MINIMUM SUBMITTAL REQUIREMENTS:
932 Site Plan Application Fee . .
STAFF: ':'(/)
~ 350 Non-Residential Architectural Standards I Northgate Building Review Application Fee (if applicable).
~$600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is
1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600 , the balance is
_/due prior to the issuance of any plans or development permit).
e:J Application completed in full . This application form provided by the City of College Station must be used
and may not be adjusted or altered .
~Six (6) folded copies of site plan .
(§/One (1) folded copy of the landscape plan .
/ ~ One (1) copy of the following for Non-Residential Architectural Standards building review or Northgate
Build ing Review (if applicable).
D Building elevations to scale for all buildings .
D A list of building materials for all facade and screening.
D Color samples for all buildings or list colors to be used from the approved color palette .
D Electronic copy of Site Plan e-mailed to csuelectdesign@cstx .gov .
~ Two (2) copies of the grading , drainage , and erosion control plans with supporting drainage report .
LJ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
&'Uf\Traffic Impact Analysis or calculations of projected vehicle trips shoy.iing that a TIA is not necessary for the
r" proposed request (if applicable).
D The attached Site Plan Non-Residential Architectural Standards Building Review and Northgate Building
Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not
check off.
Date of Optional Preapplication or Stormwater Management Conference -----------------
NAME OF PROJECT Ro~°'\ \o\-\C.k ~"'~'{o\t\.\°''\
ADDRESS \)...o\ w \?a--c\A. Co\\<=--~<--s..\-o-.~oV\
LEGAL DESCRIPTION (Lot , Block , Subdivision) ------------------------
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name \SM.o,\\ C)1N ~1.2,, E-mail
Street Address 5 2-l-S £ ,
City \?.._c ~ "'-o.'("9"'-:1,
Phone Number 9 !:. L GO 1
PROPERTY OWNER'S INFORMATION :
Name V \ ~ °"':\ \<z\!.'\N\ a..'<
' Street Address Lf';:\ t> L\ f>" 12-~ l ~( '.::::.
City ~vi-0
Phone Number ~e,,-d--sr:-(n c> 4Y
Revi sed 4/1 4
\\...\ <o \_
State :]7')6
Fax Number
D=t'1
State 7 +
Fax Number
Zip Cod;\'"\ \ t° ~
Zip Code 11 fO L
9 ~A,-"GJ3--Ch \Y 2.
Pag e 1 of 11
.• r..
f'
ARCHITECT OR ENGINEER'S INFORMATION :
Name
Street Address
City State _________ Zip Code
Phone Number Fax Number
OTHER CONTACTS (Please specify type of contact):
Name E-mail
Street Address
City ------------------State _________ Zip Code
Phone Numbe r Fax Number
----------------~
Current zoning --------------------------------------
Present use of property
Proposed use of prope rt y
Number of parking spaces required Number of parking spaces proposed --------
1 s there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes I . No
Th is information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance . Notwithstanding any assertion made ,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
[";Yes
f' No
If yes , provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name :
City Project Number (i n known):
Date I Timeframe when submitted :
Rev ised 4 /14 Page 2 of 1 1
.(
.,
MULTl-FAMIL Y RESIDENTIAL
Total Acreage
Floodplain Acreage ____ _
Housing Units
___ # of 1 Bedroom Units
___ # of 2 Bedroom Units
___ # of 3 Bedroom Units
#of 4 Bedroom Units ---
FOR 2 BEDROOM UNITS ONLY
# Bedrooms = 132 sq . ft .
---
# Bedrooms < 132 sq . ft . ---
PARKLAND DEDICATION
(Fees due prior to the issuance of a Building Permit)
#of Multi-Family Dwelling Units
# of acres in floodplain
# of acres in detention
# of acres in greenways
Date dedication approved by Parks &
____ Recreation Advisory Board
COMMERCIAL
Total Acreage · \..\2-
Building Square Feet L); ('o <2°"\, \ '\-
Floodplain Acreage ____ _
* Projects that were vested prior to January 1 , 2008 , per Chapter 245 of the Texas Local Government
Code may be assessed a different amount. Please contact city staff for additional information .
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true
and correct.
Signature and title Date
Revised 4/14 Pag e 3of11
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued .
2. The permit may be revoked if any false statements are made herein.
3. If revoked , all wor k must cease unt il permit is re -issued .
4. Development sha ll not be used or occ upied until a Certificate of Occupancy is issued .
5. The permit will ex pi re if no significant work is progressing within 24 months of issuance .
6. Other permits ma y be required to fulfill local , state, and federal requirements . Owner will obta in or show
compliance with all necessary State and Federa l Permits prior to construction including NOi and SWPPP.
7. If required , Elevat ion Certificates will be provided with elevat ions certified during construction (forms at slab pre-
pour) and post construction .
8. Owner hereby gives consent to City representatives to make reasonable inspections required t o verify
compliance .
9. If, stormwater mitigat ion is required , including detention ponds proposed as part of this project , it shall be
designed and co nst ructed first in the construction sequence of the project.
10 . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken
to i nsure that all debr is from construct ion , erosion , and sedimentation shall not be deposited in city streets , or
ex isting drainage facil ities . All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Stat ion shall apply .
