-024 was found. Shown on Table 1, the modeled pressure is slightly below actual observed pressures during field testing . A simulated fire flow of 1300 gpm was then added to Node J-025 (RUN 2). The mode led residua l pressure (79 .19 psi) results were slightly higher than the actual observed residual pressure (76 psi). A comparison of measured and modeled values for the fire flow calibration run can be found on Table 1 : CSISD-Cente r for Alterna tive Learning Pa ge 2 ,\ FLOW HYDRANT Measured Modeled No de Number J-025 Nozzle size 2 .5 Pitot rea d in in PSI 60 7 3 .33 F l ow in G.P .M. 1300 1300 STATIC HYDRANT Measured Modeled Node Num b er J-024 Static PS I 80 79.9 Residua l PSI 76 7 9 .19 Tabl e 1 Fire Flow of 1300 gpm placed at Node J-025 and Corresponding Pressure Measured at Node J-024 Since the model returned values relatively similar, or conservative, to those actually observed during the calibration event it is considered a reasonable base model. This base mode l was used to determ ine CAL's effects on the system during Average , Peak and Fire Flow conditions. CAL DEMANDS Water demands for CAL were determined by the project MEP, Estes, McClure & Associates, Inc. Using the fixture unit count method for the proposed schoo l, the average day demand was 35.75 GPM . The Peak Day demand from this fixture unit method is calculated as 143 gpm . CAL FIRE FLOWS CAL will be a 56,006 SF school fac ility and be constructed using Type 11-B construction. Using Table B 105 .1 of t h e International Fire Code 2012 (Exhibit 7) t he requ ired fire f low fo r a building this size and construction type is 5,000 GPM. Since the struct u re will ha ve a fire suppression system, the required fire flow can be d ecreased by 50% resulti n g in a req u ired fire flow of 2,500 gpm min imum. Two different fire flow simulations were modeled to better understand the system under different fire flow conditions . For the first simula t ion, the requ ired f ire f lo w was split between Nodes C.A.L.- 3 and C.A.L.-4 during peak day demand. Results from this simula ti on can be seen on Exhibit 10 A&B . The second simu lation had the requ ired fire flow evenly d istributed among three nodes : J- 023, C.A.L.-3, and C.A.L.-4 . Results from this simu lation can be seen on Exhibit 11 A&B. WATER SUPPLY SYSTEM UPGRADES CAL currently has availab le a 6 inch waterline in Timber Street to connect to for a fire hydrant run to the rear of the CAL bu ilding where the Fire Department Connection (FDC) will be located. This 6 inch line when mode led was u nable to handle the ·required fire fl ows for the b uilding . As a resu lt CAL will require the construction of approximately 360 LF of 8" PVC waterline (C.A.L-WL & C.A.L.- FH) connected to the existing 16 inch waterline along George Bush Drive wit h in the CAL parking lot A fire hydrant w ill be placed at the end of this extens ion (Node C.A.L.-3). Another fire hydrant CSISD -Center for Alternative Learning Page 3 " placed will be placed at Node C.A.L.