HomeMy WebLinkAbout14-251FOR OFFICF 11i:s: n•n v
CASE NO.: IL\ -2 5 I
C ITY OF COLLEGE STATI ON
Homt ofTo:tU At:f M Univerriry'
DATE SUBMIITE~: QC\ l2J0 I J 4-
TIME : )Q '.Q5
SITE PLAN APPLICATION
GENERAL
STAFF: ~N:J.......,,,__ _____ _
MINIMUM SUBMITTAL REQUIREMENTS:
D $932 Site Plan Application Fee.
D
0
$350 Non-Residential Architectural Standards I Northgate Building Review Application Fee (if applicable).
$600 (minimum) Development Pennit Application I Public Infrastructure Review and Inspection Fee. Fee is
1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, t he balance is
due prior to the issuance of any plans or development permit).
IKJ Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered .
!&] Six (6) folded copies of site plan.
!&] One (1) folded copy of the landscape plan.
!Kl One (1) copy of the following for Non-Residential Architectural Standards building review or Northgate
Building Review (if applicable).
1KJ Building elevations to scale for all buildings.
IX] A list of building materials for all facade and screening.
!&] Color samples for all buildings or list colors to be used from the approved color palette.
!&] Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov.
IX] Two (2) copies of the grading, drainage , and erosion control plans with supporting drainage report.
Two (2) cop ies of the Public infrastructure plans and supporting documents (if applicable). 0
0 Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the
proposed request (if applicable).
!&) The attached S ite Plan Non-Residential Architectural Standards Building Review and Northgate Building
Review checklists {as applicable) with all items checked off or a brief explanation as to why they are not
check off.
Date of Optional Preapplication or Stonnwater Management Conference ----------------
NAME OF PROJECT Lick Creek Nature Center
ADDRESS 13600 East Rock Prairie Road , College St ation , Texas 77840
LEGAL DESCRIPTION (Lot, Block, Subdivision) Lick Creek Park Tract, S.W. Robertson League, A-202
APPLICANT/PROJECT MANAGER'S INFORMATION {Primary contact for the project):
Name Richard Hollington E-mail RHollington@RHArch itects .com
Street Address 33 15 Marquart Street. suite 205
City Houston State Texas Zip Code 77027 -------
Phone Number 713-524-6131 Fax Number
--------------~
PROPERTY OWNER'S INFORMATION :
Name City of College Station E-mail efisher@cstx .gov
Street Address PO Box 9960
--------------------------------~
City College Station state Texas Zip Code _7_7_84_2 ____ _
Phone Number 979-764-3500 Fax Number
--------------~
Revised 4/1 4 Page 1of 11
ARCHITECT OR ENGINEER'S INFORMATION :
Name Richard Hollington E-mail RHollington@RHArchitects.com
Street Address 3315 Marquart Street, Suite 205
City Houston State Texas Zip Code 77027 -------
Phone Number 713-524-6131 Fax Number ----------------
0 THE R CONTACTS (Please specify type of contact):
Name E-mail
----------------~ -----------------~
Street Address
City -----------------State --------Zip Code -------
Phone Number ----------------Fax Number --------------
Current zoning Rural ------------------------------------
Present use of property Parkland ---------------------------------
Proposed use of property _P_a_r_k_la_n_d ___________________________ _
Number of parking spaces required N/A Number of parking spaces proposed _5_8 _____ _
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? IX Yes I No
This information is necessary to help staff identify the appropriate standards to review the appl ication and will be used to
help determine if the application qualifies for vesting to a previous ordinance . Notwithstanding any assertion made ,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
I Yes
~No
If yes, provide infonnation regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name:
City Project Number (in known):
Date I Timeframe when submitted:
Revised 4/14 Page 2of 11
MUL Tl-FAMILY RESIDENTIAL
Total Acreage
Floodplain Acreage ____ _
Housing Units
# of 1 Bedroom Units ---
# of 2 Bedroom Units ---
___ # of 3 Bedroom Units
___ # of 4 Bedroom Units
FOR 2 BEDROOM UNITS ONLY
#Bedrooms= 132 sq. ft. ---
#Bedrooms< 132 sq. ft. ---
PARKLAND DEDICATION
(Fees due prior to the issuance of a Building Permit)
#of Multi-Family Dwelling Units
X$1636=$ --------
# of acres in floodplain
# of acres in detention
# of acres in greenways
Date dedication approved by Parks &
____ Recreation Advisory Board
COMMERCIAL
Total Acreage
Building Square Feet ___ _
Floodplain Acreage ____ _
* Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government
Code may be assessed a different amount. Please contact city staff for additional information.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true
1 O September 2014
Date
Revised 4/14 Page 3of11
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein .
3. If revoked, all work must cease until permit is re-issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements . Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP .
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction .
8. Owner hereby gives consent to City representatives to make reasonable inspections requ ired to verify
compliance .
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets , or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ord in ances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE , AND
ACCURATE.
Property Owner(s) Date
Engineer Certification:
1. The project has been designed to ensure that storrnwater mitigation, including detention ponds , proposed as part
of the project will be constructed first in the construction sequence.
2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOi and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin .
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FO H EVELOPMENT PERMIT APPLICATION , ARE, TO THE BEST OF MY KNOWLEDGE, TRUE , AND
C T.
1 O September 2014
Date
Revised 4/14 Page 4of11
The following CERTIFICATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill /Grading Permits, and Clearing Only
Permits:*
certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation ;
(ii) create additional areas of Special Flood Hazard Area;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor
(v) increase Base Flood velocities.
beyond those areas exempted by ordinance in Section 5.11 .3a of Chapter 13 Code of Ordinances.
Engineer Date
Initial
D • If a platting-status exemption to this requirement is asserted, provide written justification under separate
letter in lieu of certification.
Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits:
B. I, , certify to the following:
(i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is
designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm .
Engineer Date
Additional certification for Floodway Encroachments:
c. I, , certify that the construction, improvement, or fill covered by this
~~~~~~~~~~~~~~~·
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments .
Engineer Date
Revised 4/14 Page 5of 1 1
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D. I, , certify that all new construction or any substantial improvement
of any res idential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre-pour) and post construction.
Engineer I Surveyor Date
Commercial Structures:
E. I, ----------------, certify that all new construction or any substantial improvement
of any commercial , industrial, or other non-residential structure are designed to have the lowest floor, including all
utilities, ductwork and basements , elevated at least one foot above the Base Flood Elevation
Engineer I Surveyor Date
OR
I, , certify that the structure w ith its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork,
basement and san itary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-
pour) and post construction.
Engineer I Surveyor Date
Conditions or comments as part of approval:
Revised 4/14 Page 6 of 11
CITY OF COI.Ll::G.E ST,\TION
Ho= ofTtxAJ AoM Univmity'
SITE PLAN MINIMUM REQUIREMENTS
(ALL CllY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
[X] Sheet size -24" x 36• (minimum).
!XJ A key map (not necessarily to scale).
00 ntle block to include:
IR] Name, address, location , and legal description
!XJ Name, address , and telephone number of applicant
[RJ Name, address , and telephone number of developer/owner (if differs from applicant)
IRJ Name, address , and telephone number of architect/engineer (if differs from applicant)
1RJ Date of submittal
[] Total site area
1ZJ North arrow.
· !XJ Scale should be largest standard engineering sca le possible on sheet.
O Ownership and current zoning of parcel and all abutting parcels.
O The total number of multi-family buildings and units to be constructed on the proposed project site.
O The density of dwelling units per acre of the proposed project.
!XJ The gross square footage of all buildings and structures and the proposed use of each. If different uses are to be
located in a single building, show the location and size of the uses within the building. Building separation is a
minimum of 15 feet w/o additional fire protection.
Locations of the following on or adjacent to the subject site:
Designate between existing and proposed
O The density of dwelling units per acre of the proposed project.
D Phasing. Each phase must be able to stand alone to meet ordinance requirements .
[g] Build ings (Existing and Proposed).
IR] Setbacks according to UDO, Article 5.
Geography
D Water courses.
