Loading...
HomeMy WebLinkAbout14-264FOR OFFICE USE ONLY CASE NO .: 14 -2..l.04 DATE SUBMITTED : \,QI. \l \ 1 ~ TIME : \ '. :j S CITY or-COT.LEGE STATl ON Hom e o/Texas A&M University• STAFF : ~~ ~,~=---------- CONCEPT PLAN MINOR AMENDMENT APPLICATION (Check one) [8] Planned Development District (PDD) D Planned -Mixed Used Development (P-MUD) MINIMUM SUBMITTAL REQUIREMENTS: ~175 Concept Plan Minor Amendment Application Fee . (,k .~7A~ [8] Application completed in full. This application form prov~;d <t{y the City of College\JSt;t ~ must be used and may not be adjusted or altered. Please attach pages if additional information is provided . [8] Fourteen (14) copies of the adopted Concept Plan ; [8] Fourteen (14) copies of the proposed Concept Plan on 24"x36 " paper ; [8] The attached Concept Plan checklist with all items checked off or a brief explanation as to why they are not checked off. NOTE: The adopted and proposed Concept Plans may be shown on the same document if the information is legible . Date of Optional Preapplication Conference _N_YA _______________________ _ NAME OF PROJECT Chimney Hill Redevelopment ADDRESS 701 and 715 University Drive LEGAL DESCRIPTION (Lot, Block , Subdivision) Lots 1 & 2, Block 1 of the Chimney Hill Retail Plaza Subdivision GENERAL LOCATION OF PROPERTY IF NOT PLATTED : Chimney Hill Retail Center located along the north side of University Drive surrounded by East Tarrow and Tarrow Avenue. TOTAL ACREAGE 7.95 acres -------------- APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Natalie Ruiz, /PS Group E-mail natalie@ipsgroup .us ------ Street Address 3204 Earl Rudder Freeway South City College Station State Texas Zip Code _7_7_84_5 ____ _ Phone Number 979 .229 . 6797 Fax Number 979.324 .9196 ---------------- 10/10 Page 1 of 3 PROPERTY OWNER'S INFORMATION : Name City of College Station Street Address 1101 Texas Avenue South City College Station State Texas Zip Code 77540 ~~~~~~~~~ -~~~~~~~ Phone Number Fax Number ~~~~~~~~~~~~~~~~~ OTHER CONTACTS (Please specify type of contact , i.e. project manager, potential buyer, local contact , etc.): Name Doug Demiano, PM Realty Group Street Address 1000 Main Street, Suite 2400 City Woodlands State Texas Zip Code 77002 ~~~~~~~~--~~~~~~~ Phone Number 713 .209.5987 Fax Number ~~~~~~~~~~~~~~~~~ This property was conveyed to owner by deed dated October 29 , 2008 of the Brazos County Official Records. and recorded in Volume 8853 , Page 069 Existing Zoning : fX Planned Development District (POD) I Planned Mixed-Use District (P-MUD) The approved purpose and intent of the POD or P-MUD District: Encourage the redevelopment of an existing underperform ing retail center along the University Drive Corridor. MINOR AMENDMENT INFORMATION The minor addition and modification to the approved Concept Plan meets the following criteria (check all applicable): IX Minor add itions to structures ; I Minor new accessory structures if the location does not interfere with existing site layout (e .g ., circulation , parking , loading , storm water management facilities , open space , landscaping , buffering); [' Minor additions to parking lots ; I Clearing or grading of areas not depicted on the concept plan as a conservation area , greenway , or park ; and I Final determination of the specific meritorious modifications such as setbacks, lot size , dimensional standards , etc ., granted generally as part of the Concept Plan . The specific change(s) is proposed for the following reason(s): Modify the main building with the parking garage to incorporate hotel uses on the west end . Please note that a "complete site plan " must be submitted to Planning & Development Services for a formal review after the "concept plan" has been approved by the City Council prior to the issuance of a building permit - except for single-family development. 10/10 Page 2 of 3 The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true , correct, and complete . IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf Signature and title Date CONCEPTUAL PDD/P-MUD SITE PLAN MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: D All information provided on adopted concept plan , with all proposed changes "bubbled". [g] An updated title block to include : [g] Name , address, location , and legal description. [g] Name , address , and telephone number of applicant [g] Name , address , and telephone number of developer/owner (if differs from applicant) [g] Name , address, and telephone number of architecUengineer (if differs from applicant) [g] Date of submittal [g] Total site area 10/1 o Page 3 of 3 CONCEPT PLAN AMENDMENT Chimney Hill Redevelopment October 15, 2014 The following is a summary of changes to the approved Concept Plan requested via this amendment: • The main building along the rear of the property that includes the parking garage has