11 . The information and conclusions contained in the attached plans and support ing documents will comply with the
current requirements of the City of College Station , Texas City Code, Chapter 13 and associated BCS Unified
Des ign Guideline s Technical Specifications , and Standard Details . All development has been designed in
accordance with a ll applicable codes and ordinances of the City of College Station and State and Federal
Regulations .
12 . Release of plans to (name or firm ) is authorized for bidding purposes
only . I understand that final approva l and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13 . I , THE OW R , AGREE TO AND CE FY THAT ALL STATEMENTS HEREIN , AND IN ATTACHMENTS FOR
THE DEV L . PMENT PER IT !CATION , ARE , TO THE BEST OF MY KNOWLEDGE , TRUE , AND
ACCURA E.
Date \
Engineer Certification:
r
1. The project has been designed to ensure that stormwater mitigation , includ ing detention ponds , proposed as part
of the project w i ll be constructed first in the construction sequence .
2. I will obtain or can show compliance with all necessary Local , State and Federal Permits prior to construction
including NOi and SWPPP . Des ign w il l not preclude compliance with TPDES : i.e., projects over 10 acres may
require a sed imentation basin .
3. The informatio n and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code , Chapter 13 and assoc iated BCS Un ified
Design Guidel ines . All development has been designed in accordance w ith all applicable codes and ordinances
of the City of Colle ge Station and State and Federal Regulations .
4. I, THE ENGINEER , AGREE TO AN D CERTIFY THAT ALL STATEMENTS HEREIN , AND IN ATTACHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION , ARE , TO THE BEST OF MY KNOWLEDGE , TRUE , AND
ACCURATE .
Engineer Date
'
Rev ised 4/14 Page 4 of 11 "! ~'~ .., ...
.( .
The following CERTIFICATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill/ Grading Permits, and Clearing Only
Permits:*
A. I, certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit , shall not:
(i) increase the Base Flood elevation ;
(ii) create additional areas of Special Flood Hazard Area ;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second . This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances , Chapter 13 concerning encroachment into the Special Flood Hazard Area ; nor
(v) increase Base Flood velocities .
beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances .
Engineer ['J
I
Initial
D * If a platting-status exemption o th eq
letter in lieu of certification .
Date
;re~asserted, prov;de wr;tten just;ficat;on under separate
Required for Site Plans, Final Plats, Construction Plans, and Fill/ Grading Permits:
B. I, , certify to the following :
(i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is
designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm.
Engineer Date
Additional certification for Floodway Encroachments:
C . I , ________________ , certify that the construction, improvement , or fill covered by this
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
Engineer Date
Revised 4/14 Pag e 5 of 11
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D. I, , certify that all new constr ucti on or any substa ntial improvement
of any residential structure shall have t he lowest floor , including all utilities , ductwork and any basement , at an
elevation at least one foot above the Base Flood Elevation . Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre-pour) and post construction.
Engineer I Surveyor Date
Commercial Structures:
E. I, _________________ , certify that all new construct ion or any substantial improvement
of any commercia l, i ndustrial, or other non-residential stru ture are designed to have the lowest floor, including all
utilities , ductwork and basements , elevated at least one f ot above the Base Flood Elevation
Engineer I Surveyo r
OR
I, , certify that the structure with its attendant utility, ductwork,
basement and san itary facilities is designed to be flood-proofed so that the structure and utilities , ductwork ,
basement and san itary facilities are designed to be watertight and impermeab le to the intrus ion of water i n all
areas below the Base Flood Elevation , and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post co nstruction .
Eng ineer I Surveyo r Date
Conditions or comments as part of approval :
Rev ised 4/14 Page 6 of 11
.. . ... ... ·. . . . ..•· -·.· ... ,.; ...... -. . .
LETTER OF TRANSMITTAL
DATE: NOVEMBER 17. 2014
DELIVERED TO:
NAME: CITY OF COLLEGE STATION/ATTN:JESSICA BULLOCK
ADDRESS: 11 OJ TEXAS AVENUE
CITY -ZIP: COLLEGE STATION TEXAS 77842
SUBJECT: l20l W~LLSOW» ROAD
ROYAL TOUCH LAUNDRY
ITEMIZED LIST:
RESPONSES TO STAFF COMMENTS. EACH DEPARTMENTS
COMMENTS ARE ON A SEPERATE PAGE FOR EASE OF
DISPERSAL TO DEPARTMENTS HEADS.
FROM:
CHARLES HENRY PHILIPS, ARCHITECT
417 WEST BLUM AL VIN TEXAS 77511
PHONE: 281 331 5407
..
. . . . '"•
·• . . -::: .
····.: .. · .. .•. . . . . :·· .
''t •• •! ..
·~ . . . . ' ... ... ·:·.· . ·· .
. ·' ·. :· .. .. .. . . ...
. ;. . . . .·· . . . .
·' .. • . . :.··.
' -: .. . . . ·.· ... ,,
. .,.. ··-. . .
.. · . ..
• c • •
...... .... .
; .... . · ....... . .
·. .... .. : . ..
..... . .
. . ~ ....
-.
. -: ;· .. ·.:··.
.. · .....
. .....
~ •. .
·:. ;-
.... ;'• . . . ··.·
, ; ,•1 ' ,·
.....