[XJ 100 yr . floodplain and floodway {if applicable) on or adjacent to the proposed project site . Please note if there is none
on the site with confirming FEMA/FIRM map number.
[X] Existing topography (2' max or spot elevations) and other pertinent drainage information . (If plan has too much
informati on , show drainage on separate sheet.)
[X] Proposed grading (1 ' max for proposed or spot elevations) and other pertinent drainage information . (If plan has to o
much information , show drainage on separate sheet.)
Revised 4/14 Page 7 of11
Streets, Parking, and Sidewalks
00 Existing streets and sidewalks (R.0.W.).
[XJ Existing Driveways , both opposite and adjacent to the site according to UDO, Article 7 .
1KJ Proposed drives . Minimum drive aisle width according to UDO, Article 7
[Kl Indicate proposed driveway throat length according to UDO, Article 7
IBJ Proposed curb cuts.
D For each proposed curb cut (including driveways, streets, alleys , etc.) locate existing curb cuts on the same and
opposite side of the street to determine separation distances between existing and proposed curb cuts.
[XI Proposed curb and pavement detail.
D A 6" raised curb is required around all edges of all parts of all paved areas without exception . (To include island ,
planting areas, access ways , dumpster locations , utility pads , etc.) No exception will be made for areas
designated as "reserved for Mure parking".
D Proposed medians.
[XI Proposed sidewalks (both public and private).
[XJ Proposed pedestrian/bike circulation and facilities for non-residential buildings (UDO, Article 7).
[XJ Off-Street parking areas with parking spaces drawn, tabulated, and dimensioned.
D Designate number of parking spaces required by ordinance and provided by proposal.
[XI Handicap parking spaces.
[XJ Parking Islands drawn and dimensioned with square footage calculated according to UDO, Section 7 .2 or 7 .9 fornon-
residential buildings.
D Parking setback from R.O.W. to curb of parking lot as required.
D Wheelstops may be required when cars overhang onto property not owned by the applicant or where there may be
conflict with pedestrian or bike facilities, handicap accessible routes or above ground utilities, signs or other conflicts .
[XJ Security gates , showing swing path and design specs with colors.
D Guardrails. Include design and colors.
D Traffic Impact Analysis for non-residential development (UDO, Article 7).
00 Please note if none is required.
D Will there be access from a TxDOT R.O.W.? D Yes IX] No
If yes , then TxDOT permit must be submitted with this application .
Easements and Utilities
IX] Easements -clearly designate as existing or proposed and type (utility, access , etc.)
IX] Utilities (noting size and designate as existing or proposed) within or adjacent to the proposed site, including building
transformer locations, above ground and underground service connections to buildings, and drainage inlets .
O Sewer Design Report (if applicable).
D Water Design Report and/or Fire Flow Report (if applicable).
D Drainage Report with a Technical Design Summary.
00 Meter locations, existing and proposed (must be located in public R.O .W. or public utility easement).
D Provide a water and sanitary sewer legend to include
D Minimum water demands
D Maximum water demands
D Average water demands in gallons per minute, and
D Maximum sewer loadings in gallons per day
D Will there be access from a TxDOT R.O.W.? D Yes IX] No
If yes, then TxDOT permit must be submitted with this application.
Revised 4/14 Page 8of11
Fire Protection
[ZJ Show fire lanes . Fire lanes with a minimum of 20 feet in width with a minimum height clearance of 14 feet must be
established if any portion of the proposed structure is more than 150 feet from the curb line or pavement edge of a
public street or highway.
IBJ Show proposed and existing fire hydrants. Fire hydrants must be located on the same side of a major street as a
project, and shall be in a location approved by the City Engineer. Any structure in any zoning district other than R-1,
R-1A, or R-2 must be within 300 feet of a fire hydrant as measured along a public street, highway or des ignated fire
lane.
NOTE: Fire hydrants must be operable and accepted by the City , and drives must have an all weather surface before a
building perm it can be issued .