-4, connecting directly to the existing 16 inch waterline running parallel to George Bush Drive. With the addition of these two fire hydrants the building will be adequately covered in compliance with the City of College Station Fire Department building coverage and Engineering waterline design guidelines. CONCLUSION Average Day and Peak Day system performance with the proposed CAL demands can be seen on Exhibits 8A&B and 9A&B respectively . In all scenarios, the 20 psi minimum pressure and velocities at or below 12 ft/sec guidelines have been met. The model results show that with the system upgrades as proposed the system can sufficiently serve the domestic and fire flow needs of CAL . CSISD-Center for Alternative Learning Page 4 ,, ATTACHMENTS EXHIBIT 1 EXHIBIT 2 EXHIBIT 3 EXHIBIT 4A EXHIBIT 4B EXHIBIT SA EXHIBIT SB EXHIBIT 6 EXHIBIT 7 EXHIBIT SA EXHIBIT SB EXHIBIT 9A EXHIBIT 98 EXHIBIT 10A EXHIBIT 108 EXHIBIT 11A EXHIBIT 11B Utility Plan MikeURBAN Node Locations MikeURBAN Link Locations Average Day System Dynamics Node Results Average Day System Dynamic s Link Results Average Day Calibration Run with Fire Flow at J-025 Node Results Average Day Calibration Run with Fire Flow at J-025 Link Results Node J-025 Flow Test IFC Fire Flow Table Average Day Demands with System Improvements Node Resu lts Average Day Demands with System Improvements Link Results Peak Day Demands with System Improvements Node Results Peak Day Demands with System Improvements Link Results Peak Day Demands and Fire Flow with System Improvements (Nodes CAL-3 & CAL-4) Node Re sults Peak Day Demands and Fire Flow with System Improvements (Nodes CAL-3 & CAL-4) Link Results Peak Day Demands and Fire Flo w with System Improvements (Nodes J-023, CA L-3 , & CAL-4) Link Res ults Peak Day Demands and Fire Flow with System Improvements Nodes J-023, CAL- 3, & CAL-4) Link Results CSISD -Center for Alternative Learning Page 5 EXHIBIT 2 MikeURBAN Node Identifiers Description: Select MikeURBAN Node Locations CSISD-Center for Alternative Learning Exhibit 2 EXHIBIT 3 Mike URBAN Link Identifiers Description: Select MikeURBAN Link Locations CSISD-Center for Alternative Learning Exhibit 3 EXHIBIT 4A MikeURBAN Node Identifiers Description: Steady St ate Anal ys is-Average Day D emand on Exi sting Sys tem Node Results Name Demand Pressure (gpm) (psi) 508 3.22275 91.14093 567 1.0455 93.3026 572 0 92 .98977 573 1.289 92 .98132 591 0 91.37807 601 1.87625 92.81099 604 1.31775 92 .81004 611 0 90.67873 614 0.2435 88.08528 615 0 88.44802 643 0 85.45837 647 1.2605 80 .41084 651 0 86.46796 657 1.7905 83 .1592 659 2 .57825 76 .97074 665 0 .98825 85 .50809 673 0 .58725 84 .21248 674 1.461 79 .94653 677 0 .8165 79.23856 684 1.2175 80 .03337 702 5 .91525 83.21359 C.A.L.-1 0 79 .76063 C.A.L.-2 0 82 .2781 C.A.L.-3 0 81.88813 C.A.L.-4 0 82 .05659 J-023 0 83 .75366 J-024 0 79.90053 J-025 0 80.02349 CSISD-Center for Alternative Learning Exhibit 4A EXHIBIT4B MikeURBAN Link Identifiers Description: Steady State Analysis-Average Day Demand on Existin g System Link Results Name Diameter Velocity Headloss/1000 Roughness Friction (in) (ft/s) (ft) (millift) Factor 108 8 0 .041759 0 .003224 90 0 .079366 110 8 0 .062329 0.006901 90 0 .076265 121 6 0.194315 0 .034072 140 0 .029057 135 6 0.376775 0.267321 90 0 .060635 16 8 0.212165 