·-.
·: ..
... :· . ~ .. . . :
. . . ·.··· :. ·;. · .... :·. ~-.-..
. . ': ·-............
.. . .. , :·. -..... .
.. ~-'.:: -·-. . ·· ... . ·-: . .. .-. . ! .
ADDRESSING COLLEGE STATION POST SUBMITTAL ISSUES
STAFF REVIEW COMMENTS NO. l
Project Royal Touch Laundry (SP) 14-00900235
ALL RESPO SES BELOW ( IN COLOR) ARE BY THE ARCHITECT
(ITEMS OTED BELOW, .. 0 RESPO SE FROM ISMAIL", PERTAIN TO
INFORMA TlO REPEATEDLY REQUESTED FROM ISMAIL, THE CONTRACTOR. BY
THE ARCHITECT)
(THEE GINEER, CHARLES S., WAS HlRED BY THE CONTRACTOR AND
FUNCTIO ED INDEPENDENTLY (DID HIS OWN THING) WITHOUT REGARD FOR
THE DESIG OF, OR THE EEDS OF, THE PROJECT AS A WHOLE).
l) Please provide a vicinity map including north arrow and a note saying not to scale
DO E
2) Please provide title block with the following information:
a. Name, address, location and legal description
b. Name, address, and telephone number of applicant
c. Name, address and telephone number of developer/owner (if differs fi:om applicant)
d. ame, a~ and telephone number of Architect/Engineer
e. Date of submittal
[ Total site area
lTEM E OT AVAILABLE TO ME -NO RESPO SE FROM ISMAlL
3) The Site Plan should be in engineering scale
DO E
4) Provide ownership and current zoning of all abutting parcels
THIS FORMA TIO IS SIMPLY NOT AVAILABLE TO ME AND 0 0 E WANTS TO
TAKE RESPO SIBILITY -0 RESPO SE FROM ISMAIL -
5) Please label Wellborn Road as such. Also, provide right of way and street widths on both
Wellborn (Road) and Southland Street
WELLBORN ROAD ROW & STREET WIDTHS INFORMATION OT PROVIDED TO ME
AND 0 ONE WANTS TO TAKE RESPO SIBILITY -NO RESPO SE FROM ISMAIL
6) Please provide building height
EE B lLDING ELE TlO PAGE A-2
7) Please identify handicap parking space and verify it meets the required minimum van space
requirements
DO E -SEE TT ACHED PAGES ll 0, 111 J 12 OF 2012 TEXAS ACCE SlBILITY
STA DAROS ~THIS FALLS UNDER THE JURlSDlCTIO OF THE REGISTERED
ACCESS SPECIALIST WHICH HAS BEE RETAINED FOR THE JOB-{MY RAS
LICE SE wuMBER I 65)
8) Retitle the "15' landscape easement" to "15' landscape buffer"
DO E-WITHI THIS SAME DOC ME T, A OTHER DEPARTME HAS REQUIRED
THAT IT BE LABELED "PUC" (PUBLIC UTILITY EASEMENT) -THUSLY, IT HAS
BEE LABELED AS BEING BOTH
9) Please note that all paved areas should have a 6 " monolithic curb. This includes the parking
area behind the wheel stops and bollards
W AITlNG ON RESPONSE FROM COLLEGE STATION
10) Please label throat depth length. It should be measured from the street to the first point of
conflict in the driveway
00 E -SEE lTE PLAN
l l ) Please include uhlities on the site plan
WATER DGAS LOC TlONS HAVE ALWAYS BEE SHOWN-
lNFORMATIO OT PROVIDED TO ME RE: ELECTRICAL & SEWER-NO RESPONSE
FROMrsMAIL
12) What are the following labels related to. "Y-S2", "W-S2", D-S2", "B-Si-1, "S-S2"?
THESE ARE CO CRETE DETAILS 0 PAGE S-2
13) Provide curb and driveway details as shown in the Site Design Standards (SDS). Also please
label curb radius
DO -DETAIL 0 PAGE -3, CONCRETE DETAIL -I INCREASED THEE TRY
CURB RADIUS FOR CO E £ENCE OF THE SANIT A HON DEPT -IF EED BE WE
C ROTA TE THE DU 1PSTER ENCLOSURE
l4) Provide standard and thickened paving details as shown in the SDS
DO E -PAGFE S-.
15) Provide bike rack details as shown in the SDS. Also verify that four spaces are provided
00 E -SEE PAGE S-3 D SITE PLAN
l6) Please show fire hydrant and label fire lanes.
DO E
17) Please verify that the mechanical equipment on the roof will be fully screened by the parapet
wall Provide a general note on the site plan that all roof and ground mounted mechanical
equipment shall be screened from view or isolated so as to not be visible from any public
right of way or residential district within 150 feet from the subject lot measured from a point
five feet from above grade. Such screening shall be coordinated with the building
architecture and scale to maintain a unified appearance.
