HomeMy WebLinkAbout14-252~----------.~ , .
t~ ..... -~·· . .FOR.OFFICE USE ONl:.Y • •,
~ASE NO.: lL.\-Zfi"2.
CITY OF C OLLEGE STATIO
Hom e of Texas A &M University"
DATE SUBMITTED: OC\ji\ 0 I \'-\-
TIME : L\ ·. SQ .
SITE PLAN APPLICATION
GENERAL
STAFF : ~fil~-------
MINIMUM SUBMITTAL REQUIREMENTS:
$932 Site Plan Application Fee .
$350 Non-Residential Architectural Standards I Northgate Building Rev iew Application Fee (if applicable).
$600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee . Fee is
1 % of acceptable Engineer's Estimate for public infrastructure , $600 minimum (if fee is > $600 , the balance is
due prior to the issuance of any plans or development permit).
[g] Application completed in full. This application form prov ided by the City of College Station must be used
and may not be adjusted or altered .
Six (6) folded copies of site plan .
One (1) folded copy of the landscape plan.
One (1) copy of the following for Non-Residential Architectural Standards building review or Northgate
Building Review (if applicable).
tfilrt" Building elevations to scale for all buildings .
IP/Al A list of building materials for all facade and screening .
$ Color samples for all buildings or list colors to be used from the approved color palette .
rpj)' Electronic copy of Site Plan e-mailed to csuelectdesign@cstx .gov.
Two (2) copies of the grading, drainage , and erosion control plans with supporting drainage report .
Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
Traffic Impact Analys is or calculations of projected vehicle trips showing that a TIA is not necessary for the
proposed request (if applicable).
The attached Site Plan Non-Residential Architectural Standards Building Review and Northgate Building
Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not
check off.
Date of Optional Preapplication or Stormwater Management Conference
NAME OF PROJECT LAKER/OGE TOWNHOMES PHASE 3
ADDRESS 1198 JONES-BUTLER ROAD
LEGAL DESCRIPTION (Lot, Block, Subdivision) LOT 1, BLOCK 1, LAKER/OGE SUBDIVISION
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name MITCHELL & MORGAN, LLP E-mail V@M/TCHELLANDMORGAN. COM
Street Address 3204 EARL RUDDER FREEWAY SOUTH
City COLLEGE STATION State TEXAS Zip Code _7_78_4_5 ____ _
Phone Number (979) 260-6963 Fax Number _(9_7_9)_26_0_-_35_6_4 ________ _
PROPERTY OWNER'S INFORMATION :
Name LAKER/OGE LIVING LP
Street Address P.O. BOX 10028
E-mail JIMBSTEWART@GMAIL. COM
C ity COLLEGE STAT/ON State TEXAS Zip Code _7 _78_4_2 ____ _
Phone Number (979) 739-9944 Fax Number (979) 694-3774
~~~~~~~~~~~~~~~~
Rev ised 4/14 Page 1 of 11
~-
ARCHITECT OR ENGINEER'S INFORMATION :
Name MITCHELL & MORGAN, LLP E-mail V@MITCHELLANDMORGAN. COM
Street Address 3204 EARL RUDDER FREEWAY SOUTH
City COLLEGE STATION State TEXAS Zip Code _7_78_4_5 ____ _
Phone Number (979) 260-6963 Fax Number (979) 260-3564 --------------
0 THE R CONTACTS (Please specify type of contact):
Name NIA E-mail NIA -------------------------------------
Street Address NIA -----------------------------------
City NIA State NIA Zip Code NIA ----------------------------------
Phone Number NIA Fax Number NIA
---------------~ --------------
Current zoning _R'--4-'------------------------------------
Present use of property UNDEVELOPED-VACANT
Proposed use of property MUL Tl-FAMILY --------------------------------
Number of parking spaces required 286-PH3 (Total: 660) Number of parking spaces proposed 293-PH3 (Total: 706)
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes l'X No
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance . Notwithstanding any assertion made ,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law .
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
IX Yes
I No
If yes , provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name: Lakeridge Townhomes
City Project Number (in known): unknown
Date I Timeframe when submitted: 2010
Revised 4/14 Page 2of11
~ Please no+~ -+h -
bl). i \Qi Y1gS In
LAru+ C,D~ be-\6w
se 3 +hct+ hOJTC no
f6v-~ --the
a been p~· -tted . *
MUL Tl-FAMILY RESIDENTIAL
Total Acreage 4.50 AC (PH3)
Floodplain Acreage _o ___ _
Housing Units 54 ------
10 #of 1 Bedroom Units ---
0 #of 2 Bedroom Units ---
16 #of 3 Bedroom Units ---
28 #of 4 Bedroom Units ---
FOR 2 BEDROOM UNITS ONLY
0 #Bedrooms= 132 sq . ft.
---
0 # Bedrooms < 132 sq . ft. ---
PARKLAND DEDICATION
(Fees due prior to the issuance of a Building Permit)
#of Multi-Family Dwelling Units
54 x $1636 = $ 88,344
--------
0 # of acres in floodplain
0 #of acres in detention
0 #of acres in greenways
08127109 Date dedication approved by Parks &
____ Recreation Advisory Board
COMMERCIAL
Total Acreage _N._YA ____ _
Building Square Feet NIA ----
Floodplain Acreage _N._YA ___ _
* Projects that were vested prior to January 1, 2008 , per Chapter 245 of the Texas Local Government
Code may be assessed a different amount. Please contact city staff for additional information.
The a licant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true
and o rect.
Date
Revised 4/14 Page 3of11
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued .
2. The permit may be revoked if any false statements are made herein .
3. If revoked , all work must cease until permit is re-issued .
4. Development shall not be used or occupied until a Certificate of Occupancy is issued .
5 . The permit will expire if no significant work is progressing within 24 months of issuance .
6. Other permits may be required to fulfill local. state, and federal requirements . Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP .
7 . If required . Elevation Certificates will be provided with elevations certified during construction (forms al slab pre -
pour) and post construction .
8 . Owner hereby gives consent to City representatives to make reasonable inspections requ ired to verify
compliance.
9 . If. stormwater mitigation is required , including detention ponds proposed as part of this project , it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the C ity of College Station, measures shall be taken
to insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets, or
existing drainage facilities . All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project . All of the applicable codes and ordinances of the
City of College Station shall apply.
11 . The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code , Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details . All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations .
12 . Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Deve lopment Permit.
13 . I, THE OWNER, REE TO AND RTIFY THAT ALL STATEMENTS HEREIN , AND IN ATTACHMENTS FOR
THE DEVELO PERMIT A LIGATION, ARE , TO THE BEST OF MY KNOWLEDGE, TRUE, AND
AC J"
1. The project has been designed to ensure that stormwater mit igation, including detention ponds, proposed as part
of the project w ill be constructed first in the construction sequence .
2 . I will obtain or can show compliance with all necessary Local , State and Federal Permits prior to construction
including NOi and SWPPP . Design will not preclude compliance with TPDES : i.e ., projects over 10 acres may
require a sedimentation basin .
3 . The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the C ity of College Station , Texas City Code, Chapter 13 and associated BCS Unified
Design Guidel ines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State a~9.egulations .
4 . I, THE ENGINEER , AGREE TO ANO..e; ~STATEMENTS HEREIN, AND IN ATTACHMENTS
THE DEVELOPMENT PERM~~<:~ ·: ·~· TO THE BEST OF MY KNOWLEDGE, TRUE, AND 1~ URA TE f * / ~-· :::.~J~
l.i ~ 1.~..:: ......... ·········~-~
\, . ~\JERoN:~'?.~~=~=-·········1 a: ~ ~/z "" .. ''~ ~ r--1-···-:;···· 116ffd /lfjJ ~-fVfJ _ ~ ·. ~-·· ;f-,!"4'-----"4-'---J--+------
\ ~··.:9ea1s1t~ .. ··& .&'Date '• .. .. ~ -" s . . .. . . .. . . 1(;.':, ..:'
The following CERTIF1ll110NS apply to development in O cial Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only
Permits:*
A. I, Not Applicable certify, as demonstrated in the attached drainage study , that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation ;
(ii) create additional areas of Special Flood Hazard Area ;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances , Chapter 13 concerning encroachment into the Special Flood Hazard Area ; nor
(v) increase Base Flood velocities.
beyond those areas exempted by ordinance in Section 5.11 .3a of Chapter 13 Code of Ordinances .
Engineer Date
Initial
D * If a platting-status exemption to this requirement is asserted, provide written justification under separate
letter in lieu of certification .
Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits:
B. I, Not Applicable , certify to the following :
(i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is
designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm.
Engineer Date
Additional certification for Floodway Encroachments:
C. I, Not Applicable , certify that the construction , improvement, or fill covered by this
permit shall not increase the base flood elevation . I will apply for a variance to the Zoning Board of Adjustments.
Engineer Date
' Required for all projects proposing structures in Special Flood Hazara Area (Elevation Certificate
required).
Residential Structures:
D. I, Not Applicable , certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor , including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre-pour) and post construction .
Engineer I Surveyor Date
Commercial Structures:
E. I, Not Applicable , certify that all new construction or any substantial improvement
of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all
utilities , ductwork and basements , elevated at least one foot above the Base Flood Elevation
Engineer I Surveyor Date
OR
I, Not Applicable , certify that the structure with its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation , and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions .
Required Elevation Certificates will be provided with elevations certified during construction {forms at slab pre-
pour) and post construction .
Engineer I Surveyor Date
Conditions or comments as part of approval :
Revised 4/14 Page 6of11
C ITY OF C OLLEG E S TATION
Home o/Texas A&M Un iversity "
SITE PLAN MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
[8] Sheet size -24" x 36" (minimum).
[8] A key map (not necessarily to scale).
[8] Title block to include :
[8] Name , address , location , and legal description
[8] Name, address, and telephone number of applicant
[8] Name, address, and telephone number of developer/owner (if differs from applicant)
$Name, address , and telephone number of architect/engineer (if differs from applicant)
[8] Date of submittal
[8] Total site area
[8] North arrow .
[8] Scale should be largest standard engineering scale possible on sheet.