0.054256 100 0 .051748 2080 8 0.008163 0 90 0 2087 6 0 .365677 0.128298 130 0 .030894 23-A 6 0.541488 0 .230974 140 0.025365 23-B 6 0 .541488 0.231313 140 0 .025403 2459 0 .75 0.063133 0 .091097 100 0.091993 2460 6 0 .070363 0 .012158 90 0 .079071 2461 6 0.058163 0 .008454 90 0.080473 2588-A 16 0.922026 0.261909 120 0.026454 2588-B 16 0.922026 0 .262106 120 0 .026474 26 6 0.36844 0.11702 140 0 .027758 2631 6 0.156298 0 .023125 140 0 .030481 27 6 0.365677 0 .252952 90 0.060911 28 8 0 .310277 0 .082404 140 0 .027562 3350 16 0 .948119 0.27613 120 0 .026376 3351-A 16 0.843868 0.223487 120 0 .026948 3351-B 16 0 .843867 0 .147092 150 0 .017736 3351 -C 16 0 .843867 0 .222509 120 0 .02683 3351-D 16 0 .843867 0 .222464 120 0 .026825 3830 6 0 .310277 0 .186777 90 0 .062471 3831 6 0 .272662 0 .120986 100 0.052401 3835 6 0.365677 0 .252559 90 0 .060817 456 6 0.330594 0 .092603 140 0 .027283 64 6 0 .36844 0 .113138 140 0.026837 849 6 0 .171235 0 .051156 100 0.056178 850 6 0 .1 8505 0 .071661 90 0 .067384 854 8 0 .168609 0.035457 100 0 .053547 865 8 0.197531 0 .058758 90 0 .064654 866 8 0 .189303 0 .04398 100 0.052691 867 6 0 .076886 0 .011585 100 0 .063103 CSISD-Center for Alternative Learning Exhibit 48 Name 98 C.A.L.-FH C.A.L.-WL EXHIBIT4B MikeURBAN Link Identifiers Link Results Diameter Velocity Headloss/1000 Roughness (in) (ft/s) (ft) (millift) 8 0 .177327 0 .038461 100 8 3 .38E -08 0 150 8 3 .28E -06 0 150 CSISD -Ce nter fo r Alternative Learning Friction Factor 0 .052512 0 0 Ex hibit 4 8 EXHIBIT SA MikeURBAN Node Identifiers Des cription: Steady State Analys i s-Calibration run , 1300 gpm fire flo w placed at node J-025 and residual pressure measured at node J-024 during Average D ay D emand on Exi sting System . Node Results Name Demand Pressure (gpm) (psi) 508 3.22275 90.52787 567 1.0455 92 .5639 572 0 92 .23837 573 1.289 92 .231 591 0 90 .44557 601 1.87625 92 .08323 604 1.31775 92 .08865 611 0 89 .24388 614 0.2435 86 .506 615 0 86 .85785 643 0 82.4754 647 1.2605 79 .70017 651 0 84 .32285 657 1.7905 79 .24432 659 2 .57825 76 .27298 665 0.98825 83 .60236 673 0.58725 82 .48528 674 1.461 74 .12666 677 0 .8165 73.50551 684 1.2175 74.88306 702 5.91525 80.73854 C.A.L.-1 0 79.05456 C.A.L.-2 0 81.57203 C.A.L.-3 0 81.18206 C.A.L.-4 0 81.37113 J-023 0 83 .10529 J-024 0 79 .19179 J-025 1300 73 .33995 CSISD -Center fo r Altern ative Le a rning Exhibit SA EXHIBIT SB MikeURBAN L ink Id entifiers D es cription: Stead y State Anal ysi s -Calib ration run , 1300 gp m fue flow pl aced at node J-025 and res idual pr essure measured at n od e J -024 during Av erage Day De mand on Ex i sting Syste m. Link Results Name Diameter Velocity Headloss/1000 Roughness Friction (in) (ft/s) (ft} (millift) Factor 108 8 0.591561 0.440801 90 0.05408 110 8 0 .612131 0 .469673 90 0 .053815 121 6 3 .526235 7.423256 140 0 .019223 135 6 1.866416 5.178869 90 0 .047871 16 8 0 .527655 0 .293512 100 0 .04526 2080 8 0.654171 0 .531414 90 0.053314 2087 6 1.926984 2 .78093 130 0.024115 23-A 6 8 .038713 34.14833 140 0 .017016 23 -B 6 6 .712597 24 .45489 140 0 .017476 2459 0 .75 0.499531 4.199717 100 0 .067742 2460 6 1 .302445 2.659773 90 0 .050487 2461 