DO E -OTE A D ITE LONES ARE SHOW ON SITE PLAN(S) -
NOTE; REPEATED REQUESTS FOR INFORMATION 0 DIMENSIONS OF ROOFrOP
N C UNJTS HA VE BEEN JG ORED -NO RESPONSE FROM ISMAIL
18) Provide a general note on the site plan that states the following: Exterior building and site
lighting will meet the standards of section 7. l l of the Unified Development Ordinance. The
light source shall not project below an opaque housing and no fixture shall directly project
horizontally. Fixtures will be mounted in such a manner that the projected cone of light does
not cross any property line.
00 E -SHEET SP-L (SITE PLAN LIGHTING) HAS BEEN ADDED TO THE DR WlNGS
THIS HAS BEEN DO E BECAUSE THE E GlNEER HIRED BY THE CONTRACTOR HAS
CO SISTANTL Y IG OREO DESIGN ORA WINGS PROVIDED BY THE ARCHITECT -
OISPITE REPEATED REQUESTS FOR INFORMATION, ARCHITECT HAS OT EVEN
SEE LATEST ENGINEERING DRAWINGS-0 RESPO SE FROM ISMAIL
l 9) The city is still in negotiations with the property owner regarding the public access
easement along Wellborn Road. Additional information will be provided as soon as it
becomes available.
THI HA BE R OL D BY ITY -PUE IS HOW ON ALL ARCHIT 1 L
SITE DRAWl GS
20) Please note that any changes made to the plans that have not been requested by the city of
CoJlege Station must be explained in your next transmittal Jetter and "bubbled'" on your
plans.
DO E -(DID THE BEST I COULD)
PLANNING II
L Please provide a list of Sherwin Williams equivalent colors or provide color swatches
DO E -BRIGHT MAROO TRIM HAS BEE SELECTED -J UNDER TA D THAT
COLORS COMPRISl G DER 15% OF THE FACADE EED NOT BE ELECTED
FROM THE CITY LIST -SHERWIN WILLIAMS -FIELD COLOR IS HIGH REFLECTIVE
\VHITE #7757 TRIM COLOR IS BRIGHT MAROON #C32148
2. Facades facing Wellborn Road and Southland Street are required to have two different
elements of architectural relief every 45 feet The other facades are required to have 2
different elements every 60'. The following are types that may be used:
a. Canopies ~ permanent decorative awnings or windows accompanied by overhangs
b. Wall plane projections or recessions with a minimum of four feet depth
c . Pilasters or columns
d . Recessed entries, stoops. Porches or arcades
e. Balconies that extend from the building, or
{ Decorative stormwater management initiatives physically integrated with the building as
approved by the administrator
DO E -APPROVED BY BULLOCK
3 . No more than 66% of the roofline can be on the same elevation
00 tE -APPROVED BY f BULLOCK
4. In general CMU is not permitted as finished material. Please show materials proposed and the
% that will be used on the building and on the dumpster enclosure
00 E -PAI T D SPLIT FACE CMU HAS BEE APPROVED BY M BU LLOCK
5. Because the building is under 5000 square feet, the building may use 100°/o EFIS, stucco. high
build textured paint on concrete to simulate the appearance of EFIS or hardboard, but only if
it is painted, or tinted with a minimum of two colors to avoid monotony
NOTE : THIS APPRO ES EFrS WHICH WAS PREVIOUSLY REJECTED BY MS PAZ
WHO REQUIRED ALL MASO RY CO STRUCTION -THUSLY PROJECT WAS THE
DESIG ED AS ALL MASO RY AGAINST THE CONTRACTOR'S WI HES
6. For more informatio~ see section 12-7 .10 of the Unified Development Ordinance
(link to UDO)
PREVIOU ITEMS PERTAI TO THE ELEVATIONS WHICH HAVE BEEN APPRO ED
BYM BULLOCK
LANDSCAPlNG/STREETSCAPING/BUFFER
L (n general. CMU is not pennitted as a finished material. Please identify material for buffer
wall with both sides showing finished material.
PAINTED PUT FACE CMU HAS BEE APPROVED FOR THE B lLDI G AND I
PROPO ED FOR THE BUFFER WALL 0 THE PARKING LOT SIDE OF THE ALL -
EXCEPT THAT BRICK IS SHOWN ON THE RESIDENTIAL SIDE OF THE WALL -SEE
P GEL -2 FOR ELEVATIO SAND S-3 FOR CONSTRUCTION
2 . Please separate and identify landscaping calculations along Wellborn Road and Southland St
The calculation for Southland St is one canopy tree for every 32' of frontage. The calculations
on sheet two differ from calculations on sheet one of the landscape plans. Also, add
calculations to show that 50% of required points come from canopy trees
ITEM l : DONE-ITEM 2: OUTHLAND HAS ONE TREE PER 23.2 FEET OW -ITEM 3:
lOO°A OF LA DSCAPE POINTS ARE FROM C NOPY TREES
3 . Remov e note on page LS-I which shows 57 l .2 points required. P
DO E
4. Please note buffer plantings do not count towanl points.
DO E
5. Please label Wellborn Road Wellborn Road as such
DO E
\I' Provide a general note that all new plantings must be irrigated.
DO E
1. Provide a general note and barricade details as shown in tlle SOS stating that barricades must
be in place prior to any activity on the property, including, but not limited to. grading
DO E
8. Provide a general note that l 00% coverage of groundcover , decorative paving, decorative
rock (not loose) or a perineal grass is required in parking lot islands, swales and drainage
areas, the parking lot setback, right of ways, and adjacent property disturbed during
construction.