D Will building be sprinkled? lKJ Yes D No
If the decision to sprinkle is made after the s ite plan has been approved , then the plan must be resubmitted. If Yes,
(R] Show fire department connections . FDC's should be within 100' of the fire hydrant. They shall be accessible from
the parking lot without being blocked by parked cars or a structure .
Landscaping
D Landscape plans as required in Article 7 of the Unified Development Ordinance. The landscaping plan can be shown
on a separate sheet if too much information is on the orig inal site plan. If requesting protected tree points, then those
trees need to be shown appropriately barricaded on the landscape plan. Attempt to reduce or eliminate plantings in
easements.
Include information on the plans such as:
D required point calculations
D additional streetscape points required. Streetscape compliance is required on all streets .
D calculations for # of street trees required and proposed (proposed street tree points will accrue toward tota l
landscaping points.)
D proposed new plantings with points earned
D proposed locations of new plantings
D screening of parking lots , 50% of all shrubs used for screening shall be evergreen.
O screening of dumpsters, concrete retaining walls, off street loading areas, utility connection points , or other
areas potentially visually offensive.
D existing landscaping to remain
D show existing trees to be barricaded and barricade plan . Protected points will only be awarded if barricades are
up before the first development permit is issued .
O Buffer as required in Article 7 of the Unified Development Ordinance.
D Show irrigation system plan. (or provide note on how irrigation system requirement will be met prior to issuance of C.
O .) All plans must include irrigation systems for landscaping. Irrigation meters are separate from the regular wate r
systems for buildings and will be sized by city according to irrigation demand submitted by applicant and must
include backflow prevention protection .
D Is there any landscaping in TxDOT R.O.W.? D Yes D No
If yes, then TxDOT permit must be submitted at the time of application.
Other
D Common open spaces sites
D Loading docks
D Detention ponds
D Retaining walls
D Sites for solid waste containe'.s with screening ._ Locations ~f d~mpste:s are a.c~essible but not visible .from streets or
residential areas. Gates are discouraged and visual screening 1s required. (Minimum 12 x 12 pad required.)
D Are there impact fees associated with this development? D Yes D No
NOTE: Signs are to be permitted separately.
Revised 4/14 Page 9of11
17 September 2014
Lick Creek Nature Center
13600 East Rock Prairie Road
College Station, Texas 77840
Building material
Standing seam metal roof and trim
Sheet metal siding and trim
Masonry
Fiber-Cement siding and trim
Aluminum frames
Glazing
Wood deck
Ray+ffollington Architects, Inc. <J-f\
.B 15 marqua rt :•t. s t 11 t~ 205
lwus tun . tx 77027
71 '.1 52,1.601
List of Building Materials
Finish
Galvalume
Pac-Clad Slate Gray
Limestone
Painted
Dark bronze anodized
Blue-green tint
Dark brown stained
UDO reference color
SW 7046 Anonymous
SW 6106 Kilim Beige
SW 6079 Diverse Beige
SW 6006 Black Bean
SW 6089 Grounded
C ITY OF C OLLEGE STATION! ________ ..,. ___ ............. -
---~~='=-------Hom e o/Ttxas A&M Univ ersity" -
MEMORANDUM
DATE: October 14, 2014
TO : Richard Hollington via ; rhollington@rharch itects.com
FROM : Mark Bombek , Staff Planner
SUBJECT: LICK CREEK NATURE CENTER (NRA)
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed . Please address the comments and
submit the following information for further staff review:
One (1) revised set of elevation drawings
Color Samples
Please note that this application will expire in 90 days from the date of this memo , if the
applicant has not provided written response comments and revised documents to the
Admin ist rator that seek to address the staff review comments contained here in. If there are
comments that you are not addressing with the revised elevations , please attach a letter
expla ining the details . If you have any questions or need additional information , please call me
at 979 .764 .3570 .