6 1 .299037 2.647 111 90 0 .050511 2588-A 16 1 .165313 0.404363 1 20 0 .025569 2588-B 16 1.165313 0.405969 120 0.02567 26 6 1.924221 2.420466 140 0 .02105 2631 6 0 .648514 0 .322601 140 0 .024699 27 6 1.926984 5.494435 90 0 .047645 28 8 3 .223258 6 .285 3 11 140 0 .01948 3350 16 1.260624 0 .467895 1 20 0 .02528 1 3351-A 16 0 .032857 0 1 20 0 3351 -B 1 6 0.032857 0 .000377 1 50 0 .029959 3351 -C 16 0 .032857 0 .000475 120 0 .03776 1 3351 -D 16 0 .032857 0 .000545 120 0 .043367 3830 6 3 .223258 14.24609 90 0 .0441 5 3 3831 6 1.75002 1 3.781877 100 0 .039763 3835 6 1.926984 5.494216 90 0 .0 4 7644 456 6 3.20294 6 .21 2136 140 0 .0 19498 64 6 1.924221 2 .41774 2 140 0 .02 1026 849 6 3 .549315 14.01076 100 0 .035812 850 6 3 .5355 16 .90699 90 0 .04355 3 854 8 1.786233 2 .807907 100 0 .037783 865 8 0 .429757 0 .24 23 78 90 0 .0563 43 CSISD -Ce nter fo r Alternative Lea rning Ex hibit S B Name 866 867 98 C.A.L.-FH C.A .L.-WL EXHIBIT SB MikeURBAN L ink Identifiers Link Results Diameter Velocity Headloss/1000 Roughness (in) (ft/s) (ft) (millift) 8 0 .437985 0 .207799 100 6 0 .123171 0 .027732 100 8 0 .44996 0 .219013 100 8 5 .31E -08 0 1 50 8 2 .05E -07 0 1 50 CSISD -Ce nte r for Alte rn ati v e Le a rning Friction Factor 0.046507 0 .058858 0 .046442 0 0 Ex hibit SB ,' Exhibit 6- System Field Test Results :College SlcaJion Utilitie' Reliable, Affordable, Communit Owned Date test completed Wednesday September 17, 2014 Time completed 9:45 A.M. Test completed by Jeff Boriski Witness Howard Mitchell and Eugene Marshall I FLOW HYDRANT Location 106 Holik Nozzle size 2.5 Hydrant number J-025 Pitot reading in PSI 60 Flow in G .P .M. 1300 STATIC HYDRANT Location 101 Lee Hydrant number J-024 Static PSI 80 Residual PSI 76 ,__J Comments Requested Ex hibit 6 APPENDIX B TABLE B105 .1 MINIMUM REQUIRED FIRE-FLOW AND FLOW DURATION FOR BUILDINGS FIRE-FLOW CALCULATION AREA (square feet) FIRE-FLOW FLOW DURATION Type IA and 18' Type llA and lllA' Type IV and V-A' Type 118 and 1118' TypeV-8' (gallons per minute)• (hours) 0-22 ,700 0-12 .700 0-8.200 0-5,900 0-3 ,600 l.500 22.701 -30 ,200 12,701 -17.000 8,201-10 ,900 5.901-7 ,900 3,601 -4,800 1.750 30 ,201 -38 , 700 17,001 -21 ,800 10 ,901 -12,900 7,901 -9,800 4,801 -6,200 2,000 2 38,701-48 .300 21.801 -24 .200 12 ,901 -17,400 9.801 -12 ,600 6,201 -7,700 2,250 48 ,301 -59 .000 24,201 -33,200 17 ,401 -21.300 12,601-15.400 7.701 -9,400 2,500 59,001 -70 ,900 33 ,201 -39,700 21,301 -25,500 15,401 -18 ,400 9,401 -11,300 2.750 70,901 -83 ,700 39,701 -47 ,100 25 ,501 -30.100 18,401 -21.800 11 ,301 -13,400 3,000 83,701 -97 ,700 47,101 -54 ,900 30 , 101 -35.200 21,801 -25 ,900 13 ,401 -15,600 3,250 3 97.701 -112 ,700 54,901 -63,400 35,201 -40,600 25,901 -29,300 15,601-18,000 3,500 112 .701 -128 ,700 63 ,401 -72 ,400 40 ,601 -46,400 29.301 -33,500 18 ,001 -20.600 3.750 128 ,701-145 ,900 72.401 -82, l 00 46.401 -52,500 33,501 -37,900 20 .601 -23,300 4.000 145,901 -164 ,200 82 , 101 -92 ,400 52,501 -59,100 37,901 -42 , 700 23 .301-26,300 4,250 164 ,201-183.400 92 ,401 -103 ,100 59 .101 -66,000 42 ,701 -47 ,700 26 ,301 -29,300 4,500 183 ,401-203 ,700 103 ,101 -114,600 66 ,001 -73 ,300 47 ,701 -53,000 