DO E
9 . Please provide landscaping sheet separate from the building plans
End bullock comments
MISCELLANEOUS
L hrigation system must be protected by Pressure vacuum Breaker, a Reduced Pressure
Principle Back Flow Device or a Double Check Back Flow Device and installed as per city
ordinance 2394
DO E-SO OTED
DOUBLE CHECK BACK FLOW DEVICES ARE TO BE USED
2. All back flow devices must be installed and tested u po n installatio n as per city ordinance 2394
APPROVAL BY THE ... DMI lSTRATOR" FOR MANUAL IRRIGATlO USl G SOAKER
HOSES D IN-GROUND VALVES HAS BEE GIVEN
THE BOVE OTES HAVE BEE ADDED TO THE LA DSCAPE DRAWi GS
OTE:
AN ADDITlO AL PAGE, MEP-l, HAS BEE PROVIDED lN THlS SUBMITTAL. THlS
PAGE WAS DRA BY THE ARCHITECT FOR MEP E GlNEER S USE AT START OF
PROJECT. E GINEER lG ORED THE ARCHITECT'S PROVISIO S FOR A MANUAL
lRRlGA TIO SYSTEM UTlLlZlNG SOAKER HOSES.
ARCHITECT'S COMMENTS FOLLOW:
ENGINEERING COMMENTS No, l
L Please show location of lint trap on site plan
l SHOWED LlNT TRAP ON MY MEP SITE PLAN DRAWlNG BUT WHERE DlD
CHARLES S. ( MEP E GlNEER) SHOW HlS'! I STILL DO NOT KNOW WHERE THE
SEWER IS -NO RESPO SE FROM lSMAIL
2. Please show proposed/existing utility lines and water and service connections
G S A D ATER PO S OF CO ECTTO ARE SHOWN ON THE ARCH SITE PLA
SEWER AND ELECTRlCAL ARE UNDER THE PERVIEW OF CHARLES S .. (MEP
ENGINEER) WHO HAS PROVIDED ME 0 lNFORMATlON -NO RESPO SE FROM
lSMAIL
3. Provide construction details and erosion control plan
THOUGHT I DID -OTED STRAW FILTER AT OUTFLOW
4 . lnclude the sewer demand on the site plan
CHARLES S. (MEP E GINEER) MUST PROVIDE INFO -NO RESPO SE FROM ISMAIL
5. Your submitted plans indicate that the building type is V-B. Pleas add a note stating the
building type and a fire flow demand of l,500 gallons per minute on the site plan
lSMAIL -THIS lS FOR CHARLES S (MEP E GlNEER) TO DO
6 There is an existing power pole depicted on the site drainage plan, please show this on the site
plan and confmn that it does not conflict with the masonry wall
AT THE START. l TRlED TO DETERMlNE POLE LOCATlON BY SlGHT LINES BUT
TREES THE WAY -SURVEYOR l SISTS 0 RE-SURVEYING PROPERTY JUST ID
LOCATE THE POLE -MEP ENGlNEER, CHARLES S. TELLS ISMAIL (CONTRACTOR)
THAT HE HAS EVERYTHlNG APPROVED BY COLLEGE STATlO -MY REQUESTS
FOR INFORMA TIO GO HEEDED -lNSANITY RUNS RAMP ANT -NO RESPONSE
FROM ISMAIL
OBVIOUSLY. lF POLE OT UTILIZED. REMOVE IT -lF lT IS USED AND IS lN THE
WAY. THE MOVE IT -THIS lS NOT SO HARD
NO RESPONSE FROM lSMAIL
7. Please replace/repair curb cut along Wellborn Road
DO E -SEE SITE PLA (S)
End comments keven ferrer
FlRE
L The entrance curbs (only) need to be painted ''fire lane"
00 E -EE SITE PLA
2. Knox Box is required
001 E-EE lTE PL DFLOORPLA
End comments steve smith
SANITATlON
L Dumpster location is ok with sanitation, however. we prefer that the gates not be placed on
the enclosure as stated in the UDO
00 E -GATES HAVE BEE REMOVED
I HA VE CREASED ENTRY CURB RADIUS FOR CO VEN IE CE OF ANITA TIO
TR CK
End comments wally urrutia
THE FOLLO I G COMME T FALL PRIM RILY D R THE PER IEW OF THE
MEP E GINEER A D THE URVEYOR
ELECfRICAL COMMENTS REQUIRING IMMEDIATE ATTENTIO
l _ SITE PLAN/Pl.AT: Developer will provide CSU with a digital, AutoCad dwg format version
of plat and/or site plan as soon as it is available. E-mail to wdavis@csbcgov
2_ LOAD DATA: The developer will provide load data to CSU as soon as it is available_ This
information is critical for CSU to accurately detennine the size and number of transformers.,
and other equipment required to provide service to the project Failure to provide load data
will result in construction delays and, due to clearance requirements, could affect the final
building footprint. Delive.ry time for transformers and other equipment not in stock is
approximately 26 weeks_
3_ EASEMENTS: Developer provides temporary blanket easement for construction purposes and
upon completion of project must provide descriptive easements for electric inftastructure as
designed by CSU
4_ EASEMENTS: Developer provides descriptive easements for electric in:ftastructure as
designed by CSU as shown on plat or site plan
5_ If easements are existing. the developer will be responsibJe for locating easements on the site
to insure that electrical inftastructure is installed within easement boundaries
6. The following easements will be required:
> Make 15' Jandscape easement into a 15' PUE
SHO -0 RCHITECTURAL lTE PLA P-1
> Io• PUE on landscaped island next to parking space # 13
SHO 0 RCHITECTURAL SITE PLA SP-l
> There is a 3 phase power line available. It will need a 12208 voltage configuration (??'!)