Attachments: Staff review comments
PC : City of College Station via ; efisher@cstx .gov
P&DS Proj ect No . 14-00900251
Planning & D evelopment Services
P .O. BOX 9960 • 1101 TEXA S AVENU E ·COLLEGE STATION ·TEXAS • 77 842
TEL. 979 .7 64 .357 0 ·FAX . 9 79.764.3 496
cstx .gov/devservices
STAFF REVIEW COMMENTS NO. 1
Lick Creek Nature Center (NRA) -NRA Review
. 14-00900251
PLANNING
1. Please identify the colors of all materials . FYl. .. Paint colors being used must come from the
City of College Station approved color palette. When providing the color sample please
provide the name and paint ID number if Sherwin Williams brand . If the brand is not Sherwin
Williams please provide the paint ID equivalent, or provide the physical swatch so that we
may match the color with colors in our approved list.
2. Landscape regulations outlined in article seven of the Unified Development Ordinance state
that dumpsters , concrete retaining walls where more than six (6) vertical inches of untreated
concrete are visible , off-street loading areas , utility connections , and any other site
characteristics that could be considered visually offensive must be adequately screened .
Please treat exposed foundations on sheets A303 (North Elevation), and A304 (Side
elevation 1) to meet this requirement.
3 . Please label elevations on Sheet A301, A302 , and A304 .
4 . Please identify the two types of architectural relief for elevation 2 on sheet A304
Reviewed by: Mark Bombek Date : 10-13-2014
-...... ..,..., ... ___________ 'CITY OF Cou.EGE STATIONJ __________ _. ... ,..,.. ...... -
Hom e a/Texas A &M University • =
MEMORANDUM
DATE : October 1, 2014
TO : Richard Hollington via ; rhollington@rharchitects.com
FROM : Mark Bombek, Staff Planner
SUBJECT: LICK CREEK NATURE CENTER (NRA)
Thank you for the submittal of your Non-Residential Architectural Standards application. I have
been assigned to review this project and it is anticipated that the review will be completed and
any staff comments returned to you on or before Tuesday , October 14 , 2014 . If you have
questions in the meantime, please feel free to contact me .
PC : City of College Station via ; efisher@cstx.gov
P&DS Project No . 14-00900251
Planning & Developmtnit Services
P.O. BOX 9960 • 110 I TEXAS AVENUE ·COLLEGE STArIO N ·TEXAS • 77842
TEL 979.764.3570 ·FAX. 979.764.3496
cstx.gov/devservices
PRE-APPLICATION CONFERENCE
PAC P~~fl •\J F@'l'im~: ~·. LD Drawings/Plans due by Date:l·~·\$Time: \ 0\\1)
(Drawings are due by Monday, lOAM; if Monday holiday, due by previous Friday, IOAM.)
Main contact: .b&Xt1{,1 lt C.VlUt.V.laO.,VUff &f ...
Phone no.:~lD4 · ~ E-mail: ,(j{,l1l1~v:k.JPbftl ~f@:i~t~~·0lJ.'f
Phone number:. ------.....~ ..................... """--~~
Prnject address, location or legal '4.(f~ipj#gI!'•;.;.. __ .........,, ____ ... ~»:··-:-·-~"· --~----...,.. ........... --.....-_......___.
.'.l~tJtt -t!t~i?-14.v\'L . N1itbJ¥& {~\Q1fil~ c>1p · pvt>jtt~ ·.·
No. of acres in development: . ,:~--'--~---'-~---~-------~--...
Type of development (retail, apts, single-family, restaurant, etc.): . ....,-·,-.__,.,.._ .. _ ..... ___ ,..-__ ~_..-... ----
Building Total Square Footage : ___ .,_,;....-_..;;..~-~~-..::.........-.....----........,,.....,......---.......... _...
City Staff Present:
0 Jenifer Paz
•f
~Morgan Hester
D Teresa Rogers ,
0 Matt Robinson
D Jason Schubert
0 Jennifer Prochazka
0 Molly Hitchcock
b(Lance Simms
0 Bob Cowell
D Venessa Garza
b('Joe Guerra
0 Bridgette George
D Chris Have r
0 Alan Gibbs
0 Carol Cotter
0 Danielle Singh
~Erika Bridges
lfkGilbert Martinez
0 Sam Weido
D Eric Horton
0 Jerry Duffey
D Eric Dotson
D St.eve Smith
g;~·Q) 'd '.~~": . . ~~J: ;~thfr.Ut'>l ;1il_ 'O 1 . .