[8] Ownership and current zoning of parcel and all abutting parcels .
[8] The total number of multi-family buildings and units to be constructed on the proposed project site .
[8] The density of dwelling units per acre of the proposed project.
[8] The gross square footage of all buildings and structures and the proposed use of each . If different uses are to be
located in a single building , show the location and size of the uses within the building. Building separation is a
minimum of 15 feet w/o additional fire protection .
Locations of the following on or adjacent to the subject site:
Designate between existing and proposed
[8] The density of dwelling units per acre of the proposed project.
[8] Phasing. Each phase must be able to stand alone to meet ordinance requirements.
[8] Buildings (Existing and Proposed).
[8] Setbacks according to UDO , Article 5.
Geography
Nffirwater courses .
[8] 100 yr. floodplain and floodway (if applicable) on or adjacent to the proposed project site . Please note if there is none
on the site with confirming FEMNFIRM map number.
[8] Existing topography (2' max or spot elevations) and other pert inent drainage information. (If plan has too much
information , show drainage on separate sheet.)
[8] Proposed grading (1' max for proposed or spot elevations) and other pertinent drainage information . (If plan has too
much information , show drainage on separate sheet.)
P:rn~ 7 nf 11
Streets, Parking, and Sidewalks
[g] Existing streets and sidewalks (R .O .W .).
[g] Existing Driveways , both opposite and adjacent to the site according to UDO , Article 7 .
[g] Proposed drives. Minimum drive aisle width according to UDO , Article 7
[g] Indicate proposed driveway throat length according to UDO , Article 7
[g] Proposed curb cuts .
[g] For each proposed curb cut (including driveways, streets , alleys , etc .) locate existing curb cuts on the same and
opposite side of the street to determine separation distances between existing and proposed curb cuts .
[g] Proposed curb and pavement deta il.
[g] A 6" raised curb is required around all edges of all parts of all paved areas without exception . (To include island ,
planting areas , access ways , dumpster locations , utility pads , etc.) No exception will be made for areas
designated as "reserved for future park ing".
tejAProposed medians.
[g] Proposed sidewalks (both public and private).
~Proposed pedestrian/bike circulation and facilities for non-residential buildings (UDO , Article 7).
[g] Off-Street parking areas with park ing spaces drawn , tabulated , and dimensioned .
[g] Designate number of parking spaces required by ordinance and provided by proposal.
[g] Handicap parking spaces .
[g] Parking Islands drawn and dimensioned with square footage calculated according to UDO , Section 7.2 or 7.9 fornon-
residential buildings .
[g] Parking setback from R.O .W . to curb of parking lot as required .
~Wheelstops may be required when cars overhang onto property not owned by the appl icant or where there may be
conflict with pedestrian or bike facilities , handicap accessible routes or above ground utilities , signs or other conflicts .
[g] Security gates , showing swing path and design specs w ith colors .
~Guardrails . Include design and colors .
~Traffic Impact Analysis for non-residential development (UDO , Article 7).
~lease note if none is required .
[g] Will there be access from a TxDOT R.O .W .? D Yes [g] No
If yes, then TxDOT permit must be submitted with this application .
Easements and Utilities
[g] Easements -clearly designate as existing or proposed and type (utility , access , etc.)
[g] Utilities (noting size and designate as existing or proposed) within or adjacent to the proposed site , including building
transformer locations, above ground and underground service connections to buildings , and drainage inlets.
[g] Sewer Design Report (if applicable).
[g] Water Design Report and/or Fire Flow Report (if applicable).
[g] Drainage Report with a Technical Design Summary .
[g] Meter locations, existing and proposed (must be located in public R.O.W. or public utility easement).
[g] Provide a water and sanitary sewer legend to include
[g] Minimum water demands
[g] Maximum water demands
[g] Average water demands in gallons per minute , and
[g] Maximum sewer loadings in gallons per day
[g] Will there be access from a TxDOT R.O.W.? D Yes [g] No
If yes, then TxDOT permit must be submitted with this application .
Rev ised 4/14 Page 8of 11
Fire Protection
[g] Show fire lanes . Fire lanes with a minimum of 20 feet in width with a minimum height clearance of 14 feet must be
established if any portion of the proposed structure is more than 150 feet from the curb line or pavement edge of a
public street or highway .
[g] Show proposed and existing fire hydrants . Fire hydrants must be located on the same side of a major street as a
project, and shall be in a location approved by the City Engineer. Any structure in any zoning district other than R-1,
R-1A, or R-2 must be within 300 feet of a fire hydrant as measured along a public street, highway or designated fire
lane .
NOTE: Fire hydrants must be operable and accepted by the City , and drives must have an all weather surface before a
building permit can be issued .
[g] Will building be sprinkled? [g] Yes D No
If the decision to sprinkle is made after the site plan has been approved, then the plan must be resubmitted . If Yes,
[g] Show fire department connections . FDC's should be within 100' of the fire hydrant. They shall be accessible from
the parking lot without being blocked by parked cars or a structure .
Landscaping
[g] Landscape plans as required in Article 7 of the Unified Development Ordinance . The landscaping plan can be shown
on a separate sheet if too much information is on the original site plan. If requesting protected tree points , then those
trees need to be shown appropriately barricaded on the landscape plan . Attempt to reduce or eliminate plantings in
easements .
Include information on the plans such as :
[g] required point calculations
[g] additional streetscape points required . Streetscape compliance is required on all streets .
1v1 calculations for # of street trees required and proposed (proposed street tree points will accrue toward total ~ landscaping points .)
[g] proposed new plantings with points earned
[g] proposed locations of new plantings
[g] screening of parking lots, 50% of all shrubs used for screening shall be evergreen.
1v1 screening of dumpsters, concrete retaining walls , off street loading areas , utility connection points , or other ~ areas potentially visually offensive .
~existing landscaping to remain
~show existing trees to be barricaded and barricade plan . Protected points will only be awarded if barricades are r up before the first development permit is issued .
~ Buffer as required in Article 7 of the Unified Development Ordinance .
~~Show irrigation system plan . (or provide note on how irrigation system requirement w ill be met prior to issuance of C.
'/14 0 .) All plans must include irrigation systems for landscaping. Irrigation meters are separate from the regular water
systems for buildings and will be sized by city according to irrigation demand submitted by applicant and must
include backflow prevention protection .
[g] Is there any landscaping in TxDOT R.O .W .? D Yes [g] No
If yes , then TxDOT permit must be submitted at the time of application .
Other
!Common open spaces sites
Loading docks
Detention ponds
NZ1lt Retaining walls
~ Sites for solid waste containers with screening . Locations of dumpsters are accessible but not visible from streets or
residential areas. Gates are discouraged and visual screening is required. (Minimum 12 x 12 pad required .)
[g] Are there impact fees associated with this development? D Yes [g] No
NOTE: Signs are to be permitted separately .
RP.Vi!':P.rl 4/14 Pace 9 of 11
CITY or CollEGE STATION
Home of Texas A&M University •
NRA BUILDING REVIEW MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
Refer to UDO Section 7.9 Non-Residential Architectural Standards, as appropriate.
~ Sheet size -24" x 36" (minimum).
NJ) Title block to include: W-Name, address , location , and legal description
~ Name, address , and telephone number of applicant
ttbr
~
~ Name, address , and telephone number of developer/owner (if differs from appl icant)
~ Name, address , and telephone number of architect/engineer (if differs from applicant)
~ Date of submittal
Scale should be largest standard scale possible on sheet.
List of colors from the City of College Station color palette to be utilized or proposed equivalents.
List of materials to be utilized .
;
Color samples.
Elevat ions of each non-residential building and screening structure . Show placement of materials and colors on
the facades according to UDO Section 5.6 .B or 7.9.
~ Include the following dimensions :
~ Total vertical square footage minus openings (for each fayade separately)
~ Total vertical square footage of transparency (for each fac;ade separately in Northgate)
~ Total vertical square footage of each building material (for each fa9ade separately)
tf/Jr' Total vertical square footage of each color (for each fa9ade separately)
~ Graphic representation and/or description of existing buildings in building plot to show material , color, and
architectural harmony .
Qou icon 11/1.d. p,.m, 1nnf1 1
CITY OF CouEGE STATIO
Home o/Texas A&M University "
NORTHGATE BUILDING REVIEW MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
Refer to UDO Section 5.6. Design Districts, B. Northgate Districts (NG)
~ Sheet size : 24 " ~ 36" (minimum).
~ Title block to include:
MP.l" Name, address , location, and legal description
~ Name, address , and telephone number of applicant
~ Name, address, and telephone number of developer/owner (if differs from applicant)
tf)1tr' Name , address , and telephone number of architect/engineer (if differs from applicant)
ltilJ: Date of submittal
~ Scale should be largest standard engineering scale possible on sheet.
~ List of colors from the City of College Station Northgate color palette to be utilized or proposed
equivalents with color samples .
rf}A List of materials to be utilized.
~ Elevations of each building and screening structure . Show placement of materials and colors
on the facades and identify public entrances.
Include the following dimensions :
tfillt. Total vertical square footage minus openings (for each fa<;ade separately)
Nfh·· Total vertical square footage of each building material (for each fa<;ade separately)
ff/Jr Total vertical square footage of each color (for each fa<;ade separately)
~ Total vertical square footage of transparency between zero and eight feet (0-8') above ground
level (for each non-residential fa<;ade)
~Graphic representation and/or description of existing buildings in building plot to show material ,
color, and architectural harmony .
Revised 4/14 Print Form Page 11 of 11
CITY OF C oll.EGE S TATIO
Home o/Texas A&M Univers ity •
FOR OFFICE USE ONLY
CASE NO .:
DATE SUBMITTED : _____ _
TIME:
STAFF :
PLANNING & DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Please check one of the options below to clearly define the purpose of your submittal.