been modified: o The original building layout concentrated residential apartment uses along the east side of the parking garage. o The new layout includes the parking garage centered with hotel and residential uses as book ends . In addition, a fire lane has been extended to provide for aerial access to the west side of the building . • Driveway access points along Tarrow have been modified to eliminate conflicts with the sight visibility triangle near the west side of the site and the median gore section at the intersection of Tarrow and East Tarrow . • The building location for the commercial pad site at University Drive and East Tarrow has been moved further back from University Drive with parking in front of the building. ___ _,_,.. ___________ •C ITY OF COLLEGE STATION<-----------------Home of Texas A&M University • - MEMORANDUM DATE : October 28, 2014 TO : Natalie Ruiz , IPS Group , via ; natalie@ipsgroup.us FROM : Jason Schubert, AICP , Principal Planner SUBJECT: CHIMNEY HILL REDEVELOPMENT (PODS) Staff reviewed and approved the above-mentioned PDD Concept Plan amendment. The following page is a list of comments detailing items to be addressed when making final design of the site plan. If you have any questions or need additional information , please call me at 979.764.3570. Attachments : Staff Review Comments PC : Doug Demiano, PM Reality Group, via USPS 1000 Main Street , Suite 2400 , Woodlands TX , 77002 P&DS Project No . 14-00900264 Planning & Development Services P.O. BOX9960 • 11 0 1 TEXAS AVENUE · COLL EGE STATION · TEXAS · 77842 TEL 979.764.3570 ·.FAX. 979.764.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: CHIMNEY Hill REDEVELOPMENT (PODS) -(14-00900264) Please note that the comments included below do not need to be included in a revised Concept Plan or preliminary site plan but are to be incorporated into the final design of the proposed site plan. PLANNING 1. The revised POD Concept Plan has been approved as submitted. Please contact me if you would like stamped copies of the revised plan for your records . Rev iewed by : Jason Schubert Date : October 27 , 2014 ENGINEERING These comments reference the revised preliminary site plan that was submitted . Please incorporate these comments as part of the final design of the site plan : 1. The metes & bounds on the preliminary site plan does not close . 2 . The water line inside the plaza will need to be realigned in such a manner that there 's a 20 feet clearance with the surrounding buildings . 3 . Please change the 90-degree bend at Tarrow East Driveway to two 45 degree bends . Reviewed by : Kevin Ferrer Date : October 27 , 2014 FIRE 1. The entrance to the property on the east side shows a median . As discussed previously , the med ian will need to have a laydown curb and be able to support a fire apparatus . Reviewed by : Eric Dotson Date : October 27 , 2014 SANITATION 1. Need to show dumpster pads on site. Reviewed by: Wally Urrutia Date : October 24, 2014 TX DOT 1. The proposed deceleration lane [as reviewed on the Concept Plan] does not meet TxDOT's access management guidelines . The min imum length for a deceleration lane on a roadway speed of 40mph is 315 '-0 ", lengthening the deceleration lane to 275'-0" from 225 '-0 " will be acceptable due to available space and the proximity of an intersection , also the access point median needs to roll back slightly so as not to infringe upon the ROW. Before access can be approved this revisions must be implemented into the property 's proposed plan and commercial access request. We look forward to reviewing the revised proposal for access on the land use I access change. Reviewed by : Vincent Espinoza Date : October 27 , 2014 2 of 2 ---......... __________ _::CITY OF COLLEGE STATION Hom e of Texas A&M University" MEMORANDUM DATE : October 20 , 2014 TO: Natalie Ruiz , IPS Group , via ; natalie@ipsgroup .us FROM : Jason Schubert, AICP , Principal Planner SUBJECT: CHIMNEY HILL REDEVELOPMENT (PODS) Thank you for the submittal of your POD Concept Plan Amendment application . Kevin Ferrer, Graduate Civil Engineer, Alan Gibbs , City Engineer, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Monday , October 27 , 2014. If you have questions in the meantime , please feel free to contact us . PC : Doug Demiano , PM Reality Group , via USPS 1000 Main Street , Suite 2400 , Woodlands TX , 77002 P&DS Project No . 