'.g :~.::.
'O ~·------__,.,..,.,......-_
o ........ ------~--"--
3);L..Cl~~~~:L-W~µ_.f..:~..;L.::.~~~~~~~~.u~~-=-.1..1-~~~~~__,.,__~
4)_~~~---~~~------~~~~~~~~~~~~~~~~~~---~~~
5)~. --....=..~---~"-'-~~~~~~~~~~~----~~~~~~~-,,-~~~"--~"-'-" .....
Drainage I D etention:--------~-----~-------------
Fire Flow Rep ort: ~t.q-"\""-{··._. --------~------------...,...,...._~-
Impact Fees:------------,.~---'---------~----
FIRE
Fire Lanes:
SITE PLAN
Access I Driveways:-----~-----------~_,....,..-,....~....,,..-..,.........,......,,..,_------..
Draina ge I Deten tion:-------------------~
Fire Flow Report: E~l·""·-... -"'J"'-_ ·-----------------~-
Impact Fees:-----~-----------
FIRE
Fire Lanes:
Fire Hydrant: -~-....__.-'---..::,,,,-~_,,.,.._~------,-------....,........--~_....,___,..
Miscellaneous:. ----.--~~-----'-~------,......__---~----"----
SITE PLAN
:NRA: ~~~~~~~~~~~~~~~~~~~,/\..
lt{J, '/. ·. )
Access I Driveways:----~-----------,..._,,.,....--~-
Screening/Buffering:------=---~-~-------------
Lighting: ___________________________ _
Specific Use Standards:------------~-----------
Possible Variance/Waiver Requests:-------------------
I
Drainage I Detention:------~--------------
Fire Flow Report: _E....._,qi-'c,~J _. -------------------~
Impact Fees:-------------------------
Miscellaneous: -----------------------
FIRE
Fire Lanes:
Fire Hydrant:-----------------------
Miscellaneous: ----------------------~
SITE PLAN
NRA! ~~~~~~~~L:iw~~~~~~~~:£.1~~~.
1.t.~·1 . ~ )
Access I Driveways:---,-------------------,.-----
~~~~. l~
,~~-=-~i~~~,~~~-114.t-~=~ ;.J..~~~,'.1.,,L.l,.:~~~LJ.J.l-~~ . JC
PRE-APPLICATION CONFERENCE
PAC D~t~l ·\l \\1bTime~ a: L0 Drawings/Plans due by Date:l~·l3Time: \ D'i\1)
(Drawings are due by Monday, lOAM; if Monday holiday, due by previous Friday, lOAM.)
Main contact: .bt\n.i{.\ li t\JUtV VJUV1Kl&±
Phone no.::JlQ4 · ~ E-mail: ~ay\a,Qf)f1~f@C-G,1:~>gLJV
Phone number: ~~~~--~-----
Project address, location or legal ·descrqlj,'ion~.__------------.-~.__..
. l-\Ll<l cy~-~--~~?Ptv\L NtA·tuye, u10fel r &\P pvt zjm:.
No. of acres in development:
-------------------~---
Type of development (retail, apts, single-family, restaurant, etc.):_~-----~
Building Total Square Footage:~---------~---.,....._----~
City Staff Present:
D Jenifer Paz
~Morgan Hester
D Teresa Rogers
D Matt Robinson
D Jason Schubert
D Jennifer Prochazka
D Molly Hitchcock
D(Lance Simms
D Bob Cowell
D Venessa Garza
~JoeGuen·a
D Bridgette George
D Chris Have r
D Alan Gibbs
D Carol Cotter
D Danielle Singh
~Erika Bridges
lf!'.,Gilbert Martinez
D Sam Weido
D Eric Horton
D Jerry Duffey
D Eric Dotson
D Steve Smith
,~~~j<lmd k~r,(
'D ~---( ____ __,,,___ o '· :o '"""· .. --=,.......,..-------......_,-
o ,__ _________ _
'D ________ _
Contact ~-----~----(applicant) on following issues: 1)~~--'-="'~~-"'JC5C~~~~~:":~·-~-~'~C~X2~~f~\b~~~IY\~ .. ·~4~-0~¥\:\u.....-..,~l~}~l\.~-=-~~--..