D New Project Subm ittal
D Incomplete Project Submittal -documents needed to complete an application . Case No .:
lg] Existing Project Submittal. Case No.: 13-00900219
Project Name Lakeridge Townhomes Phase 3 -Revised Buildings 23, 24 ,27,28,30 & 32
Contact Name Veronica Morgan Phone Number 979-260-6963 --------------
We are transmitting the following for Planning & Development Services to review and comment (check all that apply):
D Comprehensive Plan Amendment D Non-Residential Architectural Standards
D Rezoning Application D Irrigation Plan
D Conditional Use Permit D Variance Request
D Preliminary Plan D Development Perm it
D Final Plat D Development Exaction Appeal
D Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR
lg] Site Plan D Grading Plan
D Special District Site Plan D Other -Please specify below
D Special District Building I Sign
D Landscape Plan
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
D Comprehensive Plan Amendment D Waterline Construction Documents
D TxDOT Driveway Permit D Sewerline Construction Documents
D TxDOT Utility Permit D Street Construction Documents
D Drainage Letter or Report D Easement Application
D Fire Flow Analysis D Other -Please specify
Spec ial Instructions :
10/10 Print Form
MITCHELL
M M
MORGAN
To: City of College Station
We are sending you:
0 Drawings
0 Letter
3204 Earl Rudder Fwy S
College Station, TX 77845
(979) 260-6963
(979) 260-3564 Fax
info@mitchellandmorgan.com
www.mitchellandmorgan.com
Letter Of Transmittal
Date: 9/26/2014 Job: 0919
Attention: Jessica Bullock
Re: Lakeridge Townhomes Ph. 3 -Bldg 23-32
[i] Attached
0 Plans
0 Order
D Under separate cover via _____ the following:
0 Prints 0 Samples 0 Specifications
0 Other _______________ _
Item Date # of Copies Description
1
2
3
4
5
6
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
1
1
6
6
1
2
Site Plan Application
Check For Site Plan Application in the amount of $932.00
Folded copies of the Revised Overall Site Plan
Folded copies of the Revised Phase 3 Site Plan
Folded copy of the Landscape Plan
Revised Construction Plansets
Transmitted as checked below:
0 For approval 0 Approved as noted 0 Resubmit ___ copies for approval
0 For your use 0 Approved as submitted 0 Submit copies for distribution
0 As requested 0 Returned for corrections 0 Return corrected copies
@ For review 0 Other ____________ _
Remarks:
If you have any questions or comments, please contact us at 979-260-6963.
Copy to: File Signed: --------------Kerry Pillow
LETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
DATE:
RE : COMPLETION OF
~~~~~~~~
Creek Meadows -Section 4 , Phase 38
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas . This approval and acceptance by the City is requested in .order that we
may finalize any subcontracts and to affirm their warranty on the work . This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one -year warranty is hereby affirmed and agreed to by Phillips Utility & Road
and by their subcontractors as indicated by signatures below.
WORK COMPLETED WARRANTY DATE
Streets and Sidewalks 09/28/2015
Sanitary Sewer 09/28/2015
Storm Sewer 09/28/2015
Water Distribution (Wellborn SUD) 09/28/2015
Owner: Creek Meadows Partners , LP Contractor: Phillips Utility & Road
Phone Number: (979) 268 -2000 Phone Number: (979) 690-7250
Address: 401 S . Texas Ave. Ste 401 Address : 4490 Castlegate Drive
Bryan , TX 77042 . College Station , TX 77845
Sign,atur~/.'.f RJid;f Signature:~
Revise d 1131107
SOP: Filing of Final Plats -Letters of Completion 10/14/2015
Engineering Inspector/Date: _:r6 N.( {4 -t. ~ ( 0-2 8-tS-
Project Engineer/Date:
DP Number:
I nspectors shall acquire written (i.e. email) punchlist comments and subsequently written
confirmation from the following contacts before forwarding Letter of Completion to development
rev iew engineer:
,S-Erosion/Drainage: Donnie Willis (0: 764-6375)
,er-cs Water Services -General: ~1 les "e a td~" \Mill.is (0: 764-3435, C: 777 -1202)
• Water -coordinate fire flow analyses (or the design engineer for non-city utilities)
and confirm test results meets min requirements with the dev review engineer
(specific hydrants to test, if simultaneous, and min allowable flow)
• Sanitary
o CS Water Service -Liftstation: Doug Wallace (0: 764-6333)
o CS Electric and Streetlights: Gilbert Martinez (0: 764-6255)
o CS Public Works-Traffic Signs/Markings): Lee Robinson (0: 764-3695)
jS BTU Electric and Streetlights: Sonia Creda (0 : 821-5770)
John Fontinoe or Randy Trimble (0: 821-5728)
Confirm with development review engineer that service agreement is in place with BTU
o Non-City Utility Service Providers: (Wellborn Water SUD, Brushy Creek SUD, Wickson
Creek SUD, etc) confirm with development review engineer that infrastructure is complete
and for outstanding issues,
o Digital Constrution Pictures: From contractor on CD-R, Inspector to confirm and file
o Record Drawings: (2 Red-Lined Copies) for all Public Infrastructure with the
following attestation:
"I, General Contractor for development, certify that the
improvements shown on this sheet were actually built, and that said improvements are
shown substantially hereon. I hereby certify that to the best of my knowledge, that the
materials of construction and sizes of manufactured items, if any are stated correctly
hereon."
General Contractor
t5' Record Drawings: (2 Red-Lined Copies) for Public Drainage Infrastructure including
Private Detention Facilities with the following attestations:
"I hereby attest that I am familiar with the approved drainage plan and associated
construction drawings and furthermore, attest that the drainage facil ities have been
constructed within dimensional tolerances prescribed by the Bryan & College station
Unified Stormwater Design Guidelines and in accordance with the approved construction
plans or amendments thereto approved by the City of College Station."
(affix seal) Licensed Professional Engineer
State of Texas No. ___ _
"I certify that the subdivision improvements shown on this sheet were actually built, and
that said improvements are substantially as shown hereon. I further certify, to the best of
my knowledge, that the materials of construction and sizes of manufactured items, if any,
are stated correctly hereon."
General Contractor
Inspectors to review Red-lined Record Drawings, upon acceptable confirmation of drawings,
inspector to:
~file one set of Record Drawings in Public Works files, and
y-Torward one set of Record Drawings to Jeffery Speed (CSU)
Inspectors should forward Letters of Completion to the development review engineer that
reviewed and stamped the construction plans after confirming:
~he date on the Letter of Completion Warranty should reflect the date when all associated
punchlist items are completed, and
~the Owner is shall be listed as the one affirming the one-year warranty
Development review engineer to:
o add Dev Permit Number to Letter of Completion
o stamp the Letter of Completion to confirm by initialing that the final plat is filed (or mylar
is ready to be filed), all necessary easements (including offsite) have been filed, and
blanket easement issues are resolved, and
o Initial and route the Final Plat Mylar for filing. (Note if the developer provided surety the
plat it may have been filed ahead of construction.)
Deborah Grace-Rosier (Planning) to file the Final Plat utilizes a coversheet to confirm:
o infrastructure is accepted by Letter of Completion -or-Surety is provided and acceptable,
o signed and notarized mylar of final plat,
o parkland dedication has been paid,
o digital file of final plat is provided,
o a current paid tax certificate has been submitted,
o sidewalk fee in lieu paid (if applicable), and
Development review engineer, upon the filing of Final Plat, stamp the Letter of Completion
with the new stamp and verify-initial-n/a the Final Plat was filed, offsite easements have been
filed, we have all necessary easements, etc -and then forward the Letter of Completion to Alan
Gibbs (City Engineer) for final signature.
Carol (Sr. Asst. City Engineer) to:
o enter the engineer's estimate and Letter of Completion date into Inspection List
o forward hard original of finalized Letter of Completion to Crystal (P&DS).
Crystal to: verify
o signatures on the Letter of Completion,
o forward scanned copy of Letter of Completion and associated Engineers Estimate to the
owner, developer, contractor, Terry Boriskie (Building), Ben McCarty (Building), Brian
Binford (Building), Carol Thompson (Accounting), Kristina Keller (Accounting), Courtney
Kennedy (Accounting), Jeffery Speed (CSU), Stephen Maldonado Sr. (CSU), Charles
"Butch" Willis (CSU), Carol Cotter (Engineering), Alan Gibbs (Engineering), Erika Bridges
(Engineering), Danielle Singh (Engineering), Gilbert Martinez (Electric) and Deborah Grace-
Rosier (Planning). Kristina Keller will forward to Diane Broadhurst (CSU) after her review.
o If don't have email addresses, mail copies to the owner and contractor, and attach it to the
project in TRAKiT.
Deborah to place a hard copy of the Letter of Completion in the associated Planning Final Plat file.
,
NO.