14-00900264 Pla11ni11g & D evelopment Services P.O. BOX 9960 • 1101 TEXAS AVENUE · COLLEGE STATlON ·TEXAS · 77842 TEL. 979.764.3570 ·FAX. 979.764.3496 cst>1.gov/devservices CHIMNEY HILL REDEVELOPMENT Response to Staff Comments -Round #2 The following are responses to staff review comments received via email regarding the preliminary site plan . Changes and updates are shown in red .: • I cannot tell from the drawing where laydown curbs are located so as not to i mpinge upon the fire lane width , with particular attention to the median at the driveway across from the Hilton . RESPONSE: We will show more specific curb details with the final site plan . We 're willing to add additional lay down curb to ensure adequate fire department access -including the driveway and median across from the Hilton . • • • Also , the drainage/sidewalk comment in the southeast corner by the Hilton was intended for the corner down by Rosa's , not the fire lane pull off area . RESPONSE : Noted. To move the existing lot lines to create a pad site, a final plat appl i cation to replat the property would need to be submitted . RESPONSE : A rep/at/as -built plat w ill be provided to release the temporary blanket easements dedicated at closing and to modify any internal lot lines . Parkland dedication is required in the amount of $1,636 per multi-family un it . RESP-ONSE : Noted. Parkland fees will be paid at the tim e.of building permit for the multi-family building . • Sidewalks along are to be at least 6 feet wide along thoroughfares, 8 feet wide if located back of curb . RESPONSE : Noted. • You would need a private cross access easement for building B or any pad site . A temporary blanket easement is required on the front end and public utility easements would be required to cover all proposed public utilities. RESPONSE : Cross -access easements may be dedicated with the rep/at to dedicate as -built easements and modify internal lot lines. A blanket easement will be dedicated at closing . • Need to meet Non -Residential Architecture requirements . RESPONSE : Noted. • Garage driveway should be 175 feet from the tip of the gore or a median needs to be extended . Driveway radii to be between 25-30 feet . Revise plans to meet sight triangles around curve , need to be 15 feet from back of curb and 335 feet along the street . No visual obstruction between 3.5 to 7.6 feet in sight triangle . RESPONSE : The driveway into the parking garage has been moved further away from the striped gore . The driveway at Arguello has been removed to meet the sight distance triangles around the curve. • There appears to be more parking than required on the plans, the 18 spaces for the bar and 24 spaces for residential lobby/fitness are not be required as they are accessory . If a pad site, Building Bis to have all its parking on its lot. Patio areas should be as well in calculating sq . feet . Parallel spaces are minimum 10 feet wide and 22 feet long . RESPONSE : Parallel spaces have been modified to meet the minimum 10' x 22 ' standard. Additional parking has been noted in the parking legend. • Need to meet landscaping requirements . RESPONSE : Landscaping plao will be provided with complete site plan . • • • No dumpsters are shown on the plans, need to provide sanitation service to development . RESPONSE : Dumpsters will be shown on complete site plan. Signs need to be located outside of public utility easements, appears those along University Drive East are located within them. RESPONSE : Noted and moved outside of PUE 's . All parking rows need to have an end island with 6-inch raised curb that is 180-square feet in area, some by Buildings B & E are not . RESPONSE: Noted and modified near buildings B & E to comply with this standard. • Parking spaces need to be 20 feet deep each for double row of parking spaces in Building B area . Also need to maintain 10-foot parking setback from right -of-way when adjusting . RESPONSE : Noted and adjusted on preliminary site plan. • If the bar by the hotel is going to be a stand -alone bar/use, it would need a conditional use permit approved by Council. RESPONSE : The hotel bar is not a stand-alone use and is an accessory use to the hotel. No conditional use permit is required. • • TxDOT permit will be needed for driveway and decel lane on University Drive East . RESPONS TxDOT perm i t will be provi ded with the complete site plan. The phase line will need to be shown in the plans. RESPONSE : Phasing will be provided on the complete site plan . • Water lines need to be 20 feet from buildings . You may need to cut into water line and add another valve . RESPONSE : As previously agreed upon during the POD process, there are 2 locations in which the separation between a building and water line is less than 20'. Approximate water line locations are shown on the revised preliminary site pion . The two locations are along the rear of the property at the corner of the hotel building and Tarrow and the multi-family building near the intersection of Tarrow and East Tarrow . STAFF RESPONSE : The Multifamily Building Aa stairwell is depicted as having essentially no clearance with the existing adjacent 12" waterline . Not providing the full 20 ft separation was agreed to for the attached locations, with the specific location