29 ,301 -32,600 4,750 203, 701 -225 ,200 114 ,601 -126.700 73 .301 -81 ,100 53,001 -58,600 32 .601 -36,000 5,000 225.201 -247 .700 126 .701 -139 ,400 81,101 -89,200 58 ,601 -65.400 36 ,001 -39,600 5,250 247,701 -271 ,200 139 ,401-152,600 89 .201 -97,700 65,401 -70,600 39,601-43,400 5,500 271,201 -295 ,900 152 ,601 -166,500 97,701 -106,500 70,601 -77,000 43 ,401 -47,400 5,750 295,901 -Greater 166,50 I -Greater 106 ,501 -115 ,800 77.001 -83 , 700 47 ,401 -51.500 6,000 4 --115 ,801 -125,500 83 ,701 -90,600 51,501 -55,700 6,250 --125 .501 -135,500 90 ,601 -97 ,900 55 , 701 -60,200 6,500 --135 ,501-145 ,800 97 ,901 -106 ,800 60 .201-64,800 6.750 --145 ,801 -156,700 106,801 -113 ,200 64 ,801 -69,600 7,000 --156,701 -167 ,900 113 ,201 -121,300 69 ,601-74,600 7,250 --167,901 -179 ,400 121 ,301 -129,600 74 ,601 -79,800 7,500 --179 ,401-191,400 129,601 -138,300 79,801-85,100 7,750 --191 , 401 -Greater 138 ,301 -Greater 85 , 101 -Greater 8,000 For SI : I square foot -0.0929 m2 . I gallon per minute • 3.785 U m. I pound per square inch • 6 .895 kPa . a. Typ es of constru ction are based on the lntem aCional Building Code . b. Measured at 20 psi residu al press ure . Ex hibit 7 446 2012 INTERNATIONAL FIRE CODE • EXHIBIT SA MikeURBAN Node Identifiers Description: Steady State Anal ys is -Ex ist in g average day dem and on the system with CSISD- Center for Alternative Learning dem and a dded Node Results Name Demand Pressure (gpm) (psi) 508 3 .22275 91.03932 567 1 .0455 93.21866 572 0 92.90683 573 1.289 92.89859 591 0 91.294 601 1.87625 92 .73207 604 1.31775 92 .73205 611 0 90.59162 614 0.2435 87.9973 615 0 88.35993 643 0 85 .36335 647 1.2605 80.28718 651 0 86.37648 657 1 .7905 83 .06024 659 2 .57825 76 .84698 665 0.98825 85.41752 673 0.58725 84 .12267 674 1.461 79 .83895 677 0 .8165 79.13113 684 1.2175 79 .92695 702 5 .91525 83 .1114 C.A.L.-1 0 79 .63686 C.A.L.-2 35 .75 82 .15039 C.A.L.-3 0 81.76042 C.A.L.-4 0 81.93481 J-023 0 83 .63544 J-024 0 79.77684 J-025 0 79.91324 CSISD-Center for Alternative Learning Exhibit SA EXHIBIT 8B MikeURBAN L ink Identifiers D es cription: Steady State Analysis-Existing average day dem and on th e system with CSIS D- Cente r fo r A lte rnative Leaming d em and ad d ed Link Results Name Diameter Velocity Headloss/1000 Roughness Friction (in) (ft/s) (ft) (millift) Factor 108 8 0 .198396 0 .058301 90 0 .063592 110 8 0 .177825 0.047495 90 0 .064484 121 6 0 .148748 0 .020443 140 0 .029752 135 6 0 .301699 0.177187 90 0 .062681 16 8 0 .043952 0 .002987 100 0 .066375 2080 8 0.16868 0.04207 90 0 .063481 2087 6 0.337299 0 .110031 130 0 .031141 23-A 6 0 .436339 0 .154834 140 0.026186 23-B 6 0.436339 0 .154964 140 0.026208 2459 0 .75 0 .047014 0.052649 100 0 .095875 2460 6 0 .101314 0 .023531 90 0 .073816 2461 6 0 .089366 0 .018367 90 0 .074052 2588-A 16 0 .919382 0.260879 120 0 .026501 2588-B 16 0 .919382 0 .260135 120 0 .026426 26 6 0 .340062 0 .092384 140 0.025724 2631 6 0 .102271 0 .010542 140 0 .032454 27 6 0 .337299 0 .218156 90 0 .061743 28 8 0 .250696 0 .055478 140 0 .028424 3350 16 0 .937878 0 .2705 1 6 1 20 0 .026407 3351-A 16 0 .856011 0 .228624 120 0 .026791 3351-B 16 0 .798964 0 .132967 150 0 .017886 3351-C 16 0 .798964 0 .201144 1 20 0 .027057 3351-0 16 0 .798964 0 .201017 120 0 .02704 3830 6 0 .250696 0.125733 90 0 .064418 3831 6 0 .243153 0 .097837 100 0 .053284 3835 6 0 .337299 0 .217832 90 0 .061652 456 6 0.271013 0 .06407 140 0 .028088 64 6 0 .340062 0.097699 140 0 .027204 849 6 0 .125667 0 .028914 100 0.058955 850 6 0 .139483 0 .04238 90 0 .070142 854 8 0 .108968 0 .015683 100 0.056704 865 8 0 .02105 0 90 0 866 8 0 .012823 0 .001476 100 0 .385346 CSISD -Center for Alternative Learning Ex hibit SB Name 867 98 C.A.L.-FH C.A.L.-WL EXHIBIT 8B MikeURBAN Link Identifiers Link Results Diameter Velocity Headloss/1000 Roughness (in) (ft/s) (ft) (millift) 6 0 .06469 1 0 .001921 100 8 0.000847 0 .001068 100 8 3.21E-06 0 150 8 0.228187 0 .029242 150 CSISD-Center for Alternative Learning Friction Factor 0 .014779 63 .8799 1 0 0 .024111 Exhibit 88 EXHIBIT 9A MikeURBAN Node Identifiers Description: Steady State Analysis-Ex isting p eak day demand on th e system with CS I SD- Center for Alte rnati ve Leaming demand added Node Resu Its Name Demand Pressure (gpm) (psi) 508 12 .891 78 .81644 567 4 .182 81.84978 572 0 81.58012 573 5 .156 81.58332 591 0 79.92628 601 7 .505 81.65953 604 5 .271 81.72998 611 0 79 .11002 614 0.974 76.48295 615 0 76 .84319 643 0 73 .56509 647 5 .042 67 .57499 651 0 74.73604 657 7 .162 71.08646 659 10.313 64.11324 665 3 .953 73 .81535 673 2.349 72.55225 674 5.844 67.53958 677 3.266 66.83436 684 4.87 67 .64958 702 23.661 70 .93759 C.A.L.-1 0 66 .92783 C.A.L.-2 143 69 .39381 C.A.L.-3 0 69 .00385 C.A.L.-4 0 69 .24245 J-023 0 70 .97307 J-024 0 67.06146 J-025 0 67 .54544 CSISD-Center for Alternative Learning Exhibit 9A EXHIBIT 9B MikeURBAN Link Identifiers Description: Steady State Analys is-Existin g Peak Day demand on the system with CSIS D - Center for Alternative Leaming demand ad ded Link Results Diameter Velocity Headloss/1000 Roughness Friction Name (in) (ft/s) (ft) (millift) Factor 108 8 1.675799 3 .032416 90 0 .046359 110 8 1.593519 2.762525 90 0.046707 121 6 0.504253 0.202163 140 0 .025601 135 6 1.670398 4 .216955 90 0.048665 16 8 2.268328 4.370818 100 0 .036471 2080 8 1.26719 1.807362 90 0 .048323 2087 6 0.802453 0 .548879 130 0 .027447 23-A 6 1.641254 1.80079 140 0 .021526 23-B 6 1.641254 1.800989 140 0 .021528 2459 0.75 0.8407 2.400413 100 0 .01367 2460 6 0 .524901 0.494148 90 0.057751 2461 6 0.493182 0.440359 90 0.058297 2588-A 16 0.245442 0 .022484 120 0 .032047 2588-B 16 0 .245442 0.022663 120 0.032303 26 6 0 .791401 0 .465 140 0 .023906 2631 6 0.442587 0.158981 140 0.026134 27 6 0.802453 1 .084727 90 0.054242 28 8 1 .284583 1.143901 140 0 .022321 3350 16 0 .19966 0 .015405 120 0 .033181 3351-A 16 0 .468198 0 .075138 120 0 .029432 3351-B 16 0 .240013 0.014314 150 0.021336 3351-C 16 0.240013 0.021681 120 0.032317 3351-D 16 0 .240013 0.021659 120 0.032284 3830 6 1.284583 2 .592787 90 0 .050594 3831 6 0.805339 0.898378 100 0 .044602 3835 6 0.802453 1.084952 90 0 .054253 456 6 1.203315 1.013474 140 0.022538 64 6 0.791401 0 .466481 140 0 .023983 849 6 0 .596573 0 .51538 100 0 .046629 850 6 0.541312 0.523203 90 0.057495 854 8 1.249849 1.449297 100 0 .039832 865 8 1.71857 3 .176619 90 0 .046177 866 8 1.75148 2.70759 100 0.037894 CSISD-Center for Alternative Learning Exhibit 9B EXHIBIT 9B MikeURBAN Link Identifiers Link Results Name Diameter Velocity Headloss/1000 Roughness Friction (in) (ft/s) (ft) (millift) Factor 867 6 0 .773871 0 .834467 100 0 .044867 98 8 1 .799382 2.846099 100 0 .037739 C.A.L.