1
2
3
4
5
6
7
8
9
10
11
1
2
3
4
5
6
7
8
Engineer's Cost Estimate
CREEK MEADOWS -SECTION 4, PHASE 3B
PAVING, DRAINAGE, & UTILITY IMPROVEMENTS
COLLEGE STATION, BRAZOS COUNTY, TEXAS
UNIT
DESCRIPTION QUANTITY UNIT COST
PAVING IMPROVEMENTS
Mobilization, Construction Staking, All Required 1 LS $5,000 .00 Testing by Contractor & Trench Safety
SWPP Measures (Rock Rip-Rap , Seeding , Silt Fencing , 1 LS $9,500.00 Construction Entrance , Inlet Protection)
Clearing & Grubbing (ROW & All Easements) 1 LS $3 ,500 .00
In-Place Earthwork Excavation (Roadway, Alleys , 875 CY $4 .50 Drainage Channels, Sitework, etc ... )
In-Pace Earthwork Embankment (Roadway , Alleys , 500 CY $4 .50 Sitework , etc .. ) (Excavated On-Site)
In-Place Earthwork Embankment Finishing (Topsoil , Landscape 650 CY $3 .00 Berms & Miscellaneous) (Excavated On-Site)
4" Thick Reinforced Concrete Sidewalk (Includes 6 ,770 SF $4 .25 H/C Ramps)
24" Laydown Concrete Gutter 1,622 LF $11 .50
6" Compacted Lime Stabilized Subgrade 2 ,938 SY $4.75 (Residential Street)
6" Compacted Limestone Base (Residential Street) 2 ,169 SY $11 .00
2" Compacted Hot-mix Asphaltic Concrete 2 ,169 SY $13.00 (Residential Street)
TOTAL
COST
$5 ,000.00
$9 ,500 .00
$3 ,500 .00
$3 ,937 .50
$2,250.00
$1 ,950.00
$28 ,772 .50
$18 ,653 .00
$13 ,955.50
$23 ,859.00
$28 ,197.00
SUB-TOTAL= $139 ,574 .50
DRAINAGE IMPROVEMENTS
Mobil ization , Construction Staking , All Required Testing 1 LS $7 ,000.00 $7 ,000 .00 (Including TV) by Contractor & Trench Safety
Recessed Curb Inlet (10' Opening) 1 EA $4,700.00 $4 ,700.00
Recessed Curb Inlet (15' Opening) 2 EA $5 ,500 .00 $11 ,000.00
Storm Sewer Junction Box 2 EA $2,500.00 $5 ,000 .00
Tie into Existing Storm Sewer Junction Box or Storm 3 LS $750.00 $2 ,250.00 Sewer
24" RCP (CL 4) Storm Sewer w/Structural Backfill 35 LF $115.00 $4 ,025.00
24" ADS (N-12) Storm Sewer w/Non-Structural 143 LF $105.00 $15 ,015.00 Backfill & Cement Stablized Sand Bedding
36" RCP (CL 4) Storm Sewer w/Structural Backfill 43 LF $145 .00 $6 ,235 .00
CD1-260-0533-E02.xlsx 1 of 3
Engineer's Cost Estimate
9 36" ADS (N-12) Storm Sewer w/Non-Structural 278 LF
Backfill & Cement Stablized Sand Bedding $135 .00 $37 ,530 .00
SUB-TOTAL= $92 ,755.00
WATER IMPROVEMENTS
1 Mobilization, Staking, All Requ ired Testing by 1 LS $4 ,000 .00 $4 ,000 .00 Contractor & Trench Safety (Water Line)
2 8" PVC Water Line (C900, DR14) -Non Structural 306 LF $19 .00 $5 ,814 .00 Backfi ll
3 6" PVC Water Line (C900 , DR14) -Non Structural 476 LF $18 .00 $8 ,568.00 Backfill
4 6" PVC Water Line (C900 , DR14) -Structural 53 LF $26 .00 $1 ,378 .00 Backfill
5 Tie into Existing Water Line 2 EA $750 .00 $1 ,500 .00
6 8" (MJ ) Gate Valve & Box 2 EA $1 ,100.00 $2 ,200 .00
7 2" Blow-Off Valve & Riser 1 EA $1 , 100.00 $1 , 100.00
8 8" x 6" (MJ) Tee 1 EA $850.00 $850 .00
9 8" (MJ ) 45 deg Bend 4 EA $550 .00 $2 ,200 .00
10 8" (MJ ) Plug w/2" Tap 1 EA $300.00 $300 .00
11 Dual Water Service (Long Side) 4 EA $1 ,900 .00 $7 ,600 .00
12 Dual Water Service (Short Side) 6 EA $950 .00 $5 ,7 00.00
13 Single Water Service (Long Side) 2 EA $1 ,400.00 $2 ,800.00
14 Single Water Service (Short Side) 2 EA $600.00 $1 ,200.00
SUB-TOTAL= $45 ,210 .00
SANITARY SEWER IMPROVEMENTS
1 Mobilization , Staking , Trench Safety & TV Inspection 1 LS $4 ,000 .00 $4 ,000 .00 (Sewer Line)
2 6" PVC Sanitary Sewer (SDR-26, D3034) -Non 993 LF $25 .00 $24 ,825 .00 Structural Backfi ll
3 6" PVC Sanitary Sewer (SDR-26, D3034) -57 LF $42 .00 $2 ,394.00 Structural Backfill
4 4 ' Diameter Standard Manhole w/32" Opening (Ring 4 EA $3 ,200 .00 $12 ,800.00 & Cove r)
5 4 ' D iameter Drop Manhole w/32" Open ing (Ring & 1 EA $5 ,200.00 $5 ,200 .00 Cover)
CD1-260-0533-E02 .xlsx 2 of 3
Engineer's Cost Estimate
6 Tie into Existing Sanitary Sewer Line
7 Structural Bedding (Cement Stabilized Sand)
8 Dual Sanitary Sewer Service (Long Side)
9 Dual Sanitary Sewer Service (Short Side)
10 Single Sanitary Sewer Service (Long Side)
,
1 EA $1 ,000.00
20 LF $23 .00
6 EA $1,750.00
5 EA $650.00
1 EA $1,200.00
SUB-TOTAL=
ESTIMATED CONSTRUCTION COST=
10% CONTINGENCY=
$1 ,000 .00
$460 .00
$10,500.00
$3,250 .00
$1 ,200.00
$65,629.0 0
$343, 168.50
$34,316.85
GRAND TOTAL= $377 ,485.35
RME Consulting Engineers
TEXAS FIRM REGISTRATION No. F-4695
POST OFFICE BOX 9253
COLLEGE ST A TION, TEXAS 77842
OFFIF AX: (979) 764-0704
E-mail: civil@rmengineer.com
Estimates and projections prepared by RME Consulting Engineers relating to construction costs and schedules , operation and maintenance costs, equipment
characteristics and performance, and operating results are based on this office's experience, qualifications and judgment as a design professional . Since RME
has no control over weather, cost and availability oflabor, material and equipment, labor productivity, construction contractor's procedures and methods ,
unavoidable delays , co nstruction contrac tor's methods of determining prices, econom ic conditions, competitive bidding or market conditions and other
factors affecting such estimates or projections , this office does not guarantee that actual rates , costs, performance, schedules, etc., will not vary from estimates
and projections prepared by the Engineer of record.
CD1-260-0533-E02.xlsx 3 of 3
LETTER OF COMPLETION
CJTY ENGINEER DA TE: o/ .°?) \ J \ c:)
CITY OF COLLEGE ST A TION
COLLEGE STATION , TEXAS
RE : COMPLETION OF 2-0( ~ '5 fdeiuA-{ {~ -
(sf~ 2014 ~~ooz..~)
Dear S ir :
The purpose of ou r letter is to request that the followi ng li sted improvements be
approved and accepted as be ing constructed under City in spection and completed
according to plans and specifications as approved and required by the City of College
Station , Texas. This approval and acceptance by the C ity is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements li sted below does hereby void th e letter
of guarantee for the listed improvements on the above refe ren ced project.
The one-year warranty is he reby affirmed and ag reed to by ~~\\h })., 1 (a <hJp llc
and by their subcontractors as indicated by sig natures below.
WORK COMPLETED
~ S . d.Lw o. \ \t.
Owner: ~¥\At,) Lor--..\--
Phone Number: qlq --739~ 97 tf~
Address: \11{3 JovvlS M~.~
Co\ \-ey s :b t i ~"' Tx
CE & APPROVAL
WARRANTY DATE
\ \lpc"y k'Vv\ ~;1/ I~ -
l '
( q,j 3 1 / l'-'J w"/Tho9 J2i-tc
Contractor: J oY\.. -k.\t-
Phone Number: C11q-lfCZ.-2-tqz
Address: \ \ q 'i Ju¥l-f'i. t.J+4v ?J.
Co\\~ s.k,+J\b £x r7'{Y-o
JJ<.0i--e -? B-1-£0
City Representative
~ k ~.G;ibbs
Revised 1/31tfJ7
~PLAT FILED
OFFSITE ESMTS FILED
J1IA.. TEMP BLANKET ESMT FILED
.£6_NO OTHER ESMTS NEEDED
Item#
1
2
3
4
5
6
Lakeridge Townhomes
Engineers Estimate -FM 2818 Sidewalk Replat
Description Quantity
Mobilization 1
Erosion Control 1
Cellulose Fiber Mulch Seeding 1446
4" Reinforced Concrete Sidewalk (6' wide) 8826
Handicap Ramp
24" HOPE Pipe
1
20
,...,,,,,,,,,,
--~~OF Tc..t ''' ,,: ~ •.•..•.•.. 4.n 111 -"" ... *. ·· .. u I. ;~.... · ....... , s• _... .. ':.~ .. ~
i1 * : ··········:·~ ... "' ~ ~ . ..... Nl'Jn~""' 1! ~"···e·~QNICA J.B. ·········t·cr····~ "· r> ............... : ~ f.·····~··· 71fH.J .: (lJ ~ ~.~··. Q/J!ls
.... .1': •• ~ ~-· :s--"t 0~-. ... E'GtSi~~>.:_'-0':
11 ~n ··•·•··•·· ~~.: a,,~S/QN~\.. """--,,,,,,,, .......
Units Unit Price
LS $ 1,500 .00
LS $ 1,500.00
LF $ 0.40
SF $ 4 .00
LS $ 500 .00
LF $ 50.00
SUBTOTAL
Contingency (15%)
TOTALj
Price
$1,500
$1,500
$578
$35,304
$500
$1,000
$40,382
$6,057
$46,4401
MITC H ELL
MM
MORG A N
Jessica Bullock November 25 , 2014
City of College Station
Planning and Development Services
P.O. Box 9960
College Station , Texas 77842
RE: LAKERIDGE TOWNHOMES PHASE 3-R (SP)
Dear Jessica ,
Attached please find the following :
• City of College Station Transmittal Letter;
• Nine (9) complete sets of site civil construction documents (8 copies for College
Station and 1 copy to be returned to Mitchell & Morgan);
• Two (2) 24 "x36 " site plans ;
• One (1) 24"x36" landscaping plans ;
• On.e (1) 24"x36" grading and erosion control plan; and
• Cos.t Estimate.
STAFF REVIEW COMMENTS NO. 2
Project: Lakeridge Townhomes Ph 3-R (SP) -14-00900252
PLANNING
1. The island next to dumpster on the southwest side needs to be 180 square feet in
area minimum, please revise.
Response: This island has been revised to assure the 180 SF area has been
met.
2 . Please revise provided parking spaces under site calculation , on page 1 of the
overall site plan, to show 910 unless that changes with the island requirement for the
dumpster.
Response: Total parking provided is 909 total and Sheet 01 has been revised
accordingly.
3. Please change adjacent property owner information to the north to HRA Zone A&M
LLC on the partial site plan .