to maintain 14 fLclearance. Additional discussion and accommodation is needed . RESPONSE to RESPONSE; We believe we have worked out this i ssue with Alan and accommodated the separation distance and construction details requested . See revised preliminary site plan. • Site needs to maintain existing drainage patterns . Proposed storm water drains are too close to hotel area in rear . Reconfigured hotel area could help meet sight triangle and utility separation requirements . RESPONSE : Existing storm drain modifications are shown on the revised preliminary site plan near the proposed hotel. The modifications address conflicts with the existing line . STAFF RESPONSE : Similarly, the Hotel Building F stairwell is depicted as having essentially no clearance with the proposed storm sewer. Additional discussion and accommodation is needed . RESPONSE to REPONSE: W believe we have workec:Loat this issu with Alan and accommodated the separation distance through an additional junction box as requested . See revised preliminary site plan . • At the southeast corner by the Hilton, the drainage would need to go under sidewalk with curb inlet . RESPONSE : This item was discussed as a recommendation (not a requirement) given the design of the fire truck pull-out and required sidewalk to reduce the collection of silt and water along the sidewalk. We will look into the design and drainage issue with the civil package and complete site plan . STAFF RESPONSE : For the pull off, Fire was okay with a sidewalk being located through the pull off but th i s is not how it is to be designed . Public sidewalks are to be separated from the roadway surface so they are at the back of a curb above the roadway pavement or are located further away behind the curb . RESPONSE to RESPONSE : We will address this issue through the design of the pull off. • Electrical would like a preliminary plan to start planning where the utilities will go . You may need indivi dual transformers per building . We will need to look at clearance space fo r transformers . RESPONSE : We will forward the preliminary site plan to electrical once outstanding issues are addressed. • Water/fire flow, sanitary sewer, and drainage reports required with submission of site plan application . RESPONSE : Noted and will be provided with the civil package and complete site p l an . • If parking garage is open enough , you may not have to sprinkle the building . RESPONSE : Noted. • No parking spaces are allowed in the fire lane . All buildings need to be within 150-foot of a fire lane . RESPONSE : The parallel parking spaces shown w i thin the fire lane along the south side of the plaza have been removed. • A 20-foot fire lane is required for the one -story buildings , 26 -foot aerial fire lane that i s clear and unobstructed for buildings over 30 feet . Need fire lane pull off on East Tarrow by Hilton and it w i ll need to be 26 feet wide . RESPONSE : Fire lane modifications have been made on the revised p r eliminary si te plan . • FDC connection cannot be more than 100 feet from fire hydrant and they can be remoted . RESPONSE: Noted. FDC 's will be added with the civil package. • Driveway from East Tarrow by Hilton needs to serve as an aerial fire lane and be 26 feet wide , could have lay down curb . RESPONSE: Modified on the attached preliminary site plan . • All turn radii need to meet fire truck turning requirements . RESPONSE: Noted. ' ? Staff In itialsl gb I PRE-APPLICATION CONFERENCE PAC Date :j 8/6/14 I Time: I 1 :00 I Drawings/Plans due by Date:I 7/28/14 (Drawings are due by Monday at 1 Oam; if the Monday is a holiday then they are due by the p I Time :~ ervious Fri ay atl Oam) Main Contact:! Natalie Ruiz Phone Number :~l ___ 9_7_9_-_84_6_-_92_5_9 __ ~ E-mail Address : .__I ________ n_a_ta_li_e_@_ip sgroup.us Others: E-mail Address: Project address, location or legal description : 715 University Dr E -Chimney Hill property Number of acres in development: Type of development (retail, apts, single-family, restaurant , etc.): Purpose of the meeting is to re Building Total Square Footage: City Staff Present : D Jenifer Paz D Morgan Hester D Teresa Rogers [8J Jason Schubert D Jennifer Prochazka D Kelli Schlicher D Molly Hitchcock D Lance Simms Others in Attendance: D Venessa Garza D Bridgette George D Chris Haver [8J Alan Gibbs D Carol Cotter [8J Danielle Singh D Erika Bridges [8J Gilbert Martinez 0SamWeido Randall Heye (city staff), Robin Krause (city staff), Kevin Ferrer (city staff), K view the preliminary site plan D Eric Horton D Jerry Duffy D Steve Smith D Raymond Olson [8J Eric Dotson [8J !Jessica Bullock [8J !Jerry Cuaron [8J !Mark Bombek yle, Greg, Jeff Contact: I Natalie Ruiz I (app licant) on following issues: I I I I I I - COMPREHENSIVE PLAN: Future Land Use and Character Design at ion : Growth Area ? D Yes D No