GEN ERAL ELECTRICAL COMMENTS
L Developer installs conduit per CSU s~ and design
2. CSU 2will provide drawings for4 electrical installation
3 . Developerprovides 30' of rigid or lMC conduit for each riser conduit. CSU iostalls riser
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required
5. lf conduit does not exist at designated transformer or other existing devi~ developer will
furnish and install conduit as shown on CSU electrical layout
6. Developer pours electrical device pads or footings. i.e. transformers. pull boxes • or other
device. per CSU specs and design
7. Developer installs pull boxes and secondary pedestals per CSU specs and design. Pull boxes
and secondary pedestals provided by CSU
8. Final site plan must show all proposed electrical faciliti.es necessary to provide electrical
servia; ie. transformers. Pull boxes, or switchgears, all meter locations, and conduit routing
as designed by CSU
9. To discuss any of the above electrical comments please cont.act or Weldon Davis at 979 764
5027
Comments by Weldon Davis
1101 Texas Avenue , P.O. Box 9960
College Station , Texas 77842
Phone 979 .764 .3570 I Fax 979 .764 .3496
CITY OF C o1 J J ;G i:. ST,\TJ ON
HomrofTtXllsA&M Uu iwrsity•
MEMORANDUM
DATE : September 26 , 2014
TO: Ismail Owaisi , via USPS; 5225 East FM 1462 , Rosharon, TX, 77583
FROM : Jessica Bullock, Staff Planner
SUBJECT: Royal Touch Laundry NRA Review
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review :
One (1) revised set of elevation drawings
Color Samples
Please note that this application will expire in 90 days from the date of this memo , if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein . If there are
comments that you are not addressing with the revised elevations, please attach a letter
explaining the details . If you have any questions or need additional information , please call me
at 979.764.3570.
Attachments: Staff review comments
PC : Vijay Kumar, via ; riasirsa@yahoo.com
P&DS Project No . 14-00900236
~
LANNING
STAFF REVIEW COMMENTS NO. 1
Royal Touch Laundry (NRA) -NRA Review
14-00900236
Please provide a list of Sherwin William's equivalent colors or provide color swatches.
2 . Facades facing Wellborn Rd . and Southland St. are required to have 2 different elements of
architectural relief every 45 feet. The other facades are required to have 2 different
elements every 60 feet. The following are types that may be used:
a. Canopies, permanent decorative awnings , or windows accompanied by overhangs ;
b. Wall plane projections or recessions with a minimum of four-foot depth;
c . Pilasters or columns ;
d . Recessed entries , stoops , Porches , or arcades ;
e . Balconies that extend from the building ; or
f . Decorative stormwater management initiatives physically integrated with the
building , as approved by the Administrator. °"'· No more than 66% of the roofline can be on the same elevation .
4 /dn g era , MU · not ermi d as ishe , ateri9 f\ Ple~'E\ show~eria pro sed n
~\'a~ t'Re' pe nta s h ill e se o th ildin aS' we'il9$ the\c:JJJrilpste~clo ure .
r·5. Because the building is under 5,000 square feet, the building may use one hundred 100 ~ percent EIFS , Stucco , high build textured paint on concrete to simulate the appearance of
EIFS , or hardboard , but only if it is painted or tinted with a minimum of two 2 colors to avoid
monotony.
6 . For more information see section 12-7.10 or the Unified Development Ordinance. Link to UDO
Reviewed by: Jessica Bullock Date: 9/26/14
_,,,,,
q
.... ...,...,.,. __________ ~C rTY OF C or.LEGE STATION: ________ .,. ... .,.,...,... ...... .,_,..
Home ofTexasA &M University • zrr1111Fi4 #
Q#2$ :m;:;;;;;;Jtt
MEMORANDUM
DATE : September 11 , 2014
TO: Ismail Owaisi , via USPS ; 5225 East FM 1462 , Rosharon , TX , 77583
FROM : Jessica Bullock , Staff Planner
SUBJECT: ROYALTOUCHLAUNDRY(NRA)
Thank you for the submittal of your Non-Residential Architectural Standards application. I have
been assigned to review this project and it is anticipated that the review will be completed and
any staff comments returned to you on or before Thursday , September 25 , 2014 . If you have
questions in the meantime , please feel free to contact me .
PC : Vijay Kumar, via; riasirsa@yahoo .com
P&DS Project No . 14-00900236
Pla11ni11g & Developme11t St!l ·vices
· .• P .O . BOX 9960 • l 101 TEXAS AVENUE · COLLEGE STATION • T EXA.S • 77 842
TEL. 979 764.35 7 0 ·FAX . 97 9.7 64 .34%,
. cst11.gov/devservices
Crrv OF Cou .nc_;r.: STATTON
Homt: o/Texas A&M Univmiry•
FOR OFFICE USE ONLY I .