Response: This ownership has been revised as requested.
3204 EARL RUDDER FWY. S • COLLEGE STATION, TX 77845 • T 979 .260 .6963 • F 979 .260.3564
CIV IL ENGINEERIN G • HYDR AU LI CS • HYD ROLOGY • UTILIT IES • ST REET S • SITE PLANS • SU BD IVISIONS
info@m1tchellandmorgan com • www m1tchellandmorgan com
1
4. Please note that any changes made to the plans that have not been requested by
the City of College Station must be explained in your next transmittal letter.
Response: Understood.
ENGINEERING COMMENTS NO. 2
1. Note #22 on Sheet 2 states that the water meters are 1-inch unless otherwise noted , but
there are several that are not labeled as 1.5-inch on this sheet.
Response: These water meter sizes have been labeled on Sheet 2.
2 . The revised cost estimate was not included in this submittal. Please provide estimate prior
to site plan approval.
Response: A revised cost estimate is attached.
have any questions o r comments , please feel free to call our office at 979-260-6963.
Veronica J .B. org
Managing Partner
cc: File
E., C .F .M.
2
•---.......... __________ ~C ITY OF C OLLEGE STAT I ON~l __________ ...... , ................ J.rt" ..
Home of Texas A&M University • ... a
MEMORANDUM
DATE : November 24 , 2014
TO : Veronica Morgan , Mitchell & Morgan, via ; v@mitchellandmorgan .com
FROM : Jessica Bullock, Staff Planner
SUBJECT: LAKERIDGE TOWNHOMES PH 3 (SP)
Staff reviewed the above-mentioned site plan as requested . The following page is a list of staff
review comments detail ing items that need to be addressed.
Ci t y of College Station Transmittal Letter
Eight (8) complete sets of site civil construction documents for the proposed
development with the revised s ite and landscaping plans attached (one set will
be returned to you , please submit additional copies if you want more than one
approved set)
Two (2) 24 "x36 " site plans
One (1) 24 "x36 " landscaping plans
One (1) 24 "x36 " grading and erosion control plan
Please note that this application will expire in 90 days from the date of this memo , if the
appl icant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained here in . If there are
comments that you are not addressing with the revised site plan , please attach a letter
explaining the details . If you have any questions or need additional information , please call me
at 979 .764 .3570 .
Attachments : Staff review comments
PC : Lakeridge Living LP via ; jimbstewart@gmail.com
P&DS Project No. 14-00900252
Planning 6' D evelopment Services
P.O. BOX 9960 • l l 0 l TEXAS AVENUE • COLLEGE STATION ·TEXAS • 77842
TEL. 979.764 .3570 ·FAX. 979.764.3496
cstx.gov I devse rvices
STAFF REVIEW COMMENTS NO. 2
Project: Lakeridge Townhomes Ph 3-R (SP) -14-00900252
PLANNING
1. The island next to dumpster on the southwest side needs to be 180 square feet in area
minimum , please revise .
2. Please revise provided parking spaces under site calculation, on page 1 of the overall site
plan , to show 910 unless that changes with the island requirement for the dumpster.
3. Please change adjacent property owner information to the north to HRA Zone A&M LLC on
the partial site plan.
4. Please note that any changes made to the plans that have not been requested by the City of
College Station must be explained in your next transmittal letter.
Reviewed by: Jessica Bullock Date : 11/12/14
ENGINEERING COMMENTS NO. 2
1. Note #22 on Sheet 2 states that the water meters are 1-inch unless otherwise noted , but
there are several that are not labeled as 1.5-inch on this sheet.
2 . The revised cost estimate was not included in this submittal. Please provide estimate prior
to site plan approval.
Reviewed by : Erika Bridges Date : 11/21/14
Jessica Bullock
City of College Station
Planning and Development Services
P.O. Box 9960
College Station , Texas 77842
MITCHELL
M M
MORGAN
Re: Lakeridge Townhomes Phase 3-R (SP) -14-00900252
Dear Jessica ,
Attached please find the following :
• City of College Station Transmittal Letter;
• One (1) complete set of site civil construction plans ;
• Two (2) 24 "x36 " revised site plan ;
• One (1) 24 "x36 " landscaping plan ; and
• One (1) 24 "x36 " grading and erosion control plan .
STAFF REVIEW COMMENTS NO. 1
November 10 , 2014
Proj ect: Lakeridge Townhomes Phase 3-R (SP) 14 -00900252
PLANNING
V Please revise all adjoining property information to reflect current property owner and zoning
on both sheets .
• C ity of College Station and Crawford Burnet tracts are zoned GS
• The owner of Holleman V illage Addition is shown as HRA Zone A&M LLC
Response: These have been revised on the site plan sheets.
Please prov ide 2 additional handicap parking spaces to meet the 18 required , only 16 are
shown . If they are captured in phase 4 please show t hat.
Response: These are captured in Phase 4.
/. T he calculation for dumpsters should be rounded up . Based on the dumpster calculation of
18 .18 , please provide 1 additional dumpster to show 19 .
Response: We spoke to Sanitation and they are okay with 18 dumpsters.
a/ Parkland dedication is revised to reflect 93 units in phase 3. Total parkland dedication fo r
phase 3 is $152 , 148 . $49 ,080 has already been paid towards that amount.
Response: Understood.
3204 EARL RUDDER FWY. 5. • COLLEGE STATION, TX 77845 • T 979 .260 .6963 • F 979 .260 .3564
CIVIL ENGINEERING HYDRAULICS • HYDROL OGY • UTILITIES • STREET S • SITE PLANS • SUBDIVISIONS
info@m1tchellandmorgan com • www m1tchellandmorgan com
5. Please note that any changes made to the plans that have not been requested by the City of
College Station must be explained in your next transmittal letter and "bubbled " on your
plans .
Response: Understood.
LANDSCAPING/STREETSCAPING/BUFFER
/. Please change all building types to match the revised site plan .
Response: All buildings have been revised as requested.
J Please remove the current location of TP and only show the new location .
Response: The correct locations of transformer pads have been shown.
' \ I
ENGINEERING COMMENTS N0.1 OV\ ~.1,1 No-\{.-lr 2Z ~ ~+ Wµs OJYi?. 1
I 7) W,,T ~ r:s "'"" ~~ \. '5 " M~"::> ~A ·~' \Y Sh .01 -It looks like the 1-inch water meters have been upsized to 1.5-inch meters. Please
update the domestic water demand table to reflect the increased demands.
/Response: The water demand table has been updated on Sheet 01.
\j. Sh .02-The FDC for Building 24 should be moved outside of the PUE.
0,
Response: The FDC has been moved ;ut of the PUE. /'l ~ o< -\o LoC
h.02/05/06 -Please provide a plan & profile drawing , evised cost estimate and 15-ft PUE
or the fire hydrant next to Building 29 . FYI ... The easement is require o be dedica e prior
to issuance of the Letter of Com letion. 1.
Response: A revised ost estimat s attached. We have added a profile for the fire
hydrant lead. We will de site specific easements prior to requesting a letter of
/completion.
o/ Sh .05/06-The meters and isolation valves should all be located at the edges of the PUEs .
Response: All PUEs have been adjusted accordingly.
~. Sh .06 -Label the materi a l of the 4-inch portion of WL-B .
Response: The material for the 4" waterline "B" has been labeled.
lsh.06-Please replace the 90-degree bend on WL-B with two 45-degree bends .
Response: The 90 degree bend has been changed to two 45 degree bends.
SANITATION
u/ Please move the dumpster pads together at the bottom southwest end , so they are both
facing east. At that angle , we will not have a clear maneuvering path to the dumpster.
Response: These dumpsters have been revised as requested.
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
~ SITE PLAN/PLAT: Developer will provide CSU with an UPDATED digital , AutoCAD dwg
format, version of plat and I or site plan as soon as it is available . Email to :
sweido@cstx.gov
Response: This new layout has been emailed to Sam Weido.
2. LOAD DATA: The developer will provide load data to CSU as soon as it is available . Th is
information is critical for CSU to accurately determine the size and number of transformers ,
and other equipment, required to provide service to the project . Failure to provide load data
will result in construction delays and , due to clearance requ irements , could affect the fina l
bu il ding footprint. Delivery time for transformers and other equipment not in stock is
approximate 26 weeks .
Response: This load data will be emailed to Sam Weido by Jon Jett with Lakeridge
Living on Friday, November 14, 2014.
d EASEMENTS: Developer provides temporary blanket easement for construction purposes
and upon completion of project must provide descriptive easements for electric infrastructure
as designed by CSU.
Response: We believe we have a blanket easement on this property already. The
City's GIS shows that it is still present.
4. EASEMENTS: All easements on site are existing. Electric facilities will be designed within
existing easements. Building layout has changed . Existing easements may not work with
new CSU design .
Response: The easements shown are the prior Phase 3 plans were never dedicated.
We will dedicate site specific easements upon completion of this construction.
5. EASEMENTS: Developer provides descriptive easements for electric infrastructure as
designed by CSU , as shown on plat or site plan .
Response: Understood.
6. If easements are existing , the developer will be responsible for locating easements on site to
insure that electrical infrastructure is installed within easement boundaries .
Response: Understood.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design .
Response: Understood.
2. CSU will provide drawings for electrical installation .
Response: Thanks.
3. Developer provides 30 ' of rigid or IMC conduit for each riser conduit. CSU installs riser.
Response: Understood.
4 . Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required .
Response: Understood.
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
Response: Understood.
6. Developer pours electric device pads or footings , i.e. transformers, pull boxes , or other
device , per CSU specs and design .
Response: Understood.
7. Developer installs pull boxes and secondary pedestals per CSU specs and design , Pull
boxes and secondary pedestals provided by CSU.
Response: Understood.
8. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e . transformers, pull boxes , or switchgears , all meter locations, and conduit routing
as designed by CSU.
Response: Understood.
If you have any questions or comments, please feel free to call our office at 979-260-6963 .