-FH 8 3.36E -06 0 150 0 C.A.L.-WL 8 0.91274 0.382108 150 0 .019692 CSISD -Center for Alternative Learning Exhibit 9B EXHIBIT lOA MikeURBAN Node I denti fi ers Description: Steady State Analysis -Existing peak day demand on the system wi th CSISD- Center for Alternative Learning demand and 125 0 gpm fire flow ad ded to nodes C .A.L.-3 and C .A.L.-4 Node Results Name Demand Pressure (gpm) (psi) 508 12 .891 71.87743 567 4 .182 76 .00895 572 0 75 .79523 573 5 .156 75 .81062 591 0 74 .1 2515 601 7.505 76.13941 604 5 .271 76 .28098 611 0 73 .26386 614 0 .974 70 .62386 615 0 70.98313 643 0 67 .43727 647 5 .042 59 .8242 651 0 68 .82667 657 7.162 64 .71566 659 10.313 56 .49504 665 3 .953 68 .04424 673 2 .349 66 .88827 674 5 .844 60.68788 677 3 .266 59.99247 684 4 .87 60.87565 702 23.661 64 .48981 C.A.L.-1 0 59 .1366 C.A.L.-2 143 58 .16513 C.A.L.-3 1250 57 .2859 C.A.L.-4 1250 61.44328 J-023 0 63 .2758 J-024 0 59 .33034 J-025 0 60.54472 CSISD-C e nter for Altern a tive Le a rning Ex hib it lO A EXHIBIT lOB MikeURBAN Link Identifiers Description: Steady State Analys is-Ex isting pe ak d ay demand on the system with CSIS D - Center for Alternative Learning demand and 1250 gpm fire flow add ed to nodes C .A.L.-3 and C.A.L.-4 Link Results Name Diameter Velocity Headloss/1000 Roughness Friction (in) (ft/s) (ft) (millift) Factor 108 8 2 .603448 6 .856911 90 0.043433 110 8 2.521168 6.460946 90 0 .04364 121 6 1.223366 1.044889 140 0 .022481 135 6 2 .65177 9.924881 90 0.045447 16 8 3.301372 8 .758145 100 0 .0345 2080 8 1.985207 4 .149461 90 0.045204 2087 6 0 .989822 0 .809724 130 0.026612 23-A 6 3 .160399 6.060151 140 0.019537 23-B 6 3 .160399 6 .060241 140 0 .019537 2459 0 .75 0.600946 5.914154 100 0 .065915 2460 6 1.14131 2 .082874 90 0 .051488 2461 6 1.105845 1.964489 90 0 .051727 2588-A 16 2.354736 1.488386 120 0 .023049 2588-B 16 2 .354736 1.487894 120 0 .023041 26 6 0.97877 0.689802 140 0.023186 2631 6 1.409724 1 .35876 140 0 .022016 27 6 0 .989822 1.599858 90 0 .05258 28 8 2 .084615 2.804184 140 0.020778 3350 16 2.17295 1.282465 120 0.023322 3351-A 16 2 .791121 2 .038996 120 0.022474 3351-B 16 0 .568319 0 .070815 150 0.018826 3351-C 16 1.4263 0.588081 120 0.024822 3351-0 16 1.4263 0.588087 120 0 .024822 3830 6 2 .084615 6 .355665 90 0 .047094 3831 6 1.067598 1.514213 100 0 .042778 3835 6 0.989822 1.600068 90 0 .052587 456 6 2 .003346 2.605064 140 0 .020901 64 6 0.97877 0.691369 140 0.023238 849 6 1.315686 2.229791 100 0 .041478 850 6 1.260425 2.503127 90 0.050734 854 8 2 .148601 3.953094 100 0.036764 865 8 2 .541982 6.558892 90 0 .043579 CSISD-Center for Alternative Learning Exhibit 108 Name Diameter (in) 866 8 867 6 98 8 C.A.L.-FH 8 C.A.L.