CASENO.: l~-2-3 Y'
DATE SUBMITTED : ='/ 115'} I<-/
TIME : z·. () ~ 1
STAFF : ~
PLANNING & DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Please check one of the options below to clearly define the purpose of your submittal.
D New Project Submittal
D Incomplete Project Submittal -documents needed to complete an application . P&DS Project no .:
.;a--fxisting Project Submittal. P&DS Project no .: \l{,.,. 2'6 (p ------
Project Name -~_o_'j+-'-'-rV-"L.-__ ·~T_a_V\..~lk~.___.Utv,~""""-"--''--~-~-Pz_...._rM __ rrt_.---.;__ _________ _
Contact Name \J (J A-y Phone Number Cl,J 5-d-5 )-('eo Lf c
We are transmitting the following for Planning & Development Services to review and comment (check all that apply):
D Comprehensive Plan Amendment ~ Non-Residential Architectural Standards
D Rezoning Application D Irrigation Plan
D Conditional Use Permit D Variance Request
D Preliminary Plan D Development Permit
D Final Plat D Development Exaction Appeal
D Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR
D Site Plan D Grading Plan
D Special District Site Plan D Other -Please specify below
D Special District Building I Sign
D Landscape Plan
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
D Comprehensive Plan Amendment D Waterline Construction Documents
D TxDOT Driveway Perm it D Sewerline Construction Documents
D TxDOT Util ity Permit D Street Construction Documents
D Drainage Letter or Report D Easement Application
D Fire Flow Analysis D Other -Please specify
Special Instructions:
I
10/10
Jessica Bullock
From:
Sent:
To:
Subject:
Attachments:
Ms Bullock
charles philips <charles_rhonda@sbcglobal.net >
Sunday, October 19, 2014 3:14 PM
Jessica Bullock
12 01 WELLBORN ROAD
ISMAIL CS LAUN ELEVATIONS A-2 -POST S-BLK Model (1).pdf; ISMAIL CS LAUN
ELEVATIONS A-2 -POSTS Model (1).pdf
Pursuant to our last conversation about the building elevations for this project, please find attached
proposed revisions to those elevations .
-Drawing "A", the elevation facing Southland Street , is now shown to have canopies over the glazed
openings (glass). The roof parapet now goes up and down. The sloping synthetic stucco soffit now
turns up the wall and extends to the top of the wall , and both are painted maroon. The decorative
gutterbox and downspout is also painted maroon.
Drawing "B", the elevation facing Wellborn Road has the same modifications as does elevation "A"
sans the downspout.
Drawing "C", the elevation facing the parking lot of the adjacent shopping center, now has added
glass block "windows" with canopies above them , and again, the gutterbox and downspout are
painted maroon .
Drawing "D", the elevation facing the back customer's parking lot, now has added glass block
"windows", with canopies above and the decorative gutterboxes and downspouts painted maroon.
To me the building looks like it got into a fight and lost. That up and down roof makes it look like it
broke off a few teeth , but if that is what it takes, then so be it.
Would you please look at these drawings and see if this will satisfy the requirements and please let
me know of your findings . ~eto...l ~ nx::F-h5\:_a:I cf-~~da,,...n .
Charles • 5Qne "S b...f"lt •
~ -n-tlla.rO .cOi.ol'S
~-1. don\-~ CD nbp'es · ~ +l0-10 l.tu u...,e,Ll.k:::or)~ \d..e ... 1 1 ~ Q nrunled. ~ ~ .... = o........t"\ ~\n. .~ o.re -sn\\ lobeJ €d ~ Ra.J4 \..J-A"'t VJ ,--.. COl\e~ ,~)(;.Cl-.} Iµ ~ 1 ~1~ u
~~ • ts a'(..._
1
Jessica Bullock
From:
Sent:
To:
Subject:
Attachments:
Ms Bullock
charles philips < charles_rhonda@sbcglobal.net >
Sunday, October 19, 2014 3 :14 PM
Jessica Bullock
12 01 WELLBORN ROAD
ISMAIL CS LAUN ELEVATIONS A -2 -POST S-BLK Model (l).pdf; ISMAIL CS LAUN
ELEVATIONS A-2 -POSTS Model (1).pdf
Pursuant to our last conversation about the building elevations for this project , please find attached
proposed revisions to those elevations .
Drawing "A", the elevation facing Southland Street, is now shown to have canopies over the glazed
openings (glass). +Re roof f>a r-apet now goes up and down. The sloping synthetic stucco soffit now
turns up the wall and extends to the top of the wall , and both are painted maroon. The decorative
gutterbox and downspout is also painted maroon.
Drawing "B", the elevation facing Wellborn Road has the same modifications as does elevation "A"
sans the downspout.
Drawing "C", the elevation facing the parking lot of the adjacent shopping center, now has added
glass block "windows" with canopies above them , and again , the gutterbox and downspout are
painted maroon .
Drawing "D", the elevation facing the back customer's parking lot, now has added glass block
"windows", with canopies above and the decorative gutterboxes and downspouts painted maroon .
o me the building looks like it got into a fight and lost. That up and down roof makes it look like it
broke off a few teeth, but if that is what it takes, then so be it.