Veronica J .B. org
Managing Partner
cc: file
CnY OF COLLEGE Sr1\TION
Ho111 1· ofTrxns A&M Uni vers iry •
MEMORANDUM
DATE : October 15 , 2014
TO : Veronica Morgan , Mitchell & Morgan , via ; v@ mitche ll andmo rgan .com .......---
FROM : Jessica Bullock , Staff Planner
SUBJECT: LAKERIDGE TOWNHOMES PH 3-R (SP)
Staff reviewed the above-mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information for further staff review:
City of College Station Transmittal Letter ;
Memo providing written responses to all of staff's comments (identify the
specific page that each comment was addressed on or the reason for not
addressing the comment);
One (1) complete set of site civil construction documents for the proposed
development with the revised site and landscaping plans attached ;
Two (2) 24 "x36 " revised site plans ;
One (1) 24 "x36 " landscaping plan ;
One (1) 24 "x36 " grading and erosion control plan ;
Please note that this application will expire in 90 days from the date of this memo , if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein. If there
are comments that you are not addressing with the revised site plan , please attach a
letter explaining the details . If you have any questions or need additional information ,
please contact Jessica Bullock at 979 .764 .3570 .
Attachments : Staff Review Comments
PC : Lakeridge Living LP via ; jimbste wart@g mail.com .....-
P&DS Project No . 14-00900252
Plmwing 6~ De1•elopment Se1·11ic es
I' ( l. BOX ')%1) • j JO IT[\:\.';\\ I 'Ll" • ('()[ 1.u;r STAT"IUN • T EXAS. '78"12 ·
TI·L '>7').-1' )'i..,o • r·\X. <1~9.7<1"1 .. ">-1%
cs tx. gov /devservices
STAFF REVIEW COMMENTS NO. 1
Project: Lakeridge Townhomes Ph 3-R (SP) 14-00900252
PLANNING
1. Please revise all adjoining property information to reflect current property owner and
zoning on both sheets .
• City of College Station and Crawford Burnet tracts are zoned GS
• The owner of Holleman Village Addition is shown as HRA Zone A&M LLC
2 . Please provide 2 additional handicap parking spaces to meet the 18 required , only
16 are shown. If they are captured in phase 4 please show that.
3. The calculation for dumpsters should be rounded up . Based on the dumpster
calculation of 18.18, please provide 1 additional dumpster to show 19 .
4. Parkland dedication is revised to reflect 93 units in phase 3. Total parkland
dedication for phase 3 is $152 , 148 . $49 ,080 has already been paid towards that
amount.
5. Please note that any changes made to the plans that have not been requested by
the City of College Station must be explained in your next transmittal letter and
"bubbled " on your plans .
Reviewed by : Jessica Bullock Date : 10/13/14
LANDSCAPING/STREETSCAPING/BUFFER
1. Please change all building types to match the revised site plan .
2 . Please remove the current location of TP and only show the new location .
Reviewed by : Jessica Bullock Date: 10/13/14
ENGINEERING COMMENTS NO. 1
1. Sh .01 -It looks like the 1-inch water meters have been upsized to 1.5-inch meters.
Please update the domestic water demand table to reflect the increased demands .
2 . Sh .02 -The FDC for Building 24 should be moved outside of the PUE .
3. Sh .02/05/06 -Please provide a plan & profile drawing , revised cost estimate , and
15-ft PUE for the fire hydrant next to Building 29. FYI. .. The easement is required to
be dedicated prior to issuance of the Letter of Completion .
4. Sh .05/06 -The meters and isolation valves should all be located at the edges of the
PU Es .
5. Sh .06 -Label the material of the 4-inch portion of WL-B.
6 . Sh .06 -Please replace the 90-degree bend on WL-B with two 45-degree bends.
Reviewed by : Erika Bridges Date : 10/9/14
SANITATION
1. Please move the dumpster pads together at the bottom southwest end , so they are
both facing east. At that angle , we will not have a clear maneuvering path to the
dumpster.
Reviewed by : Wally Urrutia Date: 10/3/14
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. SITE PLAN/PLAT: Developer will provide CSU with an UPDATED digital , AutoCAD
dwg format , version of plat and I or site plan as soon as it is available . Email to :
sweido@cstx .gov
2. LOAD DATA: The developer will provide load data to CSU as soon as it is available .
This information is critical for CSU to accurately determine the size and number of
transformers , and other equipment , required to provide service to the project. Failure
to provide load data will result in construction delays and, due to clearance
requirements , could affect the final building footprint. Delivery time for transformers
and other equipment not in stock is approximate 26 weeks.
3. EASEMENTS: Developer provides temporary blanket easement for construction
purposes and upon completion of project must provide descriptive easements for
electric infrastructure as designed by CSU.
4. EASEMENTS: All easements on site are existing. Electric facilities will be designed
within existing easements. Building layout has changed. Existing easements may
not work with new CSU design.
5. EASEMENTS: Developer provides descriptive easements for electric infrastructure
as designed by CSU , as shown on plat or site plan.
6 . If easements are existing , the developer will be responsible for locating easements
on site to insure that electrical infrastructure is installed within easement boundaries.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation .
3. Developer provides 30 ' of rigid or IMC conduit for each riser conduit. CSU installs
riser.
4 . Developer will intercept existing conduit at designated transformers or other existing
devices and extend as required.
5. If conduit does not exist at designated transformer or other existing devices ,
developer will furnish and install conduit as shown on CSU electrical layout.
6 . Developer pours electric device pads or footings , i.e . transformers , pull boxes , or
other device , per CSU specs and design .
7 . Developer installs pull boxes and secondary pedestals per CSU specs and design ,
Pull boxes and secondary pedestals provided by CSU.
8. Final site plan must show all proposed electrical facilities necessary to provide
electrical service , i.e . transformers , pull boxes , or switchgears , all meter locations ,
and conduit routing as designed by CSU .
9 . To discuss any of the above electrical comments please contact Sam Weida at
979 .764 .6314.
Rev iewed by : Sam Weida Date : 10/1/14
CTTY OF COLI.EGE STATlONI ~----------_ ................ Home o/Texas A&M University • =
MEMORANDUM
DATE : October 1, 2014
TO : Veronica Morgan , Mitchell & Morgan , via ; v@mitchellandmorgan.com
FROM : Jessica Bullock , Staff Planner
SUBJECT : LAKERIDGE TOWNHOMES PH 3 (SP)
Thank you for the submittal of your Site Plan -Residential application . Erika Bridges , Graduate
Civil Engineer, and I have been assigned to review this project. It is anticipated that the review
will be completed and any staff comments returned to you on or before Tuesday , October 14 ,
2014 . If you have questions in the meantime , please feel free to contact us.
PC : Lakeridge Living LP via ; jimbstewart@gmail.com
P&DS Project No . 14-00900252
Planning dr Development Services
P.O. BOX9960 • 110 1 TEXAS AVENUE · CO LL EGESTJ\TIO N ·TEXAS · 77842
TEL. 979.764 .3570 ·FAX . 9 7 9.764.3496
cst><.gov/devservices
City of College Station
Administrative Approval for Required Parkland Dedications of Less than Five Acres
1. Applicant Name: _______ --'V-=e'-'-ro""'n-'-'-i=ca~M~o~rg=a=n-'-'-,~M~i~tc~h=e~ll ~&~M~o'"""'rg=a~n~, =LL=P~-------------
Address: _______________ 5_1_1_U_n_iv_e_rs_it~y_D_r_iv_e_E_a_s_t,~S_u_i_te_2_0_4 __________ ~
Phone: _____ ~9~79~-~2~6~0-~6~9~6~3 ______ E-Mail: ______ V~@~m_it~c_h~el~la~n~d_m_o~r~g~an~·~c~o~m~----
2. Development Name: _______ La_k_e_r_id~g~e_T_o_w_n_h_o_m_e_s_P_h_a_s_e_3_-_R __ _ Project #: ___ 1_4_-2_5_2 __
DevelopmentLocation: _____________ 2_6_0_0_H_a_il_es_C_o_u_rt _____________ _
3. Dwelling Units: Q_Single Family ~g~g ___ Multi-family Units , located in Neighborhood Park Zone "-7 __ _
_o_ Single Family -=-g=-g ___ Mult i-fami ly Units , located in Community Park Zone 8
4. Development Fees and Dedication Requirements:
a. Land Dedication or Fee in Lieu of Land (Choose One):
Neighborhood Community Total
Single Family: One (1) acre per 117 DU 's ac One (1) acre per 128 DU 's ac = ac
Multi -family : One (1) acre per 117 DU 's ac One (1) acre per 128 DU 's ac= ac
TOTAL = ~/~ Acres
-OR-
Fee Paid in Lieu of Land Dedication
Neighborhood Community
Single Family : @ $274 .00 per DU $ @ $250 .00 per DU $ = $
Multi-family : @ $274.00 per DU $ 27 126 @ $250 .00 per DU $ 24 750 = $ 51 876
TOTAL (Neighborhood and Community) = $ __ 5 .... 1 .... 8 .... 7....,6 __
b. Development Fee:
Neighborhood Community
Single Family @ $362 .00 per DU $ ____ _ Single Family@ $3 75 .00 per DU $ ____ = $ ___ _
Multi-family @ $362 .00 per DU $ 35,838 Multi-family@ $750 .00 per DU $ 74 ,250 = $ 110 088
TOTAL (Neighborhood and Community) = $ 161.964
5. Comments: Lakeridge Townhomes Phase 3 originally in cluded 115 units . Unit count was revised in Octobe r
2014, December 2014 , March 2015, and July 2015 . The latest revision added 4 units. 71 units are
currently built.