Existing Land Use : Proposed Land Use: Amendment Required ? D Yes D No ZONING: Ex isting Zoning : POD Planned Devel opment District (ordi nance 2014-3569) w as conditioned upon a deed for purchase of y September 15, 2014 . Through an ordinance amendment at the ve date condition will be extended to December 3 1, 2014 . Proposed Zoning : t he property is filed at the Courthouse b August 14th Council meeting, the effecti Overlay? D Yes D No Amendment Required ? [gj Yes D No PLATTING: Required? [gj Yes D No Would need to submit Cone ept Plan : Minor Amendment application as the layout of the dential units has switch ed from the approved Concept Plan. This approval. garag e and hotel rooms/resi would be a staff review and To move the ex isti ng lot lines to creat ea pad site, a final pl at application to replat the property would need to be subm itted . Parkland Dedication Fees Required : [gj Yes D No $ 1,636 per multi-family unit Impact Fees Required ? D Yes [gj No s I Sidewalks Required : [gj Yes ONo Sidewalks along are to be at least curb. 6 feet wide along thoroughfa re s, 8 feet wide if located back of Easements Required : You would nee d a private cross a ccess easement for building B or any pad site. A temporary [gj Yes ONo blanket ea sement is required on the front end and public utility easements would be required to cover all proposed public utilities T-Fare Plan/Street Requirements : t • Site Plan Building : NRA : Need to meet Non -Residential Architecture requirem ents. Garage driveway should be 175 feet from the tip of the gore or a median needs to be extended . Driveway Access/Driveways : radii to be between 25 -30 feet. Revise plans to meet sight triangles around curve, need to be 15 feet from back of curb and 335 feet along the street. No visual obstruction between 3.5 to 7.6 feet in sight triangle . There appears to be more parking than required on the plans, the 18 spac es for the bar and 24 spaces for residential Parking : lobby/fitness are not be required as they are accessory. If a pad site, Building Bis to have all its parking on its lot. Patio areas should be as will be used in calculating sq . feet. Parallel spaces are minimum 10 feet wide and 22 feet long . Landscaping : Need to meet landscaping requ i rements . Streetscaping: Dumpster: No dumpsters are shown on the plans, need to provide sanitation service to development. Lighting: Specific Use of Standards : Possible Variance/ Waiver Requests : Signs: Signs need to be located outside of public utility easements, appears those along University Drive East are located within them . All parking rows need to have an end island with 6-inch raised curb that is 180-square feet in area , some by Build i ngs B & E are not. Parking spaces need to be 20 feet deep each for double row of parking spaces in Building B area . Also need to ma i ntain Misc.: 10-foot parking setback from right-of-way when adjusting. If the bar by the hotel is going to be a stand -alone bar/use , it would need a conditional use perm it approved by Council. TxDOT permit will be needed for driveway and decel lane on Unive rsity Drive East. The phase line will need to be shown in the plans . TIA : Bike . Pedestrian.~ Greenwa y Re uirements: INFRASTRUCTURE: Water: Wat er lines nee d to be 20 feet from buildings . You may need to cut into wate r line and add another valve Sanitary Sewer : Si t e needs to mainta in existing drainage pattern s. Proposed storm water drains are too close to hotel Drainage/Dentention : area in rear . Reconfigu red hotel area could help meet sight triangle and utility separation requirements . At the southeast corner by the Hilton, the drainage would need to go under sidewa lk with curb inlet. Fire Flow Report: Electrical : Electrical would like a preliminary plan to start planning where the utilities will go. You may need individual transformers per building . We w i ll need to look at clearance space for tran sformers. Impact Fees : Miscellaneous : Water/fi re flow, sanitary sewe r, and drainage reports required with submission of site plan application. Sprinkler: If parking garage is open enough, you may not have to sprinkle the building . No park i ng spaces are allowed in the fire lane . All build i ngs need to be w ithin 150-foot of a fire lane . Fire Lanes : A 20 -foot fire lane is required for the one-story buildings, 26-foot aerial fire lane that is clear and unobstructed for bui ldings over 30 feet. Need fire lane pull off on East Tarrow by Hilton and it will need to be 26 feet wide. Fire Hydrant: FDC connection can not be more than 100 feet from fire hydrant and they can be remoted . Drive w ay from East Tarrow by Hilton needs to serve as an aerial fire lan e and be 26 feet wide, could have lay Miscellaneous : down cu rb . All tu rn radii need to me et fire truck turning requirements . I, Print Form