Would you please look at these drawings and see if this will satisfy the requirements and please let
me know of your findin s. (\ 'ni"'
Charles vJ~ _-Y r~0 y_ ti rr OD~ \.\-\'\ v -----
. Glees 'olceXD cu . Al0Y11 nLi1!
Ord CJA\DS6 a~ QS
U rd d~~cf\-~ • ~()8 ~effi °'
L/cl~ ~ l"'c.e, pv00<-..uo
1s ~~ , ,J C&Lfl} {)V~~ J.e;,~ V-X>~ .
1
Jessica Bullock
From:
Sent:
To:
Cc:
Subject:
Jessica Bullock
Friday, October 31, 2014 4:16 PM
'charles philips '
'eye zcomconstruction@yahoo .com'
Attachments:
RE : 1201 WELLBORN ROAD -ELEVATIONS & IRRIGATION
Site Design Standards .pdf
Mr. Philips,
In regards to the irrigation letter, soaker hoses are permitted . If this option is chosen, please include a general note that
states the following on the landscape plan,
• All approved landscaping will be maintained and preserved by the property owner. Replacement of material
must be of similar character and the same or higher point total as the dead or removed landscaping.
The following comments were some of my original comments from the last resubmittal that were not addressed .
• Drawing A-Can you label the where the canopies are like you did on drawing B?
• General -
o the colors are still identified as just "white" and "maroon". Please label the brand/name of color/color
id on the plans . We have a list of approved colors from a Sherwin Williams Palette which you can find
attached beginning on page 23 . Sherwin Williams does not have to be used, but if it is a different brand,
please provide physical color swatches or identify the Sherwin Williams equivalent color. If the
proposed color does not match one on our list, it cannot exceed more than 15% per fac;ade . Please
indicate the percentage that is maroon on each fac;ade .
o If you would prefer instead of the new proposed roofline, you can do a pitched roof as well. The intent
is to not have the roof all on the same visual line.
• Please add a general note that all signs will be permitted separately.
Thanks,
Jess ica
From: charles philips [mailto:charles_rhonda@sbcglobal.net]
Sent: Monday, October 27, 2014 3:22 PM
To: Jessica Bullock
Subject: 1201 WELLBORN ROAD -ELEVATIONS
Ms Bullock
Attached, please find revised building elevations per your request. I did take your advice and showed
"pilasters" at the locations suggested .
Please advise of any other elevation changes
Charles H Philips, Architect
1
Jessica Bullock
From:
Sent:
To:
Subject:
Attachments:
Mr. Ph i lips,
Jessica Bullock
Friday, October 24, 2014 5:14 PM
'charles philips'
RE : 12 01 WELLBORN ROAD
Site Design Standards.pdf
Drawing A-Can you label the where the canopies are like you did on drawing B? Your email says that the gutterbox and
downspouts are painted maroon but the labels still show that they will be painted white .
Drawing B -meets requirements
Drawings C and D -both still need another element of architectural relief. Something like pilasters on around the
downspouts would fit this requirement.
General -
• the colors are still identified as just "white" and "maroon". Please identify the brand/name of color/color id on
the plans . We have a list of approved colors from a Sherwin Williams Palette which you can find attached
beginning on page 23. Sherwin Williams does not have to be used, but if it is a different brand, please provide
physical color swatches or identify the Sherwin Williams equivalent color. If the proposed color does not match
one on our list, it cannot exceed more than 15% per fac;:ade . Please indicate the percentage that is maroon on
each fac;:ade .
• If you would prefer instead of the new proposed roofline, you can do a pitched roof as well. The intent is to not
have the roof all on the same visual line.
• Please add a general note that all signs will be permitted separately.
Feel free to send the sheet to me by email again, but depending on the color choice I will need to have physical swatches
so I can match it will the list .
Jessica
From: charles philips [mailto:charles_rhonda@sbcglobal.net]
Sent: Sunday, October 19, 2014 3:14 PM
To: Jessica Bullock
Subject: 12 01 WELLBORN ROAD
Ms Bullock
Pursuant to our last conversation about the building elevations for this project, please find attached
proposed revisions to those elevations.
Drawing "A", the elevation facing Southland Street , is now shown to have canopies over the glazed
openings (glass). The roof parapet now goes up and down . The sloping synthetic stucco soffit now
turns up the wall and extends to the top of the wall, and both are painted maroon. The decorative
gutterbox and downspout is also painted maroon .
Drawing "B", the elevation facing Wellborn Road has the same modifications as does elevation "A"
sans the downspout.
1
Drawing "C", the elevation facing the parking lot of the adjacent shopping center, now has added
glass block "windows" with canopies above t hem, and again, the gutterbox and downspout are
painted maroon.
Drawing "D", the elevation facing the back customer's parking lot, now has added glass block
"windows", with canopies above and the decorative gutterboxes and downspouts painted maroon.
To me the building looks like it got into a fight and lost. That up and down roof makes it look like it
broke off a few teeth , but if that is what it takes, then so be it.
Would you please look at these drawings and see if this will satisfy the requirements and please let
me know of your findings .
Charles