The City of College Station agrees to accept:
GRAND TOTAL (Neighborhood and Community) ,aa.Units x $1.il§. = $ _____ 1 ... 6 ... 1 .... 9 ... 6 ... 4 ____ _
Land Dedication ----------
2 c;4 ·1£
Nam e Date
City of College Station
Administrative Approval for Required Parkland Dedications of Less than Five Acres
1. Applicant Name: ________ V..:....:::.er'""""o:..:..;nc:..:ic=a:....:M~o'-"rg=a'""n""-, .:..:.M"'""it=c-'-"'h=-el"--1 =&'-'-M"'-'-o=rc.;;ig=a-'-"'n,_, =LL=P'--------------
Address: ___________ '--5~1~1_U~ni~v~er~s~it~y~D~r~iv~e~E=a~s~t,~S~u~i~te~2~0~4~-------------
Phone: ____ ---=9~7~9~-2~6~0~-6~9~6~3 _____ _ E-Mail: _____ ~v""'"@"""m~itc=h~e'"""ll-=a~nd=m~o"'"'rg=a~n"'"'.c"""'o~m'-'------
2. Development Name: ____ ---=L=a~k=e~ri=dg..._e~T~o~w~n~h~om~e~s~P~h~a=s~e~3--R~----Project #: ___ 1~4~-2~5=2~--
Development Location: ___________ '--11~9~8~Jo~n~e~s~B~u~t~le~r~R~o~a~d ____________ _
3. Dwelling Units: ___ Single Family ~9~5 __ Mult i-fa mily Units , located in Neighborhood Park Zone _7~--
___ Single Family --"9~5-Multi-fa mily Un its, located in Commun ity Park Zone B
4. Development Fees and Dedication Requirements:
a. Land Dedication or Fee in Lieu of Land (Choose One):
Neighborhood Community Total
Single Family : One (1) acre per 117 DU 's ___ _ ac One (1) acre per 128 DU 's ac = ac
Multi-family: One (1) acre per 117 DU's ___ _ ac One (1) acre per 128 DU 's ac = ac
TOTAL = Acres
-OR-
Fee Paid in Lieu of Land Dedication
Neighborhood Community
Single Family : @ $274.00 per DU $ ____ _ @ $250.00 per DU $ = $
Multi-family : @ $274 .00 per DU $ 26.030 @ $250 .00 per DU $ 23 750 = $ 49 780
TOTAL (Neighborhood and Community) = $ 49 780
b. Development Fee:
Neighborhood Community Total
Single Family @ $362.00 per DU $ ___ _ Single Family@ $375.00 per DU $ = $
Multi-family @ $362 .00 per DU $ 34 390 Multi-family@ $750 .00 per DU$ 71 ,250 = $ 105 640
TOTAL (Neighborhood and Community) = $ 105,640
5. Comments: Lakeridge Townhomes Phase 3 originally included 115 units . Unit count was revised in October of
2014 and again in December of 2014 . This revision creates two additional units in two buildings . 39 units are
current! bu ilt.
The City of College Station agrees to accept:
GRAND TOTAL (Neighborhood and Community) 95 Units x $1,636 = $ ____ 1~5~5~4=20"'"-----
Land Dedication ----------
Name Date
City of College Station
Administrative Approval for Required Parkland Dedications of Less than Five Acres
1. Applicant Name: ________ V_e~r~o_n_ic~a_M---'-o_rg~a_n~, _M_it_c_he_l_I ~&_M_o~r~g~a_n~. L~L-'-P ____________ _
Address: ___________ ---'5~1-'1_U~n~i-'-ve=r-=s~it~y-=D-'-r~iv-=-e-=E=a=s~t.-'S"-u~it=e-'2=0~4'---------------
Phone: ____ ---=9-'-7-=-9-=-2=6-=0-'-6=9-=6~3 _____ _ E-Mail: _____ -'-v@=m"'-'-i=tc=h=e=ll=an:..;...d=m..:...:.=o'""'"rg=a'-"n"".c=-=o:..:..;m,_,_ ___ _
2. Development Name: ____ ---=L=a~k=e~rid=g.,_e~T=ow~n"'"'"ho=m~e=s-'-P-'-h=a=s=e-=3-'-R'--'------Project #: __ ----'-1-'-4--=2=5=2 __
Development Location: ___________ ---'-11"'""'9'""'8~J""""o""'"n"'""'e'"""s"""'B"-u=t"""le'"'""r-'-R=o-=a=d ____________ _
3. Dwelling Units: ___ Single Family --"'9-=-3 __ Multi-family Un its, located in Neighborhood Park Zone _7 __ _
___ Single Family __ 9_3_ Multi-family Un its, located in Community Park Zone B
4. Development Fees and Dedication Requirements:
a. Land Dedication or Fee in Lieu of Land (Choose One):
Neighborhood Community Total
Single Family : One (1) acre per 117 DU 's ___ _ ac One (1) acre per 128 DU 's ac= ac
Multi-family : One (1) acre per 117 DU 's ___ _ ac One (1) acre per 128 DU 's ac= ac
TOTAL = Acres
-OR-
Fee Paid in Lieu of Land Dedication
Neighborhood Community
Single Family : @ $274 .00 per DU $ ____ _ @ $250.00 per DU $ = $
Multi-family : @ $274 .00 per DU $ 25 482 @ $250.00 per DU $ 23 250 = $ 48 732
TOTAL (Neighborhood and Community) = $ 48 732
b. Development Fee:
Neighborhood Community Total
Single Family @ $362 .00 per DU $ ___ _ Single Family@ $375.00 per DU $ = $
Multi-family @ $362.00 per DU $ 33 ,666 Multi -family@ $750 .00 per DU$ 69,750 = $ 103,068
TOTAL (Neighborhood and Community) = $ 103,068
5. Comments: Lakeridge Townhomes Phase · 3 originally included 115 units . Building 25 was revised and approved
on 10/03/14, adding one unit for a total of 116 . The applicant has revised 6 other build in gs changing the unit count to
93 with the most recent submittal. 30 units are currently built.
The City of College Station agrees to accept:
GRAND TOTAL (Neighborhood and Community) 93 Units x $1,636 = $ ____ 1~5=2~1~4~8 ____ _
Land Dedication ----------
Name Date
Jessica Bullock
From: Jessica Bullock
Sent:
To:
Monday, October 13, 2014 11 :46 AM
Stephen Smith
Subject: RE: Lakeridge Townhomes SP 14 -252
Thanks, the eave height is under 30'.
Jess
From: Stephen Smith
Sent: Monday, October 13, 2014 9:59 AM
To: Jessica Bullock
Subject: RE: Lakeridge Town homes SP 14-252
Jessica,
The Fire Access looks good if the building eve is UNDER 30'. If the building eve is over 30' from the Fire Department
access (at the level of the road) the Fire Lanes need to be 26'. Sorry I couldn't tell the width of the Fire Lane.
From: Jessica Bullock
Sent: Monday, October 13, 2014 8:56 AM
To: Stephen Smith
Subject: Lakeridge Townhomes SP 14-252
Steve,
Just checking to see if there are any comments for Lakeridge Town homes SP 14-252. The site plan is a revision of 6
buildings .
Thanks,
Jess
Jessica Bullock
Staff Planner
Planning & Development Services
City of College Station
P.O . Box 9960
l 101 Texas A venue
College Station, TX 77842
Office: 979 .7 64 .3570
Fax: 979.764.3496
Email : jbullock@cstx.gov
Website: www.cstx.gov
1
Jessica Bullock
From:
Sent:
To:
Cc:
Subject:
Veronica Morgan <v@mitchellandmorgan.com >
Tuesday, May 19, 2015 5:49 PM
Jessica Bullock
Erika Bridges
Re: Lakeridge Ph 3
ok thanks let me go look at these numbers now and see what is the differenc e
On Tue , May 19 , 2015 at 5:42 PM, Jessica Bullock <jbullock@cstx.gov> wrote:
Veronica,
See the table below for the numbers that I am using. I am getting these from the building square footage tables on the
stamped site plans which I have also attached .
~\) Co'Ol.\
1
.. if" .fuoipnt"'I~ ~ae
r'V V-CV\5cd. S~
' r k.G.'£> '-*" ~"3("('#
"-./Seid rv.. e ~
W"'~ '"""'o...c: ~&--t
~ ~&! ~ ' "' µ. t "'cl
'f!!!l\S:t-~d
i.no
Partial Site Plan
Building# Stamped 12/2014 Stamped 3/2015
21 12630 12630
22 12630 12630
23 11187 10740
24 9126 8950
25 12564 12564
26 9560 9560
27 12564 12030
28 14835 14496
30 18051 18051
31 18051 18051
131198 129702 -1496
From: Veronica Morgan [mailto:v@mitchellandmorgan.com]
Sent: Monday, May 18, 2015 9 :55 AM
To: Jessica Bullock
Cc: Erika Bridges
Subject: Re: Lakeridge Ph 3
Jessica
Jverall Site Plan ( Building Square Footage by Ty
Stamped 12/2014 Stamped 3/2015
12165
12894
13620
18051
13647
12630
11925
10204
14835
13038
11313
12564
11187
9560
13038
13038
13038
10022
7828
11187
6714
9126
261624
we tried to find your answer but cant figure out where ya'll are seeing the 46,000 sf change? can you send us a
copy of the plans you are looking at so we can answer the question.
thanks
2
..
On Thu, May 14 , 2015 at 11 :02 AM , Jessica Bullock <jbullock@cstx .gov > wrote:
; Veronica ,
I had a question on the Grading & Erosion Control plans that you submitted for buildings 23-24, 27-28, and
30-31 . We noticed that total building square footage increased by about 46 ,000 sq ft. The building footprints
did not appear to change so we are curious how that square footage is captured. Did the building height
increase or were building footprints revised?
Jessica Bullock
Staff Planner
Planning & Development Services
City of College Station
P.O. Box 9960
1101 Texas Avenue
College Station, TX 77842
Office: 979.764.3757
Fax: 979.764.3496
Email: jbullock@cstx.gov
Website: www.cstx.gov
City of College Station
Home of Texas A&M University ®
3
Veronica JB Morgan , PE
Managing Partner
Mitchell & Morga n , LLP
PLEASE MAKE NOTE OF OUR NEW ADDRESS
3204 Earl Rudder Fwy S .
College Station , TX 77845
( 0) 979-260-6963
City of Coll ege Station
Home of Texas A&M University ®
Veronica JB Morgan , PE
Managing Partner
Mitchell & Morgan , LLP
PLEASE MAKE NOTE OF OUR NEW ADDRESS
3204 Earl Rudder Fwy S.
College Station , TX 77845
( 0) 979-260-6963
4
'(
MITCHELL
MM
MORGAN
To: City of College Station
We are sending you:
3204 Ear l Rudder Fwy S
Col lege Station , TX 77845
(979) 260 -6963
(979) 260 -3564 Fax
info @mitchellandmorgan.com
www.mitchell andmorgan .com
[i] Attached D
Date: 4/8/2015 Job: 0919
Attention: Erika Bridges, EIT
Re: Lakeridge Townhomes Ph. 3
Under separate cover via the following:
D Drawings D Plans D Prints D Samples D Specifications
D Letter D Order D Other
Item Date #of Copies Description
2
3/13/2015
3/13/2015
2
2
Revised -Sheet 03A Grading & Erosion Control Plan
Revised -Sheet 038 Grading & Erosion Control Plan
Transmitted as checked below :
D For approval D Approved as noted D Resubmit ___ copies for approval
D For your use D Approved as submitted D Submit copies for distribution
D As requested D Returned for corrections D Return corrected copies
[X) Forreview D Other ____________ _
Remarks:
Erika,
These plans are revised based upon the new building dimensions .