2)~'""""'~~~~~~ ...... ~~++-'f--~~~~-:--~~~---~------=r--r-~~~ 3)~""'-~~L..Lll.~~_i...::_~~~~_,J~~~~~=u...~~~~~~~~·~~-
~---~--------~------------~---~~
5)~----------"-.---~---------~----------------~
I Stafflni1ia'I ~ I
PRE-APPLICATION CONFERENCE
PAC Date!}·\] ,\STime: ~·.LU Drawings/Plans due by Date:l·~·\2;,Time: \ D'i\D
(Drawings are due by Monday, lOAM; if Monday holiday, due by previous Friday, IOAM.)
Main contact: DO\ Y'-ll Hi CY1C1 v VJO Vl nt+
Phone no.: :Jl04 · ~
Phone number:
~~~~~-~~
Project address, location or legal descripti on:. ____________ _,,_ __
J ...\ tA!l CYW!b: \/ t1L v ~ bl t1±uy~ le.1n:tc¥: r; lP pvt ~ed
No. of acres in development:
~------------------~-
Type of developme nt (rntail, apts, single-family, restaurant, etc.): ______ _
Building Tota l Square Footage:--------------------
City Staff Present:
D Jenifer Paz
~Morgan Hester
D Teresa Rogers
D Matt Robjnson
0 J ason Schubert
D Jennifer Prochazka
D Molly Hitchcock
D(Lance Simms
D Bob Cowell
D Venessa Garza
t(Joe Guerra
D Bridgette George
0 Chris Have r
0 Alan Gibbs
0 Carol Cotter
D Danielle Singh
~Erika Bri dges
~Gilb ert Martinez
0 Sam Weido
0 Eric Horton
0 Jerry Duffey
0 Eric Dotson
D St.eve Smith
.~.-_:g;~1 ,,d Ql$9n . l . .. ~£H tl\.t}( I _
o _· -------~
0 -------~-o D ..-. ---------
0 ________ _
2)~._....=-+"V~....-.=~'""-4'..l-:.D=-'-....._.~~~~----,t--"-"~~~~~~~~--,-~r---~~~
3)~· ..W...:"""-->.~:U..~....LJJ~..LI'~~....L.::-L-~~==..i.<=-+-i..;""""" ......... ~----""""~'--"""'--.......... ~""'-'-~~~~
4)~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
5)_·~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
COMPREHENSIVE PLAN:
Future Land Use and Character Designation:-----------------
Growth Area? D Yes D No
Existing Land Use: _________ _ Proposed: ___________ _
Amendment required? D Yes D No
ZONING: Existing Zoning : Pr opo s d:
Overlay? 0Yes 0No
Amendment Required? 0Yes 0No
PLATTING: Required? 0Yes 0No
Parkland Dedication Fees Required: D Yes D No $ ___________ _
Impact Fees Required: D Yes D No $----------~
Sidewalks Required: D Yes tti_ No --------------------
Easements Required: D Yes D No -------·--------~--~-
T-Fare Plan I Street Requirements:--------------------
Bike, Pedestr ian, & Greenway Requirements:-----------,-------
17 September 2014
Lick Creek Nature Center
13600 East Rock Prairie Road
College Station, Texas 77840
Building material
Standing seam metal roof and trim
Sheet metal siding and trim
Masonry
Fiber-Cement siding and trim
Aluminum frames
Glazing
Wood deck
Ray+ Hollington Architects, Inc.
3315 ma r quart s t. su1lc 205
houston, tx 77027
713.524.6 131
List of Building Materials
Finish
Galvalume
Pac-Clad Slate Gray
Limestone
Painted
Dark bronze anodized
Blue -green tint
Dark brown stained
UDO reference color
SW 7046 Anonymous
SW 6106 Kilim Beige
SW 6079 Diverse Beige
SW 6006 Black Bean
SW 6089 Grounded