-WL 8 EXHIBIT lOB MikeURBAN Link Identifiers Link Results Velocity Headloss/1000 Roughness Friction (ft/s) (ft) (millift) Factor 2 .574892 5 .526754 100 0.035789 1.14655 1.723796 100 0 .042224 2 .622794 5.718907 100 0.035693 7 .978474 21 .18481 150 0.014288 8 .891212 25 .89078 150 0.014061 CSISD-Center for Alternative Learning Exhibit lOB EXHIBIT llA MikeURBAN N ode I dentifiers D es cription: Steady State Analys is-Ex isting peak day demand on the system with CSISD- Center for Alternative Leaming demand and 833 .3 gpm fi re flow added to nodes C .A.L.-3 , C .A.L.-4 and , J-023. Node Resu Its Name Demand Pressure (gpm) (psi) 508 12 .891 7 1 .8 3 825 567 4 .182 76 .00105 572 0 75 .78921 573 5 .1 56 75 .80468 591 0 74 .12164 601 7 .505 76 .13526 604 5 .27 1 76 .27733 611 0 73 .26729 614 0 .974 70 .62927 615 0 70 .98869 643 0 67.45699 647 5 .042 59 .88812 651 0 68 .83985 657 7 .162 64 .74265 659 10.313 56 .55648 665 3 .953 68 .05946 673 2 .349 66 .90504 674 5 .844 60 .72937 677 3 .266 60 .03379 684 4 .87 60 .9157 702 2 3 .661 64.52391 C.A.L.-1 0 59 .20131 C.A.L.-2 143 59 .91241 C.A.L.-3 833 .3 59 .29157 C.A.L.-4 833 .3 6 1 .47792 J-023 8 3 3 .3 6 3 .21323 J-024 0 59 .3939 J-025 0 60 .58995 CSISD -Ce nter fo r Al te rn a tive Le a rning Ex h ib it llA EXHIBIT llB MikeURBAN Link Identifiers Description: Steady State Analy si s-Exi sting peak day demand on th e sy stem with CSISD- C enter for Alternative Learning demand and 833.3 gpm fire flow added to nodes C .A.L.-3 , C .A.L.-4 and , J-023 . Link Results Name Diameter Velocity Headloss/1000 Roughness Friction (in) (ft/s) (ft} (millift) Factor 108 8 2.625705 6.965868 90 0 .043379 110 8 2.543425 6.566998 90 0 .043583 121 6 1.213344 1.030124 140 0.022531 135 6 2 .633534 9 .798828 90 0 .045494 16 8 3.308525 8.793238 100 0 .034488 2080 8 2.005355 4 .227512 90 0.045133 2087 6 0 .96297 0 .769365 130 0.026715 23-A 6 3 .130351 5 .953975 140 0.019565 23-B 6 3 .130351 5 .953656 140 0.019564 2459 0 .75 0 .599669 5 .890844 100 0.065935 2460 6 1.148157 2.106013 90 0 .051441 2461 6 1.112671 1.986937 90 0.051678 2588-A 16 2.331178 1.460753 120 0.023081 2588-B 16 2.331178 1.46129 120 0 .023089 26 6 0.951918 0 .655928 140 0 .023308 2631 6 1.396348 1.335022 140 0 .022047 27 6 0 .96297 1.520433 90 0 .052795 28 8 2 .064589 2 .754488 140 0.020808 3350 16 2.151273 1.258927 120 0.023358 3351-A 16 2.763338 2 .001106 120 0 .022502 3351-B 16 1.205462 0 .284956 150 0 .016838 3351-C 16 0.124231 0.006409 120 0 .03566 3351-D 16 1.453923 0 .609382 120 0 .024753 3830 6 2 .064589 6.243143 90 0 .047162 3831 6 1.059385 1.492769 100 0.042829 3835 6 0.96297 1.520617 90 0.052802 456 6 1.98332 2.557055 140 0 .020932 64 6 0 .951918 0.656632 140 0 .023333 849 6 1.305664 2.198444 100 0.041525 850 6 1 .250403 2.466141 90 0 .050789 854 8 2 .142194 3 .93136 100 0 .036781 865 8 2 .547026 6 .584599 90 0 .043577 CSISD-Center for Alternative Learning Exhibit 118 Name 866 867 98 C.A.L.-FH C.A.L.-WL EXHIBIT llB MikeURBAN Link Identifiers Link Results Diameter Velocity Headloss/1000 Roughness (in) (ft/s) (ft) (millift) 8 2.579935 5.546679 100 6 1.150298 1.73343 100 8 2 .627838 5 .739206 100 8 5 .318769 9 .996941 150 8 6 .231507 13.40467 150 CSISD -Center for Alternative Learning Friction Factor 0.035777 0.042183 0 .035682 0 .015172 0 .014821 Exhibit 118