If you have any questions or comments, please contact us at 979-260-6963.
Copy to: _F_il_e _____________ Signed: Veronica Morgan
CITY OF Coll.EGE S TATIO
Home of Texas A &M University •
FOR OFFICE USE ONLY
CASE NO.: 14 -z..52
DATE SUBMITTED: \ l/21.R /llf
TIME : 3 :3D
STAFF : -+A ...... -rr~-------
PLANNING & DEVELOPMENT SERVICES
TRANS MITT AL LETTER
Please check one of the options below to clearly define the purpose of your submittal.
D New Project Submittal
D Incomplete Project Submittal -documents needed to complete an application . Case No.:
~ Existing Project Submittal. Case No .: 14-00900252
Project Name Lakeridge Townhomes Phase 3-R
Contact Name Veronica Morgan Phone Number 979-260-6963
------------~
We are transmitting the following for Planning & Development Services to review and comment (check all that apply):
D Comprehensive Plan Amendment
D Rezoning Application
D Conditional Use Permit
D Preliminary Plan
D Final Plat
D Development Plat
~ Site Plan
D Special District Site Plan
D Special District Building I Sign
~ Landscape Plan
D
D
Non-Residential Architectural Standards
Irrigation Plan
D Variance Request
D
D
D
Development Permit
Development Exaction Appeal
FEMA CLOMA/CLOMR/LOMA/LOMR
~ Grading Plan
D Other -Please specify below
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
D Comprehensive Plan Amendment ~ Waterline Construction Documents
D TxDOT Driveway Permit D Sewerline Construction Documents
D TxDOT Utility Permit D Street Construction Documents
D Drainage Letter or Report D Easement Application
D Fire Flow Analysis D Other -Please specify
Special Instructions:
10/10 Print Form
MITCHELL
MM
MORGAN
To: City of College Station
We are sending you:
0 Drawings
0 Letter
3204 Ear l Rudder Fwy S
College Stat ion . TX 77845
(979) 260-6963
(979) 260-3564 Fax
info@mitche llandmor gan .com
www.mitchell andmorgan .com
Letter Of Transmittal
Date: 11/26/2014 Job: 0919
Attention: Jessica Bullock
Re : Lakeridge Townhomes Ph . 3 Revised
[i] Attached D Under separate cover via _____ the following:
0 Plans
0 Order
0 Prints 0 Samples D Specifications
D Other ________________ ~
Item Date # of Copies Description
1 11/25/2014 1 Response to Staff Comments
2 11/25/2014 2 24 x 36 -Revised Site Plans
3 11/25/2014 1 24 x 36 -Revised Landscape Plan
4 11/25/2014 1 24 x 36 -Revised Grading & Erosion Control Plan
5 11/25/2014 9 Construction Plansets
6 11/26/2014 1 Revised Cost Estimate
Transmitted as checked below:
0 For approval 0 Approved as noted 0 Resubmit'--__ copies for approval
0 For your use 0 Approved as submitted 0 Submit copies for distribution
0 As requested 0 Returned for corrections 0 Return corrected copies
(iJ For review 0 Other ____________ _
Remarks:
Jessica,
We have provided an extra copy of the planset for stamping. Please hold up front for
Mitchell & Morgan, LLP to pick up. Thanks.
If you have any questions or comments, please contact us at 979-260-6963.
Copy to: _F_il_e _____________ Signed: Kerry Pillow
Ct// DEVELOPMENT PERMIT
PERMIT NO . 14-252
Cm· oF CciLLEGE ST,,TION
Pl~mti1t.t & llri'rl1Jpmt11t .'it-ri:i.'YJ
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lakeridge Townhomes Ph .3-R
Lakeridge Subdivision, Block 1, Lot 1
DATE OF ISSUE: 12/11/14
OWNER:
Lakeridge Living , LP (c/o Jim Stewart)
P .O . Box 10028
College Station, TX 77842
SITE ADDRESS:
1198 Jones-Butler Rd.
DRAINAGE BASIN:
Bee Creek Trib . "B"
VALID FOR 24 MONTHS
CONTRACTOR:
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized .
2. The permit may be revoked if any false statements are made herein . If revoked , all work must cease until permit is re-
issued .
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4 . Other permits may have been required to fulfill local , state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits .
5. Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to
insure that all debris from construction , erosion, and sedimentation shall not be deposited in city streets , or existing
drainage facilities . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on-site , it is the
Contractor 's responsibility to implement measures that will meet City , State, and Federal requirements .
7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance , prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , pa int , oil ,
solvents , asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construct ion shall be in accordance with the stamped approved plans and specifications for the above-named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply . Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically
requested and approved will be allowed .
10. Special Conditions :
ignature
qJ5 ~ {-11 , 2 ~z
Date ~ll= o±@&'1"11 .w .-
E-mail Phone number
I hereby grant this perm it fo r development. Contact ~~L-+-..li.,1.-..Jo....1'-.l,..llL....A......,i.-L...L-+---=-w....~__.__, the Public Works
Inspector assigned to this project 24 hours prior to beginning nstruction for scheduling required Inspections .
1l/11 hq
LAKERIDGE TOWNHOMES PH.3-Revised
PUBLIC INFRASTRUCTURE -PRELIMINARY COST ESTIMATE
11/26/2014
Water Line Items
8" PVC Waterline (AWWA C900 CL 200)
1 st ructural backfill 776 .95 LF $40 .00 $31 ,078 .00
6 " PVC Waterli ne (AWWA C900 CL 200 )
2 in structura l embedment 26 .49 LF $30 .00 $794 .70
4 " PVC Waterline (AWWA C909 CL 200)
3 in structural backfill 544 .97 LF $30 .00 $16 ,349 .10
4 8"x8 " MJ Tee 1 EA $400 .00 $400 .00
5 8"x6" MJ Tee 2 EA $400 .00 $800 .00
6 8"x4" MJ Tee 12 EA $300 .00 $3 ,600 .00
7 4 "x4" MJ Tee 3 EA $250 .00 $750 .00
8 8" MJ Gate Valve 2 EA $800 .00 $1 ,600 .00
9 6 " MJ Gate Valve 2 EA $750 .00 $1 ,500 .00
10 4" MJ Gate Valve 9 EA $500 .00 $4 ,500 .00
11 4" MJ Gate Valve w ith Locking Lid 8 EA $600 .00 $4 ,800 .00
12 8"x45deg MJ Bend 13 EA $400 .00 $5 ,200.00
13 4 "x90deg MJ Bend 2 EA $300 .00 $600 .00
14 8"x4" MJ Reduce r 1 EA $300 .00 $300.00
15 1" Domestic Water Meter 8 EA $500 .00 $4 ,000 .00
16 Std . Fire Hydrant Assembly 2 EA $3 ,750 .00 $7 ,500 .00
17 Connection to existing system 2 EA $2 ,250 .00 $4 ,500 .00
18 T rench Safety 1348.41 LF $1 .00 $1 ,348.4 1
Total $89,620.21
City Inspection Fee (1.00% of construction cost) Total lnsp Fee $896.20
,,,.. .... ,~ :\,,,,
..:-....... ~OF TE_'''' ?~~ ... ········· ... ~-'1.s-''•
:: C;> ••• * ·· .... ,, s*/ · .... ~ f~ . ..:. .......... j a .~Ai/~ ~VERONICA : .. : ...•....•.....• ~................... =a: ~ -o \ 77689 !41 J 'I,~ ... ~ Q/YJ 111 °~:· ... ~G1 sr rc.?-~··(# .&"""' 1, ~IS ············~~.: ,,,,~ION~\.."""°----,\,,,,,, ....
Item#
1
2
3
4
5
6
Lakeridge Townhomes
Engineers Estimate -FM 2818 Sidewalk Replat
Description Quantity
Mobilization 1
Erosion Control 1
Cellulose Fiber Mulch Seedinq 1446
4" Reinforced Concrete Sidewalk (6' wide) 8826
Handicap Ramp
24" HDPE Pipe
1
20
,..,,,,,,,,,,
--~~OF TE.t '" .: ~ ·····•···· 4,.. •• , -.c...~· ··*·'• .. \1 ••
,;:' ~ .·" ..... ., . ... . · .... ~ #! .. .:· ••••• l ~ * l ................ :·~A.N ~ ~ ,...... A J 0 N\\.ft"'':':.: ~ l VEP.001~~ .. :~: .......... :·cr·?. ~ ..... , ....... 71~ i(l.J J
1.~... <:>/~~ ·.1..~··~ ~.·~--.,, 0~··. cG1s1~'r; .. ~& ,::' •• ~s·· ........... 4(:.~ .:::'
a,,,,SION"\. ~--,,,,,,,,.... .
Units Unit Price
LS $ 1,500.00
LS $ 1,500.00
LF $ 0.40
SF $ 4 .00
LS $ 500.00
LF $ 50.00
SUBTOTAL
Contingency (15%)
TOTALj
Price
$1,500
$1,500
$578
$35,304
$500
$1,000
$40,382
$6,057
$46,4401
91e
cf2/7
.,. --..
()b .
--,...... ~ s ~ d) 1
.,
L. -e
~·1 prD{<g; $ ~ ((,
titb
'G'l 01 c;· 'G \ "' ~e.')(.e "') ~